1© Muninmax 2014 | Company Overview | December 2014
COMPANY PROFILE
PRESENTATION
www.Muninmax.co.th
2© Muninmax 2014 | Company Overview | December 2014
Breakthroughof the Year2015
• Re-Organization.
• Launch new low-cost brand to
meet almost of customers’
demands with low budget.
(The existing standard for Premium
customers is still available)
------------------------»»
3© Muninmax 2014 | Company Overview | December 2014
01 Overview
04 References
02 Why Choose Us
05 Product Line
03 Factory
Table of contents
4© Muninmax 2014 | Company Overview | December 2014
01
overview
Company History
Board of Director
Vision & Mission
5© Muninmax 2014 | Company Overview | December 2014
Company History
The Muninmax Company
1992 1994 1999 2003 At present
“Munin Karnchang”
was first established at
94/2 Soi Ratbumrung
10, T. Khaonoi, A.
Pranburi,
Prachuapkhirikhan with
4-7 employees.
Muninmax Co., Ltd,
that was founded
with 7-20 employees.
Located at 351/2 T.
Khaonoi, A. Pranburi,
Prachuapkirikhan.
Re-contructed our
company at 107/2
M.5, T. Wangpong, A.
Pranburi,
Prachuapkirikhan. The
total of employees is
20-40 employees at
that time.
Food Equipment
Machinery Co., Ltd
(FEMCO) was founded,
producing such
equipment, components
as pumps, valves,
fittings...etc. for Food
and Beverage Industry.
Located at 107/1 M.5, T.
Wangpong, A. Pranburi,
Prachuapkirikhan with
750 square meters of
manufacturing facility.
A substantial capital
investment brought 3,000
square meters of
manufacturing facility,
included 360 square
meters of office on
26,000 square of land.
Located at 107/1 M.5, T.
Wangpong, A. Pranburi,
Prachuapkirikhan with 70
employees (included 20
employees of FEMCO)
FOUNDED OVER 20 YEARS AGO IN 1992, MUNINMAX HAS BEEN A COMPANY
DRIVEN BY VISION. WE PROMISED “QUALITY” AND “RELIABILITY”- THE REASON
FOR SUCCESSFUL AND CONTINUAL COMPANY GROWTH.
section 1
6© Muninmax 2014 | Company Overview | December 2014
A Strong Heritage in Technology
The Muninmax Company
section 1
Managing Director, 1992 - 2010
Mr. Wikrom Munintrakorn holds a BA. Of Industrial Engineering at Khonkaen University and has over 25
working experience in F&B industry before starting his own business. With less than 10 workers at the beginning,
he develop his small business to become a company that can manufacture and design their own equipment.
During 18 years, under his management, Muninmax develop as the well-known company in both of domestic and
international market.
Managing Director, at present
Mr. Saprang Munintrakorn holds a BA. of General Management.
Career Histories:
- Work as Engineer who is responsible for machine maintenance for 10 years at Thai Pineapple Corporation
<TPC>
- Worked as Engineering Supervisor for 4 years at Prachuap Fruit Canning <Praft>
- Worked as Engineering Manager for 2 years at Bamboo Shoot Canning.
Qualifications:
- Excellent at machinery design for F&B industry, especially heat transfer equipment such as Evaporator, Heat
Exchanger, UHT etc.
- Acknowledgement of F&B industrial management.
Mr. Saprang Munintarakorn has taken the role of Managing Director instead of his old brother. He inherit the
experience in technology and management from his brother. He will be the person who finish his brother’s mission.
That is leading Muninmax reach target and become one of leading company of Thailand in F&B industry.
7© Muninmax 2014 | Company Overview | December 2014
Vision and Mission Statement
The Muninmax Company
section 1
Mission
Product Manufacture good quality products with
reasonable cost and on time delivery, with
continuous innovation.
Process Standard process with safety and high
efficiency.
Personnel Develop personnel with high potential ,
offering high income according to their
performance.
Customer Satisfying our customers both domestic and
a broad.
Market: Build our brand that will lead to customer's
confidence. Develop our market
continuously.
Return High business return both in sales volume
and profit, both short and long term.
Supporting process Good information system, design procedure.
Vision
We intend to be one of Top Ten companies of
Thailand in manufacturing food related machinery
with outstanding services and supporting technology
within a period of five years.
8© Muninmax 2014 | Company Overview | December 2014
Business Flow
Technology
The International Standard
Organization
Our Quality Management
Welding Standard
02
choose us
why
9© Muninmax 2014 | Company Overview | December 2014
Our Quality Management
Why Choose Us
section 2
 Our company achieved the ISO
9001:2008, Certificate No. 9435,
9436 by JAS-ANZ of Australia New
Zealand.
 We commit to producing and
continue to innovate our products
to meet the international quality
standards.
10© Muninmax 2014 | Company Overview | December 2014
Organization of Muninmax Co., Ltd
Why Choose Us
section 2
Pobpapob Munintarakorn
Managing Director
Business Development
Sukhonthorn Munintarakorn
Deputy Director
QMR/Manufacturing
Ukrit Jarueksahatkool
QMR
Support Group Business
Development
Design &
Development
Quality Production
General Logistic
Finance /
Acount
Wassana
Munintrakorn
Manager
HR
Sukhonthorn
Munintrakorn
Acting
Manager
Purchasing
Sutee
Hunkao
Supervisor
Store
Thanyayak
Muttopeng
Supervisor
Import /
Export
Puangphakha
Kaewploy
Supervisor
Transportation
Wassana
Munintrakorn
Sales-
Marketing / IT
Pobpapob
Munintrakorn
Acting Manager
Chanon
Munintrakorn
Assistant
Manager
Investment
Naree
Thanyalak
Manager
Control System
Design
Pipat Pumsawat
Manager
Anusorn
Munintrakorn
Assistant Manager
Mechanic
Design
Weera
Kaewploy
Manager
Process Design
/ Development
Chanon
Munitrakorn
QC
Weera
Kaewploy
Manager
QA
Pipat
Pumsawat
Manager
Anusorn
Munintrakorn
Assistant
Manager
Production
(MN)
Wuttichai
Hinkaew
Manager
QC/
Assistant
Apichart
Srimanta
Production
(FC1)
Suppot
Pumsok
Manager
QC/
Assistant
Wanidol
Malee
Production
(FC2)
Songwut
Buakam
Manager
QC/
Assistant
………….
11© Muninmax 2014 | Company Overview | December 2014
Business Flow for Muninmax Co., Ltd
Why Choose Us
section 2
Out source
Customer
specifications
IT CalibrationHuman
resources
Quality management
system
Marketing/
Sales
Approve
Producing
Standard
drawing
Design as
requirements
Generation
planning
Material
Purchasing
MDR Production QC QA PackingStore
Import, Export
Transportation
Installation
Satisfaction of
the
customer
Out source
Planning
and design
After-sales
service
FAT
Commissioning
at site
12© Muninmax 2014 | Company Overview | December 2014
Technology
Why Choose Us
section 2
We developed specific software for design new plants
or modernization of existing one.
 AutoCAD: use for design our equipment and
shop drawing
 Solid Works for design equipment
 PV Elite: use for our calculation and design for
Vessel & Heat exchanger
 CADWorx : use for piping installation
 Microsoft Project Manager for controlling the
delivery time.
All of them can help us have the accurate and precise
results. The design is optimized to give the shortest
Return on Investment (ROI) time and to guarantee
the plant performance.
13© Muninmax 2014 | Company Overview | December 2014
Our Standard
Why Choose Us
section 2
Process Installation Material
SMS (Swedish Dairy Standard or 3A Sanitary
Components)
Control System Design
IEC (International Electrotecnical Commission)
Process/Safety Design
ASME (American Society of Mechanical Engineers)
Electric Design
IEC (International Electrotecnical Commission)
Process Microbiological Design
FDA (Food and Drug Administration) Standard.
14© Muninmax 2014 | Company Overview | December 2014
Our Standard
Why Choose Us
section 2
The process of automatic welding
• Connect 2 tubes by 4-6 welding joints.
• Insert tubes into the welding head.
• Sharpen the welding joints and put into
welding head to finish welding.
Our welding machine can be done with the
repeatability precision & QA/QC verification
possible with mechanized welding.
Acceptance limits are programed for each
critical weld parameter. At the completion of
weld, a printout records details or whether
the weld was performed within the defined
limit for acceptable weld quality. If any
critical parameter falls outside the defined
limit, our engineers can know immediately
after finishing welding.
15© Muninmax 2014 | Company Overview | December 2014
Manual Welding
Why Choose Us
section 2
WPS
Welding Practice
VT Test
Requirement
For WQT
WQT Document
PQR Document
RT Test & Other
if requirement
Summit for Project
Welder Certificate
or
WPQ
RT Film & RT Report
or other Report
(if have)
WPR
Start
Direct Flow
Secondary Flow
Remarks:
WQT: Welder Qualification Test
WPS: Welding Procedure Specification
PQR: Procedure Qualification Record
WPR: Welding Performance Qualification Record
VT: Visual Inspection
WPQ: Welder Performance Qualification
RT: Radiographic Testing
16© Muninmax 2014 | Company Overview | December 2014
Why Choose Us
section 2
Manual Welding
17© Muninmax 2014 | Company Overview | December 2014
Why Choose Us
Manual Welding
section 2
18© Muninmax 2014 | Company Overview | December 2014
03
factory
CNC Machine (*)
Fabrication
Orbital Tube Welding (*)
CNC Plasma (*)
By Manual (*)
(*) Contact us for video of our factory
19© Muninmax 2014 | Company Overview | December 2014
Fabrication
Factory
section 3
20© Muninmax 2014 | Company Overview | December 2014
Fabrication
Factory
section 3
21© Muninmax 2014 | Company Overview | December 2014
04
references Domestic Customers
Overseas Customers
22© Muninmax 2014 | Company Overview | December 2014
Overseas Customers
References
Name Address Logo
Chiameei International Food Thanh Hoa District, Long An Province, Vietnam
Del Monte Bugo, Carayan de Orio City, 9000 Philippines
Summerpride East London 5201, South Africa
Nugan Quality Foods Hanwood, Australia
BanglaDutch Developments Limited Apt. 3A Gulshan-2, Dhaka-1212, Bangladesh
Profood International Corp. Metro Cebu, Philippines
Sugai Budi Group Indonesia
Cape Fruit Processors Pty., Ltd South Africa
Tien Giang Vegetables and Fruits JSC Long Dinh Chau Thanh, Tien Giang, Viet Nam
section 4
23© Muninmax 2014 | Company Overview | December 2014
Domestic Customers
References
Name Address Logo
Ampol Food Processing Co., Ltd Sampran Nakornpathom, Thailand
Central Interfood Co., Ltd Kachanaburi, Thailand
Siam Agro-Food Industry Public Rayong, Thailand
Pranburi Hotei Co., Ltd Pranburi, Prachuapkirikhan 77120, Thailand
Siam Food Product Public Co., Ltd Bangkok, Thailand
Natural Fruits Co., Ltd Pranburi, Prachuapkirikhan 77120, Thailand
Takerng Pineapple Industrial Co., Ltd Samroiyod, Prachuaplirikhan, Thailand
SCG Group Bangkok, Thailand
Food Blessing Co., Ltd Pratumthanee, Thailand
section 4
24© Muninmax 2014 | Company Overview | December 2014
Domestic Customers
References
Name Address Logo
Exotic Food Co., Ltd Thailand
Tipco Foods Public Co. Ltd Samsen Nai, Bangkok 10400 Thailand
Pure Food Co., Ltd Suphanburi , Thailand
Samroiyod Co., Ltd Samroiyod, Thailand
Thai Theparos Co., Ltd Samutprakam, Thailand
Suree Interfoods Co., Ltd Samutsakorn, Thailand
Korn Thai Co., Ltd Ratchaburi, Thailand
Pranburi Pineapple Canning Co., Ltd Pranburi Pineapple Canning Co., Ltd
Thai Agri Foods Public Co., Ltd Samutprakam, Thailand
section 4
25© Muninmax 2014 | Company Overview | December 2014
Domestic Customers
References
Name Address Logo
Prime Product Industry Co., Ltd Chonburi, Thailand
Tako Food Industry Co., Ltd Sampran. Nakornpatom 73110. Thailand
Vita Food Co., Ltd Thailand
Dutch Milk Co., Ltd Bang Phlat, Bang Phlat, Bangkok 10700 Thailand
Saming Foods Co., Ltd Saming Foods Co., Ltd
C & A Products Co., Ltd Ratchaburi, Thailand
Asiatic Agro Industry Co., Ltd Bangkok, Thailand
Behn Meyer Engineering Bangkok, Thailand
Thai Roong Ruang Sugar Group Samutsakhon, Thailand
section 4
26© Muninmax 2014 | Company Overview | December 2014
Filling
Evaporation
Sterilization
Tanks
Extraction & Peeling
Mixing
05
product
line
27© Muninmax 2014 | Company Overview | December 2014
Extraction & Peeling
Product Line
section 5
Pulper
Hammer Mill
Low Pressure
Extractor
Horizontal High
Pressure Extractor
Vertical High
Pressure
Extractor Belt Press
28© Muninmax 2014 | Company Overview | December 2014
section 5
Pineapple Peeling Machine
Pine M Max
Ginaca
Extraction & Peeling
Product Line
29© Muninmax 2014 | Company Overview | December 2014
section 5
Dicing Machine
Extraction & Peeling
Product Line
30© Muninmax 2014 | Company Overview | December 2014
section 5
Extraction & Peeling
Product Line
Aloe Vera Peeling Machine
31© Muninmax 2014 | Company Overview | December 2014
Sterilization
Product Line
section 5
Pre-Heater CIP Unit
Tunnel Cooler Jacket Heating Steam
32© Muninmax 2014 | Company Overview | December 2014
Sterilization
Product Line
section 5
How Water Making Unit Pasteurizer
UHT Hot Water Spraying Retort
33© Muninmax 2014 | Company Overview | December 2014
section 5
Sterilization
Product Line
34© Muninmax 2014 | Company Overview | December 2014
section 5
Sterilization
Product Line
35© Muninmax 2014 | Company Overview | December 2014
section 5
Water Bath Type Cooker/Cooler
Sterilization
Product Line
36© Muninmax 2014 | Company Overview | December 2014
Evaporation
Product Line
37© Muninmax 2014 | Company Overview | December 2014
section 5
Triple Effect Long Tube Falling Film Evaporator For Pineapple
located at Collondale Cannery Co., Ltd. South Africa
Evaporation
Product Line
38© Muninmax 2014 | Company Overview | December 2014
section 5
Quadruple Effect Long Tube Falling Film Evaporator For Pineapple
located at Thaiyodtip Co., Ltd. ,Prachupkirikhan , Thailand
Evaporation
Product Line
39© Muninmax 2014 | Company Overview | December 2014
section 5
Aseptic Bulk Filler – Twin Head
Filling
Product Line
40© Muninmax 2014 | Company Overview | December 2014
section 5
Filling
Product Line
Aseptic Bulk Filler – Single Head located at Central Interfood Co.,
Ltd. Kanchanaburi, Thailand
41© Muninmax 2014 | Company Overview | December 2014
section 5
Bolting Filler
Filling
Product Line
Automatic bottle mono bloc rinsing 18 h & gravity vacuum filling
18 nozzle machine
42© Muninmax 2014 | Company Overview | December 2014
section 5
Bolting FillerFilling
Product Line
Automatic completed super mono block/rinser/rotary piston filler
43© Muninmax 2014 | Company Overview | December 2014
section 5
Tanks
Product Line
Deaerator Tanks
Product:
Pineapple
Capacity: 8 TPH
for single strength
juices and for
concentrate juices.
Location: Nugan
quality food Co.,
Ltd, Hanwood,
Australia
Juice Storage Tank
Product: Pineapple
Capacity : 1,500 L. with fix speed agitator
0.75 kw.
Location : Malee Bangkok Co., Ltd. ,
Samutprakarn, Thailand.
44© Muninmax 2014 | Company Overview | December 2014
section 5
Tanks
Product Line
Juice Storage Tank Dual Feeding Tank
Product: Pineapple.
Capacity: 1.5 TPH.
Location: Bangla Dutch
Development Co., Ltd. Bangladesh
Product: Pineapple
Capacity: 5,000 L.
Location: Summer pride food Co.,
Ltd., East London, South Africa.
45© Muninmax 2014 | Company Overview | December 2014
section 5
Tanks
Product Line
Mixing Tank Syrup Storage Tank
Product: Aloe vera
Capacity: 1,000 L.
Agitator driver: Fix speed geared
motor 0.75 KW. 52 RPM.
Location: Chiameei International food
Co., Ltd. , Long An, Vietnam.
Product: Pineapple
Location: Central Interfood Co., Ltd. ,
Kanchanaburi, Thailand.
46© Muninmax 2014 | Company Overview | December 2014
section 5
Tanks
Product Line
Blending Tank Aseptic Tanks
Product: Pineapple
Location: Chiameei international food
Co., Ltd. , Long An, Vietnam
Product: Coconut milk
Location: Kornthai Product Co., Ltd. ,
Ratchaburi, Thailand.
47© Muninmax 2014 | Company Overview | December 2014
section 5
Ultra Filter
Juice Clarified
Product Line
48© Muninmax 2014 | Company Overview | December 2014
section 5
Ion Exchanger
Juice Clarified
Product Line
49© Muninmax 2014 | Company Overview | December 2014
section 5
Decantor
Juice Clarified
Product Line
50© Muninmax 2014 | Company Overview | December 2014
section 5
Top Chain Conveyor
Conveyor
Product Line
51© Muninmax 2014 | Company Overview | December 2014
section 5
Discharge Conveyor
Location : Tipco foods Co., Ltd. , Prachuapkirikhan, Thailand
Conveyor
Product Line
52© Muninmax 2014 | Company Overview | December 2014
section 5
Inspection Conveyor
at Central Interfood Co., Ltd. , Kanchanaburi, Thailand.
Conveyor
Product Line
53© Muninmax 2014 | Company Overview | December 2014
section 5
Screw Conveyor
Location: Central Interfood Co., Ltd. , Kanchanaburi, Thailand.
Conveyor
Product Line
54© Muninmax 2014 | Company Overview | December 2014
section 5
Washing Conveyor
Location : Central Interfood Co., Ltd. , Kanchanaburi, Thailand.
Conveyor
Product Line
55© Muninmax 2014 | Company Overview | December 2014
section 5
Palletizer Top Chain Conveyor
Conveyor
Product Line
56© Muninmax 2014 | Company Overview | December 2014
section 5
Conveyor
Product Line
57© Muninmax 2014 | Company Overview | December 2014
section 5
Mixing System
Product Line
58© Muninmax 2014 | Company Overview | December 2014
section 5
Mixing System
Product Line
59© Muninmax 2014 | Company Overview | December 2014
section 5
Single Strength Juice And Puree
Turn-key Project
Location : Malee Bangkok Co., Ltd. , Samutprakarn, Thailand.
60© Muninmax 2014 | Company Overview | December 2014
section 5
Pineapple Solid And Juice Concentrate
Turn-key Project
Location : Central Interfood Co., Ltd. , Kanchanaburi, Thailand.
61© Muninmax 2014 | Company Overview | December 2014
section 5
Pineapple Solid And Juice Concentrate
Turn-key Project
Location : Central Interfood Co., Ltd. , Kanchanaburi, Thailand.
62© Muninmax 2014 | Company Overview | December 2014
section 5
Pineapple Juice in Bottle
Turn-key Project
Location : Bangla Dutch Development Co., Ltd. , Dhaka-1212, Bangladesh.
63© Muninmax 2014 | Company Overview | December 2014
section 5
Soft Drink Plant
Turn-key Project
Location : Food Blessing, Thailand
64© Muninmax 2014 | Company Overview | December 2014
section 5
Soft Drink Plant
Turn-key Project
Location : Food Blessing, Thailand
65© Muninmax 2014 | Company Overview | December 2014
section 5
Aseptic Aloe Vera Plant
Turn-key Project
Location : Praft – Kuiburi, Thailand
66© Muninmax 2014 | Company Overview | December 2014
THANKS FOR
YOUR ATTENTION
WE’D LIKE TO HEAR FROM YOU !!!
Drop us your email at info@muninmax.co.th (Thailand) / candy@muninmax.co.th (Overseas) if you have any concerns.
www.Muninmax.co.th

Equipment for Food and Beverage Industry (update 2015) (Extractor, Sterilization, Evaporator, Tanks, Conveyor...)

  • 1.
    1© Muninmax 2014| Company Overview | December 2014 COMPANY PROFILE PRESENTATION www.Muninmax.co.th
  • 2.
    2© Muninmax 2014| Company Overview | December 2014 Breakthroughof the Year2015 • Re-Organization. • Launch new low-cost brand to meet almost of customers’ demands with low budget. (The existing standard for Premium customers is still available) ------------------------»»
  • 3.
    3© Muninmax 2014| Company Overview | December 2014 01 Overview 04 References 02 Why Choose Us 05 Product Line 03 Factory Table of contents
  • 4.
    4© Muninmax 2014| Company Overview | December 2014 01 overview Company History Board of Director Vision & Mission
  • 5.
    5© Muninmax 2014| Company Overview | December 2014 Company History The Muninmax Company 1992 1994 1999 2003 At present “Munin Karnchang” was first established at 94/2 Soi Ratbumrung 10, T. Khaonoi, A. Pranburi, Prachuapkhirikhan with 4-7 employees. Muninmax Co., Ltd, that was founded with 7-20 employees. Located at 351/2 T. Khaonoi, A. Pranburi, Prachuapkirikhan. Re-contructed our company at 107/2 M.5, T. Wangpong, A. Pranburi, Prachuapkirikhan. The total of employees is 20-40 employees at that time. Food Equipment Machinery Co., Ltd (FEMCO) was founded, producing such equipment, components as pumps, valves, fittings...etc. for Food and Beverage Industry. Located at 107/1 M.5, T. Wangpong, A. Pranburi, Prachuapkirikhan with 750 square meters of manufacturing facility. A substantial capital investment brought 3,000 square meters of manufacturing facility, included 360 square meters of office on 26,000 square of land. Located at 107/1 M.5, T. Wangpong, A. Pranburi, Prachuapkirikhan with 70 employees (included 20 employees of FEMCO) FOUNDED OVER 20 YEARS AGO IN 1992, MUNINMAX HAS BEEN A COMPANY DRIVEN BY VISION. WE PROMISED “QUALITY” AND “RELIABILITY”- THE REASON FOR SUCCESSFUL AND CONTINUAL COMPANY GROWTH. section 1
  • 6.
    6© Muninmax 2014| Company Overview | December 2014 A Strong Heritage in Technology The Muninmax Company section 1 Managing Director, 1992 - 2010 Mr. Wikrom Munintrakorn holds a BA. Of Industrial Engineering at Khonkaen University and has over 25 working experience in F&B industry before starting his own business. With less than 10 workers at the beginning, he develop his small business to become a company that can manufacture and design their own equipment. During 18 years, under his management, Muninmax develop as the well-known company in both of domestic and international market. Managing Director, at present Mr. Saprang Munintrakorn holds a BA. of General Management. Career Histories: - Work as Engineer who is responsible for machine maintenance for 10 years at Thai Pineapple Corporation <TPC> - Worked as Engineering Supervisor for 4 years at Prachuap Fruit Canning <Praft> - Worked as Engineering Manager for 2 years at Bamboo Shoot Canning. Qualifications: - Excellent at machinery design for F&B industry, especially heat transfer equipment such as Evaporator, Heat Exchanger, UHT etc. - Acknowledgement of F&B industrial management. Mr. Saprang Munintarakorn has taken the role of Managing Director instead of his old brother. He inherit the experience in technology and management from his brother. He will be the person who finish his brother’s mission. That is leading Muninmax reach target and become one of leading company of Thailand in F&B industry.
  • 7.
    7© Muninmax 2014| Company Overview | December 2014 Vision and Mission Statement The Muninmax Company section 1 Mission Product Manufacture good quality products with reasonable cost and on time delivery, with continuous innovation. Process Standard process with safety and high efficiency. Personnel Develop personnel with high potential , offering high income according to their performance. Customer Satisfying our customers both domestic and a broad. Market: Build our brand that will lead to customer's confidence. Develop our market continuously. Return High business return both in sales volume and profit, both short and long term. Supporting process Good information system, design procedure. Vision We intend to be one of Top Ten companies of Thailand in manufacturing food related machinery with outstanding services and supporting technology within a period of five years.
  • 8.
    8© Muninmax 2014| Company Overview | December 2014 Business Flow Technology The International Standard Organization Our Quality Management Welding Standard 02 choose us why
  • 9.
    9© Muninmax 2014| Company Overview | December 2014 Our Quality Management Why Choose Us section 2  Our company achieved the ISO 9001:2008, Certificate No. 9435, 9436 by JAS-ANZ of Australia New Zealand.  We commit to producing and continue to innovate our products to meet the international quality standards.
  • 10.
    10© Muninmax 2014| Company Overview | December 2014 Organization of Muninmax Co., Ltd Why Choose Us section 2 Pobpapob Munintarakorn Managing Director Business Development Sukhonthorn Munintarakorn Deputy Director QMR/Manufacturing Ukrit Jarueksahatkool QMR Support Group Business Development Design & Development Quality Production General Logistic Finance / Acount Wassana Munintrakorn Manager HR Sukhonthorn Munintrakorn Acting Manager Purchasing Sutee Hunkao Supervisor Store Thanyayak Muttopeng Supervisor Import / Export Puangphakha Kaewploy Supervisor Transportation Wassana Munintrakorn Sales- Marketing / IT Pobpapob Munintrakorn Acting Manager Chanon Munintrakorn Assistant Manager Investment Naree Thanyalak Manager Control System Design Pipat Pumsawat Manager Anusorn Munintrakorn Assistant Manager Mechanic Design Weera Kaewploy Manager Process Design / Development Chanon Munitrakorn QC Weera Kaewploy Manager QA Pipat Pumsawat Manager Anusorn Munintrakorn Assistant Manager Production (MN) Wuttichai Hinkaew Manager QC/ Assistant Apichart Srimanta Production (FC1) Suppot Pumsok Manager QC/ Assistant Wanidol Malee Production (FC2) Songwut Buakam Manager QC/ Assistant ………….
  • 11.
    11© Muninmax 2014| Company Overview | December 2014 Business Flow for Muninmax Co., Ltd Why Choose Us section 2 Out source Customer specifications IT CalibrationHuman resources Quality management system Marketing/ Sales Approve Producing Standard drawing Design as requirements Generation planning Material Purchasing MDR Production QC QA PackingStore Import, Export Transportation Installation Satisfaction of the customer Out source Planning and design After-sales service FAT Commissioning at site
  • 12.
    12© Muninmax 2014| Company Overview | December 2014 Technology Why Choose Us section 2 We developed specific software for design new plants or modernization of existing one.  AutoCAD: use for design our equipment and shop drawing  Solid Works for design equipment  PV Elite: use for our calculation and design for Vessel & Heat exchanger  CADWorx : use for piping installation  Microsoft Project Manager for controlling the delivery time. All of them can help us have the accurate and precise results. The design is optimized to give the shortest Return on Investment (ROI) time and to guarantee the plant performance.
  • 13.
    13© Muninmax 2014| Company Overview | December 2014 Our Standard Why Choose Us section 2 Process Installation Material SMS (Swedish Dairy Standard or 3A Sanitary Components) Control System Design IEC (International Electrotecnical Commission) Process/Safety Design ASME (American Society of Mechanical Engineers) Electric Design IEC (International Electrotecnical Commission) Process Microbiological Design FDA (Food and Drug Administration) Standard.
  • 14.
    14© Muninmax 2014| Company Overview | December 2014 Our Standard Why Choose Us section 2 The process of automatic welding • Connect 2 tubes by 4-6 welding joints. • Insert tubes into the welding head. • Sharpen the welding joints and put into welding head to finish welding. Our welding machine can be done with the repeatability precision & QA/QC verification possible with mechanized welding. Acceptance limits are programed for each critical weld parameter. At the completion of weld, a printout records details or whether the weld was performed within the defined limit for acceptable weld quality. If any critical parameter falls outside the defined limit, our engineers can know immediately after finishing welding.
  • 15.
    15© Muninmax 2014| Company Overview | December 2014 Manual Welding Why Choose Us section 2 WPS Welding Practice VT Test Requirement For WQT WQT Document PQR Document RT Test & Other if requirement Summit for Project Welder Certificate or WPQ RT Film & RT Report or other Report (if have) WPR Start Direct Flow Secondary Flow Remarks: WQT: Welder Qualification Test WPS: Welding Procedure Specification PQR: Procedure Qualification Record WPR: Welding Performance Qualification Record VT: Visual Inspection WPQ: Welder Performance Qualification RT: Radiographic Testing
  • 16.
    16© Muninmax 2014| Company Overview | December 2014 Why Choose Us section 2 Manual Welding
  • 17.
    17© Muninmax 2014| Company Overview | December 2014 Why Choose Us Manual Welding section 2
  • 18.
    18© Muninmax 2014| Company Overview | December 2014 03 factory CNC Machine (*) Fabrication Orbital Tube Welding (*) CNC Plasma (*) By Manual (*) (*) Contact us for video of our factory
  • 19.
    19© Muninmax 2014| Company Overview | December 2014 Fabrication Factory section 3
  • 20.
    20© Muninmax 2014| Company Overview | December 2014 Fabrication Factory section 3
  • 21.
    21© Muninmax 2014| Company Overview | December 2014 04 references Domestic Customers Overseas Customers
  • 22.
    22© Muninmax 2014| Company Overview | December 2014 Overseas Customers References Name Address Logo Chiameei International Food Thanh Hoa District, Long An Province, Vietnam Del Monte Bugo, Carayan de Orio City, 9000 Philippines Summerpride East London 5201, South Africa Nugan Quality Foods Hanwood, Australia BanglaDutch Developments Limited Apt. 3A Gulshan-2, Dhaka-1212, Bangladesh Profood International Corp. Metro Cebu, Philippines Sugai Budi Group Indonesia Cape Fruit Processors Pty., Ltd South Africa Tien Giang Vegetables and Fruits JSC Long Dinh Chau Thanh, Tien Giang, Viet Nam section 4
  • 23.
    23© Muninmax 2014| Company Overview | December 2014 Domestic Customers References Name Address Logo Ampol Food Processing Co., Ltd Sampran Nakornpathom, Thailand Central Interfood Co., Ltd Kachanaburi, Thailand Siam Agro-Food Industry Public Rayong, Thailand Pranburi Hotei Co., Ltd Pranburi, Prachuapkirikhan 77120, Thailand Siam Food Product Public Co., Ltd Bangkok, Thailand Natural Fruits Co., Ltd Pranburi, Prachuapkirikhan 77120, Thailand Takerng Pineapple Industrial Co., Ltd Samroiyod, Prachuaplirikhan, Thailand SCG Group Bangkok, Thailand Food Blessing Co., Ltd Pratumthanee, Thailand section 4
  • 24.
    24© Muninmax 2014| Company Overview | December 2014 Domestic Customers References Name Address Logo Exotic Food Co., Ltd Thailand Tipco Foods Public Co. Ltd Samsen Nai, Bangkok 10400 Thailand Pure Food Co., Ltd Suphanburi , Thailand Samroiyod Co., Ltd Samroiyod, Thailand Thai Theparos Co., Ltd Samutprakam, Thailand Suree Interfoods Co., Ltd Samutsakorn, Thailand Korn Thai Co., Ltd Ratchaburi, Thailand Pranburi Pineapple Canning Co., Ltd Pranburi Pineapple Canning Co., Ltd Thai Agri Foods Public Co., Ltd Samutprakam, Thailand section 4
  • 25.
    25© Muninmax 2014| Company Overview | December 2014 Domestic Customers References Name Address Logo Prime Product Industry Co., Ltd Chonburi, Thailand Tako Food Industry Co., Ltd Sampran. Nakornpatom 73110. Thailand Vita Food Co., Ltd Thailand Dutch Milk Co., Ltd Bang Phlat, Bang Phlat, Bangkok 10700 Thailand Saming Foods Co., Ltd Saming Foods Co., Ltd C & A Products Co., Ltd Ratchaburi, Thailand Asiatic Agro Industry Co., Ltd Bangkok, Thailand Behn Meyer Engineering Bangkok, Thailand Thai Roong Ruang Sugar Group Samutsakhon, Thailand section 4
  • 26.
    26© Muninmax 2014| Company Overview | December 2014 Filling Evaporation Sterilization Tanks Extraction & Peeling Mixing 05 product line
  • 27.
    27© Muninmax 2014| Company Overview | December 2014 Extraction & Peeling Product Line section 5 Pulper Hammer Mill Low Pressure Extractor Horizontal High Pressure Extractor Vertical High Pressure Extractor Belt Press
  • 28.
    28© Muninmax 2014| Company Overview | December 2014 section 5 Pineapple Peeling Machine Pine M Max Ginaca Extraction & Peeling Product Line
  • 29.
    29© Muninmax 2014| Company Overview | December 2014 section 5 Dicing Machine Extraction & Peeling Product Line
  • 30.
    30© Muninmax 2014| Company Overview | December 2014 section 5 Extraction & Peeling Product Line Aloe Vera Peeling Machine
  • 31.
    31© Muninmax 2014| Company Overview | December 2014 Sterilization Product Line section 5 Pre-Heater CIP Unit Tunnel Cooler Jacket Heating Steam
  • 32.
    32© Muninmax 2014| Company Overview | December 2014 Sterilization Product Line section 5 How Water Making Unit Pasteurizer UHT Hot Water Spraying Retort
  • 33.
    33© Muninmax 2014| Company Overview | December 2014 section 5 Sterilization Product Line
  • 34.
    34© Muninmax 2014| Company Overview | December 2014 section 5 Sterilization Product Line
  • 35.
    35© Muninmax 2014| Company Overview | December 2014 section 5 Water Bath Type Cooker/Cooler Sterilization Product Line
  • 36.
    36© Muninmax 2014| Company Overview | December 2014 Evaporation Product Line
  • 37.
    37© Muninmax 2014| Company Overview | December 2014 section 5 Triple Effect Long Tube Falling Film Evaporator For Pineapple located at Collondale Cannery Co., Ltd. South Africa Evaporation Product Line
  • 38.
    38© Muninmax 2014| Company Overview | December 2014 section 5 Quadruple Effect Long Tube Falling Film Evaporator For Pineapple located at Thaiyodtip Co., Ltd. ,Prachupkirikhan , Thailand Evaporation Product Line
  • 39.
    39© Muninmax 2014| Company Overview | December 2014 section 5 Aseptic Bulk Filler – Twin Head Filling Product Line
  • 40.
    40© Muninmax 2014| Company Overview | December 2014 section 5 Filling Product Line Aseptic Bulk Filler – Single Head located at Central Interfood Co., Ltd. Kanchanaburi, Thailand
  • 41.
    41© Muninmax 2014| Company Overview | December 2014 section 5 Bolting Filler Filling Product Line Automatic bottle mono bloc rinsing 18 h & gravity vacuum filling 18 nozzle machine
  • 42.
    42© Muninmax 2014| Company Overview | December 2014 section 5 Bolting FillerFilling Product Line Automatic completed super mono block/rinser/rotary piston filler
  • 43.
    43© Muninmax 2014| Company Overview | December 2014 section 5 Tanks Product Line Deaerator Tanks Product: Pineapple Capacity: 8 TPH for single strength juices and for concentrate juices. Location: Nugan quality food Co., Ltd, Hanwood, Australia Juice Storage Tank Product: Pineapple Capacity : 1,500 L. with fix speed agitator 0.75 kw. Location : Malee Bangkok Co., Ltd. , Samutprakarn, Thailand.
  • 44.
    44© Muninmax 2014| Company Overview | December 2014 section 5 Tanks Product Line Juice Storage Tank Dual Feeding Tank Product: Pineapple. Capacity: 1.5 TPH. Location: Bangla Dutch Development Co., Ltd. Bangladesh Product: Pineapple Capacity: 5,000 L. Location: Summer pride food Co., Ltd., East London, South Africa.
  • 45.
    45© Muninmax 2014| Company Overview | December 2014 section 5 Tanks Product Line Mixing Tank Syrup Storage Tank Product: Aloe vera Capacity: 1,000 L. Agitator driver: Fix speed geared motor 0.75 KW. 52 RPM. Location: Chiameei International food Co., Ltd. , Long An, Vietnam. Product: Pineapple Location: Central Interfood Co., Ltd. , Kanchanaburi, Thailand.
  • 46.
    46© Muninmax 2014| Company Overview | December 2014 section 5 Tanks Product Line Blending Tank Aseptic Tanks Product: Pineapple Location: Chiameei international food Co., Ltd. , Long An, Vietnam Product: Coconut milk Location: Kornthai Product Co., Ltd. , Ratchaburi, Thailand.
  • 47.
    47© Muninmax 2014| Company Overview | December 2014 section 5 Ultra Filter Juice Clarified Product Line
  • 48.
    48© Muninmax 2014| Company Overview | December 2014 section 5 Ion Exchanger Juice Clarified Product Line
  • 49.
    49© Muninmax 2014| Company Overview | December 2014 section 5 Decantor Juice Clarified Product Line
  • 50.
    50© Muninmax 2014| Company Overview | December 2014 section 5 Top Chain Conveyor Conveyor Product Line
  • 51.
    51© Muninmax 2014| Company Overview | December 2014 section 5 Discharge Conveyor Location : Tipco foods Co., Ltd. , Prachuapkirikhan, Thailand Conveyor Product Line
  • 52.
    52© Muninmax 2014| Company Overview | December 2014 section 5 Inspection Conveyor at Central Interfood Co., Ltd. , Kanchanaburi, Thailand. Conveyor Product Line
  • 53.
    53© Muninmax 2014| Company Overview | December 2014 section 5 Screw Conveyor Location: Central Interfood Co., Ltd. , Kanchanaburi, Thailand. Conveyor Product Line
  • 54.
    54© Muninmax 2014| Company Overview | December 2014 section 5 Washing Conveyor Location : Central Interfood Co., Ltd. , Kanchanaburi, Thailand. Conveyor Product Line
  • 55.
    55© Muninmax 2014| Company Overview | December 2014 section 5 Palletizer Top Chain Conveyor Conveyor Product Line
  • 56.
    56© Muninmax 2014| Company Overview | December 2014 section 5 Conveyor Product Line
  • 57.
    57© Muninmax 2014| Company Overview | December 2014 section 5 Mixing System Product Line
  • 58.
    58© Muninmax 2014| Company Overview | December 2014 section 5 Mixing System Product Line
  • 59.
    59© Muninmax 2014| Company Overview | December 2014 section 5 Single Strength Juice And Puree Turn-key Project Location : Malee Bangkok Co., Ltd. , Samutprakarn, Thailand.
  • 60.
    60© Muninmax 2014| Company Overview | December 2014 section 5 Pineapple Solid And Juice Concentrate Turn-key Project Location : Central Interfood Co., Ltd. , Kanchanaburi, Thailand.
  • 61.
    61© Muninmax 2014| Company Overview | December 2014 section 5 Pineapple Solid And Juice Concentrate Turn-key Project Location : Central Interfood Co., Ltd. , Kanchanaburi, Thailand.
  • 62.
    62© Muninmax 2014| Company Overview | December 2014 section 5 Pineapple Juice in Bottle Turn-key Project Location : Bangla Dutch Development Co., Ltd. , Dhaka-1212, Bangladesh.
  • 63.
    63© Muninmax 2014| Company Overview | December 2014 section 5 Soft Drink Plant Turn-key Project Location : Food Blessing, Thailand
  • 64.
    64© Muninmax 2014| Company Overview | December 2014 section 5 Soft Drink Plant Turn-key Project Location : Food Blessing, Thailand
  • 65.
    65© Muninmax 2014| Company Overview | December 2014 section 5 Aseptic Aloe Vera Plant Turn-key Project Location : Praft – Kuiburi, Thailand
  • 66.
    66© Muninmax 2014| Company Overview | December 2014 THANKS FOR YOUR ATTENTION WE’D LIKE TO HEAR FROM YOU !!! Drop us your email at info@muninmax.co.th (Thailand) / candy@muninmax.co.th (Overseas) if you have any concerns. www.Muninmax.co.th