 Introduction to Contract Management
 Definition
 Contract Management Issues
 Activities Overview
 Contract Manager: DECS
 Importance of the role
 Responsibilities
 Skills
 Appointing a Contract Manager
 Contract Manager Authority
 Implementing a Contract
 Contract Management Plan
 Risk Management
 Monitoring Performance
 Occupational Health, Safety & Welfare
 Variations
 Contract Management: Key Tasks
 DECS Procurement Policies & Guidelines
Introduction to Contract
Management
 Final stage of the tendering and contract cycle.
 Includes all administrative activities associated with
administering a contract after it is executed.
 Level of contract management may vary from contract to
contract
 Simple to Complex contracts
Contract Management Definition
 An administrative process to ensure all parties
understand their responsibilities and obligations
to a contract, allowing efficient and effective
contract performance
 Undertaken by DECS worksites
Contract Management Issues
 Relationships: buyers, suppliers & end users
 Lack of preparation or contingency planning
 Requirement changes
 Variations to the contract
 Failure to consult
 Description errors
 Pricing errors/omissions
 Failure or refusal to perform
 Suppliers experiencing financial difficulties
 Delivery/transport problems
Contract Manager:
Importance of the role
 Obtain value for money
 Ensure contractual obligations met
 Improve communication
 Control risks
Contract Manager: Responsibilities
(Varies in Complexity of Contract)
 Establish Contract Management Plan
 Process reviews inc Post-contract reviews
 Liaise between and provide advice/information to
internal managers, users & suppliers
 Monitor performance
 Accurate and timely reporting
Contract Manager: Responsibilities
(cont)
(Varies in Complexity of Contract)
 Maintain insurance policy(s) & terms and conditions
 Ensure certification and specifications are met
 Manage contract change procedures
 Resolve disputes
 Ethical standards
 Refer to Code of Ethics for the South Australian
Public Sector
Contract Manager: Skills
Skills required include:
 Strategic skills
 Project Management
 Communication and Liaison
 People Management
 Negotiation
 Conflict resolution
 Record-keeping and File Management
 Decision-making
 Research and Analytical
 Professionalism
Appointing a Contract Manager
 Should occur prior to execution of the contract
 Contract management arrangements identified and
planned including:
 Responsibilities;
 Delegations;
 Reporting requirements, and;
 Relationships
 Duties and powers governed by the conditions of contract
and general law
Contract Manager Authority
 Contract Manager needs a level of authority to ensure
project runs smoothly
 Limited delegation to approve variations that involve extra
cost.
Implementing the Contract
Consider the following:
 The Contract Manager appointed
 Notification to unsuccessful suppliers
 Joint briefings for all relevant parties
 Resources available
 Copies of final contract
 Initial issues requiring immediate attention
Contract Management Plan
 Details how the contract is to be managed to achieve
outcomes.
 Depending upon complexity, Contract Management
Plans may include:
 Monitoring of compliance with contract conditions
 Performance Evaluation and Reporting (e.g. KPIs,
SLAs)
 Communication Strategies
 Roles and Responsibilities of stakeholders
 Risk Management
 Financial Management
 Contract Review
 Contract completion and transition
Contract Management Plan (Cont
 To develop an effective Plan, need to
understand contract and objectives.
 Review & gain an understanding of:
 Acquisition plans
 Tender documents
 Specifications
 Selection reports
 Purchase recommendations
 Records of negotiations
 The contract
 File notes
Risk Management Plan
 Planning for & managing risks essential
 Complex contracts may require a Risk
Management Plan, including:
 Identification
 Analysis
 Evaluation
 Treatment Plans
 The Risk Management Plan will form part of the
Contract Management Plan
Risk Management Plan (Cont)
Types of Risks:
 Changed circumstances
 Communication Breakdown
 Breach of Confidentiality
 Breach of Intellectual Property (IP)
 Breaches of Security & Privacy arrangements
 Inappropriate Occupational Health, Safety & Welfare (OHS&W)
management
 Insurance policies may not adequately indemnify DECS – may
need to determine insurances required (e.g. workers’
compensation, personal injury, public liabilty, product liability
etc)
Risk Management Plan (Cont)
Types of Risks (Cont):
 Breaches of contract:
 Performance securities / guarantees not received;
 Deliverables not in accordance with the contract;
 Fraud;
 Variations, and;
 Disagreement or disputes.
 Refer DECS Guideline - Managing Risk in
Procurement for further information
Monitoring Performance
 Effective Performance Monitoring requires the
Contract Manager to:
 Establish and monitor formal KPIs and Service Level
Agreements (SLAs)
 Monitor progress
 Conduct random inspections
 Ensure all conditions and clauses are acted upon
Monitoring Performance (Cont)
 Advise Contractor of performance issues
 Develop effective feedback mechanisms
 Keep written records of all dealings with
Contractor and administration of the contract
 Maintain comprehensive documentation
Occupational Health, Safety and
Welfare (OHS&W)
 Contract Managers should:
 Monitor and audit Contractor's workplace
performance
 Ensure Contractor applies appropriate level of
OHS&W management
 See DECS ‘OHS&W and Injury Management Policy’ and
the ‘DECS Code of Practice for Contractors’
(www.decs.sa.gov.au/ohs/)
Contract Variations
 Should State (in written form):
 What has been agreed;
 Actual changes to the contract;
 If applicable:
 Current price;
 Variation amount, and;
 New price
 Ensure:
 Additional funds are available (if required)
 Appropriate approvals obtained
Variations (Cont)
 May be necessary to contractual arrangements e.g.:
 Changes to specified personnel;
 Changes to contract milestone dates;
 Changes to supplies quantities;
 Change in scope of the requirement
 Changes to specifications; and
 Introduction of new technology.
 Stakeholder consultation required
Contract Management:
Key Tasks
 Receipt and Acceptance of Variables
 Payment
 Dispute Resolution
 Complaints Procedure
 Discharge of Contract
Contract Management:
Key Tasks (Cont)
 Liquidated Damages
 Performance Evaluation and Debriefing
 Product Warranties
 Contract Completion
 Record Maintenance & Reporting
Contract Completion
Options include:
 Contract extension option
 Expiration of existing contract
 Call for new tenders
 No further requirements for goods or
services
 If contract extension unnecessary; undertake
transition from the contract.
Record Maintenance
 Maintain comprehensive and accurate records in relation to
 Responsibilities,
 claims,
 payments,
 negotiations,
 agreed changes,
 incorrect deliveries,
 poor service,
 other significant activities.
 Electronic records
 Audit trail
 Comply with State Records of South Australia Requirements
(www.archives.sa.gov.au)
Reporting
 Regular/ad-hoc reporting on various aspects of
departmental contracts, including:
 Supplier information
 Contract value
 Usage
 Savings
 Performance
 Improvement opportunities
Reporting (Cont)
Contract Closure Report
 For acquisitions deemed high risk and falling in
Quadrant 2 or 4 of the State Procurement Board’s
Acquisition Planning Guidelines
 Report should be prepared at completion of the
contract and forwarded to Procurement Unit
DECS Procurement Policies &
Guidelines
Refer to ‘Contract Management Guidelines’
 In.decs (Procurement web pages)
 SSONet (Procurement web pages)
 Or contact Procurement Unit on 8226 1610

More Related Content

What's hot

Overview to contract management
Overview to contract managementOverview to contract management
Overview to contract managementPriyesh Nair
 
Contract management
Contract managementContract management
Contract managementNishant Rai
 
Contract Administration Presentation
Contract Administration PresentationContract Administration Presentation
Contract Administration PresentationYanet Ormeno
 
contract management, stages of contract management
 contract management, stages of contract management contract management, stages of contract management
contract management, stages of contract managementVISHAKA BOTHRA
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16Arvind Solanki
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008AYM1979
 
Project management procurement
Project management  procurementProject management  procurement
Project management procurementMalcolm Peart
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in constructionMahSobeh
 
Lecture 2 project procurement and contract management .pdf
Lecture 2  project procurement and contract management .pdfLecture 2  project procurement and contract management .pdf
Lecture 2 project procurement and contract management .pdfaxmedbaasaay
 
Procurement Contract Types | PMP | iZenBridge - Webinar
Procurement Contract Types | PMP | iZenBridge - Webinar Procurement Contract Types | PMP | iZenBridge - Webinar
Procurement Contract Types | PMP | iZenBridge - Webinar Saket Bansal
 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.Aszahari Aie
 
The Basics of Tendering & Bidding
The Basics of Tendering & BiddingThe Basics of Tendering & Bidding
The Basics of Tendering & BiddingMoatasem Mabrouk
 

What's hot (20)

Contract Management
Contract Management Contract Management
Contract Management
 
Contract management
Contract managementContract management
Contract management
 
Overview to contract management
Overview to contract managementOverview to contract management
Overview to contract management
 
Contract management
Contract managementContract management
Contract management
 
Contract Administration Presentation
Contract Administration PresentationContract Administration Presentation
Contract Administration Presentation
 
contract management, stages of contract management
 contract management, stages of contract management contract management, stages of contract management
contract management, stages of contract management
 
Project procurement management PMBOK Sixth Edition
Project procurement management PMBOK Sixth EditionProject procurement management PMBOK Sixth Edition
Project procurement management PMBOK Sixth Edition
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Project management procurement
Project management  procurementProject management  procurement
Project management procurement
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
 
Total Quality Management In Construction
Total Quality Management In ConstructionTotal Quality Management In Construction
Total Quality Management In Construction
 
Lecture 2 project procurement and contract management .pdf
Lecture 2  project procurement and contract management .pdfLecture 2  project procurement and contract management .pdf
Lecture 2 project procurement and contract management .pdf
 
Procurement Contract Types | PMP | iZenBridge - Webinar
Procurement Contract Types | PMP | iZenBridge - Webinar Procurement Contract Types | PMP | iZenBridge - Webinar
Procurement Contract Types | PMP | iZenBridge - Webinar
 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.
 
Procurement management
Procurement managementProcurement management
Procurement management
 
Quality management
Quality managementQuality management
Quality management
 
Procurement system
Procurement systemProcurement system
Procurement system
 
Procurement Plan
Procurement PlanProcurement Plan
Procurement Plan
 
The Basics of Tendering & Bidding
The Basics of Tendering & BiddingThe Basics of Tendering & Bidding
The Basics of Tendering & Bidding
 

Similar to Contract Management Essentials

CONTRACT MANAGEMENT.pptx
CONTRACT MANAGEMENT.pptxCONTRACT MANAGEMENT.pptx
CONTRACT MANAGEMENT.pptxihsanmuhammad44
 
Procurement Managementxxxxxxxxxxxxxxxxxxxxxx.pptx
Procurement Managementxxxxxxxxxxxxxxxxxxxxxx.pptxProcurement Managementxxxxxxxxxxxxxxxxxxxxxx.pptx
Procurement Managementxxxxxxxxxxxxxxxxxxxxxx.pptxs2022027028
 
Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701Peter Soetevent
 
L8_PROJECT CONTRACT Management.ppt
L8_PROJECT CONTRACT Management.pptL8_PROJECT CONTRACT Management.ppt
L8_PROJECT CONTRACT Management.pptMUST
 
Getting ML Contracting and procurement right!
Getting ML Contracting and procurement right!Getting ML Contracting and procurement right!
Getting ML Contracting and procurement right!Tarun Philip
 
Mar 2012 cdphe contractor performance monitoring trng
Mar 2012 cdphe contractor performance monitoring trngMar 2012 cdphe contractor performance monitoring trng
Mar 2012 cdphe contractor performance monitoring trngBrandon Williams
 
Maximizing value through vendor mgt july, lagos
Maximizing value through vendor mgt july, lagosMaximizing value through vendor mgt july, lagos
Maximizing value through vendor mgt july, lagosPetro Nomics
 
Senior Contract Specialist Roles and Responsibilities at PG&E
Senior Contract Specialist Roles and Responsibilities at PG&ESenior Contract Specialist Roles and Responsibilities at PG&E
Senior Contract Specialist Roles and Responsibilities at PG&EAlberto Rocha
 
PROCUREMENT & CONTRACT MANAGEMENT.pptx
PROCUREMENT & CONTRACT MANAGEMENT.pptxPROCUREMENT & CONTRACT MANAGEMENT.pptx
PROCUREMENT & CONTRACT MANAGEMENT.pptxSyedWajihUlHassan4
 
Knowing and managing what's been agreed the case for contract management
Knowing and managing what's been agreed   the case for contract managementKnowing and managing what's been agreed   the case for contract management
Knowing and managing what's been agreed the case for contract managementRichard Austin
 
Procurement ManagementImportance of Project Procurem
Procurement ManagementImportance of Project ProcuremProcurement ManagementImportance of Project Procurem
Procurement ManagementImportance of Project ProcuremDaliaCulbertson719
 
Contracting process paper cpmgt302september 21, 2015
Contracting process paper cpmgt302september 21, 2015Contracting process paper cpmgt302september 21, 2015
Contracting process paper cpmgt302september 21, 2015SONU61709
 

Similar to Contract Management Essentials (20)

CONTRACT MANAGEMENT.pptx
CONTRACT MANAGEMENT.pptxCONTRACT MANAGEMENT.pptx
CONTRACT MANAGEMENT.pptx
 
Procurement Managementxxxxxxxxxxxxxxxxxxxxxx.pptx
Procurement Managementxxxxxxxxxxxxxxxxxxxxxx.pptxProcurement Managementxxxxxxxxxxxxxxxxxxxxxx.pptx
Procurement Managementxxxxxxxxxxxxxxxxxxxxxx.pptx
 
Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701
 
L8_PROJECT CONTRACT Management.ppt
L8_PROJECT CONTRACT Management.pptL8_PROJECT CONTRACT Management.ppt
L8_PROJECT CONTRACT Management.ppt
 
Getting ML Contracting and procurement right!
Getting ML Contracting and procurement right!Getting ML Contracting and procurement right!
Getting ML Contracting and procurement right!
 
Contract Management
Contract ManagementContract Management
Contract Management
 
Mar 2012 cdphe contractor performance monitoring trng
Mar 2012 cdphe contractor performance monitoring trngMar 2012 cdphe contractor performance monitoring trng
Mar 2012 cdphe contractor performance monitoring trng
 
Maximizing value through vendor mgt july, lagos
Maximizing value through vendor mgt july, lagosMaximizing value through vendor mgt july, lagos
Maximizing value through vendor mgt july, lagos
 
Senior Contract Specialist Roles and Responsibilities at PG&E
Senior Contract Specialist Roles and Responsibilities at PG&ESenior Contract Specialist Roles and Responsibilities at PG&E
Senior Contract Specialist Roles and Responsibilities at PG&E
 
PROCUREMENT & CONTRACT MANAGEMENT.pptx
PROCUREMENT & CONTRACT MANAGEMENT.pptxPROCUREMENT & CONTRACT MANAGEMENT.pptx
PROCUREMENT & CONTRACT MANAGEMENT.pptx
 
Knowing and managing what's been agreed the case for contract management
Knowing and managing what's been agreed   the case for contract managementKnowing and managing what's been agreed   the case for contract management
Knowing and managing what's been agreed the case for contract management
 
Procurement ManagementImportance of Project Procurem
Procurement ManagementImportance of Project ProcuremProcurement ManagementImportance of Project Procurem
Procurement ManagementImportance of Project Procurem
 
Vendor management, lagos
Vendor management, lagosVendor management, lagos
Vendor management, lagos
 
Vendor Management, Lagos
Vendor Management, LagosVendor Management, Lagos
Vendor Management, Lagos
 
Vendor Management, Lagos
Vendor Management, LagosVendor Management, Lagos
Vendor Management, Lagos
 
Vendor Management, Lagos
Vendor Management, LagosVendor Management, Lagos
Vendor Management, Lagos
 
Vendor Management, Lagos
Vendor Management, LagosVendor Management, Lagos
Vendor Management, Lagos
 
Vendor Management, Lagos
Vendor Management, LagosVendor Management, Lagos
Vendor Management, Lagos
 
Contracting process paper cpmgt302september 21, 2015
Contracting process paper cpmgt302september 21, 2015Contracting process paper cpmgt302september 21, 2015
Contracting process paper cpmgt302september 21, 2015
 
FMSuport Ltd
FMSuport LtdFMSuport Ltd
FMSuport Ltd
 

More from MUST

Lecture 4-ELECTRIC MOTORS-ACTUATION SYSTEMS2.ppt
Lecture 4-ELECTRIC MOTORS-ACTUATION SYSTEMS2.pptLecture 4-ELECTRIC MOTORS-ACTUATION SYSTEMS2.ppt
Lecture 4-ELECTRIC MOTORS-ACTUATION SYSTEMS2.pptMUST
 
NYQUIST_PLOTS.pdf
NYQUIST_PLOTS.pdfNYQUIST_PLOTS.pdf
NYQUIST_PLOTS.pdfMUST
 
ME451_L10_RouthHurwitz.pdf
ME451_L10_RouthHurwitz.pdfME451_L10_RouthHurwitz.pdf
ME451_L10_RouthHurwitz.pdfMUST
 
LECTURE 1. Control Systems Engineering_MEB 4101.pdf
LECTURE 1. Control Systems Engineering_MEB 4101.pdfLECTURE 1. Control Systems Engineering_MEB 4101.pdf
LECTURE 1. Control Systems Engineering_MEB 4101.pdfMUST
 
Stability criteria and Analysis_Control Systems Engineering_MEB 4101.pdf
Stability criteria and Analysis_Control Systems Engineering_MEB 4101.pdfStability criteria and Analysis_Control Systems Engineering_MEB 4101.pdf
Stability criteria and Analysis_Control Systems Engineering_MEB 4101.pdfMUST
 
LECTURE 3_On-off_Control Systems Engineering_MEB 4101.pptx
LECTURE 3_On-off_Control Systems Engineering_MEB 4101.pptxLECTURE 3_On-off_Control Systems Engineering_MEB 4101.pptx
LECTURE 3_On-off_Control Systems Engineering_MEB 4101.pptxMUST
 
LECTURE 4. Stability criteria and Analysis_Control Systems Engineering_MEB 41...
LECTURE 4. Stability criteria and Analysis_Control Systems Engineering_MEB 41...LECTURE 4. Stability criteria and Analysis_Control Systems Engineering_MEB 41...
LECTURE 4. Stability criteria and Analysis_Control Systems Engineering_MEB 41...MUST
 
2 Robot Actuators and drive systems.ppt
2 Robot Actuators and drive systems.ppt2 Robot Actuators and drive systems.ppt
2 Robot Actuators and drive systems.pptMUST
 
ON-OFF CONTROL (2).ppt
ON-OFF CONTROL (2).pptON-OFF CONTROL (2).ppt
ON-OFF CONTROL (2).pptMUST
 
L7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdfL7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdfMUST
 
L4_Cost Management.ppt
L4_Cost Management.pptL4_Cost Management.ppt
L4_Cost Management.pptMUST
 
Project procurement Management.ppt
Project procurement Management.pptProject procurement Management.ppt
Project procurement Management.pptMUST
 
PROJECT RISK MANAGEMENT.pdf
PROJECT RISK MANAGEMENT.pdfPROJECT RISK MANAGEMENT.pdf
PROJECT RISK MANAGEMENT.pdfMUST
 
pmp11-risk-180412035349-2.pdf
pmp11-risk-180412035349-2.pdfpmp11-risk-180412035349-2.pdf
pmp11-risk-180412035349-2.pdfMUST
 
2nd_order.pdf
2nd_order.pdf2nd_order.pdf
2nd_order.pdfMUST
 
History of Robotics.ppt
History of Robotics.pptHistory of Robotics.ppt
History of Robotics.pptMUST
 
Machine Vision Systems.pptx
Machine Vision Systems.pptxMachine Vision Systems.pptx
Machine Vision Systems.pptxMUST
 
Project Human Resources Management.ppt
Project Human Resources Management.pptProject Human Resources Management.ppt
Project Human Resources Management.pptMUST
 
Robot actuation and feedback components.pptx
Robot actuation and feedback components.pptxRobot actuation and feedback components.pptx
Robot actuation and feedback components.pptxMUST
 
L2_Scope Management.ppt
L2_Scope Management.pptL2_Scope Management.ppt
L2_Scope Management.pptMUST
 

More from MUST (20)

Lecture 4-ELECTRIC MOTORS-ACTUATION SYSTEMS2.ppt
Lecture 4-ELECTRIC MOTORS-ACTUATION SYSTEMS2.pptLecture 4-ELECTRIC MOTORS-ACTUATION SYSTEMS2.ppt
Lecture 4-ELECTRIC MOTORS-ACTUATION SYSTEMS2.ppt
 
NYQUIST_PLOTS.pdf
NYQUIST_PLOTS.pdfNYQUIST_PLOTS.pdf
NYQUIST_PLOTS.pdf
 
ME451_L10_RouthHurwitz.pdf
ME451_L10_RouthHurwitz.pdfME451_L10_RouthHurwitz.pdf
ME451_L10_RouthHurwitz.pdf
 
LECTURE 1. Control Systems Engineering_MEB 4101.pdf
LECTURE 1. Control Systems Engineering_MEB 4101.pdfLECTURE 1. Control Systems Engineering_MEB 4101.pdf
LECTURE 1. Control Systems Engineering_MEB 4101.pdf
 
Stability criteria and Analysis_Control Systems Engineering_MEB 4101.pdf
Stability criteria and Analysis_Control Systems Engineering_MEB 4101.pdfStability criteria and Analysis_Control Systems Engineering_MEB 4101.pdf
Stability criteria and Analysis_Control Systems Engineering_MEB 4101.pdf
 
LECTURE 3_On-off_Control Systems Engineering_MEB 4101.pptx
LECTURE 3_On-off_Control Systems Engineering_MEB 4101.pptxLECTURE 3_On-off_Control Systems Engineering_MEB 4101.pptx
LECTURE 3_On-off_Control Systems Engineering_MEB 4101.pptx
 
LECTURE 4. Stability criteria and Analysis_Control Systems Engineering_MEB 41...
LECTURE 4. Stability criteria and Analysis_Control Systems Engineering_MEB 41...LECTURE 4. Stability criteria and Analysis_Control Systems Engineering_MEB 41...
LECTURE 4. Stability criteria and Analysis_Control Systems Engineering_MEB 41...
 
2 Robot Actuators and drive systems.ppt
2 Robot Actuators and drive systems.ppt2 Robot Actuators and drive systems.ppt
2 Robot Actuators and drive systems.ppt
 
ON-OFF CONTROL (2).ppt
ON-OFF CONTROL (2).pptON-OFF CONTROL (2).ppt
ON-OFF CONTROL (2).ppt
 
L7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdfL7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdf
 
L4_Cost Management.ppt
L4_Cost Management.pptL4_Cost Management.ppt
L4_Cost Management.ppt
 
Project procurement Management.ppt
Project procurement Management.pptProject procurement Management.ppt
Project procurement Management.ppt
 
PROJECT RISK MANAGEMENT.pdf
PROJECT RISK MANAGEMENT.pdfPROJECT RISK MANAGEMENT.pdf
PROJECT RISK MANAGEMENT.pdf
 
pmp11-risk-180412035349-2.pdf
pmp11-risk-180412035349-2.pdfpmp11-risk-180412035349-2.pdf
pmp11-risk-180412035349-2.pdf
 
2nd_order.pdf
2nd_order.pdf2nd_order.pdf
2nd_order.pdf
 
History of Robotics.ppt
History of Robotics.pptHistory of Robotics.ppt
History of Robotics.ppt
 
Machine Vision Systems.pptx
Machine Vision Systems.pptxMachine Vision Systems.pptx
Machine Vision Systems.pptx
 
Project Human Resources Management.ppt
Project Human Resources Management.pptProject Human Resources Management.ppt
Project Human Resources Management.ppt
 
Robot actuation and feedback components.pptx
Robot actuation and feedback components.pptxRobot actuation and feedback components.pptx
Robot actuation and feedback components.pptx
 
L2_Scope Management.ppt
L2_Scope Management.pptL2_Scope Management.ppt
L2_Scope Management.ppt
 

Recently uploaded

The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project ManagementCIToolkit
 
How Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesHow Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesMassimo Canducci
 
Exploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisExploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisCIToolkit
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...CIToolkit
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingCIToolkit
 
Overview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentationOverview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentationPMIUKChapter
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementCIToolkit
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsCIToolkit
 
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...Nagarjuna Reddy Aturi
 
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...dsnow9802
 
The Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsThe Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsCIToolkit
 
The Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsThe Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsCIToolkit
 
HOTEL MANAGEMENT SYSTEM PPT PRESENTATION
HOTEL MANAGEMENT SYSTEM PPT PRESENTATIONHOTEL MANAGEMENT SYSTEM PPT PRESENTATION
HOTEL MANAGEMENT SYSTEM PPT PRESENTATIONsivani14565220
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentCIToolkit
 
Operations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdfOperations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdfcoolsnoopy1
 
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational DesignManagement 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational Designshakkardaddy
 
Management 11th Edition - Chapter 13 - Managing Teams
Management 11th Edition - Chapter 13 - Managing TeamsManagement 11th Edition - Chapter 13 - Managing Teams
Management 11th Edition - Chapter 13 - Managing Teamsshakkardaddy
 
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...Conny Dethloff
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Giuseppe De Simone
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsHannah Smith
 

Recently uploaded (20)

The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project Management
 
How Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesHow Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human Resources
 
Exploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisExploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram Analysis
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-Making
 
Overview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentationOverview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentation
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous Improvement
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
 
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
 
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
 
The Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsThe Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data Insights
 
The Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsThe Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data Sets
 
HOTEL MANAGEMENT SYSTEM PPT PRESENTATION
HOTEL MANAGEMENT SYSTEM PPT PRESENTATIONHOTEL MANAGEMENT SYSTEM PPT PRESENTATION
HOTEL MANAGEMENT SYSTEM PPT PRESENTATION
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
 
Operations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdfOperations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdf
 
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational DesignManagement 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
 
Management 11th Edition - Chapter 13 - Managing Teams
Management 11th Edition - Chapter 13 - Managing TeamsManagement 11th Edition - Chapter 13 - Managing Teams
Management 11th Edition - Chapter 13 - Managing Teams
 
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
 

Contract Management Essentials

  • 2. Contents  Introduction to Contract Management  Definition  Contract Management Issues  Activities Overview  Contract Manager: DECS  Importance of the role  Responsibilities  Skills  Appointing a Contract Manager  Contract Manager Authority  Implementing a Contract  Contract Management Plan  Risk Management  Monitoring Performance  Occupational Health, Safety & Welfare  Variations  Contract Management: Key Tasks  DECS Procurement Policies & Guidelines
  • 3. Introduction to Contract Management  Final stage of the tendering and contract cycle.  Includes all administrative activities associated with administering a contract after it is executed.  Level of contract management may vary from contract to contract  Simple to Complex contracts
  • 4. Contract Management Definition  An administrative process to ensure all parties understand their responsibilities and obligations to a contract, allowing efficient and effective contract performance  Undertaken by DECS worksites
  • 5. Contract Management Issues  Relationships: buyers, suppliers & end users  Lack of preparation or contingency planning  Requirement changes  Variations to the contract  Failure to consult  Description errors  Pricing errors/omissions  Failure or refusal to perform  Suppliers experiencing financial difficulties  Delivery/transport problems
  • 6. Contract Manager: Importance of the role  Obtain value for money  Ensure contractual obligations met  Improve communication  Control risks
  • 7. Contract Manager: Responsibilities (Varies in Complexity of Contract)  Establish Contract Management Plan  Process reviews inc Post-contract reviews  Liaise between and provide advice/information to internal managers, users & suppliers  Monitor performance  Accurate and timely reporting
  • 8. Contract Manager: Responsibilities (cont) (Varies in Complexity of Contract)  Maintain insurance policy(s) & terms and conditions  Ensure certification and specifications are met  Manage contract change procedures  Resolve disputes  Ethical standards  Refer to Code of Ethics for the South Australian Public Sector
  • 9. Contract Manager: Skills Skills required include:  Strategic skills  Project Management  Communication and Liaison  People Management  Negotiation  Conflict resolution  Record-keeping and File Management  Decision-making  Research and Analytical  Professionalism
  • 10. Appointing a Contract Manager  Should occur prior to execution of the contract  Contract management arrangements identified and planned including:  Responsibilities;  Delegations;  Reporting requirements, and;  Relationships  Duties and powers governed by the conditions of contract and general law
  • 11. Contract Manager Authority  Contract Manager needs a level of authority to ensure project runs smoothly  Limited delegation to approve variations that involve extra cost.
  • 12. Implementing the Contract Consider the following:  The Contract Manager appointed  Notification to unsuccessful suppliers  Joint briefings for all relevant parties  Resources available  Copies of final contract  Initial issues requiring immediate attention
  • 13. Contract Management Plan  Details how the contract is to be managed to achieve outcomes.  Depending upon complexity, Contract Management Plans may include:  Monitoring of compliance with contract conditions  Performance Evaluation and Reporting (e.g. KPIs, SLAs)  Communication Strategies  Roles and Responsibilities of stakeholders  Risk Management  Financial Management  Contract Review  Contract completion and transition
  • 14. Contract Management Plan (Cont  To develop an effective Plan, need to understand contract and objectives.  Review & gain an understanding of:  Acquisition plans  Tender documents  Specifications  Selection reports  Purchase recommendations  Records of negotiations  The contract  File notes
  • 15. Risk Management Plan  Planning for & managing risks essential  Complex contracts may require a Risk Management Plan, including:  Identification  Analysis  Evaluation  Treatment Plans  The Risk Management Plan will form part of the Contract Management Plan
  • 16. Risk Management Plan (Cont) Types of Risks:  Changed circumstances  Communication Breakdown  Breach of Confidentiality  Breach of Intellectual Property (IP)  Breaches of Security & Privacy arrangements  Inappropriate Occupational Health, Safety & Welfare (OHS&W) management  Insurance policies may not adequately indemnify DECS – may need to determine insurances required (e.g. workers’ compensation, personal injury, public liabilty, product liability etc)
  • 17. Risk Management Plan (Cont) Types of Risks (Cont):  Breaches of contract:  Performance securities / guarantees not received;  Deliverables not in accordance with the contract;  Fraud;  Variations, and;  Disagreement or disputes.  Refer DECS Guideline - Managing Risk in Procurement for further information
  • 18. Monitoring Performance  Effective Performance Monitoring requires the Contract Manager to:  Establish and monitor formal KPIs and Service Level Agreements (SLAs)  Monitor progress  Conduct random inspections  Ensure all conditions and clauses are acted upon
  • 19. Monitoring Performance (Cont)  Advise Contractor of performance issues  Develop effective feedback mechanisms  Keep written records of all dealings with Contractor and administration of the contract  Maintain comprehensive documentation
  • 20. Occupational Health, Safety and Welfare (OHS&W)  Contract Managers should:  Monitor and audit Contractor's workplace performance  Ensure Contractor applies appropriate level of OHS&W management  See DECS ‘OHS&W and Injury Management Policy’ and the ‘DECS Code of Practice for Contractors’ (www.decs.sa.gov.au/ohs/)
  • 21. Contract Variations  Should State (in written form):  What has been agreed;  Actual changes to the contract;  If applicable:  Current price;  Variation amount, and;  New price  Ensure:  Additional funds are available (if required)  Appropriate approvals obtained
  • 22. Variations (Cont)  May be necessary to contractual arrangements e.g.:  Changes to specified personnel;  Changes to contract milestone dates;  Changes to supplies quantities;  Change in scope of the requirement  Changes to specifications; and  Introduction of new technology.  Stakeholder consultation required
  • 23. Contract Management: Key Tasks  Receipt and Acceptance of Variables  Payment  Dispute Resolution  Complaints Procedure  Discharge of Contract
  • 24. Contract Management: Key Tasks (Cont)  Liquidated Damages  Performance Evaluation and Debriefing  Product Warranties  Contract Completion  Record Maintenance & Reporting
  • 25. Contract Completion Options include:  Contract extension option  Expiration of existing contract  Call for new tenders  No further requirements for goods or services  If contract extension unnecessary; undertake transition from the contract.
  • 26. Record Maintenance  Maintain comprehensive and accurate records in relation to  Responsibilities,  claims,  payments,  negotiations,  agreed changes,  incorrect deliveries,  poor service,  other significant activities.  Electronic records  Audit trail  Comply with State Records of South Australia Requirements (www.archives.sa.gov.au)
  • 27. Reporting  Regular/ad-hoc reporting on various aspects of departmental contracts, including:  Supplier information  Contract value  Usage  Savings  Performance  Improvement opportunities
  • 28. Reporting (Cont) Contract Closure Report  For acquisitions deemed high risk and falling in Quadrant 2 or 4 of the State Procurement Board’s Acquisition Planning Guidelines  Report should be prepared at completion of the contract and forwarded to Procurement Unit