KIOT
Lean system engineering
Target group: 3rd year GED
Chapter three
Stability
By: Endashaw Yohannes
Kombolcha/Ethiopia
April , 2019
4/9/2019 1
Stability
“Give me a place to stand, and I can move the earth.”
(Archimedes)
what is basic stability?
o In the simplest sense stability implies general predictability
and consistent availability in terms of (the 4Ms. )
» Man power
» Machine
» Material
» Method
4/9/2019 2
1.Manpower
2. Machines
3. Materials
4. Methods
4/9/2019 3
4/9/2019 4
1. Manpower
• Basic stability starts with a well trained workforce. Fortunately
employees tend to know their jobs very well or we would all be
in serious trouble
• The three specific job training components for production
supervisors :
1. Job instruction,
2. Job methods and
3. Job relations.
4/9/2019 5
1. Manpower cont..
• Job instruction (JI) taught supervisors how to plan for the
correct resources they would need in production, how to break
down jobs for instruction, and how to teach people safely,
correctly, and conscientiously.
• Job methods (JM) taught supervisors how to analyze jobs and
make simple improvements within their realms of control.
• Job relations (JR) taught supervisors to treat people as
individuals and solve basic human-related problems in
production rather than to ignore them.
4/9/2019 6
2. Machines
• You do not need equipment with perfect uptime, but you must
know your customer demand, the capacity of your process, and the
actual average output.
• If you have theoretical capacity as well as demonstrated capacity to
meet customer demand then there is no problem.
• It is only when you have no demonstrated capacity to meet demand
that you have a basic machine stability problem.
• For example, if customer demand is 700 units per shift and your
actual output is only 500 units despite having the capacity for 1000,
then you need more availability.
4/9/2019 7
3. Materials
• In general the goal of lean is to reduce waste and shorten the timeline from
when an order is received until the time it is produced. Normally this
requires the reduction of inventory in the value stream.
• If you suffer from basic instability, however, you might need to increase
inventory in the short term in some places or in some instances. The reason
is because with some processes you can flow production one by one or in
very small amounts.
Two pieces of advice on this topic.
• First, not all inventories are waste. Only inventory beyond what is needed
to run the process is waste.
• Second, inventory often exists as a symptom of a problem in the process.
Solving the problem earns you the right to reduce the inventory.
4/9/2019 8
4. Method
• Finally, achieving basic stability requires having standard methods
for manufacturing.
• The key point here is the definition of a standard.
• The normal definition is that a standard is a rule or way to do things.
• The definition of a standard in Toyota is slightly different. A standard
is a “rule or a basis for comparison.”
• A standard is nothing more that a tool to measure how we are doing
something and refer to when we want to make a change.
• The standards are what we use to measure and compare our changes
so that we know if the new way is better or not.
4/9/2019 9
Lean System Standards
Three fundamental lean questions and answers about standard
1. What is a standard?
o A standard is a clear image of a desired condition.
2. Why are standards so important in the Lean system?
o Standards make abnormalities immediately obvious so that
corrective action can be taken.
3. What makes an effective standard?
o A good standard is simple, clear, and visual.
4/9/2019 10
Work place organization philosophy
•First impression is very important
• Cost of pure work place
organization means waste
• Two segments of work place organization
1. Visual management
2. 5s
4/9/2019 11
Visual Management
• The Visual Management is designed to create a visual
workplace environment that is
»Self-explaining
»Self-ordering, and
»Self-improving.
• In a visual workplace, the out-of-standard situation is
immediately obvious and employees can easily correct it.
4/9/2019 12
4/9/2019 13
4/9/2019 14
4/9/2019 15
4/9/2019 16
visual management triangle
SEEING AS A GROUP
• Production status
• Inventory levels
• Machine availability
ACTING AS A GROUP
• Consensus on rules and
objectives
• Involvement in
improvement activities
KNOWING AS A
GROUP
• Delivery commitments
• Goals and schedules
• Management rules
Figure 3.1 The visual management triangle.4/9/2019 17
4/9/2019 18
4/9/2019 19
4/9/2019 20
4/9/2019 21
4/9/2019 22
4/9/2019 23
4/9/2019 24
4/9/2019 25
4/9/2019 26
5s principle
4/9/2019 27
4/9/2019 28
4/9/2019 29
4/9/2019 30
4/9/2019 31
Red Tagging
• Define what you need to meet your production objectives and
clear out everything else.
• The key S1 tool is red tagging.
• The red tag is a simple tag containing the following information:
o Item classification
o Item ID and quantity
o Reason for red tagging
o Work section
o Date
4/9/2019 32
4/9/2019 33
4/9/2019 34
4/9/2019 35
4/9/2019 36
2s set in order
4/9/2019 37
4/9/2019 38
4/9/2019 39
4/9/2019 40
4/9/2019 41
4/9/2019 42
4/9/2019 43
4/9/2019 44
4/9/2019 45
4/9/2019 46
4/9/2019 47
Total Productive Maintenance
• “The performance standard is zero breakdowns.”
Seiichi Nakajima
• 5S naturally leads to total productive maintenance (TPM), which is
the key to machine stability and effectiveness.
• TPM assigns basic maintenance work such as inspection, cleaning,
lubricating, and tightening to production team members.
• This frees up maintenance team members for predictive
maintenance, equipment improvement and overhauls, training,
and other high-value activities
4/9/2019 48
• TPM represents a profound shift from the
“I OPERATE; YOU FIX” MINDSET, TO “WE ARE
ALL RESPONSIBLE FOR OUR EQUIPMENT,
OUR PLANT, AND OUR FUTURE.”
• Just as in safety, where the target is zero accidents, the
target of TPM is zero breakdowns.
TPM = (Preventive + Predictive maintenance) + Total involvement
4/9/2019 49
• Equipment
improvement
• Overhauls
• Training
• Maintenance
prevention
• Predictive
maintenance
New Tasks Made
Possible
• 20% - 50%
Maintenance
Department
• Simple
maintainability
kaizen
• Cleaning
• Inspection
• Lubrication
• Adjustment
Tasks Transferred to
Production
Figure 3.2 How TPM shifts maintenance tasks.
4/9/2019 50
Six Big Losses
• TPM entails involving all team members to eliminate
the six big losses that downgrade machine
effectiveness:
4/9/2019 51
• Downtime
1. Equipment breakdowns
2. Setup and adjustment delays
• Speed or Hidden Losses
3. Idling and minor stoppages (the machine is being run but no product is
processed)
4. Reduced speed (the actual machine speed is less than the design
speed)
• Defects
5. Process defects (e.g., scrap, defects that require repair)
6. Reduced yield (e.g., from machine startup to stable production)
4/9/2019 52
4/9/2019 53

More Related Content

What's hot

Poka Yoke in Manufacturing
Poka Yoke in Manufacturing Poka Yoke in Manufacturing
Poka Yoke in Manufacturing Prachi Sharma
 
Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)Vishal Shinde
 
Training module 4 m change
Training module   4 m changeTraining module   4 m change
Training module 4 m changeDeepak Sharma
 
Poka yoke (mistake proofing)
Poka yoke (mistake proofing)Poka yoke (mistake proofing)
Poka yoke (mistake proofing)Animesh Khamesra
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive MaintenanceAnand Subramaniam
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive MaintenanceMahendra K SHUKLA
 
Muda,Mura & Muri
Muda,Mura & MuriMuda,Mura & Muri
Muda,Mura & Murimanijayjay
 
Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozenQC Labs
 
Tps and lean manufacturing
Tps and lean manufacturingTps and lean manufacturing
Tps and lean manufacturingAdeel Javaid
 

What's hot (20)

Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Poka Yoke in Manufacturing
Poka Yoke in Manufacturing Poka Yoke in Manufacturing
Poka Yoke in Manufacturing
 
Visual management
Visual managementVisual management
Visual management
 
Lean Thinking by Operational Excellence Consulting
Lean Thinking by Operational Excellence ConsultingLean Thinking by Operational Excellence Consulting
Lean Thinking by Operational Excellence Consulting
 
Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)
 
Training module 4 m change
Training module   4 m changeTraining module   4 m change
Training module 4 m change
 
Poka yoke (mistake proofing)
Poka yoke (mistake proofing)Poka yoke (mistake proofing)
Poka yoke (mistake proofing)
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Man and machine chart
Man and machine chartMan and machine chart
Man and machine chart
 
7 QC TOOLS PRESENTATION PPT
 7 QC TOOLS PRESENTATION PPT 7 QC TOOLS PRESENTATION PPT
7 QC TOOLS PRESENTATION PPT
 
Kaizen Ppt
Kaizen PptKaizen Ppt
Kaizen Ppt
 
Root Cause Analysis (RCA)
Root Cause Analysis (RCA)Root Cause Analysis (RCA)
Root Cause Analysis (RCA)
 
TPM: 7 Steps of Autonomous Maintenance (Jishu Hozen) Poster
TPM: 7 Steps of Autonomous Maintenance (Jishu Hozen) PosterTPM: 7 Steps of Autonomous Maintenance (Jishu Hozen) Poster
TPM: 7 Steps of Autonomous Maintenance (Jishu Hozen) Poster
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive Maintenance
 
Muda,Mura & Muri
Muda,Mura & MuriMuda,Mura & Muri
Muda,Mura & Muri
 
Digital Manufacturing
Digital ManufacturingDigital Manufacturing
Digital Manufacturing
 
Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozen
 
Tpm (group 8)
Tpm (group 8)Tpm (group 8)
Tpm (group 8)
 
Gemba Walk
Gemba WalkGemba Walk
Gemba Walk
 
Tps and lean manufacturing
Tps and lean manufacturingTps and lean manufacturing
Tps and lean manufacturing
 

Similar to LEAN STABILITY

Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptxMargi Shah
 
Lean Manufacturing and Reliability Concepts report
Lean Manufacturing and Reliability Concepts reportLean Manufacturing and Reliability Concepts report
Lean Manufacturing and Reliability Concepts reportAndy Page
 
IRJET- Implementation of 5S in the Manufacturing Industry
IRJET-  	  Implementation of 5S in the Manufacturing IndustryIRJET-  	  Implementation of 5S in the Manufacturing Industry
IRJET- Implementation of 5S in the Manufacturing IndustryIRJET Journal
 
Total Productivity Maintenance - 60 pg PPT
Total Productivity Maintenance - 60 pg PPTTotal Productivity Maintenance - 60 pg PPT
Total Productivity Maintenance - 60 pg PPTmihirpatel306953
 
k10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th semk10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th semGuddu Ali
 
9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdfNittamallik216
 
Module 2 - The Nuts and Bolts of Apprenticeships
Module 2  - The Nuts and Bolts of Apprenticeships Module 2  - The Nuts and Bolts of Apprenticeships
Module 2 - The Nuts and Bolts of Apprenticeships caniceconsulting
 
Chapter-Two-Lean.pdf
Chapter-Two-Lean.pdfChapter-Two-Lean.pdf
Chapter-Two-Lean.pdfmengist4
 
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraTotal Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Total Productivity Maintenance
Total Productivity MaintenanceTotal Productivity Maintenance
Total Productivity MaintenanceGohelYash1
 
Phoenix Symposium update 2023.pptx
Phoenix Symposium update 2023.pptxPhoenix Symposium update 2023.pptx
Phoenix Symposium update 2023.pptxSumit697996
 
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESSIMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESSIRJET Journal
 
Week 8 Supply Chain- Medium Term Decisions Lesson Files.pdf
Week 8 Supply Chain- Medium Term Decisions  Lesson Files.pdfWeek 8 Supply Chain- Medium Term Decisions  Lesson Files.pdf
Week 8 Supply Chain- Medium Term Decisions Lesson Files.pdfAbdullahGhazal5
 
Lean Production POM.pptx
Lean Production POM.pptxLean Production POM.pptx
Lean Production POM.pptxSaranshGera2
 

Similar to LEAN STABILITY (20)

LEAN STANDARDIZED WORK TOOL
LEAN STANDARDIZED WORK TOOLLEAN STANDARDIZED WORK TOOL
LEAN STANDARDIZED WORK TOOL
 
LEAN SYSTEM ENGINEERING
LEAN SYSTEM ENGINEERINGLEAN SYSTEM ENGINEERING
LEAN SYSTEM ENGINEERING
 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptx
 
Lean Manufacturing and Reliability Concepts report
Lean Manufacturing and Reliability Concepts reportLean Manufacturing and Reliability Concepts report
Lean Manufacturing and Reliability Concepts report
 
Work study manual
Work study manualWork study manual
Work study manual
 
IRJET- Implementation of 5S in the Manufacturing Industry
IRJET-  	  Implementation of 5S in the Manufacturing IndustryIRJET-  	  Implementation of 5S in the Manufacturing Industry
IRJET- Implementation of 5S in the Manufacturing Industry
 
Total Productivity Maintenance - 60 pg PPT
Total Productivity Maintenance - 60 pg PPTTotal Productivity Maintenance - 60 pg PPT
Total Productivity Maintenance - 60 pg PPT
 
k10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th semk10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th sem
 
9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf
 
Presentation1 best
Presentation1 bestPresentation1 best
Presentation1 best
 
Module 2 - The Nuts and Bolts of Apprenticeships
Module 2  - The Nuts and Bolts of Apprenticeships Module 2  - The Nuts and Bolts of Apprenticeships
Module 2 - The Nuts and Bolts of Apprenticeships
 
Chapter-Two-Lean.pdf
Chapter-Two-Lean.pdfChapter-Two-Lean.pdf
Chapter-Two-Lean.pdf
 
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraTotal Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
 
Total Productivity Maintenance
Total Productivity MaintenanceTotal Productivity Maintenance
Total Productivity Maintenance
 
Phoenix Symposium update 2023.pptx
Phoenix Symposium update 2023.pptxPhoenix Symposium update 2023.pptx
Phoenix Symposium update 2023.pptx
 
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESSIMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
 
5 s & poka yoke
5 s & poka yoke5 s & poka yoke
5 s & poka yoke
 
Week 8 Supply Chain- Medium Term Decisions Lesson Files.pdf
Week 8 Supply Chain- Medium Term Decisions  Lesson Files.pdfWeek 8 Supply Chain- Medium Term Decisions  Lesson Files.pdf
Week 8 Supply Chain- Medium Term Decisions Lesson Files.pdf
 
TPM - tech talk
TPM - tech talk TPM - tech talk
TPM - tech talk
 
Lean Production POM.pptx
Lean Production POM.pptxLean Production POM.pptx
Lean Production POM.pptx
 

More from Endashaw Yohannes Hailu (8)

PLANNING AND INSTALLATION OF LAYOUT
PLANNING AND INSTALLATION OF LAYOUTPLANNING AND INSTALLATION OF LAYOUT
PLANNING AND INSTALLATION OF LAYOUT
 
PLANT LAYOUT TECHNIQUES AND MODEL
PLANT LAYOUT TECHNIQUES AND MODELPLANT LAYOUT TECHNIQUES AND MODEL
PLANT LAYOUT TECHNIQUES AND MODEL
 
PLANT LOCATION
PLANT LOCATIONPLANT LOCATION
PLANT LOCATION
 
PLANT LAYOUT AND TYPES OF LAYOUTS
PLANT LAYOUT AND TYPES OF LAYOUTSPLANT LAYOUT AND TYPES OF LAYOUTS
PLANT LAYOUT AND TYPES OF LAYOUTS
 
FACILITY PLANNING
FACILITY PLANNINGFACILITY PLANNING
FACILITY PLANNING
 
LEAN SYSTEM JIDOKA
LEAN SYSTEM JIDOKALEAN SYSTEM JIDOKA
LEAN SYSTEM JIDOKA
 
JUST IN TIME PRODUCTION SYSTEM
JUST IN TIME PRODUCTION SYSTEMJUST IN TIME PRODUCTION SYSTEM
JUST IN TIME PRODUCTION SYSTEM
 
BIRTH OF LEAN SYSTEM
BIRTH OF LEAN SYSTEMBIRTH OF LEAN SYSTEM
BIRTH OF LEAN SYSTEM
 

Recently uploaded

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 

Recently uploaded (20)

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 

LEAN STABILITY

  • 1. KIOT Lean system engineering Target group: 3rd year GED Chapter three Stability By: Endashaw Yohannes Kombolcha/Ethiopia April , 2019 4/9/2019 1
  • 2. Stability “Give me a place to stand, and I can move the earth.” (Archimedes) what is basic stability? o In the simplest sense stability implies general predictability and consistent availability in terms of (the 4Ms. ) » Man power » Machine » Material » Method 4/9/2019 2
  • 5. 1. Manpower • Basic stability starts with a well trained workforce. Fortunately employees tend to know their jobs very well or we would all be in serious trouble • The three specific job training components for production supervisors : 1. Job instruction, 2. Job methods and 3. Job relations. 4/9/2019 5
  • 6. 1. Manpower cont.. • Job instruction (JI) taught supervisors how to plan for the correct resources they would need in production, how to break down jobs for instruction, and how to teach people safely, correctly, and conscientiously. • Job methods (JM) taught supervisors how to analyze jobs and make simple improvements within their realms of control. • Job relations (JR) taught supervisors to treat people as individuals and solve basic human-related problems in production rather than to ignore them. 4/9/2019 6
  • 7. 2. Machines • You do not need equipment with perfect uptime, but you must know your customer demand, the capacity of your process, and the actual average output. • If you have theoretical capacity as well as demonstrated capacity to meet customer demand then there is no problem. • It is only when you have no demonstrated capacity to meet demand that you have a basic machine stability problem. • For example, if customer demand is 700 units per shift and your actual output is only 500 units despite having the capacity for 1000, then you need more availability. 4/9/2019 7
  • 8. 3. Materials • In general the goal of lean is to reduce waste and shorten the timeline from when an order is received until the time it is produced. Normally this requires the reduction of inventory in the value stream. • If you suffer from basic instability, however, you might need to increase inventory in the short term in some places or in some instances. The reason is because with some processes you can flow production one by one or in very small amounts. Two pieces of advice on this topic. • First, not all inventories are waste. Only inventory beyond what is needed to run the process is waste. • Second, inventory often exists as a symptom of a problem in the process. Solving the problem earns you the right to reduce the inventory. 4/9/2019 8
  • 9. 4. Method • Finally, achieving basic stability requires having standard methods for manufacturing. • The key point here is the definition of a standard. • The normal definition is that a standard is a rule or way to do things. • The definition of a standard in Toyota is slightly different. A standard is a “rule or a basis for comparison.” • A standard is nothing more that a tool to measure how we are doing something and refer to when we want to make a change. • The standards are what we use to measure and compare our changes so that we know if the new way is better or not. 4/9/2019 9
  • 10. Lean System Standards Three fundamental lean questions and answers about standard 1. What is a standard? o A standard is a clear image of a desired condition. 2. Why are standards so important in the Lean system? o Standards make abnormalities immediately obvious so that corrective action can be taken. 3. What makes an effective standard? o A good standard is simple, clear, and visual. 4/9/2019 10
  • 11. Work place organization philosophy •First impression is very important • Cost of pure work place organization means waste • Two segments of work place organization 1. Visual management 2. 5s 4/9/2019 11
  • 12. Visual Management • The Visual Management is designed to create a visual workplace environment that is »Self-explaining »Self-ordering, and »Self-improving. • In a visual workplace, the out-of-standard situation is immediately obvious and employees can easily correct it. 4/9/2019 12
  • 17. visual management triangle SEEING AS A GROUP • Production status • Inventory levels • Machine availability ACTING AS A GROUP • Consensus on rules and objectives • Involvement in improvement activities KNOWING AS A GROUP • Delivery commitments • Goals and schedules • Management rules Figure 3.1 The visual management triangle.4/9/2019 17
  • 32. Red Tagging • Define what you need to meet your production objectives and clear out everything else. • The key S1 tool is red tagging. • The red tag is a simple tag containing the following information: o Item classification o Item ID and quantity o Reason for red tagging o Work section o Date 4/9/2019 32
  • 37. 2s set in order 4/9/2019 37
  • 48. Total Productive Maintenance • “The performance standard is zero breakdowns.” Seiichi Nakajima • 5S naturally leads to total productive maintenance (TPM), which is the key to machine stability and effectiveness. • TPM assigns basic maintenance work such as inspection, cleaning, lubricating, and tightening to production team members. • This frees up maintenance team members for predictive maintenance, equipment improvement and overhauls, training, and other high-value activities 4/9/2019 48
  • 49. • TPM represents a profound shift from the “I OPERATE; YOU FIX” MINDSET, TO “WE ARE ALL RESPONSIBLE FOR OUR EQUIPMENT, OUR PLANT, AND OUR FUTURE.” • Just as in safety, where the target is zero accidents, the target of TPM is zero breakdowns. TPM = (Preventive + Predictive maintenance) + Total involvement 4/9/2019 49
  • 50. • Equipment improvement • Overhauls • Training • Maintenance prevention • Predictive maintenance New Tasks Made Possible • 20% - 50% Maintenance Department • Simple maintainability kaizen • Cleaning • Inspection • Lubrication • Adjustment Tasks Transferred to Production Figure 3.2 How TPM shifts maintenance tasks. 4/9/2019 50
  • 51. Six Big Losses • TPM entails involving all team members to eliminate the six big losses that downgrade machine effectiveness: 4/9/2019 51
  • 52. • Downtime 1. Equipment breakdowns 2. Setup and adjustment delays • Speed or Hidden Losses 3. Idling and minor stoppages (the machine is being run but no product is processed) 4. Reduced speed (the actual machine speed is less than the design speed) • Defects 5. Process defects (e.g., scrap, defects that require repair) 6. Reduced yield (e.g., from machine startup to stable production) 4/9/2019 52