The China-Pakistan Economic Corridor (CPEC) is a $46 billion investment in Pakistan that includes infrastructure projects focused on connecting China's western province of Xinjiang to Gwadar Port in Pakistan. CPEC aims to provide China with cheaper access to the Middle East, Africa, and Europe while also upgrading Pakistan's infrastructure through projects like roads, railways, and power plants. The 3,000 km network seeks to facilitate trade and regional connectivity. CPEC's energy projects account for $33.8 billion while infrastructure projects make up $11.8 billion of total investment under the program.
The China-Pakistan Economic Corridor (CPEC) Opportunities and Challenges.MWaqasAkbar3
Brief introduction about CPEC projects, opportunities from this project to both China and Pakistan, and the challenges for both countries faced by this project.
Presentation on China Pakistan Economic Corridor ProjectAamir Gill
Outline of Project:
Introduction
Brief history
Projects of CPEC
China Pakistan economic corridor is a type of economic projects whose products are as
Roads
Railways
Special economic zone
Energy production
Mass transit
Importance , advantages of Cpec , disadvantages of CPEC , Cpec Benefits to China , Cpec Benefits To Pakistan , Pakistan China Relations , Karakoram Highway , Major Projects Under Cpec , Railway Motorway Projects , Opportunities Of Cpec
China Pakistan Economic Corridor (CPEC)Asad Afridi
in this ppt we gathered a lot of information about China Pakistan Economic Corridor.
CPEC is the abbreviation.
these slides contain about cpec project .............
comment for any kind of Problems.
The China-Pakistan Economic Corridor (CPEC) Opportunities and Challenges.MWaqasAkbar3
Brief introduction about CPEC projects, opportunities from this project to both China and Pakistan, and the challenges for both countries faced by this project.
Presentation on China Pakistan Economic Corridor ProjectAamir Gill
Outline of Project:
Introduction
Brief history
Projects of CPEC
China Pakistan economic corridor is a type of economic projects whose products are as
Roads
Railways
Special economic zone
Energy production
Mass transit
Importance , advantages of Cpec , disadvantages of CPEC , Cpec Benefits to China , Cpec Benefits To Pakistan , Pakistan China Relations , Karakoram Highway , Major Projects Under Cpec , Railway Motorway Projects , Opportunities Of Cpec
China Pakistan Economic Corridor (CPEC)Asad Afridi
in this ppt we gathered a lot of information about China Pakistan Economic Corridor.
CPEC is the abbreviation.
these slides contain about cpec project .............
comment for any kind of Problems.
In this presentation , i will explain information about CPEC. in which i will explain what is CPEC , Pakistan China relation, and Advantages and Disadvantages.
Presentation on China Pakistan Economic Corridor. Cpec is initiative of Pakistan and China to reduce the travel costs and improve the economy of both countries.
In this presentation , i will explain information about CPEC. in which i will explain what is CPEC , Pakistan China relation, and Advantages and Disadvantages.
Presentation on China Pakistan Economic Corridor. Cpec is initiative of Pakistan and China to reduce the travel costs and improve the economy of both countries.
CPEC Chinese Language with reference to the current eraMuhammad Yousaf
Royal Institute of Management Sciences is a training and development institution which is committed to build the professional capability of the people of Pakistan. RIMS is an affiliated institute of E-Pakistan. E-Pakistan is going to engage people with its subset project E-CPEC.
Embracing GenAI - A Strategic ImperativePeter Windle
Artificial Intelligence (AI) technologies such as Generative AI, Image Generators and Large Language Models have had a dramatic impact on teaching, learning and assessment over the past 18 months. The most immediate threat AI posed was to Academic Integrity with Higher Education Institutes (HEIs) focusing their efforts on combating the use of GenAI in assessment. Guidelines were developed for staff and students, policies put in place too. Innovative educators have forged paths in the use of Generative AI for teaching, learning and assessments leading to pockets of transformation springing up across HEIs, often with little or no top-down guidance, support or direction.
This Gasta posits a strategic approach to integrating AI into HEIs to prepare staff, students and the curriculum for an evolving world and workplace. We will highlight the advantages of working with these technologies beyond the realm of teaching, learning and assessment by considering prompt engineering skills, industry impact, curriculum changes, and the need for staff upskilling. In contrast, not engaging strategically with Generative AI poses risks, including falling behind peers, missed opportunities and failing to ensure our graduates remain employable. The rapid evolution of AI technologies necessitates a proactive and strategic approach if we are to remain relevant.
Introduction to AI for Nonprofits with Tapp NetworkTechSoup
Dive into the world of AI! Experts Jon Hill and Tareq Monaur will guide you through AI's role in enhancing nonprofit websites and basic marketing strategies, making it easy to understand and apply.
Operation “Blue Star” is the only event in the history of Independent India where the state went into war with its own people. Even after about 40 years it is not clear if it was culmination of states anger over people of the region, a political game of power or start of dictatorial chapter in the democratic setup.
The people of Punjab felt alienated from main stream due to denial of their just demands during a long democratic struggle since independence. As it happen all over the word, it led to militant struggle with great loss of lives of military, police and civilian personnel. Killing of Indira Gandhi and massacre of innocent Sikhs in Delhi and other India cities was also associated with this movement.
Acetabularia Information For Class 9 .docxvaibhavrinwa19
Acetabularia acetabulum is a single-celled green alga that in its vegetative state is morphologically differentiated into a basal rhizoid and an axially elongated stalk, which bears whorls of branching hairs. The single diploid nucleus resides in the rhizoid.
Read| The latest issue of The Challenger is here! We are thrilled to announce that our school paper has qualified for the NATIONAL SCHOOLS PRESS CONFERENCE (NSPC) 2024. Thank you for your unwavering support and trust. Dive into the stories that made us stand out!
Palestine last event orientationfvgnh .pptxRaedMohamed3
An EFL lesson about the current events in Palestine. It is intended to be for intermediate students who wish to increase their listening skills through a short lesson in power point.
The French Revolution, which began in 1789, was a period of radical social and political upheaval in France. It marked the decline of absolute monarchies, the rise of secular and democratic republics, and the eventual rise of Napoleon Bonaparte. This revolutionary period is crucial in understanding the transition from feudalism to modernity in Europe.
For more information, visit-www.vavaclasses.com
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
3. Outline
Introduction
Why CPEC is needed?
For Pakistan
a) Removal of Energy Crisis
b) Infrastructure development
c) Economic development
d) Balanced in south Asia
e) To cash comparative Advantage of Nature.
For China
a) Extension of volume of Trade with Arab countries /
Global trade
b) Shorter lead times than earlier
c) Equal Development all in China
4. Outline
History of Gwadar
Historical perspective
Why CPEC is created?
a) Job Opportunities:
Total Area and Cost included
a) Routes Ahead For Pakistan
b) Cost Included
5. Outline
Advantages Disadvantages and Benefits of CPEC to Pakistan and China
Advantages
a) Overcoming Energy crises
b) Infrastructure development
c) Economic Development
d) Removal of poverty
e) Peace and prosperity in Provinces
f) Advantages to China:
Disadvantages:
a) Indian aggression:
b) Opposition from Baluchistan Nationalists:
c) Concerns by Gwadar Residents
d) Security concerns ( cost on security)
6. Introduction
WHAT IS CPEC?
May 2013 by china President
3000 KM Network Of Road, Rail, Pipeline and Optical Fibers.
Linking kashgar northwest china’s Xinxiang Uyghur
autonomous region and southwest Pakistan’s gwadar port.
Transport infrastructure
Gwadar Port
7. Introduction
Energy Projects
Industrial Corporations
China Is Providing $45.6 Billion
$11.8 For Infrastructure
$33.8 Billion For Power Projects
Majority Of Projects Will Completed At The End of 2017
14. Zonergy Solar Power Plant
Located At Bhawalpur
World Largest solar Power Plant
$1.5 Billion Project
900 MV Production Expected
Build In 3 Phases
Complete At The end Of 2016
By Zonergy Company
18. Karot hydro Power plant
It is on Jhelum river near to the Islamabad
Produce 720 MW
$1.65 Billion Project
Complete in 2020
By Three Goreges Corporation
28. Karakorum Highway Realignment
• Attabad Barrier Lake
• $275 million Project
• 24 KM Bypass
• 5 KM Worth Of Tunnels
• 2 Large Bridges
• 78 Small bridges
34. Karachi–Peshawar main railway line
Over Haul and Reconstruction Of Rail
$3.65 billion Project
train travel at up to 160 kilometers per hour
First Stage Peshawar to Multan
Second Stage Multan to Hyderabad
Third Stage Hyderabad to Karachi
expected completion by December 2019
40. Gwadar City And Port
Gawadar Coal Power Project (360 million dollars)
construction of breakwaters (130 million dollars)
water treatment plant (114 million dollars)
state-of-the-art hospital (100 million dollars)
Free Economic Zones (35 million dollars)
technical and vocational institute (10 million dollars)
41.
42. Benefits for China in CPEC
It would decrease the travel distance and travel cost
greatly from China to Gulf states
Independent path from Indian and USA’s interference
It would decrease their labour cost
New business market in another country
44. HISTORY OF PAK CHINA RELATIONS
Pakistan–China relations began in 1950.
Strategic alliance was formed in 1972 and economic
co-operation began in 1979.
China had invested $20 billion in various projects
Mega infrastructural projects in Pakistan
Gwadar Port, the Coastal-Highway linking Karachi with
Gwadar, Karakoram Highway, the Chashma nuclear
power plants, and a number of hydro-power projects.
45. PAK-CHINA ECONOMIC CORRIDOR
The kkh was started in 1959 and was completed in 1979 (open to the
public since 1986)
Length 1,300 km (Pakistan 887 km ) China 413 km
It connects China's Xinjiang region with Pakistan's Gilgit–Baltistan and
Khyber Pakhtunkhwa regions
Major cities Hasanabdal, Abbottabad, Thakot, Chilas, Gilgit, Aliabad, Sust,
Khunjerab Pass, Kashgar
The importance of Karakoram Highway
Chinese companies
Tourism in Pakistan
Transportations
46. The kkh highly contribute economic activities of both countries
export and import
47. Economic Gateway Gwadar
On 8 September 1958 prince Aga khan karim purchased the
Gwadar enclave from Oman for $3 million, and gave it to
Pakistan and it officially became part of Pakistan.
Gwadar Port is located at the mouth of the Persian Gulf.
Gwadar is a planned free trade port.
Gwadar Port is a strategic developed jointly by the both
countries
48. Economic Gateway Gwadar
National Highway Authority (NHA) began construction of the
653 km-long Makran Coastal Highway linking Gwadar with
Karachi
In 2004, Pakistan's NHA began construction of the 820-km
long M8 motorway linking Gwadar with Ratodero in Sindh
province Turbat, Hoshab, Awaran and Khuzdar
In 2007 Civil Aviation Authority of Pakistan acquired 6,000
acres (17-24 km2) to construct a new greenfield airport, at
an estimated cost of Rs 7.5 billion.
49. GWADAR ECONOMIC ZONE
GDA was established to promote industrial activities in
mega port city of Gwadar
China focused on the fast-track construction of roads,
other infrastructure and public buildings
In 2013, Gwadar Port operations were officially handed
over to China,
To connect china with Gwadar through railway track has
already begun.
50. Total Area and Cost
Length of the corridor: 3000km (Gwadar-Kashgar)
Overall Construction costs: $46 billion (4.6 trillion
PKR)
Operational Time: 3 years (For many of the
projects)
No. of projects signed : A total of 51 MOUs signed
Project Financiers: Chinese Government banks
51. Total Area and Cost
The road network from Gwadar Port to Kashgar will be having
3 routes:
1. Western Route
2. Central Route
3. Eastern Route
The western route i.e Gwadar to D.I.K. and Peshawar is the
shortest route and will be completed first by 2016
D.I. Khan already linked with Peshawar will be further linked
with Gwadar through Quetta to complete Route 1
56. Advantages
1.43 trillion, including an Rs.282.32 billion foreign
assistance while a total of Rs.179.85 billion has
been spent till June 30, 2016.
129.858 billion for 38 projects in the current fiscal
year.
500 million for financial year 2016-17
57. Advantages
Can benefit new emerging regional cooperation
Save time, cost and freight charges
Facilitate trade, have Economic Zone en-route and will allow
reaping of full benefits of development, economic and social
uplift
58. Advantages
Increase the economic collaboration between both countries
by connecting western china to Gwadar
Regional stability in Asia awa in whole world
Pakistan economy will Boost
59. Advantages
Pakistan can avail great opportunities from chine’s expert in
various sectors like energy, Technology and Education sector
Create new employment opportunities
Pakistan and china both collectively target the half of the
population of the world, it will provide great opportunity for
both countries to expend their market
60. Disadvantages
FTA leads to threat for local markets and local manufacturers
Disturb of local industries
Difficult to compete china’s product in market
Increase the ratio of unemployment
Dependent to China