This randomized controlled trial studied three surgical techniques used in caesarean sections to determine their effects on maternal infectious morbidity: 1) Single vs double layer closure of the uterine incision, 2) Closure vs non-closure of the pelvic peritoneum, and 3) Liberal vs restricted use of a subrectus sheath drain. The trial recruited 3033 women undergoing their first caesarean section. It found no significant differences in maternal infectious morbidity between any of the surgical technique pairs studied. The results have implications for changing current guidance on peritoneum closure.