SlideShare a Scribd company logo
1 of 5
CONTRACT MANAGEMENT RESPONSIBILITIES MATRIX
PROJECT: DATE:
LOCATION: DOC. REV. NO.: 00
MAIN TASK SUB-TASK 1 SUB-TASK 2 SUB-TASK 3 SUB-TASK 4 SUB-TASK 5
Develop and
Maintain Contract
Management
Responsibilities
Matrix
Review matrix,
modify as necessary
for project
requirements
Assign
responsibilities
Maintain/update
matrix
Lead: Assigned to: Assigned to: Assigned to:
Establish Contract
Baseline
Review whole
contract package
and establish
baseline
Maintain baseline
following changes
Train the team
Lead: Assigned to: Assigned to: Assigned to:
Form Contract
Requirements
Action List
Develop the list Assign individuals
who are responsible
for actions
Monitor actions Maintain/update list
Lead: Assigned to: Assigned to: Assigned to: Assigned to:
Handle
Correspondences
Maintain and update
correspondence log
Assign responsible
individuals for
raising/answering
correspondence
Review outgoing
correspondence for
commercial
appropriateness
Act as authorized
signatory
Perform contract
archiving
requirements
Lead: Assigned to: Assigned to: Assigned to: Assigned to: Assigned to:
Manage Project
Submittals
Identify submittal
requirements
Develop and
maintain submittal
schedule
Monitor open
submittals for
acknowledgment or
returns
Prepare and submit
notices for delays in
responding to
submittals
Perform contract
archiving
requirements
Lead: Assigned to: Assigned to: Assigned to: Assigned to: Assigned to:
CONTRACT MANAGEMENT RESPONSIBILITIES MATRIX
PROJECT: DATE:
LOCATION: DOC. REV. NO.: 00
MAIN TASK SUB-TASK 1 SUB-TASK 2 SUB-TASK 3 SUB-TASK 4 SUB-TASK 5
Perform contract
flow-downs
Identify contract
clauses to be flowed
down to
subcontracts
Obtain HQ review of
revised contract
terms to ensure
proper flow-down
Lead: Assigned to: Assigned to:
Manage Drawing
Submittals
Identify the
requirements and
review/approval
process
Log, monitor and
follow-up submittals
Prepare notices for
delays or unfair
rejections
Perform contract
archiving
requirements
Lead: Assigned to: Assigned to: Assigned to: Assigned to:
Manage Project
Schedule
Identify the
requirements
Prepare and submit
project baseline and
update schedules
Monitor, update,
maintain historical
file of schedule
Log, monitor delay
events and prepare
notices
Perform time impact
analysis
Lead: Assigned to: Assigned to: Assigned to: Assigned to: Assigned to:
Record Project
Progress
Lead:
Establish progress
measurement
system
Assigned to:
Prepare and submit
daily reports:
Assigned to:
Prepare and submit
weekly/monthly
reports:
Assigned to:
Take photos/videos:
Assigned to:
Manage
Subcontracting and
Subcontracts
Tender for
subcontract
packages
Perform technical
and commercial bid
evaluation
Get commitment
authorization and do
award
Provide Notice to
Proceed and kick-off
the works
Administer
subcontracts
Lead: Assigned to: Assigned to: Assigned to: Assigned to: Assigned to:
Perform Risk
Management
Identify contractual
risks
Prepare Contract
Liability Plan
Monitor the risks Administer all
insurance policies
Conduct regular risk
workshops
Lead: Assigned to: Assigned to: Assigned to: Assigned to: Assigned to:
CONTRACT MANAGEMENT RESPONSIBILITIES MATRIX
PROJECT: DATE:
LOCATION: DOC. REV. NO.: 00
MAIN TASK SUB-TASK 1 SUB-TASK 2 SUB-TASK 3 SUB-TASK 4 SUB-TASK 5
Handle Bonds and
Guarantees
Lead:
Log, monitor bonds
and guarantees
Assign to:
Keep original copies
of subcontract
bonds/guarantees
Assign to:
Renew the bonds
before expiry dates
Assigned to:
Manage Client-
issued resources
Identify
requirements for
Client-issued
resources
Log, monitor, update
Client-issued
resources
Prepare notices for
inadequate and/or
delayed resources
Lead: Assigned to: Assigned to: Assigned to:
Handle Progress
Payments
Prepare and submit
payment
applications
Submit invoices Monitor payments
Lead: Assigned to: Assigned to: Assigned to:
Administer Changes Develop changes
procedures and
determine
authorizations
Monitor changes
and prepare
required notices
Develop change
proposals
Log, monitor, update
changes log and
keep records for
change
Negotiate and settle
changes
Lead: Assigned to: Assigned to: Assigned to: Assigned to: Assigned to:
Handle Claims Develop claim
procedures
Monitor claims and
prepare notices,
draft claim
narratives
Price claims Log, monitor, update
claims log and keep
records for claims
Negotiate and settle
claims
Lead: Assigned to: Assigned to: Assigned to: Assigned to: Assigned to:
CONTRACT MANAGEMENT RESPONSIBILITIES MATRIX
PROJECT: DATE:
LOCATION: DOC. REV. NO.: 00
MAIN TASK SUB-TASK 1 SUB-TASK 2 SUB-TASK 3 SUB-TASK 4 SUB-TASK 5
Handle Backcharges Prepare
acknowledgement or
return notices
Forward
backcharges to
subcontractors
Log, monitor, update
backcharge log
Negotiate and settle
backcharges
Lead: Assigned to: Assigned to: Assigned to: Assigned to:
Manage Requests
for Information
(RFIs)
Raise RFIs Develop, maintain,
and update RFI log
Identify responses
resulting in changes
and prepare notices
Lead: Assigned to: Assigned to: Assigned to:
Manage Warranties Gather and submit
warranties
Develop, maintain,
and update
Warranty log
Extend warranties
before expiry if
extended timeline
Lead: Assigned to: Assigned to: Assigned to:
Manage Material
and Equipment
Approval Requests
Raise Material and
Equipment Approval
Requests
Develop, maintain,
and update log
Lead: Assigned to: Assigned to:
Manage Costs Establish
commitment value
Monitor cost against
commitment value
Provide notice to
Client when reached
to cost limit
Lead: Assigned to: Assigned to: Assigned to:
Manage Close-out
Lead:
Verify fulfilment of
prerequisites for
taking over
Assigned to:
Invite and participate
final inspection
Assigned to:
Apply Taking Over
Certificate
Assigned to:
Prepare and
manage punch list
Assigned to:
Ensure document
retention
Assigned to:
CONTRACT MANAGEMENT RESPONSIBILITIES MATRIX
PROJECT: DATE:
LOCATION: DOC. REV. NO.: 00
MAIN TASK SUB-TASK 1 SUB-TASK 2 SUB-TASK 3 SUB-TASK 4 SUB-TASK 5
Handle Waiver and
Release of Lien
Obtain
releases/waivers
from
suppliers/subcontrac
tors
Obtain legal review
before formalizing
releases/waivers
Verify the payment
status of
suppliers/subcontrac
tors
Lead: Assigned to: Assigned to: Assigned to:
Perform Lessons
Learned Workshops
Input to lesson
learned database:
Lead: Assigned to:
Provide Legal
Advice
Draft subcontract
terms and conditions
Draft contract
amendments
Process dispute
resolution
Lead: Assigned to: Assigned to: Assigned to:

More Related Content

Similar to Contract+Management+Responsibilities+Matrix.docx

James dimas it infrastructure approach
James dimas it infrastructure approachJames dimas it infrastructure approach
James dimas it infrastructure approach
James (JD) Dimas
 
Project plan preparation guidelines
Project plan preparation guidelinesProject plan preparation guidelines
Project plan preparation guidelines
Kapila Kapila
 
Section-1 250 words Subject Initiating the ProjectR.docx
Section-1 250 words  Subject Initiating the ProjectR.docxSection-1 250 words  Subject Initiating the ProjectR.docx
Section-1 250 words Subject Initiating the ProjectR.docx
jeffreye3
 
Project Management Presentation Template.pdf
Project Management Presentation Template.pdfProject Management Presentation Template.pdf
Project Management Presentation Template.pdf
apoorvaguptaspn27
 
Projects Management
Projects ManagementProjects Management
Projects Management
Nirmal Shah
 
Sunny Mui_X474.3_Contract Closure
Sunny Mui_X474.3_Contract ClosureSunny Mui_X474.3_Contract Closure
Sunny Mui_X474.3_Contract Closure
sunnycmui
 
Construction process
Construction processConstruction process
Construction process
Mazen Al-Qadi
 
Project Manager Job Description
Project Manager Job DescriptionProject Manager Job Description
Project Manager Job Description
Trevor Rutter
 

Similar to Contract+Management+Responsibilities+Matrix.docx (20)

Resume 082516
Resume 082516Resume 082516
Resume 082516
 
Pmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_aPmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_a
 
James dimas it infrastructure approach
James dimas it infrastructure approachJames dimas it infrastructure approach
James dimas it infrastructure approach
 
PPRPreparationGuide
PPRPreparationGuidePPRPreparationGuide
PPRPreparationGuide
 
Contract Management
Contract ManagementContract Management
Contract Management
 
Project plan preparation guidelines
Project plan preparation guidelinesProject plan preparation guidelines
Project plan preparation guidelines
 
Event management process
Event management process Event management process
Event management process
 
Project mangment
Project mangmentProject mangment
Project mangment
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
Section-1 250 words Subject Initiating the ProjectR.docx
Section-1 250 words  Subject Initiating the ProjectR.docxSection-1 250 words  Subject Initiating the ProjectR.docx
Section-1 250 words Subject Initiating the ProjectR.docx
 
Project Management Presentation Template.pdf
Project Management Presentation Template.pdfProject Management Presentation Template.pdf
Project Management Presentation Template.pdf
 
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENTHOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
 
Contract management.ppt
Contract management.pptContract management.ppt
Contract management.ppt
 
Projects Management
Projects ManagementProjects Management
Projects Management
 
Sunny Mui_X474.3_Contract Closure
Sunny Mui_X474.3_Contract ClosureSunny Mui_X474.3_Contract Closure
Sunny Mui_X474.3_Contract Closure
 
Group Presentation MSMS
Group Presentation MSMSGroup Presentation MSMS
Group Presentation MSMS
 
PM framework by Ijaz Haider Malik
PM framework by Ijaz Haider MalikPM framework by Ijaz Haider Malik
PM framework by Ijaz Haider Malik
 
Spm unit 4
Spm unit 4Spm unit 4
Spm unit 4
 
Construction process
Construction processConstruction process
Construction process
 
Project Manager Job Description
Project Manager Job DescriptionProject Manager Job Description
Project Manager Job Description
 

Recently uploaded

01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
AshwaniAnuragi1
 
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
A
 

Recently uploaded (20)

Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Presentation on Slab, Beam, Column, and Foundation/Footing
Presentation on Slab,  Beam, Column, and Foundation/FootingPresentation on Slab,  Beam, Column, and Foundation/Footing
Presentation on Slab, Beam, Column, and Foundation/Footing
 
Databricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdfDatabricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdf
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
 
History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & Modernization
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Station
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Introduction-to- Metrology and Quality.pptx
Introduction-to- Metrology and Quality.pptxIntroduction-to- Metrology and Quality.pptx
Introduction-to- Metrology and Quality.pptx
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
 

Contract+Management+Responsibilities+Matrix.docx

  • 1. CONTRACT MANAGEMENT RESPONSIBILITIES MATRIX PROJECT: DATE: LOCATION: DOC. REV. NO.: 00 MAIN TASK SUB-TASK 1 SUB-TASK 2 SUB-TASK 3 SUB-TASK 4 SUB-TASK 5 Develop and Maintain Contract Management Responsibilities Matrix Review matrix, modify as necessary for project requirements Assign responsibilities Maintain/update matrix Lead: Assigned to: Assigned to: Assigned to: Establish Contract Baseline Review whole contract package and establish baseline Maintain baseline following changes Train the team Lead: Assigned to: Assigned to: Assigned to: Form Contract Requirements Action List Develop the list Assign individuals who are responsible for actions Monitor actions Maintain/update list Lead: Assigned to: Assigned to: Assigned to: Assigned to: Handle Correspondences Maintain and update correspondence log Assign responsible individuals for raising/answering correspondence Review outgoing correspondence for commercial appropriateness Act as authorized signatory Perform contract archiving requirements Lead: Assigned to: Assigned to: Assigned to: Assigned to: Assigned to: Manage Project Submittals Identify submittal requirements Develop and maintain submittal schedule Monitor open submittals for acknowledgment or returns Prepare and submit notices for delays in responding to submittals Perform contract archiving requirements Lead: Assigned to: Assigned to: Assigned to: Assigned to: Assigned to:
  • 2. CONTRACT MANAGEMENT RESPONSIBILITIES MATRIX PROJECT: DATE: LOCATION: DOC. REV. NO.: 00 MAIN TASK SUB-TASK 1 SUB-TASK 2 SUB-TASK 3 SUB-TASK 4 SUB-TASK 5 Perform contract flow-downs Identify contract clauses to be flowed down to subcontracts Obtain HQ review of revised contract terms to ensure proper flow-down Lead: Assigned to: Assigned to: Manage Drawing Submittals Identify the requirements and review/approval process Log, monitor and follow-up submittals Prepare notices for delays or unfair rejections Perform contract archiving requirements Lead: Assigned to: Assigned to: Assigned to: Assigned to: Manage Project Schedule Identify the requirements Prepare and submit project baseline and update schedules Monitor, update, maintain historical file of schedule Log, monitor delay events and prepare notices Perform time impact analysis Lead: Assigned to: Assigned to: Assigned to: Assigned to: Assigned to: Record Project Progress Lead: Establish progress measurement system Assigned to: Prepare and submit daily reports: Assigned to: Prepare and submit weekly/monthly reports: Assigned to: Take photos/videos: Assigned to: Manage Subcontracting and Subcontracts Tender for subcontract packages Perform technical and commercial bid evaluation Get commitment authorization and do award Provide Notice to Proceed and kick-off the works Administer subcontracts Lead: Assigned to: Assigned to: Assigned to: Assigned to: Assigned to: Perform Risk Management Identify contractual risks Prepare Contract Liability Plan Monitor the risks Administer all insurance policies Conduct regular risk workshops Lead: Assigned to: Assigned to: Assigned to: Assigned to: Assigned to:
  • 3. CONTRACT MANAGEMENT RESPONSIBILITIES MATRIX PROJECT: DATE: LOCATION: DOC. REV. NO.: 00 MAIN TASK SUB-TASK 1 SUB-TASK 2 SUB-TASK 3 SUB-TASK 4 SUB-TASK 5 Handle Bonds and Guarantees Lead: Log, monitor bonds and guarantees Assign to: Keep original copies of subcontract bonds/guarantees Assign to: Renew the bonds before expiry dates Assigned to: Manage Client- issued resources Identify requirements for Client-issued resources Log, monitor, update Client-issued resources Prepare notices for inadequate and/or delayed resources Lead: Assigned to: Assigned to: Assigned to: Handle Progress Payments Prepare and submit payment applications Submit invoices Monitor payments Lead: Assigned to: Assigned to: Assigned to: Administer Changes Develop changes procedures and determine authorizations Monitor changes and prepare required notices Develop change proposals Log, monitor, update changes log and keep records for change Negotiate and settle changes Lead: Assigned to: Assigned to: Assigned to: Assigned to: Assigned to: Handle Claims Develop claim procedures Monitor claims and prepare notices, draft claim narratives Price claims Log, monitor, update claims log and keep records for claims Negotiate and settle claims Lead: Assigned to: Assigned to: Assigned to: Assigned to: Assigned to:
  • 4. CONTRACT MANAGEMENT RESPONSIBILITIES MATRIX PROJECT: DATE: LOCATION: DOC. REV. NO.: 00 MAIN TASK SUB-TASK 1 SUB-TASK 2 SUB-TASK 3 SUB-TASK 4 SUB-TASK 5 Handle Backcharges Prepare acknowledgement or return notices Forward backcharges to subcontractors Log, monitor, update backcharge log Negotiate and settle backcharges Lead: Assigned to: Assigned to: Assigned to: Assigned to: Manage Requests for Information (RFIs) Raise RFIs Develop, maintain, and update RFI log Identify responses resulting in changes and prepare notices Lead: Assigned to: Assigned to: Assigned to: Manage Warranties Gather and submit warranties Develop, maintain, and update Warranty log Extend warranties before expiry if extended timeline Lead: Assigned to: Assigned to: Assigned to: Manage Material and Equipment Approval Requests Raise Material and Equipment Approval Requests Develop, maintain, and update log Lead: Assigned to: Assigned to: Manage Costs Establish commitment value Monitor cost against commitment value Provide notice to Client when reached to cost limit Lead: Assigned to: Assigned to: Assigned to: Manage Close-out Lead: Verify fulfilment of prerequisites for taking over Assigned to: Invite and participate final inspection Assigned to: Apply Taking Over Certificate Assigned to: Prepare and manage punch list Assigned to: Ensure document retention Assigned to:
  • 5. CONTRACT MANAGEMENT RESPONSIBILITIES MATRIX PROJECT: DATE: LOCATION: DOC. REV. NO.: 00 MAIN TASK SUB-TASK 1 SUB-TASK 2 SUB-TASK 3 SUB-TASK 4 SUB-TASK 5 Handle Waiver and Release of Lien Obtain releases/waivers from suppliers/subcontrac tors Obtain legal review before formalizing releases/waivers Verify the payment status of suppliers/subcontrac tors Lead: Assigned to: Assigned to: Assigned to: Perform Lessons Learned Workshops Input to lesson learned database: Lead: Assigned to: Provide Legal Advice Draft subcontract terms and conditions Draft contract amendments Process dispute resolution Lead: Assigned to: Assigned to: Assigned to: