Design Brief
• Using an A4 Acrylic sheet, laser
cutting, and SolidWorks, design a
compact yet efficient gearbox which
can pull 10kg up a ramp
• The weight must move 500mm along
the positive slope of the ramp
• The gearbox is to be powered by a 6V
9000RPM DC electric motor
Gear Box Designs
• Gears are very versatile, many types exist
such as bevel, helical, worm and spur
gears
• These gears can be arranged in many
ways, such as extensive gear chains, or
planetary gearing systems, or
combinations of such
• Many of these are not viable to
manufacture with the tools we have – a
thin sheet of acrylic and laser cutting
• Spur gears are reasonably easy to
Gear Type Pros Cons
Spur Gears Inexpensive and easy to
manufacture
Relatively simple
mathematical analysis
Can fail when under large
torque
Not suitable for high speed
operation
Helical Gears Can achieve high torque
Low amounts of noise
More complex to manufacture
and analyse
Requires extensive gear
chains for large reductions
Worm Gears Can handle large amount of
torque
Simple operation
Very low efficiency
Unsuitable for high speed
rotation
Planetary Gears Capable of very large
reductions
Extremely efficient, up to 97%
Can cause high stress on
shaft bearings
Can be very noisy with the
increase of operating speed
The Performance
Formula
𝑝 =
𝑚𝑔ℎ 2
𝑉𝐼𝑡2 𝐷3
• By analysing the terms within the formula, it is
clear certain characteristics of the gearbox
must be in balance for a maximum p – value
• The time value is a squared value and the
largest axial dimension is a cubed value; it is
important to focus on minimising these values
for this mathematical reason
• It is clear that a gearbox can not be perfect in
every aspect; a large gearbox can have more
torque but will potentially turn gears at a slower
rpm
SCAMPER
• Substitute
• Combine
• Adapt
• Modify
• Put to another use
• Eliminate
• Reverse
Winch
• Use the SCAMPER creativity guidelines to
analyse a simple hand crank system
• Modifications can be made, a winch is
made to pull massive amounts of weight,
we can increase the speed of a winch
system in sacrifice of torque, as we do not
need to pull thousands of kilograms
• Drawing inspiration from current inventions
Motor Efficiency
Compound Planetary Gear
System
Conclusion
• Use the creative process
• Draw inspiration from real world ideas and
change them to suit our needs; SCAMPER
• Need to take into consideration the tools
we have at hand, a laser cutter and a thin
sheet of acrylic
• Take into account the skills we have,
mathematically and with modelling
processes
• Be original

More Related Content

What's hot

Power generation from speed breakers
Power generation from speed breakersPower generation from speed breakers
Power generation from speed breakers
Praveen Kumar
 
Presentation gearboys
Presentation gearboysPresentation gearboys
Presentation gearboys
Joshua Clarke
 
Outlining RC Aircraft project specification and proposed solution[demo]
Outlining RC Aircraft project specification and proposed solution[demo]Outlining RC Aircraft project specification and proposed solution[demo]
Outlining RC Aircraft project specification and proposed solution[demo]
Rex Tony
 
Km243 metal cutting and foot step power generation
Km243 metal cutting and foot step power generationKm243 metal cutting and foot step power generation
Km243 metal cutting and foot step power generation
1000kv technologies
 
21 st century aviation
21 st century aviation 21 st century aviation
21 st century aviation
Darani Daran
 
Engg projects
Engg projectsEngg projects
Engg projectssubhavdel
 
MSM project reference in Crane_Oct 2015
MSM project reference in Crane_Oct 2015MSM project reference in Crane_Oct 2015
MSM project reference in Crane_Oct 2015Sergelen Byamba
 
Solar rickshaw in new delhi
Solar rickshaw in new delhiSolar rickshaw in new delhi
Solar rickshaw in new delhi
econinternational1
 
SEGWAY
SEGWAY SEGWAY
SEGWAY
itfakash
 
Rickshaw
RickshawRickshaw
Rickshaw
Ritesh Yadav
 
Power Generation by speed breakers.
Power Generation by speed breakers.Power Generation by speed breakers.
Power Generation by speed breakers.
Ashwini Swaminathan
 
Gear
GearGear
SW CNC Çeşitleri
SW CNC ÇeşitleriSW CNC Çeşitleri
Energy conservation using planetary crystallizers
Energy conservation using planetary crystallizersEnergy conservation using planetary crystallizers
Energy conservation using planetary crystallizers
Kaustubh Phadtare
 
Tech481_ProjectPresentation_GroupB - Copy
Tech481_ProjectPresentation_GroupB - CopyTech481_ProjectPresentation_GroupB - Copy
Tech481_ProjectPresentation_GroupB - CopyKyle Malec
 
Power generation through speed breaker
Power generation through speed breakerPower generation through speed breaker
Power generation through speed breaker
vaibhav patel
 
Analysis of Variable Displacement Engine by Introduction of Hydraulic Crankshaft
Analysis of Variable Displacement Engine by Introduction of Hydraulic CrankshaftAnalysis of Variable Displacement Engine by Introduction of Hydraulic Crankshaft
Analysis of Variable Displacement Engine by Introduction of Hydraulic Crankshaft
IRJET Journal
 
Km83 quadra hacksaw four side hacksaw - haxa (wecompress)
Km83 quadra hacksaw   four side hacksaw - haxa (wecompress)Km83 quadra hacksaw   four side hacksaw - haxa (wecompress)
Km83 quadra hacksaw four side hacksaw - haxa (wecompress)
1000kv technologies
 

What's hot (19)

Power generation from speed breakers
Power generation from speed breakersPower generation from speed breakers
Power generation from speed breakers
 
Presentation gearboys
Presentation gearboysPresentation gearboys
Presentation gearboys
 
Outlining RC Aircraft project specification and proposed solution[demo]
Outlining RC Aircraft project specification and proposed solution[demo]Outlining RC Aircraft project specification and proposed solution[demo]
Outlining RC Aircraft project specification and proposed solution[demo]
 
Km243 metal cutting and foot step power generation
Km243 metal cutting and foot step power generationKm243 metal cutting and foot step power generation
Km243 metal cutting and foot step power generation
 
21 st century aviation
21 st century aviation 21 st century aviation
21 st century aviation
 
Engg projects
Engg projectsEngg projects
Engg projects
 
MSM project reference in Crane_Oct 2015
MSM project reference in Crane_Oct 2015MSM project reference in Crane_Oct 2015
MSM project reference in Crane_Oct 2015
 
Solar rickshaw in new delhi
Solar rickshaw in new delhiSolar rickshaw in new delhi
Solar rickshaw in new delhi
 
SEGWAY
SEGWAY SEGWAY
SEGWAY
 
Rickshaw
RickshawRickshaw
Rickshaw
 
Power Generation by speed breakers.
Power Generation by speed breakers.Power Generation by speed breakers.
Power Generation by speed breakers.
 
Stirling Engine Project
Stirling Engine ProjectStirling Engine Project
Stirling Engine Project
 
Gear
GearGear
Gear
 
SW CNC Çeşitleri
SW CNC ÇeşitleriSW CNC Çeşitleri
SW CNC Çeşitleri
 
Energy conservation using planetary crystallizers
Energy conservation using planetary crystallizersEnergy conservation using planetary crystallizers
Energy conservation using planetary crystallizers
 
Tech481_ProjectPresentation_GroupB - Copy
Tech481_ProjectPresentation_GroupB - CopyTech481_ProjectPresentation_GroupB - Copy
Tech481_ProjectPresentation_GroupB - Copy
 
Power generation through speed breaker
Power generation through speed breakerPower generation through speed breaker
Power generation through speed breaker
 
Analysis of Variable Displacement Engine by Introduction of Hydraulic Crankshaft
Analysis of Variable Displacement Engine by Introduction of Hydraulic CrankshaftAnalysis of Variable Displacement Engine by Introduction of Hydraulic Crankshaft
Analysis of Variable Displacement Engine by Introduction of Hydraulic Crankshaft
 
Km83 quadra hacksaw four side hacksaw - haxa (wecompress)
Km83 quadra hacksaw   four side hacksaw - haxa (wecompress)Km83 quadra hacksaw   four side hacksaw - haxa (wecompress)
Km83 quadra hacksaw four side hacksaw - haxa (wecompress)
 

Viewers also liked

How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your Niche
Leslie Samuel
 
Creativity journey.-group-17
Creativity journey.-group-17Creativity journey.-group-17
Creativity journey.-group-17
Emma Wallace
 
Burj Al Babas
Burj Al BabasBurj Al Babas
Burj Al Babas
BURJ AL BABAS MUDURNU
 
Actividad 1.1
Actividad 1.1Actividad 1.1
Actividad 1.1
Ireana1988
 
Creative jouney
Creative jouneyCreative jouney
Creative jouney
Matthew Lloyd
 
Antibiotics
AntibioticsAntibiotics
Antibiotics
akifab93
 
Acrylic gearbox creative journey
Acrylic gearbox creative journeyAcrylic gearbox creative journey
Acrylic gearbox creative journey
Raymond Bell
 
Sexto ccnn 2016 2017
Sexto ccnn 2016 2017Sexto ccnn 2016 2017
Sexto ccnn 2016 2017
Mmendieta1981
 
Git drugs
Git drugsGit drugs
Git drugs
akifab93
 

Viewers also liked (11)

How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your Niche
 
Creativity journey.-group-17
Creativity journey.-group-17Creativity journey.-group-17
Creativity journey.-group-17
 
Burj Al Babas
Burj Al BabasBurj Al Babas
Burj Al Babas
 
Actividad 1.1
Actividad 1.1Actividad 1.1
Actividad 1.1
 
Creative jouney
Creative jouneyCreative jouney
Creative jouney
 
Antibiotics
AntibioticsAntibiotics
Antibiotics
 
Acrylic gearbox creative journey
Acrylic gearbox creative journeyAcrylic gearbox creative journey
Acrylic gearbox creative journey
 
Sexto ccnn 2016 2017
Sexto ccnn 2016 2017Sexto ccnn 2016 2017
Sexto ccnn 2016 2017
 
Git drugs
Git drugsGit drugs
Git drugs
 
Gearbox
GearboxGearbox
Gearbox
 
Ife basic 1
Ife basic 1Ife basic 1
Ife basic 1
 

Similar to Creative journey

Gearless transmission
Gearless transmissionGearless transmission
Gearless transmission
Ravindra Jondhale
 
Gearless transmission system
Gearless transmission systemGearless transmission system
Gearless transmission system
Akash Maurya
 
Gearless transmission
Gearless transmissionGearless transmission
Gearless transmission
k10481
 
Creative journey - Acrylic gearbox
Creative journey - Acrylic gearboxCreative journey - Acrylic gearbox
Creative journey - Acrylic gearbox
james mcivor
 
Skidded helicopter tug design calculation
Skidded helicopter tug design calculationSkidded helicopter tug design calculation
Skidded helicopter tug design calculation
Lahiru Dilshan
 
Creative journal
Creative journalCreative journal
Creative journal
Declan Howard
 
Electricity generation through cycling as exercise
Electricity generation through cycling as exerciseElectricity generation through cycling as exercise
Electricity generation through cycling as exercise
jagdish kumar sahu
 
gearlesstransmissionfinalppt-150322153503-conversion-gate01 (2)
gearlesstransmissionfinalppt-150322153503-conversion-gate01 (2)gearlesstransmissionfinalppt-150322153503-conversion-gate01 (2)
gearlesstransmissionfinalppt-150322153503-conversion-gate01 (2)Rohit kumar vidyarthi
 
Chaindrives
ChaindrivesChaindrives
Chaindrives
MUKULWADHOKAR
 
self balancing unicycle ppt
self balancing unicycle pptself balancing unicycle ppt
self balancing unicycle ppt
sumit katiyar
 
3 Robot Actuators systems.pptx
3 Robot Actuators systems.pptx3 Robot Actuators systems.pptx
3 Robot Actuators systems.pptx
nachiketkale5
 
Senior Project Presentation_Final
Senior Project Presentation_FinalSenior Project Presentation_Final
Senior Project Presentation_FinalKate Mays
 
PLANETARY GEARBOXES
PLANETARY GEARBOXESPLANETARY GEARBOXES
PLANETARY GEARBOXES
asksolution1
 
bottle neck operation through critical path method
bottle neck operation through critical path methodbottle neck operation through critical path method
bottle neck operation through critical path method
Saurav Kumar
 
Zero Turn Radius Presentation - Team Panache
Zero Turn Radius Presentation - Team PanacheZero Turn Radius Presentation - Team Panache
Zero Turn Radius Presentation - Team PanacheSiddhesh Ozarkar
 
Gear Fundamentals & _Failure Analysis.pdf
Gear Fundamentals & _Failure Analysis.pdfGear Fundamentals & _Failure Analysis.pdf
Gear Fundamentals & _Failure Analysis.pdf
Ziad Salem
 
FABRICATION OF SOLAR BICYCLE.pptx new edited
FABRICATION OF SOLAR BICYCLE.pptx new editedFABRICATION OF SOLAR BICYCLE.pptx new edited
FABRICATION OF SOLAR BICYCLE.pptx new editedankur rajput
 
Design and Fabrication of Shaft Drive for two Wheelers
Design and Fabrication of Shaft Drive for two WheelersDesign and Fabrication of Shaft Drive for two Wheelers
Design and Fabrication of Shaft Drive for two Wheelers
IJMERJOURNAL
 
DMFA (Cordless Screwdriver)
DMFA (Cordless Screwdriver)DMFA (Cordless Screwdriver)
DMFA (Cordless Screwdriver)soham pal
 
Wheel Hub Motor for Automotive Applications
Wheel Hub Motor for Automotive ApplicationsWheel Hub Motor for Automotive Applications
Wheel Hub Motor for Automotive Applications
ssuser0c220d
 

Similar to Creative journey (20)

Gearless transmission
Gearless transmissionGearless transmission
Gearless transmission
 
Gearless transmission system
Gearless transmission systemGearless transmission system
Gearless transmission system
 
Gearless transmission
Gearless transmissionGearless transmission
Gearless transmission
 
Creative journey - Acrylic gearbox
Creative journey - Acrylic gearboxCreative journey - Acrylic gearbox
Creative journey - Acrylic gearbox
 
Skidded helicopter tug design calculation
Skidded helicopter tug design calculationSkidded helicopter tug design calculation
Skidded helicopter tug design calculation
 
Creative journal
Creative journalCreative journal
Creative journal
 
Electricity generation through cycling as exercise
Electricity generation through cycling as exerciseElectricity generation through cycling as exercise
Electricity generation through cycling as exercise
 
gearlesstransmissionfinalppt-150322153503-conversion-gate01 (2)
gearlesstransmissionfinalppt-150322153503-conversion-gate01 (2)gearlesstransmissionfinalppt-150322153503-conversion-gate01 (2)
gearlesstransmissionfinalppt-150322153503-conversion-gate01 (2)
 
Chaindrives
ChaindrivesChaindrives
Chaindrives
 
self balancing unicycle ppt
self balancing unicycle pptself balancing unicycle ppt
self balancing unicycle ppt
 
3 Robot Actuators systems.pptx
3 Robot Actuators systems.pptx3 Robot Actuators systems.pptx
3 Robot Actuators systems.pptx
 
Senior Project Presentation_Final
Senior Project Presentation_FinalSenior Project Presentation_Final
Senior Project Presentation_Final
 
PLANETARY GEARBOXES
PLANETARY GEARBOXESPLANETARY GEARBOXES
PLANETARY GEARBOXES
 
bottle neck operation through critical path method
bottle neck operation through critical path methodbottle neck operation through critical path method
bottle neck operation through critical path method
 
Zero Turn Radius Presentation - Team Panache
Zero Turn Radius Presentation - Team PanacheZero Turn Radius Presentation - Team Panache
Zero Turn Radius Presentation - Team Panache
 
Gear Fundamentals & _Failure Analysis.pdf
Gear Fundamentals & _Failure Analysis.pdfGear Fundamentals & _Failure Analysis.pdf
Gear Fundamentals & _Failure Analysis.pdf
 
FABRICATION OF SOLAR BICYCLE.pptx new edited
FABRICATION OF SOLAR BICYCLE.pptx new editedFABRICATION OF SOLAR BICYCLE.pptx new edited
FABRICATION OF SOLAR BICYCLE.pptx new edited
 
Design and Fabrication of Shaft Drive for two Wheelers
Design and Fabrication of Shaft Drive for two WheelersDesign and Fabrication of Shaft Drive for two Wheelers
Design and Fabrication of Shaft Drive for two Wheelers
 
DMFA (Cordless Screwdriver)
DMFA (Cordless Screwdriver)DMFA (Cordless Screwdriver)
DMFA (Cordless Screwdriver)
 
Wheel Hub Motor for Automotive Applications
Wheel Hub Motor for Automotive ApplicationsWheel Hub Motor for Automotive Applications
Wheel Hub Motor for Automotive Applications
 

Recently uploaded

J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 

Recently uploaded (20)

J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 

Creative journey

  • 1. CRICOS 00111D TOID 3059 MEE30003 Machine Design Creative Journey Revolio Clockberg Henry Kissick 100622970 Matt Wildoer 100614757 Steven Krybolder 100584258 Lachie Wearden 100600329
  • 2. Design Brief • Using an A4 Acrylic sheet, laser cutting, and SolidWorks, design a compact yet efficient gearbox which can pull 10kg up a ramp • The weight must move 500mm along the positive slope of the ramp • The gearbox is to be powered by a 6V 9000RPM DC electric motor
  • 3. Gear Box Designs • Gears are very versatile, many types exist such as bevel, helical, worm and spur gears • These gears can be arranged in many ways, such as extensive gear chains, or planetary gearing systems, or combinations of such • Many of these are not viable to manufacture with the tools we have – a thin sheet of acrylic and laser cutting • Spur gears are reasonably easy to
  • 4. Gear Type Pros Cons Spur Gears Inexpensive and easy to manufacture Relatively simple mathematical analysis Can fail when under large torque Not suitable for high speed operation Helical Gears Can achieve high torque Low amounts of noise More complex to manufacture and analyse Requires extensive gear chains for large reductions Worm Gears Can handle large amount of torque Simple operation Very low efficiency Unsuitable for high speed rotation Planetary Gears Capable of very large reductions Extremely efficient, up to 97% Can cause high stress on shaft bearings Can be very noisy with the increase of operating speed
  • 6. 𝑝 = 𝑚𝑔ℎ 2 𝑉𝐼𝑡2 𝐷3 • By analysing the terms within the formula, it is clear certain characteristics of the gearbox must be in balance for a maximum p – value • The time value is a squared value and the largest axial dimension is a cubed value; it is important to focus on minimising these values for this mathematical reason • It is clear that a gearbox can not be perfect in every aspect; a large gearbox can have more torque but will potentially turn gears at a slower rpm
  • 7. SCAMPER • Substitute • Combine • Adapt • Modify • Put to another use • Eliminate • Reverse
  • 8. Winch • Use the SCAMPER creativity guidelines to analyse a simple hand crank system • Modifications can be made, a winch is made to pull massive amounts of weight, we can increase the speed of a winch system in sacrifice of torque, as we do not need to pull thousands of kilograms • Drawing inspiration from current inventions
  • 11. Conclusion • Use the creative process • Draw inspiration from real world ideas and change them to suit our needs; SCAMPER • Need to take into consideration the tools we have at hand, a laser cutter and a thin sheet of acrylic • Take into account the skills we have, mathematically and with modelling processes • Be original