Guided By Dr. U. J. Kahalekar Sir

                                     Represented by Rahul Agrawal


                              Govt. College of Engg., A' bad

April 18, 2013              Construction Management                 1
                                    Agrawal
Planning

  1.      Planning is the most important technique of the management.
  2.      Planning means “Looking ahead”.
  3.      This is mental process requiring the use of intellectual
          facilities, imagination, foresight and sound judgment, to be
          dine, who will do it an how the results are to be evaluated.
  4.      Planning is necessary to ensure proper utilization of human
          and material resources to achieve the objectives of the
          project.




April 18, 2013              Construction Management                      2
                                    Agrawal
Site Selection Criteria considerations

  1.      Availability of land, soil characteristics and cover of
          land
  2.      Approach to site
  3.      Transportation and availability of material
  4.      Availability of man-power
  5.      Availability of other facilities such water supply,
          electricity, drainage, etc
  6.      Acceptance of the project by the local bodies




April 18, 2013              Construction Management                 3
                                    Agrawal
Financial Analysis

  1.      Engg. and Project management cost
  2.      Lump sum payment for technology cost
  3.      Engg. Fee
  4.      Management and supervision during construction
  5.      Enabling works
  6.      Construction equipment used
  7.      Miscellaneous fixed assets
  8.      Provision of contingencies
  9.      Operating cost
  10.     Working cost


April 18, 2013             Construction Management         4
                                   Agrawal
Steps involved in planning

  1.      Crystallizing the opportunity or problem
  2.      Securing and analyzing necessary information
  3.      Establishing planning premises and constraints
  4.      Ascertaining alternative course of action or plan
  5.      Selecting optimum plan
  6.      Determining derivative plan
  7.      Fixing the timing of introduction
  8.      Arranging future evaluation of effectiveness of the plan




April 18, 2013               Construction Management                 5
                                     Agrawal
Objectives of Planning

  1.      Proper design of each element of the project
  2.      Proper selection of equipment and machinery in big project
  3.      Proper arrangement of repair of equipment and machinery near the site of
          work to keep them ready to work
  4.      Procurement of material well in advance
  5.      Employment of trained and experienced staff on the project
  6.      To provide welfare schemes for the staff and workers such as medical and
          recreational facilities
  7.      To provide incentive for good workers
  8.      To arrange constant flow of funds for the completion of the project
  9.      To provide proper safety measures such as proper ventilation, proper
          arrangement of light and water
  10.     Proper arrangements of means of communications and feedback etc..




April 18, 2013                  Construction Management                              6
                                        Agrawal
Advantage of Planning

  1.      Advantage to contractors
  2.      Advantage to clients
  3.      Advantage to architects/ engineer




April 18, 2013              Construction Management   7
                                    Agrawal
Advantage to contractors

  1.      Job is studied in details by help of bar chart
  2.      Loss of money and help to relieve the financial burden to
          contractor
  3.      Labours requirement are used properly
  4.      Actual work can be measured
  5.      Job is completed in time




April 18, 2013               Construction Management                  8
                                     Agrawal
Limitation in Planning


  1.      The effectiveness of the plan depends upon the correctness of
          assumptions
  2.      Planning is expansive
  3.      Planning delays action
  4.      Planning encourages a false sense of security




April 18, 2013              Construction Management                       9
                                    Agrawal
Stages in Planning

  1.      Preplanning : objectives are clearly spelt out, general
          framework of the project is formulated, cost benefit analysis
          and investment alternatives.
  2.      Detailed Planning : preparation of detailed design, detailed
          working drawings, specifications and detailed bill of
          quantities.
  3.      Monitoring and Control : updating of the schedule, taking
          into account the actual progress of project and preparing
          revised forecasting regarding availability of various
          resources.



April 18, 2013               Construction Management                      10
                                     Agrawal
Types of Plans

  1.      Standing Plan : used repeatedly & including
          managements policies, procedures, rules
  2.      Single use Plan : used for single purpose and objective
          is accomplish within short period of time. (Ex. Budgets)
  3.      Strategic Plan : Vitally effect development of an
          organization. Factor include economic, technological
          and environmental factors.
  4.      Administrative Plan : this is less subjective than
          strategic plan. It focus on how to accomplish objective
          of project or project or organization.


April 18, 2013             Construction Management                   11
                                   Agrawal
Contract

  Contract is an agreement, which will be valid in law or enforceable
       by law, between or among two or more parities, for provision
       of supplies and/or services against consideration of monitory
       value, either in cash or in kind.
  Types of Contract
  1. Lump Sum contract
  2. Cost plus fixed contract
  3. Cost plus bid free contract
  4. Guaranteed Maximum contract
  5. Negotiated contract
  6. Unit price contract

April 18, 2013            Construction Management                       12
                                  Agrawal
Specification

  This is description of items of work to be provided in a project
        along with details regarding materials to be used and
        workmanship to be done.
  Types of Specification
  •     General specification
  •     Detailed specification
  •     Special specification
  •     Restricted specification
  •     Manufacturer’s specification




April 18, 2013             Construction Management                   13
                                   Agrawal
Tender Information

  1.      Name of the dept. calling for tenders
  2.      Name of work and location
  3.      Designation of officer inviting tenders
  4.      Last date and time of receipt of tenders
  5.      Period of availability of tender forms
  6.      Cost of tender documents
  7.      Time of completion and type of contract
  8.      Earnest money deposits to be paid
  9.      Date, time and place of opening tenders
  10.     Designation of the officer opening tenders




April 18, 2013                   Construction Management   14
                                         Agrawal
Tender Types                     Tender Document

  1.      Open tender                       1.       General consideration of
  2.      Limited tender                             tender
  3.      Single tender                     2.       Schedule of items of
  4.      Rate contract                              work with clear
                                                     specification
                                            3.       Special conditions




April 18, 2013             Construction Management                              15
                                   Agrawal
Scheduling

           Construction scheduling is a graphical representation
               which shows the phasing rate of construction
              activities with the starting completion dates and
           sequential relationship among the various activities or
            operations in project so that work can be carried out
                     in an orderly and effective manner.




April 18, 2013              Construction Management                  16
                                    Agrawal
Preparation of scheduling
  1.      The project is divided into number of operation and the
          sequences of these operation can be derived after knowing
          their relationship properly.
  2.      The quantity of work involved in each operation has to be
          calculated.
  3.      The time required for completion of the project as well as
          different activities are to be calculated. This can be done
          from the quantity of work involved and rate of performing
          each work.




April 18, 2013               Construction Management                    17
                                     Agrawal
Uses of scheduling Advantages of scheduling

  1.      Gives quantity of work           1.     Many alternative method can
          involved, labour,                       be choose
          materials and equipment          2.     Clear idea regarding workers,
          at each stage.                          materials, equipments
  2.      Actual progress of work          3.     Staring time of work is
          can be check                            known
  3.      Carried out in systematic        4.     Resources utilization is
          manner                                  minimum
                                           5.     Actual work is monitored
                                           6.     Inter-relationship of various
                                                  activities are known



April 18, 2013                 Construction Management                            18
                                       Agrawal
Bar charts
    Henry Gantt around 1900 A.D.
    Bar chart consists of two coordinate axes representing the jobs or
       activities to be performed and other representing time elapsed.
    Following step are involved
    1. Divide project into many activities
    2. List out the activities
    3. Find the inter-relationship among these activities
    4. Arrange activities in systematic way
    5. Calculate quantity of work and time required
    6. Draw it according to scale


April 18, 2013                   Construction Management                 19
                                         Agrawal
Limitation of Bar Chart

  1.      They can be used only for small projects
  2.      It does not show the interdependencies between the
          various activities in project
  3.      The progress of the work in project cannot be monitored
          scientifically
  4.      Delays in the work cannot be detected
  5.      It does not indicate critical activities of project
  6.      It gives some idea about the physical progress of
          project.
  7.      It can’t be used as controlling devices by the project
          manager to take any timely action.

April 18, 2013             Construction Management                  20
                                   Agrawal
Network Diagram

             Network is graphical and logical model or plan which lists
                    out the sequences of various operations (with
             interdependencies) which are required to be performed for
                   the final achievement of the project objectives.




April 18, 2013               Construction Management                      21
                                     Agrawal
Terms in Network Diagram

  1.      Activity : any position of project which consume time ot
          resources and has a definite beginning and an end called as
          an activity. It is denoted by an arrow
  2.      Event : the beginning or completion of an activity is termed
          as an event. It indicates a particular instant of time at which
          some specific milestone has been achieved.
  3.      Network logic : this denotes the technical dependencies
          among activities. A good network logic reflects cost
          effectiveness of project in long run.
  4.      Dummy : it similar to an activity but it does not consume
          any resources. It represent by Dashed Arrow


April 18, 2013                Construction Management                       22
                                      Agrawal
Terms in Network Diagram

     Activity
                                                            Dummy
                                      Node

                 Representation of Activity, Node, Dummy



                        A                 B
           1                     2                    3



                 Representation of Network Logic



April 18, 2013                    Construction Management           23
                                          Agrawal
Types of Events

  1.       Tail Event : which marks the beginning of an activity.
  2.       Head Event : which marks the completion of an activity.
  3.       Dual Role Event : which acts as tail event for one activity
           and head event for other activity.
  4.       Burst & Merge Event
                 A                                    2
                         2                                        A
                     B
         1                   3                            3               1
                                                              B
   Burst                                                                      Merge
                         4                             4                      Event
   Event         C
                                                                      C



April 18, 2013                     Construction Management                            24
                                           Agrawal
Types of NETWORKS

  1.      Activity on Arrow (A-O-A) or Arrow Diagram : the arrow
          represent activities and node represent the events.
  2.      Activity on Node (A-O-N) or Precedence Diagram : the
          node represent activities and arrow represent the events.
  3.      Event oriented networks (PERT type)




April 18, 2013             Construction Management                    25
                                   Agrawal
Rules for drawing a Networks
  1.      Network will have only one initial node. Initial node will be only out going
          arrows
  2.      Network can have only one final node. Final node will have only one incoming
          arrow
  3.      No activity can start until its tail event has occurred
  4.      An event can’t occur until all the activities leading upto it are completed
  5.      No event can occur twice. Hence network looping isn’t permitted
  6.      An arrow should represent singular situation. Individuality and separate entity
          of each activity should be maintained.
  7.      The network should be drafted such that all activities are completed to reach
          end objectives
  8.      All constraints and interdependencies should be shown properly on the network
          using dummies
  9.      Network logic should always be maintained
  10.     Time flow is usually shown from left to right.


April 18, 2013                    Construction Management                                   26
                                          Agrawal
Fulkerson’s Rule for Numbering the Events

  1.      There will be single initial event in network which has only
          arrows coming out of it. This event is given number 1.
  2.      All arrows coming out of event 1 are neglected. This
          provides us with one or more initial events. These event are
          numbered 2,3,4,5 etc.
  3.      Again neglect all the arrows coming out of these numbered
          events. A few more initial events will be created. These are
          also numbered similarly.
  4.      This operation is continued until last event is reached and
          numbered.



April 18, 2013               Construction Management                     27
                                     Agrawal
CPM Critical Path Method

  1.      CPM was discovered jointly by DuPont and Reunington
          Rand Univac in 1957




April 18, 2013           Construction Management                28
                                 Agrawal
Difference between CPM & PERT

•   CPM is activity oriented               •   PERT is event oriented
•   Time estimates are of fair degree      •   Time estimates are not that
    of accuracy                                accurate
•   Deterministic approach                 •   Probabilistic approach
•   Cost is governing factor               •   Time is governing factor
•   Project duration is fixed and cost     •   Cost is directly proportional to
    is minimum                                 time
•   Critical path which joins critical     •   Her critical path is path which
    activities                                 joins the critical events




April 18, 2013                Construction Management                             29
                                      Agrawal
CPM
  •       Earliest Event Time : earliest occurrence time is the earliest time
          at which an event can occur.
          TEj = TEi + tij
          where TEj = earliest event time of head event
                 TEi = earliest event time of tail event
                  tij = duration of the activity (i-j)

  •       Latest Event Time : latest allowable occurrence time is the latest
          time by which an event must occur to keep project on schedule.
          TL = TLi - tij
          where TL = latest event time of head event
                 TLi = earliest event time of tail event
                  tij = duration of the activity (i-j)




April 18, 2013                 Construction Management                          30
                                       Agrawal
CPM Activity Time
  •         Earliest start time : is earliest time by which an activity can start.
        –        EST =TE(i)

  •         Earliest finish time : is earliest time by which an activity can completed.
        –        EFT = EST = tij

  •         Latest start time : time at which an activity can start without delaying
            completion of project as whole.
        –        LST = LFT - tij

  •         Latest finish time : time at which an activity can finish without delaying
            completion of project as whole.
        –        LFT = TL(i)




April 18, 2013                      Construction Management                               31
                                            Agrawal
Float
   •         Float denote the flexibility range within which activity start and
             finish times many fluctuate without affecting total project
             duration
   •         Total Float : it is time span by which starting or finishing of an activity
             can delayed without affecting overall completion time of project.
         –       FT = LFT – EFT
   •         Free Float : it is that duration by which an activity can be delayed
             without delaying any other succeeding activity.
         –       FF = FT - Sj
   •         Independent Float : it is excess time available if the preceding activity
             ends as late as possible and the succeeding activity starts as early as
             possible.
         –       FID = FF - Si
   •         Interfering Float : it is that difference between total float and free
             float.
         –       FIT = FT – FF = Si


April 18, 2013                        Construction Management                              32
                                              Agrawal
Classification of Activities
  1.      Sub critical activities : when float is +ve; the activity
          needs normal attention but has no flexibility.
  2.      Critical activities : when float is zero; the activity needs
          extra attention. This has no freedom of action.
  3.      Super critical activities : when float is –ve; such
          activities require very special attention and care.




April 18, 2013                Construction Management                    33
                                      Agrawal
PERT
  •       Program Evaluation and Review Technique is management tool
          used for planning, controlling and reviewing a project.
  •       It follows probabilistic approach towards time durations.
  •       It is also event oriented network method where more importance is
          given to the achievement of discernible milestone rather than the
          activity can’t be made.
  •       Slack can be positive, zero or negative
  •       Positive Slack = it is obtained when TL is more than TE. It
          indicates on schedule condition
  •       Zero Slack = it TL is equal to TE. It indicate on schedule condition
  •       Negative Slack = it TL is less than TE. It indicates behind the
          schedule




April 18, 2013                 Construction Management                           34
                                       Agrawal
Classification of Construction Equipment

      1.         Earth moving equipment
      2.         Hauling Equipment
      3.         Hoisting Equipment
      4.         Conveying Equipment
      5.         Aggregate and concrete production Equipment
      6.         Pile Driving Equipment
      7.         Tunneling and Rock Drilling Equipment
      8.         Pumping and Dewatering Equipment




April 18, 2013                  Construction Management        35
                                        Agrawal
Excavation Equipment : Power Sovels
  1.      Long lasting and useful class of earth moving equipment.
  2.      One of basic equipment employed to excavate the earth and to load the
          trucks.
  3.      It is capable of excavating all types of earth, except hard rock.
  4.      It may be crawler mounted or wheel mounted.
  5.      Crawler mounted have low speeds but very effective in unstable soils
  6.      Wheel mounted have higher speeds and are effective only in firm soils
  7.      The size of Power Sovels varies from 0.375 to 5 cubic meter
  8.      Basic parts include track system, cabin, cables, rack, stick, foot pin, saddle
          block, boom point sheaves and bucket.




April 18, 2013                    Construction Management                                  36
                                          Agrawal
Excavation Equipment : Back Hoe

   1.      It is also termed as Hoe, Back Sovels and Pull Shovel
   2.      Generally used to excavate below natural surface on which it rests.
   3.      Used to excavate trenches, pits for basements and generally grading work,
           which requires precise control of depths.
   4.      Basic parts include Boom, Jack Boom, Boom foot drum, Boom Sheave,
           Stick Sheave, Bucket and Bucket Sheave.




April 18, 2013                   Construction Management                               37
                                         Agrawal
Excavation Equipment : Drag Line

   1.      Prominent operation of dragging the bucket against the material to be dug
   2.      Long light crane boom and bucket is loosely attached to the boom through
           cables.
   3.      Useful in digging below its track level and handling softer materials
   4.      The capacity of dragline is indicated by size of the bucket in cubic meters
   5.      It can be crawler mounted, wheel mounted or trucked mounted.
   6.      Basic part dragline include the boom, hoist cable, drag cable, hoist chain,
           drag chain and bucket.




April 18, 2013                   Construction Management                                 38
                                         Agrawal
Excavation Equipment : Clamshell

   1.      Also named as resemblance of its bucket to a clam which is like a shell
           fish with hinged double shell.
   2.      The front end is essentially a crane boom with specially designed bucket
           loosely attached at the end through cables as in drag line.
   3.      Basic part are closing line, hoist line, sheaves, brackets, tagline, shell and
           hinge.




April 18, 2013                    Construction Management                                   39
                                          Agrawal
Excavation Equipment : Trenching Machine

   1.      These are used for excavating trenches for laying pipelines, sewers, cables
           etc.
   2.      Their operation is quick giving the required depth or width.
   3.      Wheel type : this can be used for providing depth of 3m and width ranging
           from 0.3 to 0.6m. The machine consist of power driven wheel provided
           with a number of detachable buckets having cutting teeth.
   4.      Ladder type : this consists of telescopic ladder or boom. There are two
           endless chains on which detachable buckets are mounted. The boom is
           holding the chains. The excavated material is conveyed to conveyor belt
           which disposes off the excavated earth.




April 18, 2013                   Construction Management                                 40
                                         Agrawal
Excavating & Earth-moving Equipment :
                       Scrapers
   1.      Result of compromise between best loading and best hauling machines
   2.      They have established an important position in the earth moving field
   3.      It unique machine for digging and long distance hauling of ploughable
           materials
   4.      Self operating machine which digs and carry its own load through
           scrapping the ground, hauls it over the required distance and discharging
   5.      Classified as crawler-tractor-pulled and wheel-tractor-pulled depending on
           the type of tractor used to pull them
   6.      Basic part are bowl, apron, and tail gate or ejector.




April 18, 2013                   Construction Management                                41
                                         Agrawal
Excavating & Earth-moving Equipment :
                      Bull Dozers
   1.      These versatile equipments are commonly used in construction projects
   2.      Heavy blade attached to the tractor pushes material from one place to other
   3.      Classified on basic of position of blades, mountings and controlled
   4.      Generally used for spreading earth fill
   5.      For opening uproot roads through mountainous and rocky terrains
   6.      Clearing construction site
   7.      Maintaining hauls roads




April 18, 2013                   Construction Management                                 42
                                         Agrawal
Excavating & Earth-moving Equipment :
                       Tractors
   1.      These are multi purpose machines used mainly for pulling and pushing the
           other equipment or heavy loads
   2.      They are also used for agricultural purposes.
   3.      Classified as crawler type tractor and wheel type tractor
   4.      Crawler type tractor is versatile equipment used to move bull dozers,
           scrapers and wagons on rough roads. The speed of this type doesn’t 12
           kmph normally. It isn’t used on bituminous road
   5.      Wheel type tractor is mounted on four wheels. The main advantage is
           higher speed upto 50kmph. Used for long distance hauling and on good
           roads. And agricultural used




April 18, 2013                  Construction Management                               43
                                        Agrawal
Excavating Compaction Equipment :
                   Smooth Wheel Rollers
   1.      Plain steel rollers, self-propelled type, weighing from 5 to 15 tones and are
           used for ordinarily rolling work is where deep compaction isn’t required,
           the principal application being wider.
   2.      These roller are usually diesel engine type
   3.      Compacts only small top thickness of earth and it effect doesn’t reach
           bottom of the layer
   4.      After compaction roller leave the surface smooth




April 18, 2013                    Construction Management                                  44
                                          Agrawal
Excavating Compaction Equipment :
                    Sheep Wheel Rollers
   1.      Compacting earth work in embankment and canals where compaction deep
           into layer of earth is required, these types of rollers are used
   2.      Tamping effect produce good effect
   3.      Roller is hollow steel drum
   4.      Self-propelled or as towed units
   5.      Weigh upto 15tonnes or more and travel at speed of 25kmph




April 18, 2013                 Construction Management                            45
                                       Agrawal
Excavating Compaction Equipment :
                  Pneumatic Tyred Rollers
   1.      Consist of base or platform mounted between tow axles, the rear of which
           has one more wheel than the front
   2.      Tyres must be so arranged that the tracks of forward wheels lie in between
           tracks of backward wheels
   3.      Compacting fine grained soil and well graded sands
   4.      Self propelled and ballasting is done using either water or sand or pig iron
           to increase self weight




April 18, 2013                   Construction Management                                  46
                                         Agrawal
Difference between Crawler & Wheeled

•   Crawler type roller has slow       •   Wheeled type roller has greater
    speed                                  speed
•   More compact and powerful and      •   Can handle only lighter jobs
    can handle heavier jobs
                                       •   Cheaper
•   Costly
•                                      •   Operational & maintenance cost is
    Cost of operation & maintenance
    is high                                less
•   Stick control for steering         •   Wheel steering control
•   Moves on rough roads only          •   Moves on rough as well as good
•   Used for short distances               roads
•   Requires skillful operation,       •   Used for longer distances
    maintenance & repairs              •   Lesser skills required for operation,
                                           maintenance & repairs


April 18, 2013              Construction Management                           47
                                    Agrawal
Hauling Equipment

   1.      Defined as movement of material form one place to another
   2.      Equipment used for transportation of material is called as hauling
           equipment or simply haulers
   3.      They classified as Dump Trucks and Dumpers
   4.      Dump trucks : used for earth moving purpose. Dumping of earth can done
           rear, on the sides or at the bottom of truck.
   5.      Selection of the type of dump trucks for a specific job depends on the soil
           condition and the nature of the haul road
   6.      Dumpers : are high speed pneumatic wheeled trucks with short chassis
           and strong bodies.
   7.      The hauling and dumping and dumping is done very fast compared to
           other equipment by using the dumper.




April 18, 2013                   Construction Management                                 48
                                         Agrawal
Hoisting Equipment
   1.      It is the operation of lifting a weight from one location and moving it to
           another location which is at a reasonable distance and then dumping it.
   2.      Now a days, many big projects such as construction of dams, industrial
           buildings etc. require hoisting equipment.
   3.      It includes jacks, winches, chain hoists and cranes.
   4.      As hoisting equipment, crane is only single machine which has a single
           piece, is capable of providing three dimensional movement of a weight.
   5.      Cranes are broadly classified as
         1.      Stationary or derrick cranes
         2.      Mobile cranes
         3.      Overhead or gantry cranes
         4.      Traveler cranes
         5.      Tower cranes




April 18, 2013                       Construction Management                            49
                                             Agrawal
Hoisting Equipment : Derrick Cranes
   1.      It consist of mast, a boom and a bull wheel on which the boom rotates
           about vertical axis and guys or supporting members
   2.      These cranes are either electrically operated, diesel operated or both
   3.      The guy derrick has small mast supported by a number of guys and boom
           pivoted at the lower end of the mast. The boom can revolve through 360’.
           This crane is used for heavy loads upto 200 tons.
   4.      When load become less then 50 tons, guy ropes are replaced by trussed
           structure which become stiff leg derrick. It consists of mast, which can
           rotate and a boom. A stiff leg derrick is used for loads from 7 to 50tons.




April 18, 2013                   Construction Management                                50
                                         Agrawal
Hoisting Equipment : Mobile Cranes
   1.      These are mounted on mobile units which is either crawlers type or wheel
           type.
   2.      Truck cranes have high mobility while the crawler mounted cranes move
           slowly.
   3.      Crawler type are capable of moving on rough terrain
   4.      Used for transportation of loads to shorter distances




April 18, 2013                  Construction Management                               51
                                        Agrawal
Hoisting Equipment : Traveler Cranes
   1.      They have their crabs moving on girders which are supported on legs
           instead of on overhead gantry track as used in overhead cranes.
   2.      The legs are capable of moving on tracks laid on the floors



             Hoisting Equipment : Tower Cranes
   1.      Used for industrial and residential high rise building.
   2.      These are commonly used for assembly of industrial plants with steel
           structures.
   3.      Main part of crane are under carriage, slewing platform, tower with
           operator’s cabin and jibs
   4.      Tower has truss structure welded from steel bars and channels




April 18, 2013                   Construction Management                          52
                                         Agrawal
Conveying Equipment
   1.      It is process of transporting material from one place to another over a
           stationary structure.
   2.      They are those which carry material in continuous stream with its distinct
           features such as endless chain or belt.
   3.      When equipment does horizontally conveying it is know as conveyor
   4.       When equipment does vertically conveying it is know as elevator
   5.      Advantages of conveyor are
         1.      It increases output
         2.      It facilitates continuity in operation
         3.      It results in time saving
         4.      These are no waiting periods




April 18, 2013                         Construction Management                          53
                                               Agrawal
Conveying Equipment : Belt Conveyor
   1.      It is one of popular conveying machinery
   2.      Used when large quantities of materials have to be conveyed over long
           distances at fast speed
   3.      Simplest form consists of belt running over a pair of end drums or pulleys
           and supported at regular intervals by series of rollers called idlers
   4.      Advantages of belt conveyor are
         1.      It can handles light/ heavy materials, dry/ wet, fine/ coarse.
         2.      Designed for conveying several thousand tons of material per hour and for
                 distances of several kilometers.
         3.      Can carry material horizontally or inclined
         4.      Lighter in weight then other conveyors
         5.      Controlled discharge of material




April 18, 2013                       Construction Management                                 54
                                             Agrawal
Conveying Equipment : Screw Conveyor
   1.      Used for handling granular or pulverized material
   2.      Quantity of material conveyed is less compared to the belt conveyor, at
           same time cost is also less.
   3.      Can inclined maximum upto 35’
   4.      Length of conveyor is 65m



        Conveying Equipment : Bucket Conveyor
  1.      Has bucket in shape of V which are open at top
  2.      Length is limited upto 25m due to weight of the conveyor and strength of
          the chains.
  3.      Generally used for coal handling




April 18, 2013                   Construction Management                             55
                                         Agrawal
Aggregate Production Equipment
   1.      Crushers are generally used to reduce size of the large stone or rock to
           smaller uniform sized aggregates required for concrete mix.
         1.      Jaw Crusher : primary crusher, operates by allowing stone to flow into the
                 space between two jaws one of which stationary and other is movable.
         2.      Gyratory Crusher : hardened steel plates. Lead has long conical shape, with
                 trough shaft suspended in bearing at the top and an eccentric base connection
                 connected to gears.
         3.      Cone Crusher : are capable of producing large quantities of uniformly fine
                 crushed stone. It has shorter cone with smaller inlet and outlet openings.
         4.      Roll Crusher : consists of heavy cast iron frame equipped with two counter
                 rotating rollers mounted on separate horizontal shaft.




April 18, 2013                       Construction Management                                     56
                                             Agrawal
Factors affecting selection of Construction
                           Equipment
   1.      Use of equipment available with the organization
   2.      Suitability for job condition with special references to climatic and
           operating conditions
   3.      Uniformity of type
   4.      Size of equipment
   5.      Use of standard equipment
   6.      Country of origin
   7.      Unit cost of production
   8.      Availability of spare parts and selection of manufacturers
   9.      Suitability of local labour for operation




April 18, 2013                    Construction Management                          57
                                          Agrawal
Equipment Management Checklist
   1.      Mechanize selectively for economy of production, quality and speed of
           construction
   2.      Choose between buying, hiring and leasing
   3.      Choose size and number of equipment including standby
   4.      Select the prime mover –petrol/diesel/electric
   5.      check suitability for local conditions
   6.      Decide on mobile or stationary equipment
   7.      Arrange finance for purchase
   8.      Examine the warranties while purchasing
   9.      Commission equipment within warranty period
   10.     Freeze productivity norms and ensure same
   11.     Use only trained personal for operation
   12.     Insist on regular preventative maintenance
   13.     Ensure that standby power is available
   14.     Insist on safety measures

April 18, 2013                  Construction Management                            58
                                        Agrawal
Management Information Systems in
                  Construction Industry
•   Date : it can be defined as group of non-random symbols which represent
    things that have happened. Data of facts that are obtained by observation or
    research and which are recorded frequently are called as Raw data or Basic
    data
•   Information : the concept of information in an organizational sense is
    more complex and difficult than frequent use of this common word would
    suggest. Information is data that have been interpreted and understood by
    the recipient of the message.
•   Communication : information is transmitted by the process of
    communication. Communication involves the interchange of thoughts or
    opinion by word, letters or by similar means.




April 18, 2013                Construction Management                         59
                                      Agrawal
Management Information Systems in
                  Construction Industry
•   An Organization is an institute which promotes mechanism of
    interpersonal relations and activates collaboration many resources available
    such as, Monetary, technical, marketing and business.




April 18, 2013                Construction Management                         60
                                      Agrawal
Requirement of MIS
•   To provide an organized and efficient means of measuring, collection,
    verifying and qualifying data, reflecting the progress and status of operations
    on the project with respect to progress, cost, resources and quantity
•   To provide a standard against which progress and cost can be compared
•   To provide an organized, accurate and effectiveness means of converting the
    data from the operation into information. The information systems should be
    realistic should be realistic and should recognize
     – Means of processing the information
     – Skills available
     – Value of information compared with the cost of obtaining
     – Report the correct and necessary information
     – Identify and isolate critical information
     – To deliver the information


April 18, 2013                  Construction Management                               61
                                        Agrawal
Payment of Wages Act 1982
   1.      This act was introduced to regulate the payment of wages, imposition of
           fines, etc
   2.      The term Wages includes all remuneration including all allowances,
           bonus, notice pay, etc but doesn’t include house rent, water and electricity
           charges, travel allowance, medical allowance, pension, gratuity etc
   3.      Accordingly to Act, wages are to be paid promptly on a monthly basis and
           if any person is terminated from service, his wages should be settled
           within two days of the termination.
   4.      This Act is applicable to employees having a salary less then Rs. 1600 pm




April 18, 2013                   Construction Management                                  62
                                         Agrawal
Minimum Wages Act 1986
   1.      This act prevents the exploitation of the unorganized labour in the
           construction industry by the employers.
   2.      Accordingly to this Act, provision is made for the statuary fixation of
           minimum rate of wages in the establishment.
   3.      Wages to construction workers in India is paid either in time rate basis or
           piece rate basis
   4.      In the time rate basis, suitable rate of payment is fixed per unit of time that
           the worker is engaged for the work
   5.      Accordingly to this Act, different minimum rates can be fixed depending
           on the class of work, type of personal employed and depending on the
           location of work.




April 18, 2013                    Construction Management                                    63
                                          Agrawal
Indian Contract Act 1872
   •       In this Act the following words and expressions are used in the following
           senses, unless a contrary intention appears from the context:-
         –      When one person signifies to another his willingness to do or to
                abstain from doing anything, with a view to obtaining the assent of
                that other to such act or abstinence, he is said to make a proposal
         –      When the person to whom the proposal is made signifies his assent
                thereto, the proposal is said to be accepted. A proposal, when
                accepted, becomes a promise
         –      The person making the proposal is called the" promisor and the person
                accepting the proposal is called the It promise"
         –      When, at the desire of the promisor, the promise or any other person
                has clone or abstained from doing, or does or abstains from doing, or
                promises to do or to abstain from doing, something, such Act or
                abstinence or promise is called a consideration for the promise



April 18, 2013                   Construction Management                                64
                                         Agrawal
Workmen Compensation Act
  1.      In case of death: 40% of the monthly wage of the deceased workman,
          multiplied by the relevant factor or Rs. 20,000; whichever is more.
  2.      In case of total permanent disablement: 50% of the monthly wage, multiplied
          by the relevant factor: or Rs. 24,000; whichever is more.
  3.      In case of partial permanent disablement: The compensation is a percentage of
          that payable in the case of total permanent disablement. The earning capacity is
          determined by a qualified medical practitioners.
  4.      In case of (total or partial) temporary disablement" A sum equal to 25% of the
          monthly wages of the workman shall be paid half-monthly.
  •       The minimum rate of compensation is proposed to be raised from 50,000 to Rs.
          80,000 for death and from Rs. 60,000 to Rs. 90,000 in case of permanent/total
          disablement. State Government appoints Commissioners to investigate and
          solve every case for workmen's compensation. The appointed Commissioner's
          tribunal has some of the powers of a civil court. An appeal against any order of
          the Commissioner can be filed in the High Court. This must be done within 60
          days of the order or decision of the Commissioner.


April 18, 2013                    Construction Management                                    65
                                          Agrawal
Preparation for the Construction Interview
   1.      Personal characteristics : such as physical appearance, health, sense of
           humor, Self confidence, cultural level, alertness, manners, general working
           habits.
   2.      Technical Competency : information about the exams passed, grades
           obtained, awards and honors and extra- curricular activities.
   3.      To find the initiative, common sense and general smartness
   4.      Ability to inspire confidence by sustained effort without super-vision ,
           level making ability, originality and initiative.
   5.      Capacity to work in team-by knowing about his family, community
           interests and his type of friends.
   6.      Potential for growth-long range aspirations of the applicant – whether he is
           a drifter or one who would exploit every possible chance to develop his
           potential to the maximum.
   7.      Having Details of construction done in nearby area he is leaving.




April 18, 2013                   Construction Management                                  66
                                         Agrawal
Form work removing periods
   •         Walls, columns and vertical sides of beams
         –       24 to 48 hours may be decided by Engineer-in-charge
   •         Slabs (Prop left under ) 3 day
   •         Beam soffit (Prop left under ) 7 days
   •         Removing of props to slabs
         –       Spanning less then 4.5m = 7 days
         –       Spanning over 4.5m = 14 days
   •         Removing of props to beams and arches
         –       Spanning less then 6m = 14 days
         –       Spanning over 6m = 21 days




April 18, 2013                      Construction Management            67
                                            Agrawal
April 18, 2013   Construction Management   68
                         Agrawal

More Related Content

What's hot

Fineness air permeability final (1)
Fineness air permeability final (1)Fineness air permeability final (1)
Fineness air permeability final (1)Dave Madhav
 
Civil engineering internship report
Civil engineering internship reportCivil engineering internship report
Civil engineering internship reportMd Mohsin Mohsin
 
Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...A Makwana
 
Selection criteria of building materials
Selection criteria of building materialsSelection criteria of building materials
Selection criteria of building materialsRiskanMohamed
 
Report on Widening and Construction of Roads
Report on Widening and Construction of RoadsReport on Widening and Construction of Roads
Report on Widening and Construction of RoadsSanjeev B
 
Effect of rice husk ash on the strenght and durability of concrete by debasree
Effect of rice husk ash on the strenght and durability of concrete  by debasreeEffect of rice husk ash on the strenght and durability of concrete  by debasree
Effect of rice husk ash on the strenght and durability of concrete by debasreeDEBASREE GHOSH
 
Training project report BSRDCL by Amit Kumar
Training project report BSRDCL by Amit KumarTraining project report BSRDCL by Amit Kumar
Training project report BSRDCL by Amit KumarAmitKumar7069
 
replacement of cement with rice husk ash by 20%
replacement of cement with rice husk ash by 20%replacement of cement with rice husk ash by 20%
replacement of cement with rice husk ash by 20%Rajput Praveer
 
14 three moment equation
14 three moment equation14 three moment equation
14 three moment equationalokbshukla
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building ConstructionEsmael Aragaw
 
Coconut shell as coarse aggregate in the concrete
Coconut shell as coarse aggregate in the concreteCoconut shell as coarse aggregate in the concrete
Coconut shell as coarse aggregate in the concreteAglaia Connect
 
building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)rahul jangid
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-ContractsNikhil Kumar
 
Admixtures for water proofing in concrete
Admixtures for water proofing in concreteAdmixtures for water proofing in concrete
Admixtures for water proofing in concreteSanjipta Behera
 
Civil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman KhokanCivil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman KhokanAnis Rahman Khokan
 
polypropylene fiber
polypropylene fiberpolypropylene fiber
polypropylene fiberanjalisah20
 
Summer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction SiteSummer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction SiteRAVI KUMAR
 
SUMMER TRAINING REPORT BY VIJAY VERMA
SUMMER TRAINING REPORT BY VIJAY VERMASUMMER TRAINING REPORT BY VIJAY VERMA
SUMMER TRAINING REPORT BY VIJAY VERMAvjverma123
 

What's hot (20)

Fineness air permeability final (1)
Fineness air permeability final (1)Fineness air permeability final (1)
Fineness air permeability final (1)
 
Civil engineering internship report
Civil engineering internship reportCivil engineering internship report
Civil engineering internship report
 
Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...
 
Selection criteria of building materials
Selection criteria of building materialsSelection criteria of building materials
Selection criteria of building materials
 
Report on Widening and Construction of Roads
Report on Widening and Construction of RoadsReport on Widening and Construction of Roads
Report on Widening and Construction of Roads
 
Effect of rice husk ash on the strenght and durability of concrete by debasree
Effect of rice husk ash on the strenght and durability of concrete  by debasreeEffect of rice husk ash on the strenght and durability of concrete  by debasree
Effect of rice husk ash on the strenght and durability of concrete by debasree
 
Training project report BSRDCL by Amit Kumar
Training project report BSRDCL by Amit KumarTraining project report BSRDCL by Amit Kumar
Training project report BSRDCL by Amit Kumar
 
Marshaltest
MarshaltestMarshaltest
Marshaltest
 
replacement of cement with rice husk ash by 20%
replacement of cement with rice husk ash by 20%replacement of cement with rice husk ash by 20%
replacement of cement with rice husk ash by 20%
 
14 three moment equation
14 three moment equation14 three moment equation
14 three moment equation
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
 
Coconut shell as coarse aggregate in the concrete
Coconut shell as coarse aggregate in the concreteCoconut shell as coarse aggregate in the concrete
Coconut shell as coarse aggregate in the concrete
 
building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
 
Admixtures for water proofing in concrete
Admixtures for water proofing in concreteAdmixtures for water proofing in concrete
Admixtures for water proofing in concrete
 
Civil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman KhokanCivil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman Khokan
 
Civil final project
Civil final projectCivil final project
Civil final project
 
polypropylene fiber
polypropylene fiberpolypropylene fiber
polypropylene fiber
 
Summer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction SiteSummer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction Site
 
SUMMER TRAINING REPORT BY VIJAY VERMA
SUMMER TRAINING REPORT BY VIJAY VERMASUMMER TRAINING REPORT BY VIJAY VERMA
SUMMER TRAINING REPORT BY VIJAY VERMA
 

Viewers also liked

Construction management
Construction managementConstruction management
Construction managementRahul
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipmentsAshish Parihar
 
OR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULINGOR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULINGJignesh Kariya
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFShankar Ramasamy
 
Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project managementRahul Dubey
 
Routing simulator ppt
Routing simulator pptRouting simulator ppt
Routing simulator pptRITESH SHAW
 
Catia V5 Training
Catia  V5 TrainingCatia  V5 Training
Catia V5 Traininggueste28c56
 
Construction Machines and Plants
Construction Machines and PlantsConstruction Machines and Plants
Construction Machines and PlantsXubitech
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)TechnoSysCon
 
Hoisting equipments
Hoisting equipmentsHoisting equipments
Hoisting equipmentsvipul308
 
building construction,ppt
building construction,pptbuilding construction,ppt
building construction,pptPawankumarm65
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTShankar Ramasamy
 
Plants PowerPoint
Plants PowerPointPlants PowerPoint
Plants PowerPointBiologyIB
 

Viewers also liked (20)

Construction management
Construction managementConstruction management
Construction management
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 
OR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULINGOR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULING
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
 
Trucks and Hauling Equipment
Trucks and Hauling EquipmentTrucks and Hauling Equipment
Trucks and Hauling Equipment
 
Gantt Charts
Gantt ChartsGantt Charts
Gantt Charts
 
Pert cpm
Pert cpmPert cpm
Pert cpm
 
Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project management
 
Routing simulator ppt
Routing simulator pptRouting simulator ppt
Routing simulator ppt
 
cpmpertmy (1)
cpmpertmy (1)cpmpertmy (1)
cpmpertmy (1)
 
Catia V5 Training
Catia  V5 TrainingCatia  V5 Training
Catia V5 Training
 
Early Equipment Management
Early Equipment ManagementEarly Equipment Management
Early Equipment Management
 
Construction Machines and Plants
Construction Machines and PlantsConstruction Machines and Plants
Construction Machines and Plants
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
Ms project training ver 01
Ms project training ver 01Ms project training ver 01
Ms project training ver 01
 
Hoisting equipments
Hoisting equipmentsHoisting equipments
Hoisting equipments
 
building construction,ppt
building construction,pptbuilding construction,ppt
building construction,ppt
 
Pert Cpm Nis
Pert   Cpm NisPert   Cpm Nis
Pert Cpm Nis
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
 
Plants PowerPoint
Plants PowerPointPlants PowerPoint
Plants PowerPoint
 

Similar to Cm be civil

Efficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential ProjectEfficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential ProjectIJERA Editor
 
Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013IRJET Journal
 
Project typed
Project typedProject typed
Project typedRahul
 
Project Planning and Scheduling
Project Planning and SchedulingProject Planning and Scheduling
Project Planning and Schedulingijtsrd
 
Project Management Skills unit-4 Notes
Project Management Skills unit-4 NotesProject Management Skills unit-4 Notes
Project Management Skills unit-4 NotesSamarthVarpe
 
Event driven optimizer an approach to optimize the events that transition fr...
Event driven optimizer  an approach to optimize the events that transition fr...Event driven optimizer  an approach to optimize the events that transition fr...
Event driven optimizer an approach to optimize the events that transition fr...prjpublications
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptpisal3
 
Planning and control
Planning and controlPlanning and control
Planning and controlAnju George
 
Primavera p3 [compatibility mode]
Primavera p3 [compatibility mode]Primavera p3 [compatibility mode]
Primavera p3 [compatibility mode]Rahul
 
Event driven optimizerevent driven optimizer
Event driven optimizerevent driven optimizerEvent driven optimizerevent driven optimizer
Event driven optimizerevent driven optimizerprjpublications
 
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...IRJET Journal
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET Journal
 
Managing over allocation of resource in steel
Managing over allocation of resource in steelManaging over allocation of resource in steel
Managing over allocation of resource in steeleSAT Publishing House
 
76 s201905
76 s20190576 s201905
76 s201905IJRAT
 
Introduction Construction Planning and Management
Introduction Construction Planning and Management Introduction Construction Planning and Management
Introduction Construction Planning and Management Akhil Shetty
 
Project Management Leadership, And Skills : Planning And Control | Assignment...
Project Management Leadership, And Skills : Planning And Control | Assignment...Project Management Leadership, And Skills : Planning And Control | Assignment...
Project Management Leadership, And Skills : Planning And Control | Assignment...Emre Dirlik
 
IIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIRJET Journal
 

Similar to Cm be civil (20)

Efficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential ProjectEfficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential Project
 
Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013
 
Project typed
Project typedProject typed
Project typed
 
Lecture Project Planning
Lecture Project PlanningLecture Project Planning
Lecture Project Planning
 
Cps print
Cps printCps print
Cps print
 
Project Planning and Scheduling
Project Planning and SchedulingProject Planning and Scheduling
Project Planning and Scheduling
 
Project Management Skills unit-4 Notes
Project Management Skills unit-4 NotesProject Management Skills unit-4 Notes
Project Management Skills unit-4 Notes
 
Event driven optimizer an approach to optimize the events that transition fr...
Event driven optimizer  an approach to optimize the events that transition fr...Event driven optimizer  an approach to optimize the events that transition fr...
Event driven optimizer an approach to optimize the events that transition fr...
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
 
Planning and control
Planning and controlPlanning and control
Planning and control
 
Primavera p3 [compatibility mode]
Primavera p3 [compatibility mode]Primavera p3 [compatibility mode]
Primavera p3 [compatibility mode]
 
Event driven optimizerevent driven optimizer
Event driven optimizerevent driven optimizerEvent driven optimizerevent driven optimizer
Event driven optimizerevent driven optimizer
 
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
Planning, Scheduling, Resource Allocating and Tracking of Residential (G+2) V...
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 
H1303024956
H1303024956H1303024956
H1303024956
 
Managing over allocation of resource in steel
Managing over allocation of resource in steelManaging over allocation of resource in steel
Managing over allocation of resource in steel
 
76 s201905
76 s20190576 s201905
76 s201905
 
Introduction Construction Planning and Management
Introduction Construction Planning and Management Introduction Construction Planning and Management
Introduction Construction Planning and Management
 
Project Management Leadership, And Skills : Planning And Control | Assignment...
Project Management Leadership, And Skills : Planning And Control | Assignment...Project Management Leadership, And Skills : Planning And Control | Assignment...
Project Management Leadership, And Skills : Planning And Control | Assignment...
 
IIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction Project
 

More from Rahul

ACEP Magazine 3.pdf
ACEP Magazine 3.pdfACEP Magazine 3.pdf
ACEP Magazine 3.pdfRahul
 
ACEP Magazine 2.pdf
ACEP Magazine 2.pdfACEP Magazine 2.pdf
ACEP Magazine 2.pdfRahul
 
GECA Water Magazine Edition one.pdf
GECA Water Magazine Edition one.pdfGECA Water Magazine Edition one.pdf
GECA Water Magazine Edition one.pdfRahul
 
ACEP Magazine.pdf
ACEP Magazine.pdfACEP Magazine.pdf
ACEP Magazine.pdfRahul
 
Scope of geology in engineering
Scope of geology in engineeringScope of geology in engineering
Scope of geology in engineeringRahul
 
Engineering project writing
Engineering project writingEngineering project writing
Engineering project writingRahul
 
Wce agronomic water conservation measures
Wce agronomic water conservation measuresWce agronomic water conservation measures
Wce agronomic water conservation measuresRahul
 
WCE -- watershed management
WCE -- watershed managementWCE -- watershed management
WCE -- watershed managementRahul
 
Unit i gel space ratio rpa
Unit i gel space ratio rpaUnit i gel space ratio rpa
Unit i gel space ratio rpaRahul
 
Unit vi ferro cement rpa
Unit vi ferro cement rpaUnit vi ferro cement rpa
Unit vi ferro cement rpaRahul
 
Acem water cement ratio MCQ
Acem water cement ratio MCQAcem water cement ratio MCQ
Acem water cement ratio MCQRahul
 
Formwork
FormworkFormwork
FormworkRahul
 
April bulletin
April bulletinApril bulletin
April bulletinRahul
 
Construction equpiment
Construction equpimentConstruction equpiment
Construction equpimentRahul
 
Egrm
EgrmEgrm
EgrmRahul
 
Retaining walls
Retaining wallsRetaining walls
Retaining wallsRahul
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRahul
 
Multistorey building
Multistorey buildingMultistorey building
Multistorey buildingRahul
 
Indiandrinking
IndiandrinkingIndiandrinking
IndiandrinkingRahul
 
Circular slabs
Circular slabsCircular slabs
Circular slabsRahul
 

More from Rahul (20)

ACEP Magazine 3.pdf
ACEP Magazine 3.pdfACEP Magazine 3.pdf
ACEP Magazine 3.pdf
 
ACEP Magazine 2.pdf
ACEP Magazine 2.pdfACEP Magazine 2.pdf
ACEP Magazine 2.pdf
 
GECA Water Magazine Edition one.pdf
GECA Water Magazine Edition one.pdfGECA Water Magazine Edition one.pdf
GECA Water Magazine Edition one.pdf
 
ACEP Magazine.pdf
ACEP Magazine.pdfACEP Magazine.pdf
ACEP Magazine.pdf
 
Scope of geology in engineering
Scope of geology in engineeringScope of geology in engineering
Scope of geology in engineering
 
Engineering project writing
Engineering project writingEngineering project writing
Engineering project writing
 
Wce agronomic water conservation measures
Wce agronomic water conservation measuresWce agronomic water conservation measures
Wce agronomic water conservation measures
 
WCE -- watershed management
WCE -- watershed managementWCE -- watershed management
WCE -- watershed management
 
Unit i gel space ratio rpa
Unit i gel space ratio rpaUnit i gel space ratio rpa
Unit i gel space ratio rpa
 
Unit vi ferro cement rpa
Unit vi ferro cement rpaUnit vi ferro cement rpa
Unit vi ferro cement rpa
 
Acem water cement ratio MCQ
Acem water cement ratio MCQAcem water cement ratio MCQ
Acem water cement ratio MCQ
 
Formwork
FormworkFormwork
Formwork
 
April bulletin
April bulletinApril bulletin
April bulletin
 
Construction equpiment
Construction equpimentConstruction equpiment
Construction equpiment
 
Egrm
EgrmEgrm
Egrm
 
Retaining walls
Retaining wallsRetaining walls
Retaining walls
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Multistorey building
Multistorey buildingMultistorey building
Multistorey building
 
Indiandrinking
IndiandrinkingIndiandrinking
Indiandrinking
 
Circular slabs
Circular slabsCircular slabs
Circular slabs
 

Recently uploaded

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 

Recently uploaded (20)

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 

Cm be civil

  • 1. Guided By Dr. U. J. Kahalekar Sir Represented by Rahul Agrawal Govt. College of Engg., A' bad April 18, 2013 Construction Management 1 Agrawal
  • 2. Planning 1. Planning is the most important technique of the management. 2. Planning means “Looking ahead”. 3. This is mental process requiring the use of intellectual facilities, imagination, foresight and sound judgment, to be dine, who will do it an how the results are to be evaluated. 4. Planning is necessary to ensure proper utilization of human and material resources to achieve the objectives of the project. April 18, 2013 Construction Management 2 Agrawal
  • 3. Site Selection Criteria considerations 1. Availability of land, soil characteristics and cover of land 2. Approach to site 3. Transportation and availability of material 4. Availability of man-power 5. Availability of other facilities such water supply, electricity, drainage, etc 6. Acceptance of the project by the local bodies April 18, 2013 Construction Management 3 Agrawal
  • 4. Financial Analysis 1. Engg. and Project management cost 2. Lump sum payment for technology cost 3. Engg. Fee 4. Management and supervision during construction 5. Enabling works 6. Construction equipment used 7. Miscellaneous fixed assets 8. Provision of contingencies 9. Operating cost 10. Working cost April 18, 2013 Construction Management 4 Agrawal
  • 5. Steps involved in planning 1. Crystallizing the opportunity or problem 2. Securing and analyzing necessary information 3. Establishing planning premises and constraints 4. Ascertaining alternative course of action or plan 5. Selecting optimum plan 6. Determining derivative plan 7. Fixing the timing of introduction 8. Arranging future evaluation of effectiveness of the plan April 18, 2013 Construction Management 5 Agrawal
  • 6. Objectives of Planning 1. Proper design of each element of the project 2. Proper selection of equipment and machinery in big project 3. Proper arrangement of repair of equipment and machinery near the site of work to keep them ready to work 4. Procurement of material well in advance 5. Employment of trained and experienced staff on the project 6. To provide welfare schemes for the staff and workers such as medical and recreational facilities 7. To provide incentive for good workers 8. To arrange constant flow of funds for the completion of the project 9. To provide proper safety measures such as proper ventilation, proper arrangement of light and water 10. Proper arrangements of means of communications and feedback etc.. April 18, 2013 Construction Management 6 Agrawal
  • 7. Advantage of Planning 1. Advantage to contractors 2. Advantage to clients 3. Advantage to architects/ engineer April 18, 2013 Construction Management 7 Agrawal
  • 8. Advantage to contractors 1. Job is studied in details by help of bar chart 2. Loss of money and help to relieve the financial burden to contractor 3. Labours requirement are used properly 4. Actual work can be measured 5. Job is completed in time April 18, 2013 Construction Management 8 Agrawal
  • 9. Limitation in Planning 1. The effectiveness of the plan depends upon the correctness of assumptions 2. Planning is expansive 3. Planning delays action 4. Planning encourages a false sense of security April 18, 2013 Construction Management 9 Agrawal
  • 10. Stages in Planning 1. Preplanning : objectives are clearly spelt out, general framework of the project is formulated, cost benefit analysis and investment alternatives. 2. Detailed Planning : preparation of detailed design, detailed working drawings, specifications and detailed bill of quantities. 3. Monitoring and Control : updating of the schedule, taking into account the actual progress of project and preparing revised forecasting regarding availability of various resources. April 18, 2013 Construction Management 10 Agrawal
  • 11. Types of Plans 1. Standing Plan : used repeatedly & including managements policies, procedures, rules 2. Single use Plan : used for single purpose and objective is accomplish within short period of time. (Ex. Budgets) 3. Strategic Plan : Vitally effect development of an organization. Factor include economic, technological and environmental factors. 4. Administrative Plan : this is less subjective than strategic plan. It focus on how to accomplish objective of project or project or organization. April 18, 2013 Construction Management 11 Agrawal
  • 12. Contract Contract is an agreement, which will be valid in law or enforceable by law, between or among two or more parities, for provision of supplies and/or services against consideration of monitory value, either in cash or in kind. Types of Contract 1. Lump Sum contract 2. Cost plus fixed contract 3. Cost plus bid free contract 4. Guaranteed Maximum contract 5. Negotiated contract 6. Unit price contract April 18, 2013 Construction Management 12 Agrawal
  • 13. Specification This is description of items of work to be provided in a project along with details regarding materials to be used and workmanship to be done. Types of Specification • General specification • Detailed specification • Special specification • Restricted specification • Manufacturer’s specification April 18, 2013 Construction Management 13 Agrawal
  • 14. Tender Information 1. Name of the dept. calling for tenders 2. Name of work and location 3. Designation of officer inviting tenders 4. Last date and time of receipt of tenders 5. Period of availability of tender forms 6. Cost of tender documents 7. Time of completion and type of contract 8. Earnest money deposits to be paid 9. Date, time and place of opening tenders 10. Designation of the officer opening tenders April 18, 2013 Construction Management 14 Agrawal
  • 15. Tender Types Tender Document 1. Open tender 1. General consideration of 2. Limited tender tender 3. Single tender 2. Schedule of items of 4. Rate contract work with clear specification 3. Special conditions April 18, 2013 Construction Management 15 Agrawal
  • 16. Scheduling Construction scheduling is a graphical representation which shows the phasing rate of construction activities with the starting completion dates and sequential relationship among the various activities or operations in project so that work can be carried out in an orderly and effective manner. April 18, 2013 Construction Management 16 Agrawal
  • 17. Preparation of scheduling 1. The project is divided into number of operation and the sequences of these operation can be derived after knowing their relationship properly. 2. The quantity of work involved in each operation has to be calculated. 3. The time required for completion of the project as well as different activities are to be calculated. This can be done from the quantity of work involved and rate of performing each work. April 18, 2013 Construction Management 17 Agrawal
  • 18. Uses of scheduling Advantages of scheduling 1. Gives quantity of work 1. Many alternative method can involved, labour, be choose materials and equipment 2. Clear idea regarding workers, at each stage. materials, equipments 2. Actual progress of work 3. Staring time of work is can be check known 3. Carried out in systematic 4. Resources utilization is manner minimum 5. Actual work is monitored 6. Inter-relationship of various activities are known April 18, 2013 Construction Management 18 Agrawal
  • 19. Bar charts Henry Gantt around 1900 A.D. Bar chart consists of two coordinate axes representing the jobs or activities to be performed and other representing time elapsed. Following step are involved 1. Divide project into many activities 2. List out the activities 3. Find the inter-relationship among these activities 4. Arrange activities in systematic way 5. Calculate quantity of work and time required 6. Draw it according to scale April 18, 2013 Construction Management 19 Agrawal
  • 20. Limitation of Bar Chart 1. They can be used only for small projects 2. It does not show the interdependencies between the various activities in project 3. The progress of the work in project cannot be monitored scientifically 4. Delays in the work cannot be detected 5. It does not indicate critical activities of project 6. It gives some idea about the physical progress of project. 7. It can’t be used as controlling devices by the project manager to take any timely action. April 18, 2013 Construction Management 20 Agrawal
  • 21. Network Diagram Network is graphical and logical model or plan which lists out the sequences of various operations (with interdependencies) which are required to be performed for the final achievement of the project objectives. April 18, 2013 Construction Management 21 Agrawal
  • 22. Terms in Network Diagram 1. Activity : any position of project which consume time ot resources and has a definite beginning and an end called as an activity. It is denoted by an arrow 2. Event : the beginning or completion of an activity is termed as an event. It indicates a particular instant of time at which some specific milestone has been achieved. 3. Network logic : this denotes the technical dependencies among activities. A good network logic reflects cost effectiveness of project in long run. 4. Dummy : it similar to an activity but it does not consume any resources. It represent by Dashed Arrow April 18, 2013 Construction Management 22 Agrawal
  • 23. Terms in Network Diagram Activity Dummy Node Representation of Activity, Node, Dummy A B 1 2 3 Representation of Network Logic April 18, 2013 Construction Management 23 Agrawal
  • 24. Types of Events 1. Tail Event : which marks the beginning of an activity. 2. Head Event : which marks the completion of an activity. 3. Dual Role Event : which acts as tail event for one activity and head event for other activity. 4. Burst & Merge Event A 2 2 A B 1 3 3 1 B Burst Merge 4 4 Event Event C C April 18, 2013 Construction Management 24 Agrawal
  • 25. Types of NETWORKS 1. Activity on Arrow (A-O-A) or Arrow Diagram : the arrow represent activities and node represent the events. 2. Activity on Node (A-O-N) or Precedence Diagram : the node represent activities and arrow represent the events. 3. Event oriented networks (PERT type) April 18, 2013 Construction Management 25 Agrawal
  • 26. Rules for drawing a Networks 1. Network will have only one initial node. Initial node will be only out going arrows 2. Network can have only one final node. Final node will have only one incoming arrow 3. No activity can start until its tail event has occurred 4. An event can’t occur until all the activities leading upto it are completed 5. No event can occur twice. Hence network looping isn’t permitted 6. An arrow should represent singular situation. Individuality and separate entity of each activity should be maintained. 7. The network should be drafted such that all activities are completed to reach end objectives 8. All constraints and interdependencies should be shown properly on the network using dummies 9. Network logic should always be maintained 10. Time flow is usually shown from left to right. April 18, 2013 Construction Management 26 Agrawal
  • 27. Fulkerson’s Rule for Numbering the Events 1. There will be single initial event in network which has only arrows coming out of it. This event is given number 1. 2. All arrows coming out of event 1 are neglected. This provides us with one or more initial events. These event are numbered 2,3,4,5 etc. 3. Again neglect all the arrows coming out of these numbered events. A few more initial events will be created. These are also numbered similarly. 4. This operation is continued until last event is reached and numbered. April 18, 2013 Construction Management 27 Agrawal
  • 28. CPM Critical Path Method 1. CPM was discovered jointly by DuPont and Reunington Rand Univac in 1957 April 18, 2013 Construction Management 28 Agrawal
  • 29. Difference between CPM & PERT • CPM is activity oriented • PERT is event oriented • Time estimates are of fair degree • Time estimates are not that of accuracy accurate • Deterministic approach • Probabilistic approach • Cost is governing factor • Time is governing factor • Project duration is fixed and cost • Cost is directly proportional to is minimum time • Critical path which joins critical • Her critical path is path which activities joins the critical events April 18, 2013 Construction Management 29 Agrawal
  • 30. CPM • Earliest Event Time : earliest occurrence time is the earliest time at which an event can occur. TEj = TEi + tij where TEj = earliest event time of head event TEi = earliest event time of tail event tij = duration of the activity (i-j) • Latest Event Time : latest allowable occurrence time is the latest time by which an event must occur to keep project on schedule. TL = TLi - tij where TL = latest event time of head event TLi = earliest event time of tail event tij = duration of the activity (i-j) April 18, 2013 Construction Management 30 Agrawal
  • 31. CPM Activity Time • Earliest start time : is earliest time by which an activity can start. – EST =TE(i) • Earliest finish time : is earliest time by which an activity can completed. – EFT = EST = tij • Latest start time : time at which an activity can start without delaying completion of project as whole. – LST = LFT - tij • Latest finish time : time at which an activity can finish without delaying completion of project as whole. – LFT = TL(i) April 18, 2013 Construction Management 31 Agrawal
  • 32. Float • Float denote the flexibility range within which activity start and finish times many fluctuate without affecting total project duration • Total Float : it is time span by which starting or finishing of an activity can delayed without affecting overall completion time of project. – FT = LFT – EFT • Free Float : it is that duration by which an activity can be delayed without delaying any other succeeding activity. – FF = FT - Sj • Independent Float : it is excess time available if the preceding activity ends as late as possible and the succeeding activity starts as early as possible. – FID = FF - Si • Interfering Float : it is that difference between total float and free float. – FIT = FT – FF = Si April 18, 2013 Construction Management 32 Agrawal
  • 33. Classification of Activities 1. Sub critical activities : when float is +ve; the activity needs normal attention but has no flexibility. 2. Critical activities : when float is zero; the activity needs extra attention. This has no freedom of action. 3. Super critical activities : when float is –ve; such activities require very special attention and care. April 18, 2013 Construction Management 33 Agrawal
  • 34. PERT • Program Evaluation and Review Technique is management tool used for planning, controlling and reviewing a project. • It follows probabilistic approach towards time durations. • It is also event oriented network method where more importance is given to the achievement of discernible milestone rather than the activity can’t be made. • Slack can be positive, zero or negative • Positive Slack = it is obtained when TL is more than TE. It indicates on schedule condition • Zero Slack = it TL is equal to TE. It indicate on schedule condition • Negative Slack = it TL is less than TE. It indicates behind the schedule April 18, 2013 Construction Management 34 Agrawal
  • 35. Classification of Construction Equipment 1. Earth moving equipment 2. Hauling Equipment 3. Hoisting Equipment 4. Conveying Equipment 5. Aggregate and concrete production Equipment 6. Pile Driving Equipment 7. Tunneling and Rock Drilling Equipment 8. Pumping and Dewatering Equipment April 18, 2013 Construction Management 35 Agrawal
  • 36. Excavation Equipment : Power Sovels 1. Long lasting and useful class of earth moving equipment. 2. One of basic equipment employed to excavate the earth and to load the trucks. 3. It is capable of excavating all types of earth, except hard rock. 4. It may be crawler mounted or wheel mounted. 5. Crawler mounted have low speeds but very effective in unstable soils 6. Wheel mounted have higher speeds and are effective only in firm soils 7. The size of Power Sovels varies from 0.375 to 5 cubic meter 8. Basic parts include track system, cabin, cables, rack, stick, foot pin, saddle block, boom point sheaves and bucket. April 18, 2013 Construction Management 36 Agrawal
  • 37. Excavation Equipment : Back Hoe 1. It is also termed as Hoe, Back Sovels and Pull Shovel 2. Generally used to excavate below natural surface on which it rests. 3. Used to excavate trenches, pits for basements and generally grading work, which requires precise control of depths. 4. Basic parts include Boom, Jack Boom, Boom foot drum, Boom Sheave, Stick Sheave, Bucket and Bucket Sheave. April 18, 2013 Construction Management 37 Agrawal
  • 38. Excavation Equipment : Drag Line 1. Prominent operation of dragging the bucket against the material to be dug 2. Long light crane boom and bucket is loosely attached to the boom through cables. 3. Useful in digging below its track level and handling softer materials 4. The capacity of dragline is indicated by size of the bucket in cubic meters 5. It can be crawler mounted, wheel mounted or trucked mounted. 6. Basic part dragline include the boom, hoist cable, drag cable, hoist chain, drag chain and bucket. April 18, 2013 Construction Management 38 Agrawal
  • 39. Excavation Equipment : Clamshell 1. Also named as resemblance of its bucket to a clam which is like a shell fish with hinged double shell. 2. The front end is essentially a crane boom with specially designed bucket loosely attached at the end through cables as in drag line. 3. Basic part are closing line, hoist line, sheaves, brackets, tagline, shell and hinge. April 18, 2013 Construction Management 39 Agrawal
  • 40. Excavation Equipment : Trenching Machine 1. These are used for excavating trenches for laying pipelines, sewers, cables etc. 2. Their operation is quick giving the required depth or width. 3. Wheel type : this can be used for providing depth of 3m and width ranging from 0.3 to 0.6m. The machine consist of power driven wheel provided with a number of detachable buckets having cutting teeth. 4. Ladder type : this consists of telescopic ladder or boom. There are two endless chains on which detachable buckets are mounted. The boom is holding the chains. The excavated material is conveyed to conveyor belt which disposes off the excavated earth. April 18, 2013 Construction Management 40 Agrawal
  • 41. Excavating & Earth-moving Equipment : Scrapers 1. Result of compromise between best loading and best hauling machines 2. They have established an important position in the earth moving field 3. It unique machine for digging and long distance hauling of ploughable materials 4. Self operating machine which digs and carry its own load through scrapping the ground, hauls it over the required distance and discharging 5. Classified as crawler-tractor-pulled and wheel-tractor-pulled depending on the type of tractor used to pull them 6. Basic part are bowl, apron, and tail gate or ejector. April 18, 2013 Construction Management 41 Agrawal
  • 42. Excavating & Earth-moving Equipment : Bull Dozers 1. These versatile equipments are commonly used in construction projects 2. Heavy blade attached to the tractor pushes material from one place to other 3. Classified on basic of position of blades, mountings and controlled 4. Generally used for spreading earth fill 5. For opening uproot roads through mountainous and rocky terrains 6. Clearing construction site 7. Maintaining hauls roads April 18, 2013 Construction Management 42 Agrawal
  • 43. Excavating & Earth-moving Equipment : Tractors 1. These are multi purpose machines used mainly for pulling and pushing the other equipment or heavy loads 2. They are also used for agricultural purposes. 3. Classified as crawler type tractor and wheel type tractor 4. Crawler type tractor is versatile equipment used to move bull dozers, scrapers and wagons on rough roads. The speed of this type doesn’t 12 kmph normally. It isn’t used on bituminous road 5. Wheel type tractor is mounted on four wheels. The main advantage is higher speed upto 50kmph. Used for long distance hauling and on good roads. And agricultural used April 18, 2013 Construction Management 43 Agrawal
  • 44. Excavating Compaction Equipment : Smooth Wheel Rollers 1. Plain steel rollers, self-propelled type, weighing from 5 to 15 tones and are used for ordinarily rolling work is where deep compaction isn’t required, the principal application being wider. 2. These roller are usually diesel engine type 3. Compacts only small top thickness of earth and it effect doesn’t reach bottom of the layer 4. After compaction roller leave the surface smooth April 18, 2013 Construction Management 44 Agrawal
  • 45. Excavating Compaction Equipment : Sheep Wheel Rollers 1. Compacting earth work in embankment and canals where compaction deep into layer of earth is required, these types of rollers are used 2. Tamping effect produce good effect 3. Roller is hollow steel drum 4. Self-propelled or as towed units 5. Weigh upto 15tonnes or more and travel at speed of 25kmph April 18, 2013 Construction Management 45 Agrawal
  • 46. Excavating Compaction Equipment : Pneumatic Tyred Rollers 1. Consist of base or platform mounted between tow axles, the rear of which has one more wheel than the front 2. Tyres must be so arranged that the tracks of forward wheels lie in between tracks of backward wheels 3. Compacting fine grained soil and well graded sands 4. Self propelled and ballasting is done using either water or sand or pig iron to increase self weight April 18, 2013 Construction Management 46 Agrawal
  • 47. Difference between Crawler & Wheeled • Crawler type roller has slow • Wheeled type roller has greater speed speed • More compact and powerful and • Can handle only lighter jobs can handle heavier jobs • Cheaper • Costly • • Operational & maintenance cost is Cost of operation & maintenance is high less • Stick control for steering • Wheel steering control • Moves on rough roads only • Moves on rough as well as good • Used for short distances roads • Requires skillful operation, • Used for longer distances maintenance & repairs • Lesser skills required for operation, maintenance & repairs April 18, 2013 Construction Management 47 Agrawal
  • 48. Hauling Equipment 1. Defined as movement of material form one place to another 2. Equipment used for transportation of material is called as hauling equipment or simply haulers 3. They classified as Dump Trucks and Dumpers 4. Dump trucks : used for earth moving purpose. Dumping of earth can done rear, on the sides or at the bottom of truck. 5. Selection of the type of dump trucks for a specific job depends on the soil condition and the nature of the haul road 6. Dumpers : are high speed pneumatic wheeled trucks with short chassis and strong bodies. 7. The hauling and dumping and dumping is done very fast compared to other equipment by using the dumper. April 18, 2013 Construction Management 48 Agrawal
  • 49. Hoisting Equipment 1. It is the operation of lifting a weight from one location and moving it to another location which is at a reasonable distance and then dumping it. 2. Now a days, many big projects such as construction of dams, industrial buildings etc. require hoisting equipment. 3. It includes jacks, winches, chain hoists and cranes. 4. As hoisting equipment, crane is only single machine which has a single piece, is capable of providing three dimensional movement of a weight. 5. Cranes are broadly classified as 1. Stationary or derrick cranes 2. Mobile cranes 3. Overhead or gantry cranes 4. Traveler cranes 5. Tower cranes April 18, 2013 Construction Management 49 Agrawal
  • 50. Hoisting Equipment : Derrick Cranes 1. It consist of mast, a boom and a bull wheel on which the boom rotates about vertical axis and guys or supporting members 2. These cranes are either electrically operated, diesel operated or both 3. The guy derrick has small mast supported by a number of guys and boom pivoted at the lower end of the mast. The boom can revolve through 360’. This crane is used for heavy loads upto 200 tons. 4. When load become less then 50 tons, guy ropes are replaced by trussed structure which become stiff leg derrick. It consists of mast, which can rotate and a boom. A stiff leg derrick is used for loads from 7 to 50tons. April 18, 2013 Construction Management 50 Agrawal
  • 51. Hoisting Equipment : Mobile Cranes 1. These are mounted on mobile units which is either crawlers type or wheel type. 2. Truck cranes have high mobility while the crawler mounted cranes move slowly. 3. Crawler type are capable of moving on rough terrain 4. Used for transportation of loads to shorter distances April 18, 2013 Construction Management 51 Agrawal
  • 52. Hoisting Equipment : Traveler Cranes 1. They have their crabs moving on girders which are supported on legs instead of on overhead gantry track as used in overhead cranes. 2. The legs are capable of moving on tracks laid on the floors Hoisting Equipment : Tower Cranes 1. Used for industrial and residential high rise building. 2. These are commonly used for assembly of industrial plants with steel structures. 3. Main part of crane are under carriage, slewing platform, tower with operator’s cabin and jibs 4. Tower has truss structure welded from steel bars and channels April 18, 2013 Construction Management 52 Agrawal
  • 53. Conveying Equipment 1. It is process of transporting material from one place to another over a stationary structure. 2. They are those which carry material in continuous stream with its distinct features such as endless chain or belt. 3. When equipment does horizontally conveying it is know as conveyor 4. When equipment does vertically conveying it is know as elevator 5. Advantages of conveyor are 1. It increases output 2. It facilitates continuity in operation 3. It results in time saving 4. These are no waiting periods April 18, 2013 Construction Management 53 Agrawal
  • 54. Conveying Equipment : Belt Conveyor 1. It is one of popular conveying machinery 2. Used when large quantities of materials have to be conveyed over long distances at fast speed 3. Simplest form consists of belt running over a pair of end drums or pulleys and supported at regular intervals by series of rollers called idlers 4. Advantages of belt conveyor are 1. It can handles light/ heavy materials, dry/ wet, fine/ coarse. 2. Designed for conveying several thousand tons of material per hour and for distances of several kilometers. 3. Can carry material horizontally or inclined 4. Lighter in weight then other conveyors 5. Controlled discharge of material April 18, 2013 Construction Management 54 Agrawal
  • 55. Conveying Equipment : Screw Conveyor 1. Used for handling granular or pulverized material 2. Quantity of material conveyed is less compared to the belt conveyor, at same time cost is also less. 3. Can inclined maximum upto 35’ 4. Length of conveyor is 65m Conveying Equipment : Bucket Conveyor 1. Has bucket in shape of V which are open at top 2. Length is limited upto 25m due to weight of the conveyor and strength of the chains. 3. Generally used for coal handling April 18, 2013 Construction Management 55 Agrawal
  • 56. Aggregate Production Equipment 1. Crushers are generally used to reduce size of the large stone or rock to smaller uniform sized aggregates required for concrete mix. 1. Jaw Crusher : primary crusher, operates by allowing stone to flow into the space between two jaws one of which stationary and other is movable. 2. Gyratory Crusher : hardened steel plates. Lead has long conical shape, with trough shaft suspended in bearing at the top and an eccentric base connection connected to gears. 3. Cone Crusher : are capable of producing large quantities of uniformly fine crushed stone. It has shorter cone with smaller inlet and outlet openings. 4. Roll Crusher : consists of heavy cast iron frame equipped with two counter rotating rollers mounted on separate horizontal shaft. April 18, 2013 Construction Management 56 Agrawal
  • 57. Factors affecting selection of Construction Equipment 1. Use of equipment available with the organization 2. Suitability for job condition with special references to climatic and operating conditions 3. Uniformity of type 4. Size of equipment 5. Use of standard equipment 6. Country of origin 7. Unit cost of production 8. Availability of spare parts and selection of manufacturers 9. Suitability of local labour for operation April 18, 2013 Construction Management 57 Agrawal
  • 58. Equipment Management Checklist 1. Mechanize selectively for economy of production, quality and speed of construction 2. Choose between buying, hiring and leasing 3. Choose size and number of equipment including standby 4. Select the prime mover –petrol/diesel/electric 5. check suitability for local conditions 6. Decide on mobile or stationary equipment 7. Arrange finance for purchase 8. Examine the warranties while purchasing 9. Commission equipment within warranty period 10. Freeze productivity norms and ensure same 11. Use only trained personal for operation 12. Insist on regular preventative maintenance 13. Ensure that standby power is available 14. Insist on safety measures April 18, 2013 Construction Management 58 Agrawal
  • 59. Management Information Systems in Construction Industry • Date : it can be defined as group of non-random symbols which represent things that have happened. Data of facts that are obtained by observation or research and which are recorded frequently are called as Raw data or Basic data • Information : the concept of information in an organizational sense is more complex and difficult than frequent use of this common word would suggest. Information is data that have been interpreted and understood by the recipient of the message. • Communication : information is transmitted by the process of communication. Communication involves the interchange of thoughts or opinion by word, letters or by similar means. April 18, 2013 Construction Management 59 Agrawal
  • 60. Management Information Systems in Construction Industry • An Organization is an institute which promotes mechanism of interpersonal relations and activates collaboration many resources available such as, Monetary, technical, marketing and business. April 18, 2013 Construction Management 60 Agrawal
  • 61. Requirement of MIS • To provide an organized and efficient means of measuring, collection, verifying and qualifying data, reflecting the progress and status of operations on the project with respect to progress, cost, resources and quantity • To provide a standard against which progress and cost can be compared • To provide an organized, accurate and effectiveness means of converting the data from the operation into information. The information systems should be realistic should be realistic and should recognize – Means of processing the information – Skills available – Value of information compared with the cost of obtaining – Report the correct and necessary information – Identify and isolate critical information – To deliver the information April 18, 2013 Construction Management 61 Agrawal
  • 62. Payment of Wages Act 1982 1. This act was introduced to regulate the payment of wages, imposition of fines, etc 2. The term Wages includes all remuneration including all allowances, bonus, notice pay, etc but doesn’t include house rent, water and electricity charges, travel allowance, medical allowance, pension, gratuity etc 3. Accordingly to Act, wages are to be paid promptly on a monthly basis and if any person is terminated from service, his wages should be settled within two days of the termination. 4. This Act is applicable to employees having a salary less then Rs. 1600 pm April 18, 2013 Construction Management 62 Agrawal
  • 63. Minimum Wages Act 1986 1. This act prevents the exploitation of the unorganized labour in the construction industry by the employers. 2. Accordingly to this Act, provision is made for the statuary fixation of minimum rate of wages in the establishment. 3. Wages to construction workers in India is paid either in time rate basis or piece rate basis 4. In the time rate basis, suitable rate of payment is fixed per unit of time that the worker is engaged for the work 5. Accordingly to this Act, different minimum rates can be fixed depending on the class of work, type of personal employed and depending on the location of work. April 18, 2013 Construction Management 63 Agrawal
  • 64. Indian Contract Act 1872 • In this Act the following words and expressions are used in the following senses, unless a contrary intention appears from the context:- – When one person signifies to another his willingness to do or to abstain from doing anything, with a view to obtaining the assent of that other to such act or abstinence, he is said to make a proposal – When the person to whom the proposal is made signifies his assent thereto, the proposal is said to be accepted. A proposal, when accepted, becomes a promise – The person making the proposal is called the" promisor and the person accepting the proposal is called the It promise" – When, at the desire of the promisor, the promise or any other person has clone or abstained from doing, or does or abstains from doing, or promises to do or to abstain from doing, something, such Act or abstinence or promise is called a consideration for the promise April 18, 2013 Construction Management 64 Agrawal
  • 65. Workmen Compensation Act 1. In case of death: 40% of the monthly wage of the deceased workman, multiplied by the relevant factor or Rs. 20,000; whichever is more. 2. In case of total permanent disablement: 50% of the monthly wage, multiplied by the relevant factor: or Rs. 24,000; whichever is more. 3. In case of partial permanent disablement: The compensation is a percentage of that payable in the case of total permanent disablement. The earning capacity is determined by a qualified medical practitioners. 4. In case of (total or partial) temporary disablement" A sum equal to 25% of the monthly wages of the workman shall be paid half-monthly. • The minimum rate of compensation is proposed to be raised from 50,000 to Rs. 80,000 for death and from Rs. 60,000 to Rs. 90,000 in case of permanent/total disablement. State Government appoints Commissioners to investigate and solve every case for workmen's compensation. The appointed Commissioner's tribunal has some of the powers of a civil court. An appeal against any order of the Commissioner can be filed in the High Court. This must be done within 60 days of the order or decision of the Commissioner. April 18, 2013 Construction Management 65 Agrawal
  • 66. Preparation for the Construction Interview 1. Personal characteristics : such as physical appearance, health, sense of humor, Self confidence, cultural level, alertness, manners, general working habits. 2. Technical Competency : information about the exams passed, grades obtained, awards and honors and extra- curricular activities. 3. To find the initiative, common sense and general smartness 4. Ability to inspire confidence by sustained effort without super-vision , level making ability, originality and initiative. 5. Capacity to work in team-by knowing about his family, community interests and his type of friends. 6. Potential for growth-long range aspirations of the applicant – whether he is a drifter or one who would exploit every possible chance to develop his potential to the maximum. 7. Having Details of construction done in nearby area he is leaving. April 18, 2013 Construction Management 66 Agrawal
  • 67. Form work removing periods • Walls, columns and vertical sides of beams – 24 to 48 hours may be decided by Engineer-in-charge • Slabs (Prop left under ) 3 day • Beam soffit (Prop left under ) 7 days • Removing of props to slabs – Spanning less then 4.5m = 7 days – Spanning over 4.5m = 14 days • Removing of props to beams and arches – Spanning less then 6m = 14 days – Spanning over 6m = 21 days April 18, 2013 Construction Management 67 Agrawal
  • 68. April 18, 2013 Construction Management 68 Agrawal