APPLICATION OF
BIM
INTRODUCTION
1.1 CONSTRUCTION STAKE HOLDERS
The activities take part in the construction industry taken by according to the RIBA plan of work
- RIBA (Royal Institute of British Architects), which establish in UK, is basically a guideline for
the consequence of construction industry. It includes 8 stages named as,
 Stage 0 - Inception
 Stage 1 – Preparation & brief
 Stage 2 – Concept design
 Stage 3 – Developed design
 Stage 4 – Technical design
 Stage 5 – Construction stage
 Stage 6 – Hand over & closeout
 Stage 7 – In use
The client or the employer who initiate to start a project. They start a project with an intention to
invest his money in an effective way so he is started the project in the inception stage from that up
to the practical in use works with different type of people those people called as stake holders of
the construction industry.
According to the Investopedia. (n.d.). A stakeholder is a party that has an interest in a company,
and can either affect or be affected by the business. The primary stakeholders in a typical
corporation are its investors, employees and customers. However, the modern theory of the idea
goes beyond this original notion to include additional stakeholders such as a community,
government or trade association.
Retrieved from http://www.investopedia.com/terms/s/stakeholder.asp/
The construction industry also has set of stake holders under that we discuss about some particular
person such as Architect, Engineers, Quantity Surveyors, Surveyors, Contractor, sub-contractors,
facility mangers and fabricators.
1.2 BUILDING INFORMATION MODELING
BIM (Building Information Modelling) is latest technology in the construction industry to prepare
the 2D and 3D model-based process the tool which support to the construction stake holders to do
their task effectively and efficiently they use this tool for plan, design, construct, and manage
buildings and infrastructure.
BIM uses for modelling the functions and behaviours of the building system and components
specially it uses for the whole stages in the construction process.
The BIM providing number of benefits in every stage such as Preconstruction benefits, Design
benefits, Construction and Fabrication benefits, post construction benefits those benefits are
supporting the stake holders who join the construction industry in every stage.
The client is the person who initiate the process and in the very beginning he meets two persons.
 Quantity Surveyors
 Financial Managers
According to the advice of these persons if he satisfy he continue with his process in the next step
he meets the suitable designers specially the architects.
Vision
Plan
Design
Cost
Operation
Maintenance
Renovation
Demolishion
ARCHITECT AND BIM
2.1 THE ARCHITECT
The architect plays the main role in a project. He is the first person appointed by the client. The
architects function is to interpret the clients brief and translate into a viable building within the
stated constraints. Architect has a responsible for obtaining the necessary approvals for planning,
ensuring compliance with regulations and supervising the materials and workmanship erection of
during the building.
2.2 BIM INVOLVES IN DESIGN
The client discuss with the architect regarding the concept of the building the duty of the
designer to give a visualization for the clients’ concept which call as conceptual design for that the
architect has to prepare number of schematic design in the earlier days they were drawn by manual
but newer days the architect can easily draw the conceptual design using the BIM it gives good
outlook so easily the client can identify whether his expectation has achieved or not and it reduces
the fatigue of the designer otherwise the designer has to spend more time for the outside layout
The second stage is the design development stage when the concept has fixed the architect
will start the schematic design specially without the services the architect will confirm the
structural of the building this drawing also will discuss with the client and finalize one of the
suitable plan. during this time, they consider the environmental conditions and site, locations
conditions.
Huck.E, Paul . T, Rafael .S & Kathleen .L. (2008). The design development stage depends on
special factors such as buildings’ function, costs, construction methods and
materials environmental impacts, building practices, cultural and aesthetic
conditions so the architect have to do changes according to this in this traditional way the
architect has to prepare drawings and sketches again and again but with the support of the BIM it
is easy to do the changes for some particular factor changes. BIM technology supports architects
throughout the design process. Gain more insight earlier in the process to optimize designs for
their clients’ requirements. BIM software helps Architect to deliver projects with improved quality
and efficiency especially.
2.3 BENEFITS OF BIM FOR ARCHITECT
 A more fluid design process - Move from conceptual design through
documentation using interoperable tools that maintain model fidelity at each stage.
 Integrated visualization and analysis tools - Create immersive visualizations and
virtual reality (VR) experiences directly from your model. Get more insight into your
designs with energy analysis tools.
 Extend BIM workflows with computational design - Build geometry, explore
design options, automate processes, and create links between multiple applications.
 Multidiscipline collaboration - Work more effectively with the extended project
team using cloud-based collaboration tools that support concurrent BIM authoring,
regardless of location. (pp.151-171). Hoboken, NJ, USA
BIM FOR STRUCTURAL ENGINEERS
3.1 STRUCTURAL ENGINEERS
The structural engineer is the one of the key stake holder in the construction industry. Specially
they consider on the structural and civil engineering process which is the large specially the
technical matters depend on these engineers. They concerned with the design and physical integrity
of buildings and other large structures, like tunnels and bridges. Structural engineers have wide
range of responsibilities - not least a duty to ensure the safety and durability of the project on which
they are working. Unlike architects, who must focus on the appearance, shape, size and use of
the building, structural engineers must solve technical problems - and help the architect achieve
his or her vision for the project.
3.2 BIM IN STRUCTURAL DRAWING
The structural engineers also the person who called as the designer according to the RIBA plan of
works during the technical design and design analysis during this stage the technical team specially
the engineers join because it consists with many functional aspects of a building’s performance,
structural integrity, temperature control, ventilation and air flows, light pedestrian
circulation, acoustics, energy distribution and consumption. The BIM support for the
following activities during this stage
 Make better structures - BIM (Building Information Modelling) processes
help structural engineers, detailers, and fabricators improve structural design
documentation, minimize errors, and streamline collaboration between teams.
 Improves collaboration - Coordinate your models across multiple
disciplines to help ensure a better design.
 Enhances structural quality - Integrate structural analysis and design to produce
better outcomes.
 Connects design to detailing - Streamline your workflows for more efficient
detailing.
 Reduces fabrication waste - Plan and coordinate during fabrication to help
improve execution on site.
BIM FOR ELECTRICAL, MECHANICAL AND PLUMPING ENGINEERS
4.1 MEP ENGINEERS
The MEP engineers are the other important engineers who involve in the design stages MEP
Engineers are Designers who are arranging the Mechanical, Electrical and plumbing (MEP)
framework including creating arrangements standard, investigation strategy and assessment
devices for MEP matters including legal branch offices, alongside get ready, audit drawing,
particular and cost gauges for the mechanical, Electrical, and/or Pipes.
MEP Engineer conduct engineering and feasibility and economics studies and prepare reports on
finding develops standard for design and technical specification, investigates new MEP design
concept and technical development of systems which are applicable to engineering problem.
 MEP engineer has to review plans and specification according to plan.
 MEP Engineer has to manages oversee the work of subordinate staff contact architects or
Engineer.
 MEP Engineer has to prepare plans, details, specified and cost estimated of plumbing,
heating, ventilating, air conditioning and general piping system.
 MEP Engineer has to provide technical advice to staff designer, supervisor, inspector and
contracting service provider, regarding installation and maintenance of MEP System.
 MEP System has to analyse mechanical, Electrical and /or plumbing engineering problems
and formulate solutions.
 MEP Engineer has to identify problems in design, plan, manage and deliver multiple
projects.
 MEP Engineer has to plan, organize review and evaluate the work of consultant, contractor
and others.
 MEP Engineer has to knowledge of MS office, AutoCAD and Project management
software.
 MEP Engineer has to prepare and deliver effective oral presentation whenever required.
4.2 BIM BENEFITS FOR MEP ENGINEERS
According to the construction industry definition the 60 percent only depend on the structural
works but the 40 percent depends on the services so the MEP engineer’s involvement also required
before hand over the Tender documents to finalize the documents this activity happen during the
Technical Design stage in the RIBA plan of work.
The BIM support to the MEP engineers to identify the unseen errors detail wise this is impossible
in the traditional system and also, they can change or re design the changes in the plumbing, and
electrical wiring, before building construction ever begins.
The contractor and client do not like to waste the time for the design problem after start the
construction because it something effect on their investment so they have to correct the design
very clear detail wise for that the BIM is the most suitable software for the following correction.
 Mechanical
The mechanical drawings normally consist various mechanical components but those
components should cooperate with the other details for example, it is a mechanical
engineer’s job to design the elevator shaft, though the electrical engineer will need to have
a hand in the process as well.
 Electrical
Electrical outlines can detail all of the electrical components of a building. This will allow
contractors to know where everything is going. It will also help all of the electricians to
know what they need to install and where so that there are no issues with maintaining code
guidelines.
 Plumbing
It is also critical to have plumbing diagrams as this will need to be signed off with by code
enforcement. It will also ensure that everything is at the level where it needs to be.
BIM IN COST ESTIMATING
5.1 THE QUANTITY SURVEYORS
A quantity surveyor (QS) is a professional working with in the construction industry concerned
with construction costs and contracts. Services provided by a quantity surveyor may include Cost
planning and commercial management throughout the entire lifecycle of the project from inception
to post -completion. There are two types of Quantity Surveyors are involving in the construction
project
 Consultant QS - The consultant QS is always in the design & construction
process, from the preliminary feasibility study through to the settlement of the final account
 Contractor QS - Quantity surveyors are also employed directly by contractors
& subcontractor. Where they are usually responsible for financial administration of
contracts & other contractual matters.
5.2 BIM AND ESTIMATION
The most important stage is the tendering stage where the Quantity Surveyors favourite stage even
though they involve the all stages. Preparing BOQ is the important task of the Quantity Surveyor
as the consultant QS and contractor QS. The detail plan and if the project is complex difficult to
take quantity for the QS so the BIM give reduce the fatigue and increase the accuracy.
There are many BIM soft wares with different functionalities in the market today. These range
from software for modelling, quantities take-off and costing, project management to cloud-based
BIM. Typically, software for quantities take-off and costing can open 2D drawings or 3D models
created by BIM design or modelling software for viewing and quantity extraction. The generation
of quantities should be according to the standards method of measurements to produce the Bills of
Quantities. These include concrete volume with same or different mix, classification of formwork
in stages, reinforcement bars, interior finishes areas, and can be separated into building works,
architectural works, landscaping works and MEP works.
5.3 BIM BENEFITS FOR QUANTITY SURVEYORS
 Provide fast, effective and efficient quantity take-off and cost estimation.
 Produce reliable and accurate quantities as well as competitive cost estimates.
 Auto computation of calculations reduces human errors.
 Generate cost estimation reports categorized according to areas, blocks, concrete grades,
subcontractor and other relevant reports and this increases the speed of deliverables.
 Improve visualization of the elements/items for measurement and minimize omissions.
 Hand over project to another party more quickly and reduce double handling.
 Enhance communication and collaboration amongst team members.
 Improve cost database management which reduces loss of information.
BIM AND SURVEYORS
6.1 BUILDING SURVEYORS
Building surveyors offer advice on many aspects of design and construction, including
maintenance, repair, refurbishment and restoration of proposed and existing buildings. They offer
quality assessments and report on defects in, or ways of improving, all kinds of buildings. As well
as finding structural faults, building surveyors recommend solutions. They can advise on the
feasibility of a building project, and how much it might cost to carry out, or how suitable a building
could be for a particular purpose.
6.2 BIM FOR SURVEYING
The most people know that other stake holder such as Engineer, Architect and Quantity Surveyors
who uses the Building information modelling (BIM) but the Surveyors also use this to achieve
their task successfully. This model-based approach combines technologies and processes to
support the efficient creation and use of information for building construction and operations. BIM
advanced co-operative platform, it offers many advantages to the project stakeholders associated
with a project. The available BIM tools involve automation and so quantity surveyors will get
advantages from this new process.
A surveyor’s responsibility in a construction industry is spread through the life span of a project
and therefore BIM provides many crucial benefits to him/her. With the help of virtual design and
construction features inside BIM, the surveyor can achieve superior control across the construction
progression. It also helps them optimize their work profile to a great extent.
 BIM enhances superior communication and co-operation among different teams in a
construction project.
 It helps the surveyor make the work quicker in lesser cost.
 BIM ensures sustainability.
 Surveyor, with the help of BIM, can produce accessible synchronous information regarding
project performance
BIM AND CONTRACTORS
7.1 CONTRACTOR
A contractor is anyone who directly employ or engages construction or manages construction.
Contractors include sub-contractors, any person self-employed worker or business organization
that carries out, manages or controls construction work. They must have the skills, knowledge,
experience and, where relevant, the organizational capacity to carry out the work safely and
without risk to wellness also they have an important role in planning, managing and monitoring
their work to ensure any risks are controlled.
Contractors on all projects must:
 Make sure the client is aware of the client duties before any work starts
 Plan, oversee and delegate all work complete without anyone else's input and their
specialists, considering the dangers to any individual who may be influenced by it
(counting kindred individual from the masses) and the touchstone expected to secure them
 Check that all workers they employ or appoint have the skills, knowledge, training and
experience to carry out the work, or are in the process of obtaining them
 Make sure that all workers under their control have a suitable, site-specific induction,
unless this has already been provided by the principal contractor
 Provide appropriate supervision, information and instructions to workers under their
control
 Ensure they do not start work on site unless reasonable steps have been taken to prevent
unauthorized access
 Ensure suitable welfare facilities are provided from the start for workers under their
control, and maintain them throughout the work.
7.2 BIM TECHNOLOGY FOR CONTRACTORS
The contractor is the person who make the project in to the practical in use. The contractor main
intention is the profit they go for the accurate Business Estimation of BIM and the contractors try
to develop the BIM technology in worldwide markets to gain brilliant market report, also BIM
encourages them to enhance profitability, proficiency, quality and security on their activities, and
in addition their own particular intensity. Specific advantages of executing BIM, for example,
diminished mistakes and oversights, limiting revamp, and the capacity to present new
administrations are viewed as huge focal points to contractual workers.
 Bid Accuracy with Model-Based Estimating: Estimators conventionally spend a ton of
time doing manual takeoffs and quantifications in order to produce a final bid. Using
building information modeling (BIM) technology, Estimators can further add validity to
the numbers and identify any gaps and areas of risk that can be detrimental to winning a
job.
 Greater Efficiency in Change-Order Management: In construction, change is constant and
the opportunities for projects to get off track are endless, so project managers must be
constantly vigilant. Relying on the traditional, manual approach to change-order
management doesn’t cut it.
 Improved Subcontractor Coordination with Schedule Visualization: A huge advantage
that comes with BIM data integration in a construction project is the ability to visualize the
expected progress and actual progress throughout the entire process. Communicating a
project schedule visually is a useful tool for coordinating with subcontractors on the job
site and even more useful when the schedule data is integrated with the quantities available
in Assemble.
In the past, creating transparency and collaboration among all specialty contractors in a project
was seen as a tall order. Today, however, BIM gives general contractors the ability to share model
data with subcontractors. This visual representation of the data helps both contractors and
subcontractors simplify and improve overall efficiency and coordination.
BIM FOR FACILITY MANAGER
8.1 FACILITY MANAGERS
A facilities manager is a job role that is responsible for making sure that buildings and their
services meet the needs of the people that work in them. Facilities managers are accountable for
services such as cleaning, security and parking, to make sure the surrounding environment is in a
suitable condition to work. They also manage any building maintenance with things like heating
and air conditioning, to maintain the working environment.
The normal elements of this employment position can shift contingent upon the organization. Be
that as it may, the obligations would regularly incorporate dealing with any repairs, remodels and
office moves to ensure they all run easily and as per design.
Facilities managers are responsible for the general upkeep and maintenance of buildings to ensure
that they meet health and safety standards and also the legal requirements. They need to manage
the cleaning, waste disposal, catering, security and parking of each site, while managing the
budgets and keeping records of all payments.
Facilities managers are also responsible for managing the office systems, which can often include
the IT and office equipment. In some cases, individuals working as facilities managers will work
for an external company, contracted in to manage a number of different organizations. The job title
may also differ. It could be anything from business services manager to support services manager
or contracts manager.
8.2 BIM AND FACILITY MANAGERS
The facility mangers are one of the unknown profession in the construction field which support to
the contractor to make satisfy the client. The facility managers mainly consider about the
Utilization of the space BIM provides significant benefits in the initial stage for entering the facility
information specially the 2D and 3D information. Identified benefits of BIM for facility Managers.
 Cost savings at both delivery and operational stages: BIM can help organizations strip
waste from their processes, as they can virtually build the facility as many times as
necessary to create the perfect model. This also provides cost certainty.
 Improved efficiency and faster project delivery: As all parties work together
collaboratively, mistakes, discrepancies and duplicate work is avoided
 Improved client satisfaction: The client receives a building which matches their
expectations and needs.
 Reduced safety risk: BIM allows crowd behavior to be analyzed and fire modelling
capability to be predicted to enable designs to be optimized for public safety.
 Greater project predictability and early modification: Projects can be visualized at an early
stage, giving owners and operators a clear idea of design intent and allowing them to
modify the design to achieve the outcomes they want.
 A greater role for FM: BIM allows the professional FM to get involved at the design stage
and have a real impact on the building outcome which both improves the outcome and
raises the profile of the FM function, which is the purpose of Government Soft Landings.
BIM AND SUB CONTRACTORS
9.1 THE SUB CONTRACTOR
Subcontractors perform work for general contractors, who give them part of an existing contract
to complete. The general contractor has a written agreement with the employer to perform a job.
The general contractor oversees the project and delegates work to the subcontractor.
Subcontractors may also have direct contracts with other subcontractors to perform a portion of
the work under contract.
9.2 BIM FOR SUB-CONTRACTORS
The sub contractor is the person appoint for the special technical works. According to the
traditional system Subcontractor will find the same information is being entered into computer
programs multiple times, each time for a distinct and separate use. Some of this duplicate data
entry occurs within the company and some of it occurs across the project team. Also, they are
limited by the tools and processes specially the long-term value to the project team is limited by
these methods and the output also reduce.
If the subcontractor use BIM, he can have connected the processes of design, engineering,
manufacturing and procurement. And also, he can have connected these processes with the rest of
the team. The improved, and in some cases new processes they employ are recognized as a great
contribution to the efficient execution of the entire construction project.
The sub-contractors who are using the BIM are seeing significant improvements to the overall
efficiency or their organization and the specific productivity of their team members. The
subcontractors have introduced new work processes that allow them to prefabricate coordinated
systems even in the most complex construction environments.
The BIM gives better advantages for the subcontractors to the better implementation of the lean
construction techniques it supports to the sub contractor to coordinate with the general contractor.
Also, it provides the basis for include planning and scheduling of subcontractors and helps to
ensure JIT (just in time)
BIM AND FEBRICATORS
10.1 THE FEBRICATORS
Structural steel fabricators provide and erect quality, fabricated steel components and structures.
They offer a cost effective, durable, and stable high-quality steel construction solution. The typical
structural steel fabricator employs admin personnel and salespeople, engineers and project
managers, detailers, shop workers, equipment operators, welders and painters, inspectors, and
delivery drivers. Construction projects range from the fabrication of several tons of structural steel
for to tens of thousands of tons for a high-rise commercial structure.
Structural steel fabricators physically prepare the structural steel components for a construction
project (bridge or building). Upon project award, the fabricator’s steel detailer is responsible for
creating accurately-dimensioned drawings of each structural steel component and connections to
be fabricated. Acceptable load dimensions must comply with the equivalent standard requirement
for that size and shape of structural steel required by code. The structural engineer approves the
drawings and the shop flow and project schedule / material management sequence is prepared, to
include:
 (Plasma) cutting to the proper length,
 Punching or drilling,
 Shop fitting (bolting, welding),
 Cleaning and painting or galvanizing when required,
 Grouping members in their field-erection order, and
 Shipping and delivering to the project site.
10.2 BIM BENEFITS FOR FABRICATORS
The auto desk Revit is the famous tool which used by the fabricators which use create architectural
scale models, and facilitate digital production of custom building components and assemblies
BIM models are increasing being used to facilitate a variety of related building activities, including
digital fabrication of building components. The use of BIM enables digital design-to-fabrication
workflows for many creating many types of building elements, including:
 Structural steel framing
 Curtain wall elements
 Façade and building envelope features (for example, rain screens, shading features, and
pre-cast panels)
 Mechanical systems and ductwork
 Piping assemblies
 Casework and furniture systems
Digital fabrication can be used during many phases of the project lifecycle, supporting both design
activities (3D printing of scale models of design options) and production tasks (creating actual
building elements). Also, the prefabrication and digital fabrication strategies typically offer many
advantages compared to on-site piece-built approaches such as
 Cost Savings
 Schedule Reductions
 Improved Quality and Control
 Better Coordination and Clash Detection
 Informed Design
OWNER AND BIM
11.1 THE OWNER
The owner also mentions as client who is the person for whom the project is carried out. In the
case of notifiable projects, clients must appoint a Principal Designer and a Principal Contractor.
Those clients without construction expertise must rely on the advice of professional experts on
how best to meet their duties, but both the Principal Designer and Principal Contractor will need
the clients support and input to be able to carry out their work effectively. The client remains
responsible for ensuring that client duties are met.
The client is the person
 Who ultimately decides what is to be constructed, where, when, and by whom?
 Who is at the head of the procurement chain?
 Who arranges for the design work?
 Who engages the contractor?
 Who initiates the work?
The owner who is the person initiate the project and from the conceptual stage up to deflects period
he travels with different type of stake holders Throughout the world, major building projects tend
to be characterized by time delays, materials waste and cost overruns. The cost of this “perfect
storm” of inefficiencies, more often than not, are borne by building owners during the ongoing
operations and maintenance stage of the building lifecycle.
11.2 BIM FOR OWNERS
The owner is the person who invest his money to the project so he always considers about cost
overruns, schedule delays and quality issues when explores how BIM helps owners and operators
gain efficiencies throughout the lifecycle of a building project from design and construction stages
through to occupancy—for improved facility management and O&M.
Huck.E, Paul . T, Rafael .S & Kathleen .L. (2008).The owners always think to manage the cost for
the lifecycle of the project the BIM which support and allow the owners to better respond to market
demands and yield a better return on their capital investments. The owner can get better output if
he gains better knowledge in BIM
Using BIM, owners can:
 Improve building quality
 Significantly reduce building lifecycle costs
 Better understand design projects from beginning to end
 Optimize operational efficiencies
 Increase occupancy and use rates
There are drivers that are motivating all types of owners to adopt BIM technologies, these drivers
are
 Design assessment early and often
 Complexity of facilities
 Time to market
 Cost reliability and management
 Product quality, in terms of leakages, malfunctions, unwarranted maintenance
 Sustainability
 Asset management (pp.305-325). Hoboken, NJ, USA
CONCLUSION
The report gives the clear idea about the stake holders who use this BIM technology also this
concept supports them to do their duties in the effective and efficient manner. Even though the
BIM technology gives the number of benefits most of the stake holders still don’t have the idea
about this and also, they like their traditional system.
The stake holders who know about the BIM application also try to away from this application
because of the challenges such as challenging with collaboration team, legal challenge to the
documentation and ownership, changes in practice and use of information.
However, BIM is changing the way construction professionals perform their individual tasks and
more importantly, how they collaborate, share and exchange information. BIM is directly
influencing building designs, functions and the ways in which buildings are built so to become the
professionalism in the current construction industry the application of BIM is the must.
REFERENCES
 Chuck Eastman, Paul Teicholz, RafaelSacks andKathleen Liston. (15 APR 2008). BIM
Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers,
Engineers, and Contractors. Hoboken,NJ, USA: 2008 John Wiley & Sons, Inc.
 Goldman, M. (Jun 21, 2010). Building Information Modeling or BIM is the hottest topic in the
construction.
 investodia. (n.d.). Retrieved from http://www.investopedia.com/terms/s/stakeholder.asp/
 THE ENGINEERING DESIGN. (2016,july 13). Retrieved from Benefits of BIM for MEP
Engineerin: https://www.theengineeringdesign.com/benefits-of-bim-for-mep-engineering/

More Related Content

What's hot

Building Information Modelling Presentation
Building Information Modelling PresentationBuilding Information Modelling Presentation
Building Information Modelling PresentationMotasem Albanna
 
BIM Presentation
BIM PresentationBIM Presentation
BIM PresentationOmer Syed
 
Bim in Construction Management
Bim in Construction ManagementBim in Construction Management
Bim in Construction ManagementMd Manzoor Akhtar
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentationryanabarton
 
Presentation on Revit Architecture
Presentation  on Revit ArchitecturePresentation  on Revit Architecture
Presentation on Revit ArchitectureMonikaSingh454
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bimkarim ead
 
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...Omer Syed
 
CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)Franco Bontempi Org Didattica
 
Revit Structure Training
Revit Structure TrainingRevit Structure Training
Revit Structure Trainingpinoy cadplus
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)Farid Ghori
 
BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for constructionCesare Caoduro
 
What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?Chun Keung Ng
 

What's hot (20)

What is BIM?
What is BIM?What is BIM?
What is BIM?
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
Building Information Modelling Presentation
Building Information Modelling PresentationBuilding Information Modelling Presentation
Building Information Modelling Presentation
 
BIM Presentation
BIM PresentationBIM Presentation
BIM Presentation
 
BIM
BIM BIM
BIM
 
Bim in Construction Management
Bim in Construction ManagementBim in Construction Management
Bim in Construction Management
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentation
 
BIM for Project Managers
BIM for Project ManagersBIM for Project Managers
BIM for Project Managers
 
Presentation on Revit Architecture
Presentation  on Revit ArchitecturePresentation  on Revit Architecture
Presentation on Revit Architecture
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bim
 
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
 
CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)
 
bim ppt 2 final
bim ppt 2 finalbim ppt 2 final
bim ppt 2 final
 
BIM
BIMBIM
BIM
 
what is BIM
what is BIMwhat is BIM
what is BIM
 
Revit Structure Training
Revit Structure TrainingRevit Structure Training
Revit Structure Training
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
BIM
BIMBIM
BIM
 
BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for construction
 
What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?
 

Similar to Application of BIM

An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...IRJET Journal
 
IRJET- Building Information Modeling in AEC Industry with its Implementation ...
IRJET- Building Information Modeling in AEC Industry with its Implementation ...IRJET- Building Information Modeling in AEC Industry with its Implementation ...
IRJET- Building Information Modeling in AEC Industry with its Implementation ...IRJET Journal
 
Building Information Modelling (BIM)
Building Information Modelling (BIM)Building Information Modelling (BIM)
Building Information Modelling (BIM)Sara Teymoor
 
BASIC TERMS IN BIM-REVIT
BASIC TERMS IN BIM-REVITBASIC TERMS IN BIM-REVIT
BASIC TERMS IN BIM-REVITnilesh masne
 
HOW CAN BIM MODELING IMPROVE THE PROCESS OF MEP INSTALLATIONS?
HOW CAN BIM MODELING IMPROVE THE PROCESS OF MEP INSTALLATIONS?HOW CAN BIM MODELING IMPROVE THE PROCESS OF MEP INSTALLATIONS?
HOW CAN BIM MODELING IMPROVE THE PROCESS OF MEP INSTALLATIONS?MarsBIM1
 
5 reasons why bim adoption is important for architects
5 reasons why bim adoption is important for architects5 reasons why bim adoption is important for architects
5 reasons why bim adoption is important for architectsArpitGautam20
 
The Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction ProjectsThe Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction ProjectsTawwabKhan4
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modelingNI BT
 
BIM Edecation Program Model Creation Sequence The following activitie.pdf
BIM Edecation Program Model Creation Sequence The following activitie.pdfBIM Edecation Program Model Creation Sequence The following activitie.pdf
BIM Edecation Program Model Creation Sequence The following activitie.pdfarishmarketing21
 
Building Information Modeling (BIM) in Industrial Projects
Building Information Modeling (BIM) in Industrial ProjectsBuilding Information Modeling (BIM) in Industrial Projects
Building Information Modeling (BIM) in Industrial Projectsbestendm06
 
4 Reasons to Implement BIM for Infrastructure Projects.pdf
4 Reasons to Implement BIM for Infrastructure Projects.pdf4 Reasons to Implement BIM for Infrastructure Projects.pdf
4 Reasons to Implement BIM for Infrastructure Projects.pdfTesla CAD - UK
 
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET Journal
 
How BIM can Impact Structural Engineerings?
How BIM can Impact Structural Engineerings?How BIM can Impact Structural Engineerings?
How BIM can Impact Structural Engineerings?MarsBIM1
 
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
IRJET -  	  Digital Engineering & Project Management for AEC Industry using BIMIRJET -  	  Digital Engineering & Project Management for AEC Industry using BIM
IRJET - Digital Engineering & Project Management for AEC Industry using BIMIRJET Journal
 
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...IRJET Journal
 
Construction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DConstruction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DYee Len Wan
 
Bim and integrated design
Bim and integrated designBim and integrated design
Bim and integrated designAnkit Singhai
 

Similar to Application of BIM (20)

An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...
 
IRJET- Building Information Modeling in AEC Industry with its Implementation ...
IRJET- Building Information Modeling in AEC Industry with its Implementation ...IRJET- Building Information Modeling in AEC Industry with its Implementation ...
IRJET- Building Information Modeling in AEC Industry with its Implementation ...
 
Building Information Modelling (BIM)
Building Information Modelling (BIM)Building Information Modelling (BIM)
Building Information Modelling (BIM)
 
BASIC TERMS IN BIM-REVIT
BASIC TERMS IN BIM-REVITBASIC TERMS IN BIM-REVIT
BASIC TERMS IN BIM-REVIT
 
HOW CAN BIM MODELING IMPROVE THE PROCESS OF MEP INSTALLATIONS?
HOW CAN BIM MODELING IMPROVE THE PROCESS OF MEP INSTALLATIONS?HOW CAN BIM MODELING IMPROVE THE PROCESS OF MEP INSTALLATIONS?
HOW CAN BIM MODELING IMPROVE THE PROCESS OF MEP INSTALLATIONS?
 
Essential-Guide-Archi.pdf
Essential-Guide-Archi.pdfEssential-Guide-Archi.pdf
Essential-Guide-Archi.pdf
 
5 reasons why bim adoption is important for architects
5 reasons why bim adoption is important for architects5 reasons why bim adoption is important for architects
5 reasons why bim adoption is important for architects
 
The Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction ProjectsThe Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction Projects
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modeling
 
BIM Edecation Program Model Creation Sequence The following activitie.pdf
BIM Edecation Program Model Creation Sequence The following activitie.pdfBIM Edecation Program Model Creation Sequence The following activitie.pdf
BIM Edecation Program Model Creation Sequence The following activitie.pdf
 
Building Information Modeling (BIM) in Industrial Projects
Building Information Modeling (BIM) in Industrial ProjectsBuilding Information Modeling (BIM) in Industrial Projects
Building Information Modeling (BIM) in Industrial Projects
 
4 Reasons to Implement BIM for Infrastructure Projects.pdf
4 Reasons to Implement BIM for Infrastructure Projects.pdf4 Reasons to Implement BIM for Infrastructure Projects.pdf
4 Reasons to Implement BIM for Infrastructure Projects.pdf
 
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
 
How BIM can Impact Structural Engineerings?
How BIM can Impact Structural Engineerings?How BIM can Impact Structural Engineerings?
How BIM can Impact Structural Engineerings?
 
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
IRJET -  	  Digital Engineering & Project Management for AEC Industry using BIMIRJET -  	  Digital Engineering & Project Management for AEC Industry using BIM
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
 
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
 
Construction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DConstruction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7D
 
Bim and integrated design
Bim and integrated designBim and integrated design
Bim and integrated design
 
4 mark mc kane, uu
4   mark mc kane, uu4   mark mc kane, uu
4 mark mc kane, uu
 
Bim
BimBim
Bim
 

More from anojan kanagarathnam

More from anojan kanagarathnam (15)

Involvement of QS in the Building Defects.pptx
Involvement of QS in the Building Defects.pptxInvolvement of QS in the Building Defects.pptx
Involvement of QS in the Building Defects.pptx
 
Report.docx
Report.docxReport.docx
Report.docx
 
Health and Safety - Responsibilities of employers’ and workers’ r for a safe ...
Health and Safety - Responsibilities of employers’ and workers’ r for a safe ...Health and Safety - Responsibilities of employers’ and workers’ r for a safe ...
Health and Safety - Responsibilities of employers’ and workers’ r for a safe ...
 
Whole Life Cycle Cost
Whole Life Cycle CostWhole Life Cycle Cost
Whole Life Cycle Cost
 
Discuss on cida act provision
Discuss on cida act provisionDiscuss on cida act provision
Discuss on cida act provision
 
Risk Management System
Risk Management System Risk Management System
Risk Management System
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selection
 
Matrix
MatrixMatrix
Matrix
 
Economics
EconomicsEconomics
Economics
 
Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning system
 
Construction industry
Construction industryConstruction industry
Construction industry
 
Application of surveying
Application of surveyingApplication of surveying
Application of surveying
 
Micro economics issues
Micro economics issuesMicro economics issues
Micro economics issues
 
Quantity surveyors jargon
Quantity surveyors jargonQuantity surveyors jargon
Quantity surveyors jargon
 
Account as a decession making tool for qs
Account as a decession making tool for qsAccount as a decession making tool for qs
Account as a decession making tool for qs
 

Recently uploaded

Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxabhijeetpadhi001
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 

Recently uploaded (20)

Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptx
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 

Application of BIM

  • 2. INTRODUCTION 1.1 CONSTRUCTION STAKE HOLDERS The activities take part in the construction industry taken by according to the RIBA plan of work - RIBA (Royal Institute of British Architects), which establish in UK, is basically a guideline for the consequence of construction industry. It includes 8 stages named as,  Stage 0 - Inception  Stage 1 – Preparation & brief  Stage 2 – Concept design  Stage 3 – Developed design  Stage 4 – Technical design  Stage 5 – Construction stage  Stage 6 – Hand over & closeout  Stage 7 – In use The client or the employer who initiate to start a project. They start a project with an intention to invest his money in an effective way so he is started the project in the inception stage from that up to the practical in use works with different type of people those people called as stake holders of the construction industry. According to the Investopedia. (n.d.). A stakeholder is a party that has an interest in a company, and can either affect or be affected by the business. The primary stakeholders in a typical corporation are its investors, employees and customers. However, the modern theory of the idea goes beyond this original notion to include additional stakeholders such as a community, government or trade association. Retrieved from http://www.investopedia.com/terms/s/stakeholder.asp/ The construction industry also has set of stake holders under that we discuss about some particular person such as Architect, Engineers, Quantity Surveyors, Surveyors, Contractor, sub-contractors, facility mangers and fabricators.
  • 3. 1.2 BUILDING INFORMATION MODELING BIM (Building Information Modelling) is latest technology in the construction industry to prepare the 2D and 3D model-based process the tool which support to the construction stake holders to do their task effectively and efficiently they use this tool for plan, design, construct, and manage buildings and infrastructure. BIM uses for modelling the functions and behaviours of the building system and components specially it uses for the whole stages in the construction process. The BIM providing number of benefits in every stage such as Preconstruction benefits, Design benefits, Construction and Fabrication benefits, post construction benefits those benefits are supporting the stake holders who join the construction industry in every stage. The client is the person who initiate the process and in the very beginning he meets two persons.  Quantity Surveyors  Financial Managers According to the advice of these persons if he satisfy he continue with his process in the next step he meets the suitable designers specially the architects. Vision Plan Design Cost Operation Maintenance Renovation Demolishion
  • 4. ARCHITECT AND BIM 2.1 THE ARCHITECT The architect plays the main role in a project. He is the first person appointed by the client. The architects function is to interpret the clients brief and translate into a viable building within the stated constraints. Architect has a responsible for obtaining the necessary approvals for planning, ensuring compliance with regulations and supervising the materials and workmanship erection of during the building. 2.2 BIM INVOLVES IN DESIGN The client discuss with the architect regarding the concept of the building the duty of the designer to give a visualization for the clients’ concept which call as conceptual design for that the architect has to prepare number of schematic design in the earlier days they were drawn by manual but newer days the architect can easily draw the conceptual design using the BIM it gives good outlook so easily the client can identify whether his expectation has achieved or not and it reduces the fatigue of the designer otherwise the designer has to spend more time for the outside layout The second stage is the design development stage when the concept has fixed the architect will start the schematic design specially without the services the architect will confirm the structural of the building this drawing also will discuss with the client and finalize one of the suitable plan. during this time, they consider the environmental conditions and site, locations conditions. Huck.E, Paul . T, Rafael .S & Kathleen .L. (2008). The design development stage depends on special factors such as buildings’ function, costs, construction methods and materials environmental impacts, building practices, cultural and aesthetic conditions so the architect have to do changes according to this in this traditional way the architect has to prepare drawings and sketches again and again but with the support of the BIM it is easy to do the changes for some particular factor changes. BIM technology supports architects throughout the design process. Gain more insight earlier in the process to optimize designs for
  • 5. their clients’ requirements. BIM software helps Architect to deliver projects with improved quality and efficiency especially. 2.3 BENEFITS OF BIM FOR ARCHITECT  A more fluid design process - Move from conceptual design through documentation using interoperable tools that maintain model fidelity at each stage.  Integrated visualization and analysis tools - Create immersive visualizations and virtual reality (VR) experiences directly from your model. Get more insight into your designs with energy analysis tools.  Extend BIM workflows with computational design - Build geometry, explore design options, automate processes, and create links between multiple applications.  Multidiscipline collaboration - Work more effectively with the extended project team using cloud-based collaboration tools that support concurrent BIM authoring, regardless of location. (pp.151-171). Hoboken, NJ, USA
  • 6. BIM FOR STRUCTURAL ENGINEERS 3.1 STRUCTURAL ENGINEERS The structural engineer is the one of the key stake holder in the construction industry. Specially they consider on the structural and civil engineering process which is the large specially the technical matters depend on these engineers. They concerned with the design and physical integrity of buildings and other large structures, like tunnels and bridges. Structural engineers have wide range of responsibilities - not least a duty to ensure the safety and durability of the project on which they are working. Unlike architects, who must focus on the appearance, shape, size and use of the building, structural engineers must solve technical problems - and help the architect achieve his or her vision for the project. 3.2 BIM IN STRUCTURAL DRAWING The structural engineers also the person who called as the designer according to the RIBA plan of works during the technical design and design analysis during this stage the technical team specially the engineers join because it consists with many functional aspects of a building’s performance, structural integrity, temperature control, ventilation and air flows, light pedestrian circulation, acoustics, energy distribution and consumption. The BIM support for the following activities during this stage  Make better structures - BIM (Building Information Modelling) processes help structural engineers, detailers, and fabricators improve structural design documentation, minimize errors, and streamline collaboration between teams.  Improves collaboration - Coordinate your models across multiple disciplines to help ensure a better design.  Enhances structural quality - Integrate structural analysis and design to produce better outcomes.  Connects design to detailing - Streamline your workflows for more efficient detailing.
  • 7.  Reduces fabrication waste - Plan and coordinate during fabrication to help improve execution on site. BIM FOR ELECTRICAL, MECHANICAL AND PLUMPING ENGINEERS 4.1 MEP ENGINEERS The MEP engineers are the other important engineers who involve in the design stages MEP Engineers are Designers who are arranging the Mechanical, Electrical and plumbing (MEP) framework including creating arrangements standard, investigation strategy and assessment devices for MEP matters including legal branch offices, alongside get ready, audit drawing, particular and cost gauges for the mechanical, Electrical, and/or Pipes. MEP Engineer conduct engineering and feasibility and economics studies and prepare reports on finding develops standard for design and technical specification, investigates new MEP design concept and technical development of systems which are applicable to engineering problem.  MEP engineer has to review plans and specification according to plan.  MEP Engineer has to manages oversee the work of subordinate staff contact architects or Engineer.  MEP Engineer has to prepare plans, details, specified and cost estimated of plumbing, heating, ventilating, air conditioning and general piping system.  MEP Engineer has to provide technical advice to staff designer, supervisor, inspector and contracting service provider, regarding installation and maintenance of MEP System.  MEP System has to analyse mechanical, Electrical and /or plumbing engineering problems and formulate solutions.  MEP Engineer has to identify problems in design, plan, manage and deliver multiple projects.  MEP Engineer has to plan, organize review and evaluate the work of consultant, contractor and others.  MEP Engineer has to knowledge of MS office, AutoCAD and Project management software.
  • 8.  MEP Engineer has to prepare and deliver effective oral presentation whenever required. 4.2 BIM BENEFITS FOR MEP ENGINEERS According to the construction industry definition the 60 percent only depend on the structural works but the 40 percent depends on the services so the MEP engineer’s involvement also required before hand over the Tender documents to finalize the documents this activity happen during the Technical Design stage in the RIBA plan of work. The BIM support to the MEP engineers to identify the unseen errors detail wise this is impossible in the traditional system and also, they can change or re design the changes in the plumbing, and electrical wiring, before building construction ever begins. The contractor and client do not like to waste the time for the design problem after start the construction because it something effect on their investment so they have to correct the design very clear detail wise for that the BIM is the most suitable software for the following correction.  Mechanical The mechanical drawings normally consist various mechanical components but those components should cooperate with the other details for example, it is a mechanical engineer’s job to design the elevator shaft, though the electrical engineer will need to have a hand in the process as well.  Electrical Electrical outlines can detail all of the electrical components of a building. This will allow contractors to know where everything is going. It will also help all of the electricians to know what they need to install and where so that there are no issues with maintaining code guidelines.  Plumbing It is also critical to have plumbing diagrams as this will need to be signed off with by code enforcement. It will also ensure that everything is at the level where it needs to be.
  • 9. BIM IN COST ESTIMATING 5.1 THE QUANTITY SURVEYORS A quantity surveyor (QS) is a professional working with in the construction industry concerned with construction costs and contracts. Services provided by a quantity surveyor may include Cost planning and commercial management throughout the entire lifecycle of the project from inception to post -completion. There are two types of Quantity Surveyors are involving in the construction project  Consultant QS - The consultant QS is always in the design & construction process, from the preliminary feasibility study through to the settlement of the final account  Contractor QS - Quantity surveyors are also employed directly by contractors & subcontractor. Where they are usually responsible for financial administration of contracts & other contractual matters. 5.2 BIM AND ESTIMATION The most important stage is the tendering stage where the Quantity Surveyors favourite stage even though they involve the all stages. Preparing BOQ is the important task of the Quantity Surveyor as the consultant QS and contractor QS. The detail plan and if the project is complex difficult to take quantity for the QS so the BIM give reduce the fatigue and increase the accuracy. There are many BIM soft wares with different functionalities in the market today. These range from software for modelling, quantities take-off and costing, project management to cloud-based BIM. Typically, software for quantities take-off and costing can open 2D drawings or 3D models created by BIM design or modelling software for viewing and quantity extraction. The generation of quantities should be according to the standards method of measurements to produce the Bills of Quantities. These include concrete volume with same or different mix, classification of formwork in stages, reinforcement bars, interior finishes areas, and can be separated into building works, architectural works, landscaping works and MEP works.
  • 10. 5.3 BIM BENEFITS FOR QUANTITY SURVEYORS  Provide fast, effective and efficient quantity take-off and cost estimation.  Produce reliable and accurate quantities as well as competitive cost estimates.  Auto computation of calculations reduces human errors.  Generate cost estimation reports categorized according to areas, blocks, concrete grades, subcontractor and other relevant reports and this increases the speed of deliverables.  Improve visualization of the elements/items for measurement and minimize omissions.  Hand over project to another party more quickly and reduce double handling.  Enhance communication and collaboration amongst team members.  Improve cost database management which reduces loss of information.
  • 11. BIM AND SURVEYORS 6.1 BUILDING SURVEYORS Building surveyors offer advice on many aspects of design and construction, including maintenance, repair, refurbishment and restoration of proposed and existing buildings. They offer quality assessments and report on defects in, or ways of improving, all kinds of buildings. As well as finding structural faults, building surveyors recommend solutions. They can advise on the feasibility of a building project, and how much it might cost to carry out, or how suitable a building could be for a particular purpose. 6.2 BIM FOR SURVEYING The most people know that other stake holder such as Engineer, Architect and Quantity Surveyors who uses the Building information modelling (BIM) but the Surveyors also use this to achieve their task successfully. This model-based approach combines technologies and processes to support the efficient creation and use of information for building construction and operations. BIM advanced co-operative platform, it offers many advantages to the project stakeholders associated with a project. The available BIM tools involve automation and so quantity surveyors will get advantages from this new process. A surveyor’s responsibility in a construction industry is spread through the life span of a project and therefore BIM provides many crucial benefits to him/her. With the help of virtual design and construction features inside BIM, the surveyor can achieve superior control across the construction progression. It also helps them optimize their work profile to a great extent.  BIM enhances superior communication and co-operation among different teams in a construction project.  It helps the surveyor make the work quicker in lesser cost.  BIM ensures sustainability.  Surveyor, with the help of BIM, can produce accessible synchronous information regarding project performance
  • 12. BIM AND CONTRACTORS 7.1 CONTRACTOR A contractor is anyone who directly employ or engages construction or manages construction. Contractors include sub-contractors, any person self-employed worker or business organization that carries out, manages or controls construction work. They must have the skills, knowledge, experience and, where relevant, the organizational capacity to carry out the work safely and without risk to wellness also they have an important role in planning, managing and monitoring their work to ensure any risks are controlled. Contractors on all projects must:  Make sure the client is aware of the client duties before any work starts  Plan, oversee and delegate all work complete without anyone else's input and their specialists, considering the dangers to any individual who may be influenced by it (counting kindred individual from the masses) and the touchstone expected to secure them  Check that all workers they employ or appoint have the skills, knowledge, training and experience to carry out the work, or are in the process of obtaining them  Make sure that all workers under their control have a suitable, site-specific induction, unless this has already been provided by the principal contractor  Provide appropriate supervision, information and instructions to workers under their control  Ensure they do not start work on site unless reasonable steps have been taken to prevent unauthorized access  Ensure suitable welfare facilities are provided from the start for workers under their control, and maintain them throughout the work.
  • 13. 7.2 BIM TECHNOLOGY FOR CONTRACTORS The contractor is the person who make the project in to the practical in use. The contractor main intention is the profit they go for the accurate Business Estimation of BIM and the contractors try to develop the BIM technology in worldwide markets to gain brilliant market report, also BIM encourages them to enhance profitability, proficiency, quality and security on their activities, and in addition their own particular intensity. Specific advantages of executing BIM, for example, diminished mistakes and oversights, limiting revamp, and the capacity to present new administrations are viewed as huge focal points to contractual workers.  Bid Accuracy with Model-Based Estimating: Estimators conventionally spend a ton of time doing manual takeoffs and quantifications in order to produce a final bid. Using building information modeling (BIM) technology, Estimators can further add validity to the numbers and identify any gaps and areas of risk that can be detrimental to winning a job.  Greater Efficiency in Change-Order Management: In construction, change is constant and the opportunities for projects to get off track are endless, so project managers must be constantly vigilant. Relying on the traditional, manual approach to change-order management doesn’t cut it.  Improved Subcontractor Coordination with Schedule Visualization: A huge advantage that comes with BIM data integration in a construction project is the ability to visualize the expected progress and actual progress throughout the entire process. Communicating a project schedule visually is a useful tool for coordinating with subcontractors on the job site and even more useful when the schedule data is integrated with the quantities available in Assemble. In the past, creating transparency and collaboration among all specialty contractors in a project was seen as a tall order. Today, however, BIM gives general contractors the ability to share model data with subcontractors. This visual representation of the data helps both contractors and subcontractors simplify and improve overall efficiency and coordination.
  • 14. BIM FOR FACILITY MANAGER 8.1 FACILITY MANAGERS A facilities manager is a job role that is responsible for making sure that buildings and their services meet the needs of the people that work in them. Facilities managers are accountable for services such as cleaning, security and parking, to make sure the surrounding environment is in a suitable condition to work. They also manage any building maintenance with things like heating and air conditioning, to maintain the working environment. The normal elements of this employment position can shift contingent upon the organization. Be that as it may, the obligations would regularly incorporate dealing with any repairs, remodels and office moves to ensure they all run easily and as per design. Facilities managers are responsible for the general upkeep and maintenance of buildings to ensure that they meet health and safety standards and also the legal requirements. They need to manage the cleaning, waste disposal, catering, security and parking of each site, while managing the budgets and keeping records of all payments. Facilities managers are also responsible for managing the office systems, which can often include the IT and office equipment. In some cases, individuals working as facilities managers will work for an external company, contracted in to manage a number of different organizations. The job title may also differ. It could be anything from business services manager to support services manager or contracts manager.
  • 15. 8.2 BIM AND FACILITY MANAGERS The facility mangers are one of the unknown profession in the construction field which support to the contractor to make satisfy the client. The facility managers mainly consider about the Utilization of the space BIM provides significant benefits in the initial stage for entering the facility information specially the 2D and 3D information. Identified benefits of BIM for facility Managers.  Cost savings at both delivery and operational stages: BIM can help organizations strip waste from their processes, as they can virtually build the facility as many times as necessary to create the perfect model. This also provides cost certainty.  Improved efficiency and faster project delivery: As all parties work together collaboratively, mistakes, discrepancies and duplicate work is avoided  Improved client satisfaction: The client receives a building which matches their expectations and needs.  Reduced safety risk: BIM allows crowd behavior to be analyzed and fire modelling capability to be predicted to enable designs to be optimized for public safety.  Greater project predictability and early modification: Projects can be visualized at an early stage, giving owners and operators a clear idea of design intent and allowing them to modify the design to achieve the outcomes they want.  A greater role for FM: BIM allows the professional FM to get involved at the design stage and have a real impact on the building outcome which both improves the outcome and raises the profile of the FM function, which is the purpose of Government Soft Landings.
  • 16. BIM AND SUB CONTRACTORS 9.1 THE SUB CONTRACTOR Subcontractors perform work for general contractors, who give them part of an existing contract to complete. The general contractor has a written agreement with the employer to perform a job. The general contractor oversees the project and delegates work to the subcontractor. Subcontractors may also have direct contracts with other subcontractors to perform a portion of the work under contract. 9.2 BIM FOR SUB-CONTRACTORS The sub contractor is the person appoint for the special technical works. According to the traditional system Subcontractor will find the same information is being entered into computer programs multiple times, each time for a distinct and separate use. Some of this duplicate data entry occurs within the company and some of it occurs across the project team. Also, they are limited by the tools and processes specially the long-term value to the project team is limited by these methods and the output also reduce. If the subcontractor use BIM, he can have connected the processes of design, engineering, manufacturing and procurement. And also, he can have connected these processes with the rest of the team. The improved, and in some cases new processes they employ are recognized as a great contribution to the efficient execution of the entire construction project. The sub-contractors who are using the BIM are seeing significant improvements to the overall efficiency or their organization and the specific productivity of their team members. The subcontractors have introduced new work processes that allow them to prefabricate coordinated systems even in the most complex construction environments. The BIM gives better advantages for the subcontractors to the better implementation of the lean construction techniques it supports to the sub contractor to coordinate with the general contractor. Also, it provides the basis for include planning and scheduling of subcontractors and helps to ensure JIT (just in time)
  • 17. BIM AND FEBRICATORS 10.1 THE FEBRICATORS Structural steel fabricators provide and erect quality, fabricated steel components and structures. They offer a cost effective, durable, and stable high-quality steel construction solution. The typical structural steel fabricator employs admin personnel and salespeople, engineers and project managers, detailers, shop workers, equipment operators, welders and painters, inspectors, and delivery drivers. Construction projects range from the fabrication of several tons of structural steel for to tens of thousands of tons for a high-rise commercial structure. Structural steel fabricators physically prepare the structural steel components for a construction project (bridge or building). Upon project award, the fabricator’s steel detailer is responsible for creating accurately-dimensioned drawings of each structural steel component and connections to be fabricated. Acceptable load dimensions must comply with the equivalent standard requirement for that size and shape of structural steel required by code. The structural engineer approves the drawings and the shop flow and project schedule / material management sequence is prepared, to include:  (Plasma) cutting to the proper length,  Punching or drilling,  Shop fitting (bolting, welding),  Cleaning and painting or galvanizing when required,  Grouping members in their field-erection order, and  Shipping and delivering to the project site.
  • 18. 10.2 BIM BENEFITS FOR FABRICATORS The auto desk Revit is the famous tool which used by the fabricators which use create architectural scale models, and facilitate digital production of custom building components and assemblies BIM models are increasing being used to facilitate a variety of related building activities, including digital fabrication of building components. The use of BIM enables digital design-to-fabrication workflows for many creating many types of building elements, including:  Structural steel framing  Curtain wall elements  Façade and building envelope features (for example, rain screens, shading features, and pre-cast panels)  Mechanical systems and ductwork  Piping assemblies  Casework and furniture systems Digital fabrication can be used during many phases of the project lifecycle, supporting both design activities (3D printing of scale models of design options) and production tasks (creating actual building elements). Also, the prefabrication and digital fabrication strategies typically offer many advantages compared to on-site piece-built approaches such as  Cost Savings  Schedule Reductions  Improved Quality and Control  Better Coordination and Clash Detection  Informed Design
  • 19. OWNER AND BIM 11.1 THE OWNER The owner also mentions as client who is the person for whom the project is carried out. In the case of notifiable projects, clients must appoint a Principal Designer and a Principal Contractor. Those clients without construction expertise must rely on the advice of professional experts on how best to meet their duties, but both the Principal Designer and Principal Contractor will need the clients support and input to be able to carry out their work effectively. The client remains responsible for ensuring that client duties are met. The client is the person  Who ultimately decides what is to be constructed, where, when, and by whom?  Who is at the head of the procurement chain?  Who arranges for the design work?  Who engages the contractor?  Who initiates the work? The owner who is the person initiate the project and from the conceptual stage up to deflects period he travels with different type of stake holders Throughout the world, major building projects tend to be characterized by time delays, materials waste and cost overruns. The cost of this “perfect storm” of inefficiencies, more often than not, are borne by building owners during the ongoing operations and maintenance stage of the building lifecycle.
  • 20. 11.2 BIM FOR OWNERS The owner is the person who invest his money to the project so he always considers about cost overruns, schedule delays and quality issues when explores how BIM helps owners and operators gain efficiencies throughout the lifecycle of a building project from design and construction stages through to occupancy—for improved facility management and O&M. Huck.E, Paul . T, Rafael .S & Kathleen .L. (2008).The owners always think to manage the cost for the lifecycle of the project the BIM which support and allow the owners to better respond to market demands and yield a better return on their capital investments. The owner can get better output if he gains better knowledge in BIM Using BIM, owners can:  Improve building quality  Significantly reduce building lifecycle costs  Better understand design projects from beginning to end  Optimize operational efficiencies  Increase occupancy and use rates There are drivers that are motivating all types of owners to adopt BIM technologies, these drivers are  Design assessment early and often  Complexity of facilities  Time to market  Cost reliability and management  Product quality, in terms of leakages, malfunctions, unwarranted maintenance  Sustainability  Asset management (pp.305-325). Hoboken, NJ, USA
  • 21. CONCLUSION The report gives the clear idea about the stake holders who use this BIM technology also this concept supports them to do their duties in the effective and efficient manner. Even though the BIM technology gives the number of benefits most of the stake holders still don’t have the idea about this and also, they like their traditional system. The stake holders who know about the BIM application also try to away from this application because of the challenges such as challenging with collaboration team, legal challenge to the documentation and ownership, changes in practice and use of information. However, BIM is changing the way construction professionals perform their individual tasks and more importantly, how they collaborate, share and exchange information. BIM is directly influencing building designs, functions and the ways in which buildings are built so to become the professionalism in the current construction industry the application of BIM is the must.
  • 22. REFERENCES  Chuck Eastman, Paul Teicholz, RafaelSacks andKathleen Liston. (15 APR 2008). BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors. Hoboken,NJ, USA: 2008 John Wiley & Sons, Inc.  Goldman, M. (Jun 21, 2010). Building Information Modeling or BIM is the hottest topic in the construction.  investodia. (n.d.). Retrieved from http://www.investopedia.com/terms/s/stakeholder.asp/  THE ENGINEERING DESIGN. (2016,july 13). Retrieved from Benefits of BIM for MEP Engineerin: https://www.theengineeringdesign.com/benefits-of-bim-for-mep-engineering/