Problem No. 1
How To Calculate Raw Materials To Produce Finished
Product/Goods?
A factory uses a particular raw material. There are three processes A, B and C. The
data relating to inputs, outputs and rejections during the month of April are given below:
Inputs (in pieces)
(Including opening W.I.P)
Rejections
(in Pieces)
Output
(in pieces)
A 18,000 6,000 12,000
B 19,800 1,800 18,000
C 20,400 3,400 17,000
Determining what should be inputs and Process A when final product transferred from
process C is 1,000 pieces.
Required:
Calculate the cost of raw materials to produce one piece of the finished product when:
(a) the weight of the finished product is 10 gram.
(b) the price of the raw material is $1 per kg.
Solution
(a). Process
No. of Pieces Rejected Pieces
Input Output No. % of ou
A 18,000 12,000 6,000
B 19,800 18,000 1,800
C 20,400 17,000 3,400
If 1,000 good pieces should be the output of Process C the input should be 1,000 plus
20%, i.e., 1,200 pieces. This input of 1,200 units of Process C should be the output of
process B. The percentage of rejection being 10% in process B, the input in process B
should be 1,200 pieces plus, i.e., 1,320 pcs. Similarly, 1,320 pcs. should be should be
the output of Process A. The rejection being 50%, the input of process A should be
1,320 plus 50%, i.e., 1,980 pcs. It can be tabulated as follows:
Process Input Rejection
% Rejection of
output
Outp
A 1,980 660 50%
B 1,320 120 10%
C 1,200 200 20%
Also Check: Cost Plus Contract
(b) Given:
weight of the finished product = 10 grams per pc.
Assuming that there is no other loss of material, the total material required for 1,980
pcs. of input of Process A shall be:
1,980 pcs. X 10 gms. = 19,800 gms.
Rate of Material = $1 per kg.
Cost of raw material = (19,800X1) / 1,000 = $19.80
Cost o fraw material per pc.= 19.80 / 1,000 = $0.0198
Problem No. 2
Calculation Of Maximum, Minimum And Reorder Stock Levels.
(1). Discuss the consideration that influences the setting of maximum, minimum and
reorder stock levels. Illustrate their computation by using the following information for a
component ‘ZYP’.
Normal usage 50 per week
Minimum usage 25 per week
Maximum usage 75 per week
Re-order quantity 300 units
Re-order period 4 to 6 weeks
Solution
(Note: For consideration influencing the stock levels, read the discussion in the previous
pages)
Re-order level = Max. consumption per day / per week etc. X Max. Re-order period
= 75 units X 6 weeks = 450 Units.
Maximum Level = Re-order Level + Re-order Quantity – (Minimum consumption
per day/per week etc. X Minimum time required to obtain supplies)
= 450 units + 300 units – (25 units x 4 weeks)
= 750 units – 100 units = 650 units
Minimum Level = Re-Order level – (Normal consumption per day/per week etc. X
Average Re-order period)
= 450 units – (50 units x 5 weeks)
= 450 units – 250 units = 200 units
(2). Two Components, A and B are used as follows:
Normal usage = 50 units per week each
Minimum usage = 25 units per week each
Maximum usage = 75 units per week each
Reorder quantity A: 400 units
Reorder quantity B: 600 units
Reorder period A: 4 to 6 weeks
Reorder period B: 2 to 4 weeks
Also Check: How to calculate profit and loss on contracts?
Required:
Calculate for each component
(i) Reorder Level
(ii) Minimum level
(iii) Maximum level
(iv) Average stock level
Solution
(i) Reorder Level = Maximum consumption per day/per week etc. X Maximum Re-
Order Period
Component A = 75 units X 6 weeks = 450 units
Component B = 75 units X 4 weeks = 300 units
(ii) Minimum Level = Reorder Level – (Normal consumption per day/per week etc. X
Average Re-order period)
Component A = 450 units – (50 units x 5 weeks) = 200 units
Component B = 300 units – (50 units x 3 weeks) = 150 units
(iii) Maximum Level = Reorder level – Reorder Quantity – (Minimum consumption per
day/per week, etc. X Minimum Time Required to get supplies)
Component A = 450 units + 400 units – (25 units x 4 weeks)
= 850 units – 100 units = 750 units
Component B = 300 units + 600 units – (25 units x 2 weeks)
= 900 units – 50 units = 850 units
Average Stock Level = Minimum Level + 1/2 (Reorder Quantity)
Component A = 200 units + (1 / 2 X 400 units) = 400 units
Component B = 150 units + (1/2 X 600 units) = 450 units
Problem 3
Calculation Of Material Turnover Ratio
Following figures were taken from the records of John and Co. for the year 31st March
2019. The valuation of inventory is $1 per kg:
Material ‘X’ Material ‘Y’
$ $
Opening Stock 1,700
Purchases 51,000
Closing Stock 1,200
Required:
Calculate the material turnover ratio and express in number of days the average
inventory is held.
Solution
Working notes:
1. Material consumed
Also Check: Pricing Methods of Material Issued
Material ‘X’
(kgs.)
Material ‘Y’
(kgs.)
Opening stock
Add: Purchases
1,700
51,000
52,700
Less: Closing Stock 1,200
51,500
2. Average Inventory
Average inventory = (Opening Stock + Closing Stock) / 2
Material X = (1,700 + 1,200) / 2 = 1,450 kgs.
Material Y = (1,200 + 1,000) / 2 = 1,100 kgs.
3. Material Turnover Ratio
= Material consumed during the period / Average Inventory
Material X = 51,500 / 1,450 = 35.5 times (approx.)
Material Y = 32,200 / 1,100 = 29.3 times (approx.)
4. Number of days Average Inventory is held
= Total No. of days in the period / Material Turnover
Material X = 365 / 35.5 = 10.3 days (approx.)
Material Y = 365 / 29.3 = 12.5 days (approx.)
Problem 4
Calculation Of Economic Order Quantity
(1). Do as directed:
Annual consumption: 40,00,000 kgs.
Cost of placing one order: $100
Cost of carrying one kg. of raw material for one year: $0.5
Required:
Calculate the Economic Order Quantity (EOQ)
Solution:
(2). The annual demand for a product is 6,400 units. The unit cost is $6 and inventory
carrying cost is 25% per annum. If the cost of one procurement is $75 determine:
(i) Economic order quantity
(ii) No. of orders per year
(iii) Time between two consecutive orders.
Solution
(i) Economic Order Quantity
(ii) No. of orders per year = Annual consumption / Size of one order
= 6,400 units / 800 units
= 8 orders
(iii) Time gap between two consecutive orders = 12 months / No. of orders
= 12 months / 8 orders
= 1.5 months
Class test of cost accounting

More Related Content

What's hot

Costi Industriali e Costi Variabili: 3.Imputazione dei costi unitari
Costi Industriali e Costi Variabili: 3.Imputazione dei costi unitariCosti Industriali e Costi Variabili: 3.Imputazione dei costi unitari
Costi Industriali e Costi Variabili: 3.Imputazione dei costi unitari
Manager.it
 
ANALISA PERHITUNGAN MRP RAW MATERIAL
ANALISA PERHITUNGAN MRP RAW MATERIALANALISA PERHITUNGAN MRP RAW MATERIAL
ANALISA PERHITUNGAN MRP RAW MATERIAL
rizky wicaksono
 
Standard Costing
Standard Costing Standard Costing
Standard Costing
Nitin Parbhakar
 
Process Costing- Chapter Four
Process Costing- Chapter FourProcess Costing- Chapter Four
Process Costing- Chapter Four
Emily Bauer
 
Variance Analysis
Variance AnalysisVariance Analysis
Variance Analysis
Dr. Rana Singh
 
Managerial Accounting in class exercise chapter 4 solution
Managerial Accounting in class exercise chapter 4 solutionManagerial Accounting in class exercise chapter 4 solution
Managerial Accounting in class exercise chapter 4 solution
Helen Wong
 
Standard cost
Standard costStandard cost
Standard cost
Rohit Mohan
 
Acct 326 week 4 midterm exam new 2016
Acct 326 week 4 midterm exam new 2016Acct 326 week 4 midterm exam new 2016
Acct 326 week 4 midterm exam new 2016
powellabril
 
Cost accounting sample assignment help
Cost accounting sample assignment helpCost accounting sample assignment help
Cost accounting sample assignment help
Expertsmind IT Education Pvt Ltd.
 
Process costing manipal jaipur bba 3 semester
Process costing manipal jaipur bba 3 semesterProcess costing manipal jaipur bba 3 semester
Process costing manipal jaipur bba 3 semester
sachin kumar sharma
 
2. Budget Flessibile
2. Budget Flessibile2. Budget Flessibile
2. Budget Flessibile
Manager.it
 
3. Analisi delle Spese Generali e Budget Flessibile
3. Analisi delle Spese Generali e Budget Flessibile3. Analisi delle Spese Generali e Budget Flessibile
3. Analisi delle Spese Generali e Budget Flessibile
Manager.it
 
Case study 1 week 1
Case study 1   week 1Case study 1   week 1
Case study 1 week 1
sam1909
 

What's hot (13)

Costi Industriali e Costi Variabili: 3.Imputazione dei costi unitari
Costi Industriali e Costi Variabili: 3.Imputazione dei costi unitariCosti Industriali e Costi Variabili: 3.Imputazione dei costi unitari
Costi Industriali e Costi Variabili: 3.Imputazione dei costi unitari
 
ANALISA PERHITUNGAN MRP RAW MATERIAL
ANALISA PERHITUNGAN MRP RAW MATERIALANALISA PERHITUNGAN MRP RAW MATERIAL
ANALISA PERHITUNGAN MRP RAW MATERIAL
 
Standard Costing
Standard Costing Standard Costing
Standard Costing
 
Process Costing- Chapter Four
Process Costing- Chapter FourProcess Costing- Chapter Four
Process Costing- Chapter Four
 
Variance Analysis
Variance AnalysisVariance Analysis
Variance Analysis
 
Managerial Accounting in class exercise chapter 4 solution
Managerial Accounting in class exercise chapter 4 solutionManagerial Accounting in class exercise chapter 4 solution
Managerial Accounting in class exercise chapter 4 solution
 
Standard cost
Standard costStandard cost
Standard cost
 
Acct 326 week 4 midterm exam new 2016
Acct 326 week 4 midterm exam new 2016Acct 326 week 4 midterm exam new 2016
Acct 326 week 4 midterm exam new 2016
 
Cost accounting sample assignment help
Cost accounting sample assignment helpCost accounting sample assignment help
Cost accounting sample assignment help
 
Process costing manipal jaipur bba 3 semester
Process costing manipal jaipur bba 3 semesterProcess costing manipal jaipur bba 3 semester
Process costing manipal jaipur bba 3 semester
 
2. Budget Flessibile
2. Budget Flessibile2. Budget Flessibile
2. Budget Flessibile
 
3. Analisi delle Spese Generali e Budget Flessibile
3. Analisi delle Spese Generali e Budget Flessibile3. Analisi delle Spese Generali e Budget Flessibile
3. Analisi delle Spese Generali e Budget Flessibile
 
Case study 1 week 1
Case study 1   week 1Case study 1   week 1
Case study 1 week 1
 

Similar to Class test of cost accounting

Material control ppt
Material control pptMaterial control ppt
Material control ppt
BarkkhaMakhija
 
Inventory-Model-8.pptx
Inventory-Model-8.pptxInventory-Model-8.pptx
Inventory-Model-8.pptx
DarlianneKlyneBayer
 
Lecture 2_Inventory Management_EOQ_EPQ.pdf
Lecture 2_Inventory Management_EOQ_EPQ.pdfLecture 2_Inventory Management_EOQ_EPQ.pdf
Lecture 2_Inventory Management_EOQ_EPQ.pdf
RaymondCabrera9
 
Topic 4 Inventory Management Model.pptx
Topic 4 Inventory Management Model.pptxTopic 4 Inventory Management Model.pptx
Topic 4 Inventory Management Model.pptx
HassanHani5
 
Activity based costing approach
Activity based costing approachActivity based costing approach
Activity based costing approach
Marina Uryasyeva
 
MANAGEMENT ACCOUNTING Model Solution CM231.-MAC-IL-II-Solution-CMA-May-2022-...
 MANAGEMENT ACCOUNTING Model Solution CM231.-MAC-IL-II-Solution-CMA-May-2022-... MANAGEMENT ACCOUNTING Model Solution CM231.-MAC-IL-II-Solution-CMA-May-2022-...
MANAGEMENT ACCOUNTING Model Solution CM231.-MAC-IL-II-Solution-CMA-May-2022-...
Sazzad Hossain, ITP, MBA, CSCA™
 
Material(economic order quantity) 2
Material(economic order quantity) 2Material(economic order quantity) 2
Material(economic order quantity) 2
LeenaKP
 
ACG 2071 Managerial Accounting Process Costing Systems .docx
ACG 2071 Managerial Accounting Process Costing Systems .docxACG 2071 Managerial Accounting Process Costing Systems .docx
ACG 2071 Managerial Accounting Process Costing Systems .docx
bobbywlane695641
 
Jiambalvo text book solutions (2)
Jiambalvo text book solutions (2)Jiambalvo text book solutions (2)
Jiambalvo text book solutions (2)
Mvs Krishna
 
Advance Variance analysis.pptx performance
Advance Variance analysis.pptx performanceAdvance Variance analysis.pptx performance
Advance Variance analysis.pptx performance
Hassani7
 
Case 14 Name(s)______________________________.docx
Case 14          Name(s)______________________________.docxCase 14          Name(s)______________________________.docx
Case 14 Name(s)______________________________.docx
jasoninnes20
 
Process costing
Process costingProcess costing
Process costing
Cat Kuching
 
Standard-Costing-Variance-Analysis.ppt
Standard-Costing-Variance-Analysis.pptStandard-Costing-Variance-Analysis.ppt
Standard-Costing-Variance-Analysis.ppt
JomarDoctora
 
Inventory management
Inventory managementInventory management
Inventory management
Uday Bansode
 
Inventory management
Inventory managementInventory management
Inventory management
Uday Bansode
 
how much to manufacture
how much to manufacturehow much to manufacture
how much to manufacture
Rahul Rathod
 
4. job order cost systems
4. job order cost systems4. job order cost systems
4. job order cost systems
Leonardo Figueroa
 
Aggregate Planning for industrial engineering
Aggregate Planning for industrial engineeringAggregate Planning for industrial engineering
Aggregate Planning for industrial engineering
ashaby
 
Productivity
ProductivityProductivity
Productivity
seema memon
 
Unit 6 Inventoy. ppt.ppt
Unit 6 Inventoy. ppt.pptUnit 6 Inventoy. ppt.ppt
Unit 6 Inventoy. ppt.ppt
AnshikaMaheshwari10
 

Similar to Class test of cost accounting (20)

Material control ppt
Material control pptMaterial control ppt
Material control ppt
 
Inventory-Model-8.pptx
Inventory-Model-8.pptxInventory-Model-8.pptx
Inventory-Model-8.pptx
 
Lecture 2_Inventory Management_EOQ_EPQ.pdf
Lecture 2_Inventory Management_EOQ_EPQ.pdfLecture 2_Inventory Management_EOQ_EPQ.pdf
Lecture 2_Inventory Management_EOQ_EPQ.pdf
 
Topic 4 Inventory Management Model.pptx
Topic 4 Inventory Management Model.pptxTopic 4 Inventory Management Model.pptx
Topic 4 Inventory Management Model.pptx
 
Activity based costing approach
Activity based costing approachActivity based costing approach
Activity based costing approach
 
MANAGEMENT ACCOUNTING Model Solution CM231.-MAC-IL-II-Solution-CMA-May-2022-...
 MANAGEMENT ACCOUNTING Model Solution CM231.-MAC-IL-II-Solution-CMA-May-2022-... MANAGEMENT ACCOUNTING Model Solution CM231.-MAC-IL-II-Solution-CMA-May-2022-...
MANAGEMENT ACCOUNTING Model Solution CM231.-MAC-IL-II-Solution-CMA-May-2022-...
 
Material(economic order quantity) 2
Material(economic order quantity) 2Material(economic order quantity) 2
Material(economic order quantity) 2
 
ACG 2071 Managerial Accounting Process Costing Systems .docx
ACG 2071 Managerial Accounting Process Costing Systems .docxACG 2071 Managerial Accounting Process Costing Systems .docx
ACG 2071 Managerial Accounting Process Costing Systems .docx
 
Jiambalvo text book solutions (2)
Jiambalvo text book solutions (2)Jiambalvo text book solutions (2)
Jiambalvo text book solutions (2)
 
Advance Variance analysis.pptx performance
Advance Variance analysis.pptx performanceAdvance Variance analysis.pptx performance
Advance Variance analysis.pptx performance
 
Case 14 Name(s)______________________________.docx
Case 14          Name(s)______________________________.docxCase 14          Name(s)______________________________.docx
Case 14 Name(s)______________________________.docx
 
Process costing
Process costingProcess costing
Process costing
 
Standard-Costing-Variance-Analysis.ppt
Standard-Costing-Variance-Analysis.pptStandard-Costing-Variance-Analysis.ppt
Standard-Costing-Variance-Analysis.ppt
 
Inventory management
Inventory managementInventory management
Inventory management
 
Inventory management
Inventory managementInventory management
Inventory management
 
how much to manufacture
how much to manufacturehow much to manufacture
how much to manufacture
 
4. job order cost systems
4. job order cost systems4. job order cost systems
4. job order cost systems
 
Aggregate Planning for industrial engineering
Aggregate Planning for industrial engineeringAggregate Planning for industrial engineering
Aggregate Planning for industrial engineering
 
Productivity
ProductivityProductivity
Productivity
 
Unit 6 Inventoy. ppt.ppt
Unit 6 Inventoy. ppt.pptUnit 6 Inventoy. ppt.ppt
Unit 6 Inventoy. ppt.ppt
 

Recently uploaded

Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
TechSoup
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxBeyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
EduSkills OECD
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
haiqairshad
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
Chapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptxChapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptx
Denish Jangid
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
HajraNaeem15
 
B. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdfB. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdf
BoudhayanBhattachari
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
Solutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptxSolutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptx
spdendr
 
Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47
MysoreMuleSoftMeetup
 
Bed Making ( Introduction, Purpose, Types, Articles, Scientific principles, N...
Bed Making ( Introduction, Purpose, Types, Articles, Scientific principles, N...Bed Making ( Introduction, Purpose, Types, Articles, Scientific principles, N...
Bed Making ( Introduction, Purpose, Types, Articles, Scientific principles, N...
Leena Ghag-Sakpal
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience
Wahiba Chair Training & Consulting
 
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
MJDuyan
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
siemaillard
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 

Recently uploaded (20)

Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxBeyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
Chapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptxChapter wise All Notes of First year Basic Civil Engineering.pptx
Chapter wise All Notes of First year Basic Civil Engineering.pptx
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
 
B. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdfB. Ed Syllabus for babasaheb ambedkar education university.pdf
B. Ed Syllabus for babasaheb ambedkar education university.pdf
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
Solutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptxSolutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptx
 
Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47
 
Bed Making ( Introduction, Purpose, Types, Articles, Scientific principles, N...
Bed Making ( Introduction, Purpose, Types, Articles, Scientific principles, N...Bed Making ( Introduction, Purpose, Types, Articles, Scientific principles, N...
Bed Making ( Introduction, Purpose, Types, Articles, Scientific principles, N...
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience
 
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 

Class test of cost accounting

  • 1. Problem No. 1 How To Calculate Raw Materials To Produce Finished Product/Goods? A factory uses a particular raw material. There are three processes A, B and C. The data relating to inputs, outputs and rejections during the month of April are given below: Inputs (in pieces) (Including opening W.I.P) Rejections (in Pieces) Output (in pieces) A 18,000 6,000 12,000 B 19,800 1,800 18,000 C 20,400 3,400 17,000 Determining what should be inputs and Process A when final product transferred from process C is 1,000 pieces. Required: Calculate the cost of raw materials to produce one piece of the finished product when: (a) the weight of the finished product is 10 gram. (b) the price of the raw material is $1 per kg. Solution (a). Process No. of Pieces Rejected Pieces Input Output No. % of ou A 18,000 12,000 6,000 B 19,800 18,000 1,800 C 20,400 17,000 3,400 If 1,000 good pieces should be the output of Process C the input should be 1,000 plus 20%, i.e., 1,200 pieces. This input of 1,200 units of Process C should be the output of process B. The percentage of rejection being 10% in process B, the input in process B should be 1,200 pieces plus, i.e., 1,320 pcs. Similarly, 1,320 pcs. should be should be
  • 2. the output of Process A. The rejection being 50%, the input of process A should be 1,320 plus 50%, i.e., 1,980 pcs. It can be tabulated as follows: Process Input Rejection % Rejection of output Outp A 1,980 660 50% B 1,320 120 10% C 1,200 200 20% Also Check: Cost Plus Contract (b) Given: weight of the finished product = 10 grams per pc. Assuming that there is no other loss of material, the total material required for 1,980 pcs. of input of Process A shall be: 1,980 pcs. X 10 gms. = 19,800 gms. Rate of Material = $1 per kg. Cost of raw material = (19,800X1) / 1,000 = $19.80 Cost o fraw material per pc.= 19.80 / 1,000 = $0.0198 Problem No. 2 Calculation Of Maximum, Minimum And Reorder Stock Levels. (1). Discuss the consideration that influences the setting of maximum, minimum and reorder stock levels. Illustrate their computation by using the following information for a component ‘ZYP’. Normal usage 50 per week Minimum usage 25 per week Maximum usage 75 per week Re-order quantity 300 units Re-order period 4 to 6 weeks Solution
  • 3. (Note: For consideration influencing the stock levels, read the discussion in the previous pages) Re-order level = Max. consumption per day / per week etc. X Max. Re-order period = 75 units X 6 weeks = 450 Units. Maximum Level = Re-order Level + Re-order Quantity – (Minimum consumption per day/per week etc. X Minimum time required to obtain supplies) = 450 units + 300 units – (25 units x 4 weeks) = 750 units – 100 units = 650 units Minimum Level = Re-Order level – (Normal consumption per day/per week etc. X Average Re-order period) = 450 units – (50 units x 5 weeks) = 450 units – 250 units = 200 units (2). Two Components, A and B are used as follows: Normal usage = 50 units per week each Minimum usage = 25 units per week each Maximum usage = 75 units per week each Reorder quantity A: 400 units Reorder quantity B: 600 units Reorder period A: 4 to 6 weeks Reorder period B: 2 to 4 weeks Also Check: How to calculate profit and loss on contracts? Required: Calculate for each component (i) Reorder Level (ii) Minimum level (iii) Maximum level (iv) Average stock level Solution (i) Reorder Level = Maximum consumption per day/per week etc. X Maximum Re- Order Period Component A = 75 units X 6 weeks = 450 units Component B = 75 units X 4 weeks = 300 units (ii) Minimum Level = Reorder Level – (Normal consumption per day/per week etc. X Average Re-order period)
  • 4. Component A = 450 units – (50 units x 5 weeks) = 200 units Component B = 300 units – (50 units x 3 weeks) = 150 units (iii) Maximum Level = Reorder level – Reorder Quantity – (Minimum consumption per day/per week, etc. X Minimum Time Required to get supplies) Component A = 450 units + 400 units – (25 units x 4 weeks) = 850 units – 100 units = 750 units Component B = 300 units + 600 units – (25 units x 2 weeks) = 900 units – 50 units = 850 units Average Stock Level = Minimum Level + 1/2 (Reorder Quantity) Component A = 200 units + (1 / 2 X 400 units) = 400 units Component B = 150 units + (1/2 X 600 units) = 450 units Problem 3 Calculation Of Material Turnover Ratio Following figures were taken from the records of John and Co. for the year 31st March 2019. The valuation of inventory is $1 per kg: Material ‘X’ Material ‘Y’ $ $ Opening Stock 1,700 Purchases 51,000 Closing Stock 1,200 Required: Calculate the material turnover ratio and express in number of days the average inventory is held. Solution Working notes: 1. Material consumed Also Check: Pricing Methods of Material Issued
  • 5. Material ‘X’ (kgs.) Material ‘Y’ (kgs.) Opening stock Add: Purchases 1,700 51,000 52,700 Less: Closing Stock 1,200 51,500 2. Average Inventory Average inventory = (Opening Stock + Closing Stock) / 2 Material X = (1,700 + 1,200) / 2 = 1,450 kgs. Material Y = (1,200 + 1,000) / 2 = 1,100 kgs. 3. Material Turnover Ratio = Material consumed during the period / Average Inventory Material X = 51,500 / 1,450 = 35.5 times (approx.) Material Y = 32,200 / 1,100 = 29.3 times (approx.) 4. Number of days Average Inventory is held = Total No. of days in the period / Material Turnover Material X = 365 / 35.5 = 10.3 days (approx.) Material Y = 365 / 29.3 = 12.5 days (approx.) Problem 4 Calculation Of Economic Order Quantity (1). Do as directed: Annual consumption: 40,00,000 kgs. Cost of placing one order: $100 Cost of carrying one kg. of raw material for one year: $0.5 Required: Calculate the Economic Order Quantity (EOQ) Solution:
  • 6. (2). The annual demand for a product is 6,400 units. The unit cost is $6 and inventory carrying cost is 25% per annum. If the cost of one procurement is $75 determine: (i) Economic order quantity (ii) No. of orders per year (iii) Time between two consecutive orders. Solution (i) Economic Order Quantity (ii) No. of orders per year = Annual consumption / Size of one order = 6,400 units / 800 units = 8 orders (iii) Time gap between two consecutive orders = 12 months / No. of orders = 12 months / 8 orders = 1.5 months