WHERE ?
1. The City of Dreams: DUBAI
2. Location
WHY?
Dubai is famous for its GOLD & OIL RESERVES.
By 2018, its main income Oil Reserves will get over.
To over come this problem, the Crown Prince
“SHAKE MOHAMED BIN RASHEED AHAMAD”
has a 2 billion dollar plan to convert Dubai into a
luxurious tourist destination.
To put Dubai in map, he had constructed one of the
luxurious hotel, top class golf, race coarse and was
planning for world’s tallest building.
The crown prince idea was to increase the tourism
from 5 million to 15 million.
 Dubai's tourism mainly depends upon the coastal area but there was no enough space for
15 million people. So, he decided to construct an island on Persian gulf.
 By the following ways, the formation of Palm Island had got the shape.
WHEN?
 World's best engineers were needed for the
project. Dutch, who have increased Holland's
land by 35%. They were booked.
 To blend in with surroundings crown prince
wanted the island to be built only by using sand
and rocks.
 Which is 94 million cubic meter of sand and 5.5
million cubic meter of rocks.
 Hence, The Palm Jumeirah was started on
AUGUST 2001 and crown prince idea was to
finish it by 2006.
CONSTRUCTION MACHINERIES
HEAVY LAND BASE MACHINES (30)
DREDGERS (04) BARGES (09)
CRANES (10)
DUMPERS (15)
CONSTRUCTION STEPS
Step-1 Estimation of WAVE STRENGTH
Step-2 Construction of BREAKWATER
Step-3 SAND FILLING and COMPACTION
Step-4 Construction of BUILDINGS
Step-1 Estimation of WAVE STRENGTH
To estimate the strength of the waves, Research team worked out that Arabian gulf and declared that
Breakwater has to be constructed having height up to 3 m & 11.5 Km long.
Dredgers would collect sand from the sea and dump it where break water was to be constructed.
For the construction, 5.5 million cubic meter of rock was needed. They were taken from quarries of
UAE. Each piece of rock weighed about 6 tons which is excavated from 16 quarries across UAE.
Step 2 Construction of BREAKWATER
Step 3A SAND FILLING
94 million cubic meter of sand was needed for the construction of this island .
Step 3B COMPACTION
 The sand was just sprayed but was not compacted .
 First they thought of Roller compacting later they considered earthquake effect and allowed Vibro
Compaction method.
Step-4 Construction of BUILDINGS
By march 2004, Phase 1 was finished and by 2006 the whole construction of the buildings must be done.
Before it was estimated for 60,000 people but later it was made double because of demand.
BEFORE
AFTER
CONCLUSION
By this, success of Palm Island the Crown Prince planed for another palm shaped island which is three times
bigger than “PALM JUMEIRAH” and named it as “PALM JEBEL ALI” & constructed the islands which looks like the
world from space and named it was “THE WORLD”.
PALM JEBEL ALI THE WORLD
THANK YOU
For any mistakes and suggestions feel free to text here
Idamakanti.jaswanth@gmail.com

More Related Content

What's hot

Palm island
Palm islandPalm island
Palm island
Palm islandPalm island
Palm island
VICKYNALKANDE
 
Artificial Island
Artificial IslandArtificial Island
Artificial Island
Ajit Kumar
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
dheeraj byrapu
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
Daniela Villa
 
Soil Densification is a Strategic Need for the Palm Island Development Sustai...
Soil Densification is a Strategic Need for the Palm Island Development Sustai...Soil Densification is a Strategic Need for the Palm Island Development Sustai...
Soil Densification is a Strategic Need for the Palm Island Development Sustai...
Istabraq Al Janabi
 
Burj al Arab Constuction
Burj al Arab ConstuctionBurj al Arab Constuction
Burj al arab hotel case study
Burj al arab hotel case study Burj al arab hotel case study
Burj al arab hotel case study
Anas Khan
 
Burj al arab by oubaid majeed
Burj al arab by oubaid majeed Burj al arab by oubaid majeed
Burj al arab by oubaid majeed
junaid bashir
 
Jeddah Tower world's coming tallest building
Jeddah Tower world's coming tallest building Jeddah Tower world's coming tallest building
Jeddah Tower world's coming tallest building
Arun Saini
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
Aglaia Connect
 
CSIA
CSIACSIA
CSIA
Rabi Nain
 
The study on construction of artificial island by Ahmad Hussain
The study on construction of artificial island by Ahmad HussainThe study on construction of artificial island by Ahmad Hussain
The study on construction of artificial island by Ahmad Hussain
Mohammad Ahmad Hussain
 
Artificial islands
Artificial islandsArtificial islands
Artificial islandsMridul Naidu
 
BURJ AL ARAB
BURJ AL ARABBURJ AL ARAB
BURJ AL ARAB
Sushil Kumar Gupta.
 
World island wonder
World island wonderWorld island wonder
World island wonder
Pranav Singh
 

What's hot (20)

Palm island
Palm islandPalm island
Palm island
 
Palm island
Palm islandPalm island
Palm island
 
World island
World islandWorld island
World island
 
Artificial Island
Artificial IslandArtificial Island
Artificial Island
 
Burj al-arab
Burj al-arabBurj al-arab
Burj al-arab
 
artificial island
artificial islandartificial island
artificial island
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
Soil Densification is a Strategic Need for the Palm Island Development Sustai...
Soil Densification is a Strategic Need for the Palm Island Development Sustai...Soil Densification is a Strategic Need for the Palm Island Development Sustai...
Soil Densification is a Strategic Need for the Palm Island Development Sustai...
 
Burj al Arab Constuction
Burj al Arab ConstuctionBurj al Arab Constuction
Burj al Arab Constuction
 
Burj al arab hotel case study
Burj al arab hotel case study Burj al arab hotel case study
Burj al arab hotel case study
 
Burj al arab by oubaid majeed
Burj al arab by oubaid majeed Burj al arab by oubaid majeed
Burj al arab by oubaid majeed
 
Jeddah Tower world's coming tallest building
Jeddah Tower world's coming tallest building Jeddah Tower world's coming tallest building
Jeddah Tower world's coming tallest building
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
CSIA
CSIACSIA
CSIA
 
The study on construction of artificial island by Ahmad Hussain
The study on construction of artificial island by Ahmad HussainThe study on construction of artificial island by Ahmad Hussain
The study on construction of artificial island by Ahmad Hussain
 
Artificial islands
Artificial islandsArtificial islands
Artificial islands
 
BURJ AL ARAB
BURJ AL ARABBURJ AL ARAB
BURJ AL ARAB
 
World island wonder
World island wonderWorld island wonder
World island wonder
 
Dubai Architecture
Dubai ArchitectureDubai Architecture
Dubai Architecture
 

Viewers also liked

Document
DocumentDocument
Document
mounika akula
 
O Emirado do Dubai
O Emirado do DubaiO Emirado do Dubai
O Emirado do Dubai
António Luís Estêvão
 
Cidade e Construção de Dubai
Cidade e Construção de DubaiCidade e Construção de Dubai
Cidade e Construção de Dubai
walterfoz10 walterfoz10@hotmail.com
 
Dubai
DubaiDubai
Dubai
stephiemc
 
Dubai power point presentation
Dubai power point presentationDubai power point presentation
Dubai power point presentationVarun Das
 

Viewers also liked (9)

Document
DocumentDocument
Document
 
Construção civil
Construção civilConstrução civil
Construção civil
 
Dubai Loucura
Dubai LoucuraDubai Loucura
Dubai Loucura
 
Dubai
DubaiDubai
Dubai
 
O Emirado do Dubai
O Emirado do DubaiO Emirado do Dubai
O Emirado do Dubai
 
Cidade e Construção de Dubai
Cidade e Construção de DubaiCidade e Construção de Dubai
Cidade e Construção de Dubai
 
Dubai
DubaiDubai
Dubai
 
Tourism in Dubai
Tourism in DubaiTourism in Dubai
Tourism in Dubai
 
Dubai power point presentation
Dubai power point presentationDubai power point presentation
Dubai power point presentation
 

Similar to Concept & Construction of PALM ISLAND

World islands, Dabai
World islands, DabaiWorld islands, Dabai
World islands, Dabai
Sumit Shokeen
 
Dubai’s Palm Islands.pptx
Dubai’s Palm Islands.pptxDubai’s Palm Islands.pptx
Dubai’s Palm Islands.pptx
VenomSnake5
 
Palm island in dubai
Palm island in dubaiPalm island in dubai
Palm island in dubai
SANAL C.WILSON
 
Tom wright
Tom wrightTom wright
Tom wright
Vipin Kaundal
 
Dubai Presentation
Dubai Presentation Dubai Presentation
Dubai Presentation
Mudassar Maqbool
 
The World
The WorldThe World
The World
OvidijusRazm
 
20-c-792 Aldar Head Quater by Jahanzaib
20-c-792 Aldar Head Quater by Jahanzaib20-c-792 Aldar Head Quater by Jahanzaib
20-c-792 Aldar Head Quater by Jahanzaib
JahanzaibAhmad13
 
Dubai city and space
Dubai city and space Dubai city and space
Dubai city and space
Kishmish Sethi
 
Rebirth of Rumaila
Rebirth of RumailaRebirth of Rumaila
Rebirth of Rumaila
ml285
 
Final report by sarthak kaura
Final report by sarthak kauraFinal report by sarthak kaura
Final report by sarthak kaura
Sarthak Kaura
 
شقق مينا راشد في دبي الإمارات العربية المتحدة
شقق مينا راشد في دبي الإمارات العربية المتحدةشقق مينا راشد في دبي الإمارات العربية المتحدة
شقق مينا راشد في دبي الإمارات العربية المتحدة
MOHAMMAD ALKHAIL
 
شقق مينا راشد في ميناء راشد في دبي الإمارات العربية المتحدة
شقق مينا راشد في ميناء راشد في دبي الإمارات العربية المتحدةشقق مينا راشد في ميناء راشد في دبي الإمارات العربية المتحدة
شقق مينا راشد في ميناء راشد في دبي الإمارات العربية المتحدة
MOHAMMAD ALKHAIL
 
آپارتمان های مینا راشد در منطقه مینا راشد در شهر دبی در امارات متحده عربی
آپارتمان های مینا راشد در منطقه مینا راشد در شهر دبی در امارات متحده عربیآپارتمان های مینا راشد در منطقه مینا راشد در شهر دبی در امارات متحده عربی
آپارتمان های مینا راشد در منطقه مینا راشد در شهر دبی در امارات متحده عربی
MOHAMMAD ALKHAIL
 
آپارتمان های مینا راشد در شهر دبی در امارات متحده عربی
آپارتمان های مینا راشد در شهر دبی در امارات متحده عربیآپارتمان های مینا راشد در شهر دبی در امارات متحده عربی
آپارتمان های مینا راشد در شهر دبی در امارات متحده عربی
MOHAMMAD ALKHAIL
 
Mina Rashid Apartments at Mina Rashid in Dubai UAE.pdf
Mina Rashid Apartments at Mina Rashid in Dubai UAE.pdfMina Rashid Apartments at Mina Rashid in Dubai UAE.pdf
Mina Rashid Apartments at Mina Rashid in Dubai UAE.pdf
MOHAMMAD ALKHAIL
 
Mina Rashid Apartments in Dubai UAE
Mina Rashid Apartments in Dubai UAEMina Rashid Apartments in Dubai UAE
Mina Rashid Apartments in Dubai UAE
MOHAMMAD ALKHAIL
 
ARTIFICIAL ISLANDS.pptx
ARTIFICIAL ISLANDS.pptxARTIFICIAL ISLANDS.pptx
ARTIFICIAL ISLANDS.pptx
itech2017
 
Seminar artificial island.pptx
Seminar  artificial island.pptxSeminar  artificial island.pptx
Seminar artificial island.pptx
VismayaChandran3
 
Evolution of technology
Evolution of technologyEvolution of technology
Evolution of technology
Piter Biswas
 

Similar to Concept & Construction of PALM ISLAND (20)

Palm islands ingles
Palm islands inglesPalm islands ingles
Palm islands ingles
 
World islands, Dabai
World islands, DabaiWorld islands, Dabai
World islands, Dabai
 
Dubai’s Palm Islands.pptx
Dubai’s Palm Islands.pptxDubai’s Palm Islands.pptx
Dubai’s Palm Islands.pptx
 
Palm island in dubai
Palm island in dubaiPalm island in dubai
Palm island in dubai
 
Tom wright
Tom wrightTom wright
Tom wright
 
Dubai Presentation
Dubai Presentation Dubai Presentation
Dubai Presentation
 
The World
The WorldThe World
The World
 
20-c-792 Aldar Head Quater by Jahanzaib
20-c-792 Aldar Head Quater by Jahanzaib20-c-792 Aldar Head Quater by Jahanzaib
20-c-792 Aldar Head Quater by Jahanzaib
 
Dubai city and space
Dubai city and space Dubai city and space
Dubai city and space
 
Rebirth of Rumaila
Rebirth of RumailaRebirth of Rumaila
Rebirth of Rumaila
 
Final report by sarthak kaura
Final report by sarthak kauraFinal report by sarthak kaura
Final report by sarthak kaura
 
شقق مينا راشد في دبي الإمارات العربية المتحدة
شقق مينا راشد في دبي الإمارات العربية المتحدةشقق مينا راشد في دبي الإمارات العربية المتحدة
شقق مينا راشد في دبي الإمارات العربية المتحدة
 
شقق مينا راشد في ميناء راشد في دبي الإمارات العربية المتحدة
شقق مينا راشد في ميناء راشد في دبي الإمارات العربية المتحدةشقق مينا راشد في ميناء راشد في دبي الإمارات العربية المتحدة
شقق مينا راشد في ميناء راشد في دبي الإمارات العربية المتحدة
 
آپارتمان های مینا راشد در منطقه مینا راشد در شهر دبی در امارات متحده عربی
آپارتمان های مینا راشد در منطقه مینا راشد در شهر دبی در امارات متحده عربیآپارتمان های مینا راشد در منطقه مینا راشد در شهر دبی در امارات متحده عربی
آپارتمان های مینا راشد در منطقه مینا راشد در شهر دبی در امارات متحده عربی
 
آپارتمان های مینا راشد در شهر دبی در امارات متحده عربی
آپارتمان های مینا راشد در شهر دبی در امارات متحده عربیآپارتمان های مینا راشد در شهر دبی در امارات متحده عربی
آپارتمان های مینا راشد در شهر دبی در امارات متحده عربی
 
Mina Rashid Apartments at Mina Rashid in Dubai UAE.pdf
Mina Rashid Apartments at Mina Rashid in Dubai UAE.pdfMina Rashid Apartments at Mina Rashid in Dubai UAE.pdf
Mina Rashid Apartments at Mina Rashid in Dubai UAE.pdf
 
Mina Rashid Apartments in Dubai UAE
Mina Rashid Apartments in Dubai UAEMina Rashid Apartments in Dubai UAE
Mina Rashid Apartments in Dubai UAE
 
ARTIFICIAL ISLANDS.pptx
ARTIFICIAL ISLANDS.pptxARTIFICIAL ISLANDS.pptx
ARTIFICIAL ISLANDS.pptx
 
Seminar artificial island.pptx
Seminar  artificial island.pptxSeminar  artificial island.pptx
Seminar artificial island.pptx
 
Evolution of technology
Evolution of technologyEvolution of technology
Evolution of technology
 

More from JASHU JASWANTH

TYPES OF TESTS ON CONCRETE
TYPES OF TESTS ON CONCRETETYPES OF TESTS ON CONCRETE
TYPES OF TESTS ON CONCRETE
JASHU JASWANTH
 
Fiber Reinforced Concrete (FRC)
Fiber Reinforced Concrete (FRC)Fiber Reinforced Concrete (FRC)
Fiber Reinforced Concrete (FRC)
JASHU JASWANTH
 
MAINTENANCE STRATEGIES & CASE STUDIES
MAINTENANCE STRATEGIES & CASE STUDIESMAINTENANCE STRATEGIES & CASE STUDIES
MAINTENANCE STRATEGIES & CASE STUDIES
JASHU JASWANTH
 
Non-Destructive Testing (NDT)
Non-Destructive Testing (NDT)Non-Destructive Testing (NDT)
Non-Destructive Testing (NDT)
JASHU JASWANTH
 
SHANGHAI TOWER - Shanghai, China
SHANGHAI TOWER - Shanghai, ChinaSHANGHAI TOWER - Shanghai, China
SHANGHAI TOWER - Shanghai, China
JASHU JASWANTH
 
COMPUTER VISION SYNDROME( CVS ) with SOFTWARE LINK involved in it.
COMPUTER VISION SYNDROME( CVS ) with SOFTWARE LINK involved in it.COMPUTER VISION SYNDROME( CVS ) with SOFTWARE LINK involved in it.
COMPUTER VISION SYNDROME( CVS ) with SOFTWARE LINK involved in it.
JASHU JASWANTH
 
The Empowerment of Women
The Empowerment of WomenThe Empowerment of Women
The Empowerment of Women
JASHU JASWANTH
 
MOBILE PHONE SECURITY./ MOBILE SECURITY
MOBILE PHONE SECURITY./ MOBILE SECURITYMOBILE PHONE SECURITY./ MOBILE SECURITY
MOBILE PHONE SECURITY./ MOBILE SECURITY
JASHU JASWANTH
 
UNITS & CONVERSIONS
UNITS & CONVERSIONSUNITS & CONVERSIONS
UNITS & CONVERSIONS
JASHU JASWANTH
 
CYBER CRIME
CYBER CRIMECYBER CRIME
CYBER CRIME
JASHU JASWANTH
 
HOW TO TEMPER GLASS ?
HOW TO TEMPER GLASS ?HOW TO TEMPER GLASS ?
HOW TO TEMPER GLASS ?
JASHU JASWANTH
 
DETAILS OF TOUGHENED GLASS OR TEMPER GLASS
DETAILS OF TOUGHENED GLASS OR TEMPER GLASSDETAILS OF TOUGHENED GLASS OR TEMPER GLASS
DETAILS OF TOUGHENED GLASS OR TEMPER GLASS
JASHU JASWANTH
 
MULTIPLE CHOICE QUESTIONS for civil engineering students or may be for engine...
MULTIPLE CHOICE QUESTIONS for civil engineering students or may be for engine...MULTIPLE CHOICE QUESTIONS for civil engineering students or may be for engine...
MULTIPLE CHOICE QUESTIONS for civil engineering students or may be for engine...
JASHU JASWANTH
 
FACE RECOGNITION TECHNOLOGY
FACE RECOGNITION TECHNOLOGYFACE RECOGNITION TECHNOLOGY
FACE RECOGNITION TECHNOLOGY
JASHU JASWANTH
 
WIRELESS MOBILE CHARGING USING MICROWAVES
 WIRELESS MOBILE CHARGING USING MICROWAVES  WIRELESS MOBILE CHARGING USING MICROWAVES
WIRELESS MOBILE CHARGING USING MICROWAVES
JASHU JASWANTH
 

More from JASHU JASWANTH (15)

TYPES OF TESTS ON CONCRETE
TYPES OF TESTS ON CONCRETETYPES OF TESTS ON CONCRETE
TYPES OF TESTS ON CONCRETE
 
Fiber Reinforced Concrete (FRC)
Fiber Reinforced Concrete (FRC)Fiber Reinforced Concrete (FRC)
Fiber Reinforced Concrete (FRC)
 
MAINTENANCE STRATEGIES & CASE STUDIES
MAINTENANCE STRATEGIES & CASE STUDIESMAINTENANCE STRATEGIES & CASE STUDIES
MAINTENANCE STRATEGIES & CASE STUDIES
 
Non-Destructive Testing (NDT)
Non-Destructive Testing (NDT)Non-Destructive Testing (NDT)
Non-Destructive Testing (NDT)
 
SHANGHAI TOWER - Shanghai, China
SHANGHAI TOWER - Shanghai, ChinaSHANGHAI TOWER - Shanghai, China
SHANGHAI TOWER - Shanghai, China
 
COMPUTER VISION SYNDROME( CVS ) with SOFTWARE LINK involved in it.
COMPUTER VISION SYNDROME( CVS ) with SOFTWARE LINK involved in it.COMPUTER VISION SYNDROME( CVS ) with SOFTWARE LINK involved in it.
COMPUTER VISION SYNDROME( CVS ) with SOFTWARE LINK involved in it.
 
The Empowerment of Women
The Empowerment of WomenThe Empowerment of Women
The Empowerment of Women
 
MOBILE PHONE SECURITY./ MOBILE SECURITY
MOBILE PHONE SECURITY./ MOBILE SECURITYMOBILE PHONE SECURITY./ MOBILE SECURITY
MOBILE PHONE SECURITY./ MOBILE SECURITY
 
UNITS & CONVERSIONS
UNITS & CONVERSIONSUNITS & CONVERSIONS
UNITS & CONVERSIONS
 
CYBER CRIME
CYBER CRIMECYBER CRIME
CYBER CRIME
 
HOW TO TEMPER GLASS ?
HOW TO TEMPER GLASS ?HOW TO TEMPER GLASS ?
HOW TO TEMPER GLASS ?
 
DETAILS OF TOUGHENED GLASS OR TEMPER GLASS
DETAILS OF TOUGHENED GLASS OR TEMPER GLASSDETAILS OF TOUGHENED GLASS OR TEMPER GLASS
DETAILS OF TOUGHENED GLASS OR TEMPER GLASS
 
MULTIPLE CHOICE QUESTIONS for civil engineering students or may be for engine...
MULTIPLE CHOICE QUESTIONS for civil engineering students or may be for engine...MULTIPLE CHOICE QUESTIONS for civil engineering students or may be for engine...
MULTIPLE CHOICE QUESTIONS for civil engineering students or may be for engine...
 
FACE RECOGNITION TECHNOLOGY
FACE RECOGNITION TECHNOLOGYFACE RECOGNITION TECHNOLOGY
FACE RECOGNITION TECHNOLOGY
 
WIRELESS MOBILE CHARGING USING MICROWAVES
 WIRELESS MOBILE CHARGING USING MICROWAVES  WIRELESS MOBILE CHARGING USING MICROWAVES
WIRELESS MOBILE CHARGING USING MICROWAVES
 

Recently uploaded

ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 

Recently uploaded (20)

ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 

Concept & Construction of PALM ISLAND

  • 1. Concept & Construction of PALM ISLAND
  • 2. Things behind it, are as follows… Where? Why? When? Construction Machineries Construction Steps Conclusion
  • 3. WHERE ? 1. The City of Dreams: DUBAI
  • 5. WHY? Dubai is famous for its GOLD & OIL RESERVES. By 2018, its main income Oil Reserves will get over. To over come this problem, the Crown Prince “SHAKE MOHAMED BIN RASHEED AHAMAD” has a 2 billion dollar plan to convert Dubai into a luxurious tourist destination. To put Dubai in map, he had constructed one of the luxurious hotel, top class golf, race coarse and was planning for world’s tallest building. The crown prince idea was to increase the tourism from 5 million to 15 million.
  • 6.  Dubai's tourism mainly depends upon the coastal area but there was no enough space for 15 million people. So, he decided to construct an island on Persian gulf.  By the following ways, the formation of Palm Island had got the shape.
  • 7. WHEN?  World's best engineers were needed for the project. Dutch, who have increased Holland's land by 35%. They were booked.  To blend in with surroundings crown prince wanted the island to be built only by using sand and rocks.  Which is 94 million cubic meter of sand and 5.5 million cubic meter of rocks.  Hence, The Palm Jumeirah was started on AUGUST 2001 and crown prince idea was to finish it by 2006.
  • 8. CONSTRUCTION MACHINERIES HEAVY LAND BASE MACHINES (30) DREDGERS (04) BARGES (09) CRANES (10) DUMPERS (15)
  • 9. CONSTRUCTION STEPS Step-1 Estimation of WAVE STRENGTH Step-2 Construction of BREAKWATER Step-3 SAND FILLING and COMPACTION Step-4 Construction of BUILDINGS
  • 10. Step-1 Estimation of WAVE STRENGTH To estimate the strength of the waves, Research team worked out that Arabian gulf and declared that Breakwater has to be constructed having height up to 3 m & 11.5 Km long.
  • 11. Dredgers would collect sand from the sea and dump it where break water was to be constructed. For the construction, 5.5 million cubic meter of rock was needed. They were taken from quarries of UAE. Each piece of rock weighed about 6 tons which is excavated from 16 quarries across UAE. Step 2 Construction of BREAKWATER
  • 12. Step 3A SAND FILLING 94 million cubic meter of sand was needed for the construction of this island .
  • 13. Step 3B COMPACTION  The sand was just sprayed but was not compacted .  First they thought of Roller compacting later they considered earthquake effect and allowed Vibro Compaction method.
  • 14. Step-4 Construction of BUILDINGS By march 2004, Phase 1 was finished and by 2006 the whole construction of the buildings must be done. Before it was estimated for 60,000 people but later it was made double because of demand. BEFORE AFTER
  • 15. CONCLUSION By this, success of Palm Island the Crown Prince planed for another palm shaped island which is three times bigger than “PALM JUMEIRAH” and named it as “PALM JEBEL ALI” & constructed the islands which looks like the world from space and named it was “THE WORLD”. PALM JEBEL ALI THE WORLD