1- INTRODUCTION
2- PROJECT MANAGEMENT LIFE CYCLE
3- PROJECT INTEGRATION MANAGEMENT
4- PROJECT SCOPE MANAGEMENT
5- PROJECT TIME MANAGEMENT
6- PROJECT COST MANAGEMENT
7- PROJECT QUALITY MANAGEMENT
8- PROJECT HUMAN RESOURCE MANAGEMENT
9- PROJECT COMMUNICATION MANAGEMENT
10- PROJECT PROCUREMENT MANAGEMENT
11- PROJECT RISK MANAGEMENT
Contents
1- Introduction
Project is a temporary endeavour undertaken to create a unique product service, or result.
 Has a beginning and an end.
 Creates a unique product, service or result.
 Always have a start and finish time
Examples of Project:
1- Building construction
2- Road construction
3- Shutdown maintenance
4- Wedding ceremony
5- Moving office to a new location
6- Election
1- Introduction
Temporary project:
A project starts when it is decided what has to be done and ends when a product or service is
Sometimes project are not successful and are terminated in the middle, because, the objectives of the
project can no longer be achieved or when it is determined that the need of project is no longer required.
Unique project:
Projects involves doing something that has not been done before.
Example: many thousands of villas are constructed, but each individual villa is unique- each has a different
owner, different location, different design, and different workers and so on.
Project can be of two types
2- Project Management
 Project management is the application of knowledge, skills, tools and
techniques to project activities to meet project requirement.
Project Management
Project management body of knowledge
 Nine knowledge areas
 Project life cycle definition
Nine knowledge areas are:
1. project integration management
2. Project scope management
3. Project time management
4. Project cost management
5. Project quality management
6. Project HR management
7. Project communication management
8. Project risk management
9. Project procurement management
PROJECT LIFE CYCLE:
PROJECT STAKE HOLDERS:
A stakeholder is someone whose intrest may be positively or negaitively impacted
By the project/customer/user/sponsor.
3- Project Integration
Management
Integration management:
Integration management is a collection of processes required to ensure that the various elements of
the projects are properly coordinated. It involves making trade-offs among competing objectives and
alternatives to meet or exceed stakeholders needs and expectation.
4-PROJECT SCOPE
MANAGEMENT
THE SCOPE MANAGEMENT PROCESS IS DIVIDED INTO THE
FOLLOWING:
1- COLLECT REQUIREMENT, 2- DEFINE SCOPE
3- CREATE WBS 4- VERIFY SCOPE
5- CONTROL SCOPE
PROJECT SCOPE MANAGEMENT:
Constantly checking to make sure that all the work has been completed.
Defining and controlling what is included and not in the included in the
project.
Preventing extra work or gold plating.
5- Project Time
Management
Project Time Management:
The process required to ensure timely completion of the project.
PTM process includes the following
a. Define activities
b. Sequence activities
c. Estimate activity resources
d. Estimate activity durations
e. Develop schedule
f. Control schedule
Precedence Diagramming Method(PDM):
 Schedule network diagramming technique to graphically represent..
 Once these particular schedule activities have been graphically displayed in the box or node
formate.
 Relationship are linked together via the use of a line.
PDM has four types of relationships:
1- FINISH TO START
 Current activity must finish before successor activity starts.
A
B
2- Start to Start (SS):
 Current activity must starts before successor activity starts.
3- Finish to Finish (FF):
 Current activity must finish before successor activity finishes.
4-Start to finish: (SF):
 Successor activity finish depends on, when the current activity starts.
A
B
A
B
A
B
ACTIVITY LEADS AND LAGS:
A LEAD may be added to start an activity before the predecessor activity is completed.
lead
lag:
A lag is inserted waiting time between activities. It directs a
Delay in the successor activity.
3days
Design
Coding
walling
finishing
lag
5days
Project Schedule Network Diagram:
Receive notice to
proceed
Submit bond and
insurance
Prepare and
submit project
Obtain building
permits
Submit monthly
request
Submit
preliminary
project
Submit shop
drawing
Detailing and
delieve
Resource Breakdown Structure:(RBS)
PROJECT MANAGER
ADMINISTRATIVE OFFICER
PROJECT LEADER
DEVELOPM
ENT
MANAGER
TECHNICAL
MANAGER
CHIEF
MANAGER
QUALITY
MANAGER
DEVELOPM
ENT GROUP
TECHNICAL
GROUP
CM GROUP QUALITY GROUP
CRITICAL PATH METHOD:
Red color indicates the critical path method.
 The longest days of chain is known to be as CPM.
B
A
E
H
C F
D G
5D
3D
2D
12D 9D 5D
7D
3D 6D
6- PROJECT COST
MANAGEMENT:
Project Cost Management:
Project cost management is the process required to complete within the approved budget. It keeps your
projects within the defined budget.
Control cost:
Control cost can make or break a project’s budget. Control cost can be best be achieved by setting up a
budget which is consistent with plans for actual spending.
Earned value management (EVM):
EVM has been called “management with the lights on” because it can help clearly and objectively
illuminate where a project is and where it is going, as compared to where it was supposed to be and
where it was supposed to be going.
Note:- If there is a maintenance cost after the end of the project then it should be included in the project
cost management strategy.
PROJECT COST
MANAGEMENT
DETERMINE
BUDGETCONTROL COSTESTIMATE COST
7- Project Quality
Management
Project Quality Management:
PQM includes the processes required to ensure that the project will satisfy the needs for which it was undertaken.
Bench Marking:
The investigation of task is said to be as BM.
Advantage of Bench Marking:
 Improve customer satisfaction
 Define the best process
 Improve already existing process
 Promote a desire to improve and change
 Identify the competitive(optional) position
8-Project Human Resource
Management
Project Human Resource Management:
Project HR management involves organizing and managing a project team. The team is usually made up
people with specific skills and responsibilities.
Training:
Encompasses improving the skills and knowledge of team members. Possible training methods are
training, online learning, on the job training, monitoring or coaching.
Team Building Activities:
En
er
gy
&
pr
od
uc
tivi
ty
Time
Forming
storming
Norming
performing
Adjourning
9-Project Communication
Management
Project Communications Management:
It is related to general communication skills but they encompass much more than an exchange of information.
Typical literary definitions of effective communications include:
 Exchange of information
 Act or instance of transmitting information
 Verbal or written message
 Technique for expressing ideas effectively
 Process by which meanings are exchanged between individuals through a common system of symbols
Understand key stakeholders:
 What financial or emotional interest do they have in the outcome of the work? What is the best way of
communicating the message to them
 What motivates them most of all
 How do they like to receive information from us? What is the best way of communicating the message to
 Who influence their opinions generally, and who influence their opinion about us?
 If they are not likely to be positive, what will win them around to support our projects?
 If we can’t win them around, how to manage their opposition?
Communication methods:
 Individual or group meetings
 Video or audio conference
 Computer/Mobile chats
 Other remote communication methods are used to distribute information
Information Distribution Tools:
o Hard copy document distribution
o Electronic communication and conferencing tools
o Web interface and project management software
10-Project Procurement
Management
Project Procurement Management:
It includes the processes involved in purchasing goods or services from vendors, contractors and suppliers
Project Manager’s role in procurement:
 Know the procurement process
 Understand contract terms and conditions
 Make sure the contract contains all project requirements such as attendance on meeting, report, actions
communications
Risk register:
Risk register includes the identified risk, risk owner responses in the procurement process
11- Project Risk
Management
Project Risk Management:
Project risk management is a continuous process engaged throughout the life cycle of the identifying the
cycle of the project. It’s a process of identifying and mitigating the risk.
Plan Risk Management:
The process of analysis and decision making with regards to be the best address, plan and implement the
management activities of a project. Appropriate stakeholder will be involved in planning.
Thank You

More Related Content

What's hot

Webpage design full project of project management
Webpage design full project of project managementWebpage design full project of project management
Webpage design full project of project managementArefeen Hridoy
 
Project Brief PowerPoint Presentation Slides
Project Brief PowerPoint Presentation Slides Project Brief PowerPoint Presentation Slides
Project Brief PowerPoint Presentation Slides SlideTeam
 
PMBOK six edition dataflow diagram by english with MS-visio
PMBOK six edition dataflow diagram by english with MS-visioPMBOK six edition dataflow diagram by english with MS-visio
PMBOK six edition dataflow diagram by english with MS-visioKose Jumnichi
 
Project Management Knowledge Areas
Project Management Knowledge AreasProject Management Knowledge Areas
Project Management Knowledge AreasMais Jauhary, PMP
 
Effective project management: Traditional, Agile, Extreme
Effective project management: Traditional, Agile, ExtremeEffective project management: Traditional, Agile, Extreme
Effective project management: Traditional, Agile, ExtremeLong Thang Pham
 
Project scope management
Project scope managementProject scope management
Project scope managementAnit Roy
 
How Project Network Diagram's Can Help You Become A Better Project Manager
How Project Network Diagram's Can Help You Become A Better Project ManagerHow Project Network Diagram's Can Help You Become A Better Project Manager
How Project Network Diagram's Can Help You Become A Better Project ManagerPraveen Malik, PMP
 
Project Scoping Powerpoint Presentation Slides
Project Scoping Powerpoint Presentation SlidesProject Scoping Powerpoint Presentation Slides
Project Scoping Powerpoint Presentation SlidesSlideTeam
 
Project manager-roles and responsibilities
Project manager-roles and responsibilitiesProject manager-roles and responsibilities
Project manager-roles and responsibilitiescollege
 
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...Francis Ho
 
Software Project Management: Budget
Software Project Management: BudgetSoftware Project Management: Budget
Software Project Management: BudgetMinhas Kamal
 
Dispute resolution technique
Dispute resolution techniqueDispute resolution technique
Dispute resolution techniqueSaad Ullah
 
RESTful API Design & Implementation with CodeIgniter PHP Framework
RESTful API Design & Implementation with CodeIgniter PHP FrameworkRESTful API Design & Implementation with CodeIgniter PHP Framework
RESTful API Design & Implementation with CodeIgniter PHP FrameworkBo-Yi Wu
 
5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIMBIM User Day
 
RPC에서 REST까지 간단한 개념소개
RPC에서 REST까지 간단한 개념소개RPC에서 REST까지 간단한 개념소개
RPC에서 REST까지 간단한 개념소개Wonchang Song
 
Mocking your Microservices with Mock Server
Mocking your Microservices with Mock ServerMocking your Microservices with Mock Server
Mocking your Microservices with Mock ServerJaap Coomans
 

What's hot (20)

Changes in construction
Changes in constructionChanges in construction
Changes in construction
 
Pmp in summary
Pmp in summaryPmp in summary
Pmp in summary
 
Webpage design full project of project management
Webpage design full project of project managementWebpage design full project of project management
Webpage design full project of project management
 
Project Brief PowerPoint Presentation Slides
Project Brief PowerPoint Presentation Slides Project Brief PowerPoint Presentation Slides
Project Brief PowerPoint Presentation Slides
 
PMBOK six edition dataflow diagram by english with MS-visio
PMBOK six edition dataflow diagram by english with MS-visioPMBOK six edition dataflow diagram by english with MS-visio
PMBOK six edition dataflow diagram by english with MS-visio
 
Project Management Knowledge Areas
Project Management Knowledge AreasProject Management Knowledge Areas
Project Management Knowledge Areas
 
Effective project management: Traditional, Agile, Extreme
Effective project management: Traditional, Agile, ExtremeEffective project management: Traditional, Agile, Extreme
Effective project management: Traditional, Agile, Extreme
 
Project scope management
Project scope managementProject scope management
Project scope management
 
How Project Network Diagram's Can Help You Become A Better Project Manager
How Project Network Diagram's Can Help You Become A Better Project ManagerHow Project Network Diagram's Can Help You Become A Better Project Manager
How Project Network Diagram's Can Help You Become A Better Project Manager
 
Project Scoping Powerpoint Presentation Slides
Project Scoping Powerpoint Presentation SlidesProject Scoping Powerpoint Presentation Slides
Project Scoping Powerpoint Presentation Slides
 
Project manager-roles and responsibilities
Project manager-roles and responsibilitiesProject manager-roles and responsibilities
Project manager-roles and responsibilities
 
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
 
Software Project Management: Budget
Software Project Management: BudgetSoftware Project Management: Budget
Software Project Management: Budget
 
BIM and Scrum in construction
BIM and Scrum in construction BIM and Scrum in construction
BIM and Scrum in construction
 
Dispute resolution technique
Dispute resolution techniqueDispute resolution technique
Dispute resolution technique
 
RESTful API Design & Implementation with CodeIgniter PHP Framework
RESTful API Design & Implementation with CodeIgniter PHP FrameworkRESTful API Design & Implementation with CodeIgniter PHP Framework
RESTful API Design & Implementation with CodeIgniter PHP Framework
 
5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM
 
RPC에서 REST까지 간단한 개념소개
RPC에서 REST까지 간단한 개념소개RPC에서 REST까지 간단한 개념소개
RPC에서 REST까지 간단한 개념소개
 
Mocking your Microservices with Mock Server
Mocking your Microservices with Mock ServerMocking your Microservices with Mock Server
Mocking your Microservices with Mock Server
 
Project Charter
Project CharterProject Charter
Project Charter
 

Viewers also liked

Top Document Mangment Software in 2016
Top Document Mangment Software in 2016Top Document Mangment Software in 2016
Top Document Mangment Software in 2016SoftwareSuggest
 
Project Management
Project ManagementProject Management
Project Managementguest4408ddc
 
Pakistan Grand Prix (Project Management)
Pakistan Grand Prix (Project Management)Pakistan Grand Prix (Project Management)
Pakistan Grand Prix (Project Management)Sikander Sardar
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction managementXubitech
 
Assessment of project management practices in pakistani software industry
Assessment of project management practices in pakistani software industryAssessment of project management practices in pakistani software industry
Assessment of project management practices in pakistani software industryjehan1987
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project managementBarun_agnihotri
 

Viewers also liked (9)

Top Document Mangment Software in 2016
Top Document Mangment Software in 2016Top Document Mangment Software in 2016
Top Document Mangment Software in 2016
 
Criss mangment
Criss mangmentCriss mangment
Criss mangment
 
Project Management
Project ManagementProject Management
Project Management
 
Pakistan Grand Prix (Project Management)
Pakistan Grand Prix (Project Management)Pakistan Grand Prix (Project Management)
Pakistan Grand Prix (Project Management)
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
 
Construction safety management
Construction safety managementConstruction safety management
Construction safety management
 
Assessment of project management practices in pakistani software industry
Assessment of project management practices in pakistani software industryAssessment of project management practices in pakistani software industry
Assessment of project management practices in pakistani software industry
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
Project planning and project work plan
Project planning and project work planProject planning and project work plan
Project planning and project work plan
 

Similar to Project mangment

Project management for technologies MGT410
Project management for technologies   MGT410Project management for technologies   MGT410
Project management for technologies MGT410Saqib Imran
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptxFawadAfridi6
 
ICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTJohn Macasio
 
Basics in Project Management
Basics in Project ManagementBasics in Project Management
Basics in Project Managementchaitanyakrsk
 
Introduction to Project and Project Management
Introduction to Project and Project ManagementIntroduction to Project and Project Management
Introduction to Project and Project ManagementMahbubun Nabi Rasel
 
20240130_UNIUD_Book Presentation_Applying Lean Project Management_(LMA).pptx
20240130_UNIUD_Book Presentation_Applying Lean Project Management_(LMA).pptx20240130_UNIUD_Book Presentation_Applying Lean Project Management_(LMA).pptx
20240130_UNIUD_Book Presentation_Applying Lean Project Management_(LMA).pptxirrosennen
 
UNIT-01_Fundamentals_ Project management
UNIT-01_Fundamentals_ Project managementUNIT-01_Fundamentals_ Project management
UNIT-01_Fundamentals_ Project managementsdbhosale860
 
Presentation of project management (907, scm. mir mohammed shorab hossein)
Presentation of project management (907, scm. mir mohammed shorab hossein)Presentation of project management (907, scm. mir mohammed shorab hossein)
Presentation of project management (907, scm. mir mohammed shorab hossein)ferozpatowary
 
Project Management Policy
Project Management PolicyProject Management Policy
Project Management PolicyDemand Metric
 
BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1Imoh Etuk
 
Project Management Methodology
Project Management MethodologyProject Management Methodology
Project Management MethodologyMohammed Al-Taee
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkejlp12
 
Construction company business plan
Construction company business planConstruction company business plan
Construction company business planfarouq umar
 
Answer sheet project management
Answer sheet project managementAnswer sheet project management
Answer sheet project managementPMlynda17
 
3 scope Management
3 scope Management 3 scope Management
3 scope Management Qussay Karam
 

Similar to Project mangment (20)

UNIT-1.pptx
UNIT-1.pptxUNIT-1.pptx
UNIT-1.pptx
 
Project management for technologies MGT410
Project management for technologies   MGT410Project management for technologies   MGT410
Project management for technologies MGT410
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptx
 
ICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENT
 
Basics in Project Management
Basics in Project ManagementBasics in Project Management
Basics in Project Management
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
Introduction to Project and Project Management
Introduction to Project and Project ManagementIntroduction to Project and Project Management
Introduction to Project and Project Management
 
20240130_UNIUD_Book Presentation_Applying Lean Project Management_(LMA).pptx
20240130_UNIUD_Book Presentation_Applying Lean Project Management_(LMA).pptx20240130_UNIUD_Book Presentation_Applying Lean Project Management_(LMA).pptx
20240130_UNIUD_Book Presentation_Applying Lean Project Management_(LMA).pptx
 
UNIT-01_Fundamentals_ Project management
UNIT-01_Fundamentals_ Project managementUNIT-01_Fundamentals_ Project management
UNIT-01_Fundamentals_ Project management
 
Presentation of project management (907, scm. mir mohammed shorab hossein)
Presentation of project management (907, scm. mir mohammed shorab hossein)Presentation of project management (907, scm. mir mohammed shorab hossein)
Presentation of project management (907, scm. mir mohammed shorab hossein)
 
Project Management Policy
Project Management PolicyProject Management Policy
Project Management Policy
 
BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1
 
Project
ProjectProject
Project
 
Project Management Methodology
Project Management MethodologyProject Management Methodology
Project Management Methodology
 
Lec#1
Lec#1Lec#1
Lec#1
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to framework
 
Project Management Methodologies
Project Management MethodologiesProject Management Methodologies
Project Management Methodologies
 
Construction company business plan
Construction company business planConstruction company business plan
Construction company business plan
 
Answer sheet project management
Answer sheet project managementAnswer sheet project management
Answer sheet project management
 
3 scope Management
3 scope Management 3 scope Management
3 scope Management
 

Recently uploaded

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIShubhangi Sonawane
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 

Recently uploaded (20)

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 

Project mangment

  • 2. 1- INTRODUCTION 2- PROJECT MANAGEMENT LIFE CYCLE 3- PROJECT INTEGRATION MANAGEMENT 4- PROJECT SCOPE MANAGEMENT 5- PROJECT TIME MANAGEMENT 6- PROJECT COST MANAGEMENT 7- PROJECT QUALITY MANAGEMENT 8- PROJECT HUMAN RESOURCE MANAGEMENT 9- PROJECT COMMUNICATION MANAGEMENT 10- PROJECT PROCUREMENT MANAGEMENT 11- PROJECT RISK MANAGEMENT Contents
  • 4. Project is a temporary endeavour undertaken to create a unique product service, or result.  Has a beginning and an end.  Creates a unique product, service or result.  Always have a start and finish time Examples of Project: 1- Building construction 2- Road construction 3- Shutdown maintenance 4- Wedding ceremony 5- Moving office to a new location 6- Election 1- Introduction
  • 5. Temporary project: A project starts when it is decided what has to be done and ends when a product or service is Sometimes project are not successful and are terminated in the middle, because, the objectives of the project can no longer be achieved or when it is determined that the need of project is no longer required. Unique project: Projects involves doing something that has not been done before. Example: many thousands of villas are constructed, but each individual villa is unique- each has a different owner, different location, different design, and different workers and so on. Project can be of two types
  • 7.  Project management is the application of knowledge, skills, tools and techniques to project activities to meet project requirement. Project Management Project management body of knowledge  Nine knowledge areas  Project life cycle definition
  • 8. Nine knowledge areas are: 1. project integration management 2. Project scope management 3. Project time management 4. Project cost management 5. Project quality management 6. Project HR management 7. Project communication management 8. Project risk management 9. Project procurement management
  • 9. PROJECT LIFE CYCLE: PROJECT STAKE HOLDERS: A stakeholder is someone whose intrest may be positively or negaitively impacted By the project/customer/user/sponsor.
  • 11. Integration management: Integration management is a collection of processes required to ensure that the various elements of the projects are properly coordinated. It involves making trade-offs among competing objectives and alternatives to meet or exceed stakeholders needs and expectation.
  • 13. THE SCOPE MANAGEMENT PROCESS IS DIVIDED INTO THE FOLLOWING: 1- COLLECT REQUIREMENT, 2- DEFINE SCOPE 3- CREATE WBS 4- VERIFY SCOPE 5- CONTROL SCOPE PROJECT SCOPE MANAGEMENT: Constantly checking to make sure that all the work has been completed. Defining and controlling what is included and not in the included in the project. Preventing extra work or gold plating.
  • 15. Project Time Management: The process required to ensure timely completion of the project. PTM process includes the following a. Define activities b. Sequence activities c. Estimate activity resources d. Estimate activity durations e. Develop schedule f. Control schedule
  • 16. Precedence Diagramming Method(PDM):  Schedule network diagramming technique to graphically represent..  Once these particular schedule activities have been graphically displayed in the box or node formate.  Relationship are linked together via the use of a line. PDM has four types of relationships: 1- FINISH TO START  Current activity must finish before successor activity starts. A B
  • 17. 2- Start to Start (SS):  Current activity must starts before successor activity starts. 3- Finish to Finish (FF):  Current activity must finish before successor activity finishes. 4-Start to finish: (SF):  Successor activity finish depends on, when the current activity starts. A B A B A B
  • 18. ACTIVITY LEADS AND LAGS: A LEAD may be added to start an activity before the predecessor activity is completed. lead lag: A lag is inserted waiting time between activities. It directs a Delay in the successor activity. 3days Design Coding walling finishing lag 5days
  • 19. Project Schedule Network Diagram: Receive notice to proceed Submit bond and insurance Prepare and submit project Obtain building permits Submit monthly request Submit preliminary project Submit shop drawing Detailing and delieve
  • 20. Resource Breakdown Structure:(RBS) PROJECT MANAGER ADMINISTRATIVE OFFICER PROJECT LEADER DEVELOPM ENT MANAGER TECHNICAL MANAGER CHIEF MANAGER QUALITY MANAGER DEVELOPM ENT GROUP TECHNICAL GROUP CM GROUP QUALITY GROUP
  • 21. CRITICAL PATH METHOD: Red color indicates the critical path method.  The longest days of chain is known to be as CPM. B A E H C F D G 5D 3D 2D 12D 9D 5D 7D 3D 6D
  • 23. Project Cost Management: Project cost management is the process required to complete within the approved budget. It keeps your projects within the defined budget. Control cost: Control cost can make or break a project’s budget. Control cost can be best be achieved by setting up a budget which is consistent with plans for actual spending. Earned value management (EVM): EVM has been called “management with the lights on” because it can help clearly and objectively illuminate where a project is and where it is going, as compared to where it was supposed to be and where it was supposed to be going. Note:- If there is a maintenance cost after the end of the project then it should be included in the project cost management strategy.
  • 26. Project Quality Management: PQM includes the processes required to ensure that the project will satisfy the needs for which it was undertaken. Bench Marking: The investigation of task is said to be as BM. Advantage of Bench Marking:  Improve customer satisfaction  Define the best process  Improve already existing process  Promote a desire to improve and change  Identify the competitive(optional) position
  • 28. Project Human Resource Management: Project HR management involves organizing and managing a project team. The team is usually made up people with specific skills and responsibilities. Training: Encompasses improving the skills and knowledge of team members. Possible training methods are training, online learning, on the job training, monitoring or coaching.
  • 31. Project Communications Management: It is related to general communication skills but they encompass much more than an exchange of information. Typical literary definitions of effective communications include:  Exchange of information  Act or instance of transmitting information  Verbal or written message  Technique for expressing ideas effectively  Process by which meanings are exchanged between individuals through a common system of symbols
  • 32. Understand key stakeholders:  What financial or emotional interest do they have in the outcome of the work? What is the best way of communicating the message to them  What motivates them most of all  How do they like to receive information from us? What is the best way of communicating the message to  Who influence their opinions generally, and who influence their opinion about us?  If they are not likely to be positive, what will win them around to support our projects?  If we can’t win them around, how to manage their opposition?
  • 33. Communication methods:  Individual or group meetings  Video or audio conference  Computer/Mobile chats  Other remote communication methods are used to distribute information Information Distribution Tools: o Hard copy document distribution o Electronic communication and conferencing tools o Web interface and project management software
  • 35. Project Procurement Management: It includes the processes involved in purchasing goods or services from vendors, contractors and suppliers Project Manager’s role in procurement:  Know the procurement process  Understand contract terms and conditions  Make sure the contract contains all project requirements such as attendance on meeting, report, actions communications Risk register: Risk register includes the identified risk, risk owner responses in the procurement process
  • 37. Project Risk Management: Project risk management is a continuous process engaged throughout the life cycle of the identifying the cycle of the project. It’s a process of identifying and mitigating the risk. Plan Risk Management: The process of analysis and decision making with regards to be the best address, plan and implement the management activities of a project. Appropriate stakeholder will be involved in planning.