COMPUTER NETWORK
&
ITS BUSINESS APPLICATIONS
Computer network
• A computer network is a system of
interconnected computers and peripheral
devices.
• For example, it may connect computers,
printers, scanners and cameras.
Communications
• Communications is about the transfer of
information from a sender, across a
distance, to a receiver.
• Communication is an act of transmitting
messages.
Computer network communication
• We transmit information or data by using
two types of signals, namely analog and
digital.
• Computers communicate with digital
signals.
• The older forms of communications
technology, such as telephones and
radios, use analog signals.
TYPES OF NETWORKS
LOCAL AREA
NETWORK
METROPOLITAN
AREA NETWORK
WIDE AREA
NETWORK
LOCAL AREA NETWORK (LAN)
• Smallest network compared to the other two
networks.
• The simplest form of LAN is to connect two
computers together.
• LAN is operated within a limited physical area,
such as at home, school, a single building or
several buildings.
• A network which consists of less than 500
interconnected devices across several buildings,
is still recognised as a LAN.
METROPOLITAN AREA
NETWORK (MAN)
• ‘Metropolitan' - describes important cities like
New Delhi, Mumbai, Kolkata, bangaluru,
Chennai etc.
• Companies that have several branches within
the Mumbai city such as banks, use a MAN.
• Can be a collection of several LANs within the
same city.
• MAN can be defined as a group of computers
and network devices connected together within a
large physical area.
WIDE AREA NETWORK (WAN)
• The largest network of all network types.
• Internet is the largest WAN in the world.
• WAN generally covers large distances such as
states, countries or continents.
• Eg: Local banks have always maintained their
business online by connecting all computers of
their branches in the countries. International
banks also use WAN to connect their computers
all over the world.
• WAN is a group of MANs or LANs or the mixture
of both networks.
Comparison of LAN, MAN, WAN
NETWORK ARCHITECTURE
Network architecture
• Overall design of a computer network
that describes how a computer
network is configured and what
strategies are being used.
• Mainly focuses on the functions of
the networks.
• Also known as network model or
network design.
Network architecture
CLIENT/SERVER NETWORK
• A client/server network is a network
in which the shared files and
applications are stored in the
server but network users (clients)
can still store files on their
individual PCs.
• A server is a computer that shares
information and resources with
other computers on a network.
• A client is a computer which
requests services or files from a
server computer.
Network architecture
Peer-to-peer or P2P
• It is a network with all the nodes
acting as both servers and
clients.
• A PC can access files located
on another PC and can also
provide files to other PCs.
• All computers in the peer-to-
peer network has equal
responsibilities and capabilities
to use the resources available
on the network.
• With peer-to-peer network, no
server is needed; each
computer in the network is
called a peer.
Differences
NETWORK TOPOLOGY
Bus Topology
DESCRIPTION OF BUS TOPOLOGY
• Very common in LAN.
• Must have a common backbone (the
central cable) to connect all devices.
• All nodes share the backbone to
communicate with each other on the
network.
• Sometimes, a bus network has more
than one server. Sometimes, a server
is not needed on the network.
A bus topology consists of a single central cable to which
all computers and other devices connect. A bus topology is
also known as a bus network.
Ring Topology
DESCRIPTION OF RING TOPOLOGY
• Can be found in LAN.
• Each node directly connect to two
neighbouring nodes.
• A server may exist in a ring network,
but it will not connect to all the nodes in
the network.
• The server, like other nodes, will only
communicate to its two neighbouring
nodes
A ring topology consists of all computers and other
devices that are connected in a loop. Ring topology is also
known as a ring network.
Star Topology
DESCRIPTION OF STAR TOPOLOGY
• A star network is found in a Local Area
Network setting.
• A star network must have a host which
acts as the centre.
• The host can be a server, hub or router.
• In a star network, every node will not
connect to the neighbouring nodes.
• Every node must connect to the host in
order to communicate.
• The host will control the flow of
communication in the network.
A star topology consists of a central host which acts as the
centre, and all nodes connect to the host. A star topology is also
known as star network.
Tree Topology
Tree topology is the combination of the bus and the star
topology. The tree like structure allows you to have many
servers on the network and you can branch out the network
on many ways. Also known as hierarchical network.
DESCRIPTION OF TREE TOPOLOGY•
• Nodes of some devices are linked to a
centrally located hub which is called the active
hub.
• The active hub has a hardware device called
the repeater.
• This strengthens the transmission and
increase the travelling distance of a signal.
• The secondary hub can isolate
communications between different computers.
Mess Topology
Mesh Network is a network where all the nodes are connected
to each other and is a complete network. In a Mesh Network
every node is connected to other nodes on the network
through hops. It is called the self healing technology where it
receives data one way or the other.
•Data is automatically configured to reach
the destination by taking the shortest route.
• The reliability factor is high in any kind of
Mesh Network.
• The Mesh Network is based on a very
sensible concept and has lesser chances of
a network breakdown.
DESCRIPTION OF MESS TOPOLOGY
Differences
Bus Topology Ring Topology Star Topology
Structure there is a single
central cable (backbone)
and all computers and
other devices connect to
it
all computers and other
devices are
connected in a circle
there is a central host and
all nodes
connect to it
Host existence depends on network
needs
depends on network needs yes
Connection
between nodes
It has no connection
between the nodes.
yes no
Host failure network can still run network will fail network will fail
Node failure network can still run network will fail network can still run
Ease of
troubleshooting
difficult. Need to
search for the
problematic node one by
one
depends on backbone. If there
is a backbone,
troubleshooting is
difficult. If there is no
backbone, the focus is on the
two nodes not communicating
depends on the host. It
is easier to repair the
problematic host. However,
if the nodes fail, then each
node has to be searched
Ease of adding
or removing nodes
easy difficult average
Number of nodes
when extending
network
many limited limited
APPLICATIONS OF COMPUTER NETWORK
• File sharing.
• Printer sharing.
• Communication and collaboration.
• Remote access.
• Data protection.
• Centralized Support and Administration.
REFERENCES
• Basic Computer Application
by: Vishal khasgiwala & Sumitra Jain
• Foundation of Information Technology
• www.slideshare.com
• www.scribd.com
• www.google.com
Presented by:
Shivangi Gour
Santosh Delwar
Sachin Shendre
Under the guidance of:
MR. Niranjan Shrivastava Sir

Computer networkppt-110208141655-phpapp02

  • 1.
  • 2.
    Computer network • Acomputer network is a system of interconnected computers and peripheral devices. • For example, it may connect computers, printers, scanners and cameras.
  • 3.
    Communications • Communications isabout the transfer of information from a sender, across a distance, to a receiver. • Communication is an act of transmitting messages.
  • 4.
    Computer network communication •We transmit information or data by using two types of signals, namely analog and digital. • Computers communicate with digital signals. • The older forms of communications technology, such as telephones and radios, use analog signals.
  • 5.
    TYPES OF NETWORKS LOCALAREA NETWORK METROPOLITAN AREA NETWORK WIDE AREA NETWORK
  • 6.
    LOCAL AREA NETWORK(LAN) • Smallest network compared to the other two networks. • The simplest form of LAN is to connect two computers together. • LAN is operated within a limited physical area, such as at home, school, a single building or several buildings. • A network which consists of less than 500 interconnected devices across several buildings, is still recognised as a LAN.
  • 7.
    METROPOLITAN AREA NETWORK (MAN) •‘Metropolitan' - describes important cities like New Delhi, Mumbai, Kolkata, bangaluru, Chennai etc. • Companies that have several branches within the Mumbai city such as banks, use a MAN. • Can be a collection of several LANs within the same city. • MAN can be defined as a group of computers and network devices connected together within a large physical area.
  • 8.
    WIDE AREA NETWORK(WAN) • The largest network of all network types. • Internet is the largest WAN in the world. • WAN generally covers large distances such as states, countries or continents. • Eg: Local banks have always maintained their business online by connecting all computers of their branches in the countries. International banks also use WAN to connect their computers all over the world. • WAN is a group of MANs or LANs or the mixture of both networks.
  • 9.
  • 10.
  • 11.
    Network architecture • Overalldesign of a computer network that describes how a computer network is configured and what strategies are being used. • Mainly focuses on the functions of the networks. • Also known as network model or network design.
  • 12.
    Network architecture CLIENT/SERVER NETWORK •A client/server network is a network in which the shared files and applications are stored in the server but network users (clients) can still store files on their individual PCs. • A server is a computer that shares information and resources with other computers on a network. • A client is a computer which requests services or files from a server computer.
  • 13.
    Network architecture Peer-to-peer orP2P • It is a network with all the nodes acting as both servers and clients. • A PC can access files located on another PC and can also provide files to other PCs. • All computers in the peer-to- peer network has equal responsibilities and capabilities to use the resources available on the network. • With peer-to-peer network, no server is needed; each computer in the network is called a peer.
  • 14.
  • 15.
  • 16.
    Bus Topology DESCRIPTION OFBUS TOPOLOGY • Very common in LAN. • Must have a common backbone (the central cable) to connect all devices. • All nodes share the backbone to communicate with each other on the network. • Sometimes, a bus network has more than one server. Sometimes, a server is not needed on the network. A bus topology consists of a single central cable to which all computers and other devices connect. A bus topology is also known as a bus network.
  • 17.
    Ring Topology DESCRIPTION OFRING TOPOLOGY • Can be found in LAN. • Each node directly connect to two neighbouring nodes. • A server may exist in a ring network, but it will not connect to all the nodes in the network. • The server, like other nodes, will only communicate to its two neighbouring nodes A ring topology consists of all computers and other devices that are connected in a loop. Ring topology is also known as a ring network.
  • 18.
    Star Topology DESCRIPTION OFSTAR TOPOLOGY • A star network is found in a Local Area Network setting. • A star network must have a host which acts as the centre. • The host can be a server, hub or router. • In a star network, every node will not connect to the neighbouring nodes. • Every node must connect to the host in order to communicate. • The host will control the flow of communication in the network. A star topology consists of a central host which acts as the centre, and all nodes connect to the host. A star topology is also known as star network.
  • 19.
    Tree Topology Tree topologyis the combination of the bus and the star topology. The tree like structure allows you to have many servers on the network and you can branch out the network on many ways. Also known as hierarchical network. DESCRIPTION OF TREE TOPOLOGY• • Nodes of some devices are linked to a centrally located hub which is called the active hub. • The active hub has a hardware device called the repeater. • This strengthens the transmission and increase the travelling distance of a signal. • The secondary hub can isolate communications between different computers.
  • 20.
    Mess Topology Mesh Networkis a network where all the nodes are connected to each other and is a complete network. In a Mesh Network every node is connected to other nodes on the network through hops. It is called the self healing technology where it receives data one way or the other. •Data is automatically configured to reach the destination by taking the shortest route. • The reliability factor is high in any kind of Mesh Network. • The Mesh Network is based on a very sensible concept and has lesser chances of a network breakdown. DESCRIPTION OF MESS TOPOLOGY
  • 21.
    Differences Bus Topology RingTopology Star Topology Structure there is a single central cable (backbone) and all computers and other devices connect to it all computers and other devices are connected in a circle there is a central host and all nodes connect to it Host existence depends on network needs depends on network needs yes Connection between nodes It has no connection between the nodes. yes no Host failure network can still run network will fail network will fail Node failure network can still run network will fail network can still run Ease of troubleshooting difficult. Need to search for the problematic node one by one depends on backbone. If there is a backbone, troubleshooting is difficult. If there is no backbone, the focus is on the two nodes not communicating depends on the host. It is easier to repair the problematic host. However, if the nodes fail, then each node has to be searched Ease of adding or removing nodes easy difficult average Number of nodes when extending network many limited limited
  • 22.
    APPLICATIONS OF COMPUTERNETWORK • File sharing. • Printer sharing. • Communication and collaboration. • Remote access. • Data protection. • Centralized Support and Administration.
  • 23.
    REFERENCES • Basic ComputerApplication by: Vishal khasgiwala & Sumitra Jain • Foundation of Information Technology • www.slideshare.com • www.scribd.com • www.google.com
  • 24.
    Presented by: Shivangi Gour SantoshDelwar Sachin Shendre Under the guidance of: MR. Niranjan Shrivastava Sir