1. Client Type: Electric Utility
Challenge/Issue: Design and install (37) retrofill
applications in a (4) week outage
Equipment Involved: Vertical lift air magnetic circuit
breakers replaced with draw-out
vacuum circuit breakers, 4160V
switchgear
Solutions: Design, build and install a retrofill
application to replace existing
switchgear with draw-out vacuum
circuit breakers
Scope/Deliverables: Design and install (34) switchgear
cells including new doors, relays,
switches and indicating lights.
Custom bus connection interfacing
with existing horizontal bus and
cable terminations
Timeframe: 4 weeks for Engineering and 4 weeks
for install
CE POWER SOLUTIONS
FAMILY OF COMPANIES
CE Power - Kentucky
CE Power - Florida
CE Power - Tennessee
Hope Engineering - Michigan
3rd Party NETA Independent
Testing Companies
CE Power - Ohio
CE Power - Minnesota
Switchgear Retrofill Upgrade
SOLUTIONPROFILE
FOR 24/7 TESTING &
MAINTENANCE SUPPORT CALL
800.434.0415
or email info@CEPower.net