This document discusses plans to build an integrated lead and zinc smelter in Chanderiya, India using the Imperial Smelting Process. The smelter aims to produce 70,000 tons of zinc and 35,000 tons of lead annually, along with valuable byproducts. It will help reduce India's dependence on imports of these metals. The smelter's design and implementation in two phases is described in detail. It is scheduled to be commissioned by early 1991.