8. Cross sectional View of crescent
• Each rock Weight up to 6 tons !
• 5.5 Million cubic meters of Rock @ 16 Quarries
• 94 Million cubic meters of Sand
• 40,000 tons of rock
• Every 27 Meters
9. Sand filling with the help of Dredgers
• Speed @10km/s
• Less than hour to fill 8 ton of sand
• Rainbowing Process
• Sand rises 4 m above water
10. • 5 men
• Hot temperature high humid levels
• 676 km in space
11. Sub sea Drilled
Directional
Crossings
• Vehicular tunnel and Monorail
Connects the spine tip to Crescent
• 12 HDD on either sides
• Frond D to Eastern side 580m
• Avg 680 m
•Western side 700 m
•Avg 800m
12. Problems
Encountered
•Two third of Crescent had
been Completed Faced a
problem.
• Water Circulation with
Fronds with Open sea.
• Replenishing the water
supply every 14 days.
13. • Sand loose & Uncompacted
• Earthquake Zone
• Liquefaction
• Vibro-Compaction
• 20 K