SlideShare a Scribd company logo
PANKAJ TYAGI.
HOUSE No.1710/2, Sector 39-B, Chandigarh 160 036
Phone +91 9814970326(M)
Email: pgtyagi@hotmail.com
JOB OBJECTIVE
Seeking assignment in Manufacturing Engineering Company for Operation, Manufacturing
Control & Projects.
Total years of experience: 25 years
AREA OF EXPERTISE
1. Country Head for Engineering for different location Operating/Manufacturing Unit in country.
2. Lead Engineering Department, with responsibility for all equipment, personnel & company
goal.
3. Subject Matter Expert for TPM & Plant Operation.
4. Working knowlege for products like Casting Foundry, Rubber Plant (Hose & Shoe), Paint,
Med-Care (Pharmacy Unit) & EPS Plants.
TRAINING
1. Trained form Harburg-Freudenberger Maschinenbau GmbH on Banbury. Intermixes, Mills, at
Freudenberger Germany.
2. Trained on Liquid Nitrogen Cooling system for Hose manufacturing lines & its Maintenance
Methods from Italy Colmec Spa.
3. Trained on Extruder Maintenance Technology with screw and barrel & feed roller on cold
feeding machines.
4. Trained on TCU's maintenance Programmer from USA.
5. Leading Maintenance Engineering Jobs Paris France.
6. Under gone Machine Health Training on Braiding, Bobbin winder & spiral machines by
Magnatech USA, with Standard to world class and Zero miles.
EXHIBITIONS VISITED
1. K-2007 & K-2013 International Trade Fair for Plastics and Rubber Düsseldorf, Germany.
2. Dubai Air show and F & E Aerospace Maintenance to zero mile standard on machine.
QUALIFICATION
BE(Mechanical Engineering).
PROJECTS
1. Set up complete Rubber Mixing Room with 270L mixer supported by 100 Inch mill for Hose
Manufacturing unit.
2. Set up Complete Rubber Mixing Plant with 110L & 190L Intermixes.
3. Set up Complete Calender 22 x 60 Line with 04 Cooling Roll Conv. And Dust Tank etc.
4. Installed Numbers of Braider, Bobbin Winder, Extruder, Mandrel Extraction & TCU.
PROFESSIONAL EXPERIENCE
1. Works Manager(Plant Head) - Handling all works related to production to achieve
targets. Planning for increasing productivity & ensure high quality product as per
customers demand. Meeting the production target schedule and set new targets to the
team with ownership to accomplish results under challenging situations of orders. Waste
control through analyzing cause & effect methodology. Custodian to the division like 5s
monitor housekeeping, safety measure and cost saving measures. Lead the entire work
force to achieve the organization goal and keep motivated workforce to improve the
overall efficiency of the plant, Define & monitor KRA & KPIs for Plant Heads. Boosting
plant heads for keeping daily in-house rejection & rework in the process & taking
necessary counter measures to reduce rejection & rework, with improvement in
production process through continuous kaizen concept, Asking all plants utilizing
maximum manpower efficiency & improving in productivity trends, Monitoring the
consumable consumption & control it at desired level.
2. Responsible for the integrity, reliability and availability of equipment and systems in the
plant. Manage multi discipline teams consisting of superintendents, Engineers,
supervisors and technicians to ensure plant reliability and availability for Operations.
3. Set up maintenance program, prepare budget forecast, and oversee maintenance spares
and materials to a optimum level to meet maintenance requirements and maintain
maximum integrity of equipments. Implement maintenance Program such as preventive,
predictive, and corrective maintenance to be perform on scheduled & Monitoring Machine
Condition With Vibration analysis of equipments.
4. Optimize and refine maintenance strategy to achieving world class standards. Thoroughly
investigate every equipment failure in order to improve reliability and availability, and
manage relevant safety standards and protocol applicable to Equipment. Program set-up
to repair and problem solving on equipment.
5. Developing Project Plans/Schedules, arranging for resources & overseeing all activities to
ensure timely execution of projects as per budgeted parameters. Techno-commercial
evaluation & Finalization of capital equipments in India & Over sea. With Equipment
Commissioning, Review and comment with detailed pre-commissioning requirement,
Supervise all start-up and initial operation of equipment until systems/equipment are
turned over from commissioning to operations.
6. Supervise the receiving, inspection and testing of commissioning materials and equipment
and ensure that they are in accordance’s with the contract prior to receipt and
acceptance.
7. Prepare and implemented detailed maintenance work procedures and practices for all
sections activities & Acquainted with planning & scheduling packages (CMMS), MP3 &
EAM. Project for major maintenance and Overhaul projects.
8. Failure Analysis and Root Cause Analysis study with finding solutions and implementing
corrective action to eliminate recurring plant problems.
9. Refurbishing of used machines & Spare parts development of Automatic plant assembly
lines & equipments.
10. Introduced and developed an approach to maintenance incorporating principles of TPM,
RCM, and Kaizen, and then created plans, programs, and strategies for personnel and
equipment improvement, This slow lead to implementation of TPM. I was SME for TPM
for Gates.
11. Improve MTTR & MTBF of the facilities.
12. Team leader of activities in relation to TS 16949/ISO9001:2000, and modern concepts like
Leader for Environment Health, Safety Projects.
13. Very good understand for Maintenance and Modification of hydraulic, pneumatic, LPG
System, Boiler, Compressors, DG Sets, ETP, STP, Chillers, Material Handling
Equipments, Air pollution control system etc with Mill Room, Barbary, Mill, Calendar,
Batch Off, Yarn & Wire Braiders, Vulcanizes and Self Carbon and filler feed units. Having
very deep understood of Injection Moulding Machine, Rubber & Plastic Extruder, with
TCU control.
14. Designing the Plant layout, storage space according to planned capacity, stream lining
flow of material, designing area wise suitable material handling system i.e. Belt
Conveyors, Material Lift, Chute etc.
WORK EXPERIENCE
 Presently working as General Manager Maintenance-India with Bata India Ltd. Form
14.07.2014. Footwear Company, Netherlands based, the organisation has a retail
presence in over 70 countries and production facilities in 26 countries.
 Worked as Sr. Manager – Maintenance From April 2008 to June 2014 with Gates
India Pvt Ltd . Company know for Rubber HOSE & Belts products. Started it Journey in
1911(USA) and reach the world masters in hose & belts products.
 Worked as Sr. Dy. General Manager (Projects & Plant Engineering) From Oct 2005
to March 2008 LAKHANI INDIA Ltd. Haridwar Well know for Shoes, Rubber Parts,
Medicare, Detergent & Soaps products.
 Worked as Works Manager From April 2002–Sept 2005, Windsor Industries Baddi
Windsor Group of company have 4 plants with three product line Viz. EPS Block &
Shape, EPS Disposable Cup & BOPP self adhesive tapes.
 Worked as Engineer (Plant Engineering) From April 2001 – March 2002 with ICI
Paints Mohali Company A Unit of IMPERIAL CHEMICAL INDUSTRIES, PLC OF
LONDON, ENGLAND. Engaged in making Paints for Automobiles Companies.
 Worked as Asst. Engineer(Plant Engineering) From April 1994 to March 2001 with
DCM Engineering Product, Ropar A Unit of D.C.M. Groups Co. Engaged in
manufacturing (Gray Cast Iron FOUNDRY) for Automobile Companies.
 Worked as Sales Engineer From June 1992–March 1994 with L & T (Eutectic),
Bombay For Marketing of welding rods for maintenance use in industry only.
PERSONAL INFORMATION
Father’s Name : G.C.Tyagi
DOB : 5th
Nov 1968
Marital Status : Married, One Child
PANKAJ TYAGI

More Related Content

What's hot (19)

Resume_chemical-2
Resume_chemical-2Resume_chemical-2
Resume_chemical-2
 
International Resume SA
International Resume SA International Resume SA
International Resume SA
 
Kanwaljit.doc
Kanwaljit.docKanwaljit.doc
Kanwaljit.doc
 
resume
resumeresume
resume
 
updated resume
updated resumeupdated resume
updated resume
 
CurriculumVitae (5)
CurriculumVitae (5)CurriculumVitae (5)
CurriculumVitae (5)
 
kumsi
kumsikumsi
kumsi
 
Ravi Kiran Balabhadruni
Ravi Kiran BalabhadruniRavi Kiran Balabhadruni
Ravi Kiran Balabhadruni
 
NM[1].R.WORD
NM[1].R.WORDNM[1].R.WORD
NM[1].R.WORD
 
CV
CVCV
CV
 
kaushalendra CV
kaushalendra CVkaushalendra CV
kaushalendra CV
 
Ganesh_Resume_DMI
Ganesh_Resume_DMIGanesh_Resume_DMI
Ganesh_Resume_DMI
 
debasish 2nd cv
debasish 2nd cvdebasish 2nd cv
debasish 2nd cv
 
J.N.SINGH
J.N.SINGHJ.N.SINGH
J.N.SINGH
 
HMS
HMSHMS
HMS
 
Pragnesh Gadaria resume planning
Pragnesh Gadaria resume planningPragnesh Gadaria resume planning
Pragnesh Gadaria resume planning
 
Sandeep raj mechanical engineer(Resume)
Sandeep raj mechanical engineer(Resume)Sandeep raj mechanical engineer(Resume)
Sandeep raj mechanical engineer(Resume)
 
Anil Kumar
Anil KumarAnil Kumar
Anil Kumar
 
CV_Abhishek Nagam_Mechanical Engineer
CV_Abhishek Nagam_Mechanical EngineerCV_Abhishek Nagam_Mechanical Engineer
CV_Abhishek Nagam_Mechanical Engineer
 

Viewers also liked

Franco Panizza Congresso PATT 11-6-2016
Franco Panizza Congresso PATT 11-6-2016Franco Panizza Congresso PATT 11-6-2016
Franco Panizza Congresso PATT 11-6-2016
PATT Trento
 
C.1 species and communities
C.1 species and communitiesC.1 species and communities
C.1 species and communities
lucascw
 
Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled PresentationElla Mihaela
 
John Penrose Reference letter.
John Penrose Reference letter.John Penrose Reference letter.
John Penrose Reference letter.Walter Scaini
 
Simone Marchiori Congresso PATT 11-6-2016
Simone Marchiori Congresso PATT 11-6-2016Simone Marchiori Congresso PATT 11-6-2016
Simone Marchiori Congresso PATT 11-6-2016
PATT Trento
 
NEW DARK AGES CONSPIRACY
NEW DARK AGES CONSPIRACY  NEW DARK AGES CONSPIRACY
NEW DARK AGES CONSPIRACY
Rauthschild, Chua & Associates, LTD
 
Reference Letter from Prof. Rolf Zeller - German
Reference Letter from Prof. Rolf Zeller - GermanReference Letter from Prof. Rolf Zeller - German
Reference Letter from Prof. Rolf Zeller - GermanAlexandre Goncalves
 
Makato and the cowrie shell
Makato and the cowrie shellMakato and the cowrie shell
Makato and the cowrie shell
Ma.Mona Liza Coronel
 
Presentation Instrument Transformer NIET
Presentation Instrument Transformer  NIET Presentation Instrument Transformer  NIET
Presentation Instrument Transformer NIET
Avdhesh kumar NIET
 
Desarrollo organizacional
Desarrollo organizacionalDesarrollo organizacional
Desarrollo organizacional
Erika Gabriela Villanueva
 

Viewers also liked (12)

Franco Panizza Congresso PATT 11-6-2016
Franco Panizza Congresso PATT 11-6-2016Franco Panizza Congresso PATT 11-6-2016
Franco Panizza Congresso PATT 11-6-2016
 
C.1 species and communities
C.1 species and communitiesC.1 species and communities
C.1 species and communities
 
scan0018
scan0018scan0018
scan0018
 
Honors ~ DNA 1213
Honors ~ DNA 1213Honors ~ DNA 1213
Honors ~ DNA 1213
 
Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentation
 
John Penrose Reference letter.
John Penrose Reference letter.John Penrose Reference letter.
John Penrose Reference letter.
 
Simone Marchiori Congresso PATT 11-6-2016
Simone Marchiori Congresso PATT 11-6-2016Simone Marchiori Congresso PATT 11-6-2016
Simone Marchiori Congresso PATT 11-6-2016
 
NEW DARK AGES CONSPIRACY
NEW DARK AGES CONSPIRACY  NEW DARK AGES CONSPIRACY
NEW DARK AGES CONSPIRACY
 
Reference Letter from Prof. Rolf Zeller - German
Reference Letter from Prof. Rolf Zeller - GermanReference Letter from Prof. Rolf Zeller - German
Reference Letter from Prof. Rolf Zeller - German
 
Makato and the cowrie shell
Makato and the cowrie shellMakato and the cowrie shell
Makato and the cowrie shell
 
Presentation Instrument Transformer NIET
Presentation Instrument Transformer  NIET Presentation Instrument Transformer  NIET
Presentation Instrument Transformer NIET
 
Desarrollo organizacional
Desarrollo organizacionalDesarrollo organizacional
Desarrollo organizacional
 

Similar to Pankaj 25 yrs

Dipayan bhattacharjee
Dipayan bhattacharjeeDipayan bhattacharjee
Dipayan bhattacharjee
Dipayan Bhattacharjee
 
Bui van thieu november-2015
Bui van thieu   november-2015Bui van thieu   november-2015
Bui van thieu november-2015
Thieu Bui Van
 
vivek Kurhade-Operations
vivek Kurhade-Operationsvivek Kurhade-Operations
vivek Kurhade-Operationskurhadev
 
Suresh new resume.docx new (2)
Suresh new resume.docx new    (2)Suresh new resume.docx new    (2)
Suresh new resume.docx new (2)
suresh Gunasekaran
 
Muhammed First Draft CV_Updated
Muhammed First Draft CV_UpdatedMuhammed First Draft CV_Updated
Muhammed First Draft CV_UpdatedAzharu786
 

Similar to Pankaj 25 yrs (20)

CV-Gurmit Singh
CV-Gurmit SinghCV-Gurmit Singh
CV-Gurmit Singh
 
Dipayan bhattacharjee
Dipayan bhattacharjeeDipayan bhattacharjee
Dipayan bhattacharjee
 
Bui van thieu november-2015
Bui van thieu   november-2015Bui van thieu   november-2015
Bui van thieu november-2015
 
PBS Resume
PBS ResumePBS Resume
PBS Resume
 
updated Resume
updated Resumeupdated Resume
updated Resume
 
Girish kumar yadav
Girish kumar yadavGirish kumar yadav
Girish kumar yadav
 
pankaj maniar
pankaj maniarpankaj maniar
pankaj maniar
 
Suresh cen
Suresh cenSuresh cen
Suresh cen
 
ChalapatiRao_Resume -1.doc
ChalapatiRao_Resume  -1.docChalapatiRao_Resume  -1.doc
ChalapatiRao_Resume -1.doc
 
Resume
ResumeResume
Resume
 
CV
CVCV
CV
 
CV 1 (1)
CV 1 (1)CV 1 (1)
CV 1 (1)
 
Yogesh Sharma
Yogesh SharmaYogesh Sharma
Yogesh Sharma
 
vivek Kurhade-Operations
vivek Kurhade-Operationsvivek Kurhade-Operations
vivek Kurhade-Operations
 
resume
resumeresume
resume
 
RahulNavale
RahulNavaleRahulNavale
RahulNavale
 
Resume new Yogesh
Resume new YogeshResume new Yogesh
Resume new Yogesh
 
Resume_ Santosh Shewale
Resume_ Santosh ShewaleResume_ Santosh Shewale
Resume_ Santosh Shewale
 
Suresh new resume.docx new (2)
Suresh new resume.docx new    (2)Suresh new resume.docx new    (2)
Suresh new resume.docx new (2)
 
Muhammed First Draft CV_Updated
Muhammed First Draft CV_UpdatedMuhammed First Draft CV_Updated
Muhammed First Draft CV_Updated
 

Pankaj 25 yrs

  • 1. PANKAJ TYAGI. HOUSE No.1710/2, Sector 39-B, Chandigarh 160 036 Phone +91 9814970326(M) Email: pgtyagi@hotmail.com JOB OBJECTIVE Seeking assignment in Manufacturing Engineering Company for Operation, Manufacturing Control & Projects. Total years of experience: 25 years AREA OF EXPERTISE 1. Country Head for Engineering for different location Operating/Manufacturing Unit in country. 2. Lead Engineering Department, with responsibility for all equipment, personnel & company goal. 3. Subject Matter Expert for TPM & Plant Operation. 4. Working knowlege for products like Casting Foundry, Rubber Plant (Hose & Shoe), Paint, Med-Care (Pharmacy Unit) & EPS Plants. TRAINING 1. Trained form Harburg-Freudenberger Maschinenbau GmbH on Banbury. Intermixes, Mills, at Freudenberger Germany. 2. Trained on Liquid Nitrogen Cooling system for Hose manufacturing lines & its Maintenance Methods from Italy Colmec Spa. 3. Trained on Extruder Maintenance Technology with screw and barrel & feed roller on cold feeding machines. 4. Trained on TCU's maintenance Programmer from USA. 5. Leading Maintenance Engineering Jobs Paris France. 6. Under gone Machine Health Training on Braiding, Bobbin winder & spiral machines by Magnatech USA, with Standard to world class and Zero miles. EXHIBITIONS VISITED 1. K-2007 & K-2013 International Trade Fair for Plastics and Rubber Düsseldorf, Germany. 2. Dubai Air show and F & E Aerospace Maintenance to zero mile standard on machine. QUALIFICATION BE(Mechanical Engineering). PROJECTS 1. Set up complete Rubber Mixing Room with 270L mixer supported by 100 Inch mill for Hose Manufacturing unit. 2. Set up Complete Rubber Mixing Plant with 110L & 190L Intermixes. 3. Set up Complete Calender 22 x 60 Line with 04 Cooling Roll Conv. And Dust Tank etc. 4. Installed Numbers of Braider, Bobbin Winder, Extruder, Mandrel Extraction & TCU. PROFESSIONAL EXPERIENCE 1. Works Manager(Plant Head) - Handling all works related to production to achieve targets. Planning for increasing productivity & ensure high quality product as per customers demand. Meeting the production target schedule and set new targets to the team with ownership to accomplish results under challenging situations of orders. Waste control through analyzing cause & effect methodology. Custodian to the division like 5s monitor housekeeping, safety measure and cost saving measures. Lead the entire work force to achieve the organization goal and keep motivated workforce to improve the overall efficiency of the plant, Define & monitor KRA & KPIs for Plant Heads. Boosting plant heads for keeping daily in-house rejection & rework in the process & taking necessary counter measures to reduce rejection & rework, with improvement in
  • 2. production process through continuous kaizen concept, Asking all plants utilizing maximum manpower efficiency & improving in productivity trends, Monitoring the consumable consumption & control it at desired level. 2. Responsible for the integrity, reliability and availability of equipment and systems in the plant. Manage multi discipline teams consisting of superintendents, Engineers, supervisors and technicians to ensure plant reliability and availability for Operations. 3. Set up maintenance program, prepare budget forecast, and oversee maintenance spares and materials to a optimum level to meet maintenance requirements and maintain maximum integrity of equipments. Implement maintenance Program such as preventive, predictive, and corrective maintenance to be perform on scheduled & Monitoring Machine Condition With Vibration analysis of equipments. 4. Optimize and refine maintenance strategy to achieving world class standards. Thoroughly investigate every equipment failure in order to improve reliability and availability, and manage relevant safety standards and protocol applicable to Equipment. Program set-up to repair and problem solving on equipment. 5. Developing Project Plans/Schedules, arranging for resources & overseeing all activities to ensure timely execution of projects as per budgeted parameters. Techno-commercial evaluation & Finalization of capital equipments in India & Over sea. With Equipment Commissioning, Review and comment with detailed pre-commissioning requirement, Supervise all start-up and initial operation of equipment until systems/equipment are turned over from commissioning to operations. 6. Supervise the receiving, inspection and testing of commissioning materials and equipment and ensure that they are in accordance’s with the contract prior to receipt and acceptance. 7. Prepare and implemented detailed maintenance work procedures and practices for all sections activities & Acquainted with planning & scheduling packages (CMMS), MP3 & EAM. Project for major maintenance and Overhaul projects. 8. Failure Analysis and Root Cause Analysis study with finding solutions and implementing corrective action to eliminate recurring plant problems. 9. Refurbishing of used machines & Spare parts development of Automatic plant assembly lines & equipments. 10. Introduced and developed an approach to maintenance incorporating principles of TPM, RCM, and Kaizen, and then created plans, programs, and strategies for personnel and equipment improvement, This slow lead to implementation of TPM. I was SME for TPM for Gates. 11. Improve MTTR & MTBF of the facilities. 12. Team leader of activities in relation to TS 16949/ISO9001:2000, and modern concepts like Leader for Environment Health, Safety Projects. 13. Very good understand for Maintenance and Modification of hydraulic, pneumatic, LPG System, Boiler, Compressors, DG Sets, ETP, STP, Chillers, Material Handling Equipments, Air pollution control system etc with Mill Room, Barbary, Mill, Calendar, Batch Off, Yarn & Wire Braiders, Vulcanizes and Self Carbon and filler feed units. Having very deep understood of Injection Moulding Machine, Rubber & Plastic Extruder, with TCU control. 14. Designing the Plant layout, storage space according to planned capacity, stream lining flow of material, designing area wise suitable material handling system i.e. Belt Conveyors, Material Lift, Chute etc.
  • 3. WORK EXPERIENCE  Presently working as General Manager Maintenance-India with Bata India Ltd. Form 14.07.2014. Footwear Company, Netherlands based, the organisation has a retail presence in over 70 countries and production facilities in 26 countries.  Worked as Sr. Manager – Maintenance From April 2008 to June 2014 with Gates India Pvt Ltd . Company know for Rubber HOSE & Belts products. Started it Journey in 1911(USA) and reach the world masters in hose & belts products.  Worked as Sr. Dy. General Manager (Projects & Plant Engineering) From Oct 2005 to March 2008 LAKHANI INDIA Ltd. Haridwar Well know for Shoes, Rubber Parts, Medicare, Detergent & Soaps products.  Worked as Works Manager From April 2002–Sept 2005, Windsor Industries Baddi Windsor Group of company have 4 plants with three product line Viz. EPS Block & Shape, EPS Disposable Cup & BOPP self adhesive tapes.  Worked as Engineer (Plant Engineering) From April 2001 – March 2002 with ICI Paints Mohali Company A Unit of IMPERIAL CHEMICAL INDUSTRIES, PLC OF LONDON, ENGLAND. Engaged in making Paints for Automobiles Companies.  Worked as Asst. Engineer(Plant Engineering) From April 1994 to March 2001 with DCM Engineering Product, Ropar A Unit of D.C.M. Groups Co. Engaged in manufacturing (Gray Cast Iron FOUNDRY) for Automobile Companies.  Worked as Sales Engineer From June 1992–March 1994 with L & T (Eutectic), Bombay For Marketing of welding rods for maintenance use in industry only. PERSONAL INFORMATION Father’s Name : G.C.Tyagi DOB : 5th Nov 1968 Marital Status : Married, One Child PANKAJ TYAGI