1. British American Tobacco – Pakistan
Maintenance Lead
2019 -
Most Recent
Responsibilities 1) Maintenance Planning & Scheduling/ Maintenance Lead
2) Skills Development in Unionized shop floor Employees
3) Team Lead shift operations/Plant Engineering
4) Large Scale Machinery Induction
5) Pillar member integrated Work system
6) EHS guidelines Implementation
7) Focal person for Implementation of Energy Management System
8) Managing/training of Shop Floor employees
9) Job specific training to EOs and seasonal 3P Employees.
10) General Management
Achievements:
•CAPEX Project worth 9 million successfully completed for Dust Units
•Successfully Modified Compressed air architecture, alleviated loopholes and accruing 7 million
Energy savings.
•Developed Energy baseline and ground work for implementation of ISO-50001, and deployment of
Enercon DMS.
•Team Lead for successfulUp-gradation of GLT SCADAs Windows Platform.
•Achieved 89% Line OEE, 91% Usable, 74% QR for GLT season-2019.
•Team Lead for annual E&I overhauling of GLT for better plant performance & Efficiency and
smooth cold start up.
UpdateBritish American Tobacco – Pakistan Maintenance Lead
Delete Attock Refinery Limited – Pakistan Electrical &
Instrumentation Engineer
Attock Refinery Limited – Pakistan
Electrical & Instrumentation Engineer
2016 - 2019
Responsibilities •Team Lead for process optimization and 400 Ton of CO2 e footprint mitigation
•Accrued 7 million PKR by developing flare system heat recovery mechanism for ARL and
substantial SO2 emissions reduction.
•Designed, developed and fabricated Syn-gasifier and resultantly reduced 20% ARL solid waste to
Syn-gas.
•Team member in Implementation, internal audit and reporting of ISO-50001 Energy Management
System.
•1.1 Million Accrued through conserving naphtha by commissioning flue gas analyzer.
• Member of the commissioning team for the commissioning of Synchro CCP for Island and grid
synchronization.
•Lead the replacement of wave guided radar with the differential pressure level equipment at critical
Naphta vessel at DHDS plant.
•Lead Overhauling of SACOSone, Symap, LOPs, SIPROTEC 24 MW captive Power plant facility.
•Commissioned Bentley Nevada 3500 for gas reciprocating Compressor
UpdateAttock Refinery Limited – Pakistan Electrical & Instrumentation Engineer
2. Delete Attock Refinery Limited – Pakistan Senior Management
Trainee
Attock Refinery Limited – Pakistan
Senior Management Trainee
2015 - 2016
Responsibilities •Annual sustainability report writing through GRI-G4 guidelines
•Implementation of environmental KPIs like waste generation rate, environmental cost accounting and
load calculations of wastewater.
•Updated Engineering documents of P&IDs, safety chains & PFDs.
•Developed, programmed and commissioned 3 Element loop for 12 ton fire tube boiler.
Managing Overhauling Team for quarterly OH of Hydrogen Plant
Developing and Managing Comparative statements on inventory procurements
Team member for induction/commissioning of EQP Fire Alarm System.
Development, modification, upgradation of SOPs for Oxygen Analyzers operations & Maintenance
Assisting Team Leader in departmental capital budgeting
Spares Inventory management in ERP Maximo