 Submitted To
Sir Atif Ali
 Submitted by
Muhammad noman
 Roll no 15-clt-36
*
*CPEC Roads Network.
*Motorways.
*National Highways.
Introduction
China-Pakistan Economic Corridor is a framework of regional connectivity. CPEC will not only
benefit China and Pakistan but will have positive impact on Iran, Afghanistan, India, Central
Asian Republic, and the region. The enhancement of geographical linkages having improved
road, rail and air transportation system with frequent and free exchanges of growth and people
to people contact, enhancing understanding through academic, cultural and regional knowledge
and culture, activity of higher volume of flow of trade and businesses, producing and moving energy
to have more optimal businesses and enhancement of co-operation by win-win model will result in
well connected, integrated region of shared destiny, harmony and development.
China Pakistan Economic Corridor is journey towards economic regionalization in the globalized world. It
founded peace, development, and win-win model for all of them.
China Pakistan Economic Corridor is hope of better region of the future with peace, development and
growth of economy.
Sign Project Length (km)
Estimated
Cost(US$ M)
Completion Year
1 KKH Phase II (Thakot -Havelian Section 118 1,366 March 2020.
2 Peshawar-Karachi Motorway (Multan-Sukkur Section) 392 2,980
Aug 2019
3 Khuzdar-Basima Road N-30 (110 km) 110 80
ECNEC approved the projects in May
2017)
4 Upgradation of D.I.Khan (Yarik) - Zhob, N-50 Phase-I (210 km) 210 195
PC-I Approved by ECNEC on 12th
April, 2017.
5 KKH Thakot-Raikot N35 remaining portion (136 Km) 136 719.8
Procedural formalities to be
completed shortly
CPEC Highways of Pakistan
Sign Project Length (km)
Estimated
Cost(US$ M)
Completion Year
1 Expansion and reconstruction of existing Line ML-1 1830
8,172
approved by CDWP in May
2018
2 Havelian Dry port (450 M. Twenty-Foot Equivalent Units)
65
signed in May 2017
3 Capacity Development of Pakistan Railways Project Progress Update
CPEC Railways of Pakistan
Motorways.
Sign Course Length (km) Lanes
Completion
Year
Status Remarks
M-1 Peshawar–Islamabad 155 6 2007 Operational Hazara Expressway interchange
completed in 2018.
M-2 Islamabad–Lahore 367 6 1997 Operational Repaved in 2016[8]
M-3 Lahore–Abdul Hakeem 230 6 2018 Sharqpur Rajana Section
complete.Under
Construction
Construction began in December
2015.
M-4 Pindi Bhattian–Multan 309 4 2018
Sections 1, 2, 5
Operational
Construction began in 2009.
Sections 3, 4 Under
Construction
M-5 Multan–Sukkur 387 6 2019
Sections 1 from Multan
Shuja'abad Operational.
Under Construction
Construction began in May 2016.
M-6 Sukkur–Hyderabad 296 6 2020 Contract Awarded
Construction not yet started. Only
Missing vital link of North to south
connectivity.
Motorways of Pakistan
M-7 Dadu–Hub 270 4 Proposed Proposed
M-8 Ratodero–Gwadar 892 2
Partially
Operational
Partially operational
Under Construction
M-9 Hyderabad–Karachi 136 6 2018
Partially
Operational Construction began in
September 2015.
Under Construction
M-10
Karachi Northern
Bypass
57 2 2007 Operational
Proposed 4 lane
expansion.
M-11 Sialkot–Lahore 89 4 2018 Under Construction
Construction began in
April 2017.
M-14 Hakla–D.I Khan 280 4 2019 Under Construction
Construction began in May
2016.
Hazara Motorway
Hasan Abdal–
Mansehra
180 6 2019
Partially
Operational
Partially operational
National Highways.
National Highways of Pakistan
Sign Course Length Lanes Completion Year Status
N-5 Karachi – Torkham 1819 km 4 1952 Operational
N-10 Karachi – Gwadar 653 km 2 2003 Operational
N-15 Mansehra – Chilas 240 km 2 - Operational
N-25 Karachi – Chaman 813 km 2 - Operational
N-30 Basim -Khuzdar 110 km 2 - Operational
N-35 Hasan Abdal – Khunjerab Pass 806 km 2 1979 Operational
N-40 Quetta – Taftan 610 km 2 - Operational
N-45 Nowshera – Chitral 309 km 2 - Operational
N-50 Kuchlak – Dera Ismail Khan 531 km 2 - Operational
N-55 Kotri – Peshawar 1264 km 4 - Operational
N-65 Sibi – Sukkur 385 km 2 - Operational
N-70 Qila Saifullah – Multan 447 km 2 - Operational
N-75 Islamabad – Kohala 138 km 4 - Operational
N-80 Islamabad – Kohat 146 km 2 - Operational
N-85 Hushab – Surab 487 km 2 - Operational
N-90 Khwazakhela – Besham 64 km 2 - Operational
N-95 Chakdara – Kalam 135 km 2 - Operational
N-105 Larkana – Lakhi 61 km 2 - Operational
N-110 Gharo – Keti Bunder 90 km 2 - Operational
N-120 Hyderabad – Khokhrapar 220 km 2 - Operational
N-125 Taxila – Haripur 44 km 2 - Operational
N-155 Larkana - Mohenjo Daro 28 km 2 - Operational
N-255 Larkana - Nasirabad 34 km 2 - Operational
N-305 Sakrand - Nawabshah 35 km 2 - Operational
N-455 Larkana - Shahdadkot 50 km 2 - Operational
N-655 Ratodero - Naudero 18 km 2 - Operational
Cpec and road in pakistan

Cpec and road in pakistan

  • 1.
     Submitted To SirAtif Ali  Submitted by Muhammad noman  Roll no 15-clt-36
  • 2.
  • 3.
    Introduction China-Pakistan Economic Corridoris a framework of regional connectivity. CPEC will not only benefit China and Pakistan but will have positive impact on Iran, Afghanistan, India, Central Asian Republic, and the region. The enhancement of geographical linkages having improved road, rail and air transportation system with frequent and free exchanges of growth and people to people contact, enhancing understanding through academic, cultural and regional knowledge and culture, activity of higher volume of flow of trade and businesses, producing and moving energy to have more optimal businesses and enhancement of co-operation by win-win model will result in well connected, integrated region of shared destiny, harmony and development. China Pakistan Economic Corridor is journey towards economic regionalization in the globalized world. It founded peace, development, and win-win model for all of them. China Pakistan Economic Corridor is hope of better region of the future with peace, development and growth of economy.
  • 5.
    Sign Project Length(km) Estimated Cost(US$ M) Completion Year 1 KKH Phase II (Thakot -Havelian Section 118 1,366 March 2020. 2 Peshawar-Karachi Motorway (Multan-Sukkur Section) 392 2,980 Aug 2019 3 Khuzdar-Basima Road N-30 (110 km) 110 80 ECNEC approved the projects in May 2017) 4 Upgradation of D.I.Khan (Yarik) - Zhob, N-50 Phase-I (210 km) 210 195 PC-I Approved by ECNEC on 12th April, 2017. 5 KKH Thakot-Raikot N35 remaining portion (136 Km) 136 719.8 Procedural formalities to be completed shortly CPEC Highways of Pakistan
  • 6.
    Sign Project Length(km) Estimated Cost(US$ M) Completion Year 1 Expansion and reconstruction of existing Line ML-1 1830 8,172 approved by CDWP in May 2018 2 Havelian Dry port (450 M. Twenty-Foot Equivalent Units) 65 signed in May 2017 3 Capacity Development of Pakistan Railways Project Progress Update CPEC Railways of Pakistan
  • 7.
  • 8.
    Sign Course Length(km) Lanes Completion Year Status Remarks M-1 Peshawar–Islamabad 155 6 2007 Operational Hazara Expressway interchange completed in 2018. M-2 Islamabad–Lahore 367 6 1997 Operational Repaved in 2016[8] M-3 Lahore–Abdul Hakeem 230 6 2018 Sharqpur Rajana Section complete.Under Construction Construction began in December 2015. M-4 Pindi Bhattian–Multan 309 4 2018 Sections 1, 2, 5 Operational Construction began in 2009. Sections 3, 4 Under Construction M-5 Multan–Sukkur 387 6 2019 Sections 1 from Multan Shuja'abad Operational. Under Construction Construction began in May 2016. M-6 Sukkur–Hyderabad 296 6 2020 Contract Awarded Construction not yet started. Only Missing vital link of North to south connectivity. Motorways of Pakistan
  • 9.
    M-7 Dadu–Hub 2704 Proposed Proposed M-8 Ratodero–Gwadar 892 2 Partially Operational Partially operational Under Construction M-9 Hyderabad–Karachi 136 6 2018 Partially Operational Construction began in September 2015. Under Construction M-10 Karachi Northern Bypass 57 2 2007 Operational Proposed 4 lane expansion. M-11 Sialkot–Lahore 89 4 2018 Under Construction Construction began in April 2017. M-14 Hakla–D.I Khan 280 4 2019 Under Construction Construction began in May 2016. Hazara Motorway Hasan Abdal– Mansehra 180 6 2019 Partially Operational Partially operational
  • 10.
  • 11.
    National Highways ofPakistan Sign Course Length Lanes Completion Year Status N-5 Karachi – Torkham 1819 km 4 1952 Operational N-10 Karachi – Gwadar 653 km 2 2003 Operational N-15 Mansehra – Chilas 240 km 2 - Operational N-25 Karachi – Chaman 813 km 2 - Operational N-30 Basim -Khuzdar 110 km 2 - Operational N-35 Hasan Abdal – Khunjerab Pass 806 km 2 1979 Operational N-40 Quetta – Taftan 610 km 2 - Operational N-45 Nowshera – Chitral 309 km 2 - Operational N-50 Kuchlak – Dera Ismail Khan 531 km 2 - Operational N-55 Kotri – Peshawar 1264 km 4 - Operational N-65 Sibi – Sukkur 385 km 2 - Operational N-70 Qila Saifullah – Multan 447 km 2 - Operational
  • 12.
    N-75 Islamabad –Kohala 138 km 4 - Operational N-80 Islamabad – Kohat 146 km 2 - Operational N-85 Hushab – Surab 487 km 2 - Operational N-90 Khwazakhela – Besham 64 km 2 - Operational N-95 Chakdara – Kalam 135 km 2 - Operational N-105 Larkana – Lakhi 61 km 2 - Operational N-110 Gharo – Keti Bunder 90 km 2 - Operational N-120 Hyderabad – Khokhrapar 220 km 2 - Operational N-125 Taxila – Haripur 44 km 2 - Operational N-155 Larkana - Mohenjo Daro 28 km 2 - Operational N-255 Larkana - Nasirabad 34 km 2 - Operational N-305 Sakrand - Nawabshah 35 km 2 - Operational N-455 Larkana - Shahdadkot 50 km 2 - Operational N-655 Ratodero - Naudero 18 km 2 - Operational