This project aims to optimize aerosol sealing of building envelopes in new home construction. The timeline runs from August 2016 to July 2019, with key milestones including builder meetings in Minnesota and California in late 2016/early 2017 and sealing of initial test homes beginning in mid-2017. The budget totals $669,179 from DOE and cost-share sources. Progress includes developing a test plan, an initial builder meeting, and plans to work with selected builders to develop and test optimized sealing approaches in Minnesota and California. The goal is to provide guides enabling reliable, lower-cost envelope tightening reducing space conditioning energy use by over 10%.
McKenney’s designed and installed mechanical systems for Balfour Beatty’s 15th floor office relocation in Atlanta, Georgia. The Old Reader is free for up to 100 feeds.
The document summarizes a project to relocate Autodesk's Massachusetts office to a new building in Waltham. The project objectives were to use public display space to showcase Autodesk technology, design the space to showcase Autodesk's development recommendations, and manage a limited budget and short timeline. The project utilized building information modeling (BIM) for 3D space mapping and integrated project delivery (IPD) for highly collaborative design between architects and contractors. Key objectives were to move 300 employees on schedule, create a case study for customers, and achieve LEED Platinum Certification for sustainable design. The project faced challenges including delays, scope changes, and balancing stakeholder needs but ultimately helped Autodesk with marketing materials
Direct Digital Control (DDC) System Installation for HVACMcKenney's Inc
McKenney's installed direct digital controls on the HVAC systems of 77 buildings at a military repair facility in Albany, Georgia. They discovered some existing HVAC systems needed repairs and connecting the new controls to the facility's network required technical expertise. McKenney's coordinated with the on-site public works department, performed field engineering to optimize system performance and install controls while adhering to base security protocols. The facility can now realize energy savings through monitoring and only operating systems when buildings are occupied.
Mission Critical Data Center Retrofit Project - Catawaba County, NCMcKenney's Inc
The McKenney's team replaced scrubbers for generators at a large data center campus to comply with new emission standards. They devised an assembly line approach to quickly lift and move each generator enclosure to install the new scrubbers and piping, finishing the retrofit in 7 months instead of the planned 11 months to minimize downtime for the facility with only N+1 redundancy. Working closely with the customer and crane contractor, the coordinated team was able to keep the backup generators operational throughout the project.
This project aims to optimize aerosol sealing of building envelopes in new home construction. The timeline runs from August 2016 to July 2019, with key milestones including builder meetings in Minnesota and California in late 2016/early 2017 and sealing of initial test homes beginning in mid-2017. The budget totals $669,179 from DOE and cost-share sources. Progress includes developing a test plan, an initial builder meeting, and plans to work with selected builders to develop and test optimized sealing approaches in Minnesota and California. The goal is to provide guides enabling reliable, lower-cost envelope tightening reducing space conditioning energy use by over 10%.
McKenney’s designed and installed mechanical systems for Balfour Beatty’s 15th floor office relocation in Atlanta, Georgia. The Old Reader is free for up to 100 feeds.
The document summarizes a project to relocate Autodesk's Massachusetts office to a new building in Waltham. The project objectives were to use public display space to showcase Autodesk technology, design the space to showcase Autodesk's development recommendations, and manage a limited budget and short timeline. The project utilized building information modeling (BIM) for 3D space mapping and integrated project delivery (IPD) for highly collaborative design between architects and contractors. Key objectives were to move 300 employees on schedule, create a case study for customers, and achieve LEED Platinum Certification for sustainable design. The project faced challenges including delays, scope changes, and balancing stakeholder needs but ultimately helped Autodesk with marketing materials
Direct Digital Control (DDC) System Installation for HVACMcKenney's Inc
McKenney's installed direct digital controls on the HVAC systems of 77 buildings at a military repair facility in Albany, Georgia. They discovered some existing HVAC systems needed repairs and connecting the new controls to the facility's network required technical expertise. McKenney's coordinated with the on-site public works department, performed field engineering to optimize system performance and install controls while adhering to base security protocols. The facility can now realize energy savings through monitoring and only operating systems when buildings are occupied.
Mission Critical Data Center Retrofit Project - Catawaba County, NCMcKenney's Inc
The McKenney's team replaced scrubbers for generators at a large data center campus to comply with new emission standards. They devised an assembly line approach to quickly lift and move each generator enclosure to install the new scrubbers and piping, finishing the retrofit in 7 months instead of the planned 11 months to minimize downtime for the facility with only N+1 redundancy. Working closely with the customer and crane contractor, the coordinated team was able to keep the backup generators operational throughout the project.
Calibre Consulting was engaged by Cassidy Construction to replace the roof of the Pinehill Reservoir in Auckland, New Zealand. The project involved designing and documenting a new steel roof structure to replace the existing domed concrete roof. Calibre Consulting worked closely with the contractor to ensure the tight six week construction deadline was met and any risks were mitigated. The new roof was completed on time and under budget to the satisfaction of the client.
McKenney’s provided a turnkey design/build solution to replace an outdated chiller plant in the operating classroom complex of a government training center.
The document discusses three converter replacement projects for sulphuric acid plants. It describes the technology changes over time from carbon steel to stainless steel converters with internal heat exchangers. It then provides details on three specific projects - one each in Canada, the USA and Brazil - including the motivations for replacement, scopes of work and outcomes.
Richard Russell has over 35 years of experience in property management, facilities management, project management, construction, and operations. He is a results-oriented leader with a track record of successfully completing multi-million dollar projects on time and on budget, including replacing electrical systems, installing backup power generators, and replacing windows after a hurricane. He motivates teams and consistently meets corporate objectives.
Software Advice BuyerView: Construction Software Report 2014Software Advice
Construction companies are evaluating new software primarily to increase efficiency of processes. Project management and estimating applications are most frequently requested. While most buyers do not have a preference for cloud-based or on-premise software, those that do prefer cloud-based options. Specialty contractors represent the largest segment of buyers.
This is a stellar example of a construction business proposal created by DC Building. Quote Roller allows them and you to create, send, track and get electronically signed impressive proposals in a matter of minutes. Here is a PDF version of their proposal.
Cutting Approval Cycles from 30 Days to Ten - Webinar, September 29, 2015Aconex
In this webinar, we heard from Victoria Stanford on how Nalcor uses Aconex to efficiently manage reviews and approvals on workflows like RFI's, design reviews and submittals. As an example, see how Nalcor was able to reduce turnaround times of technical documents from 30 days to only 10 on Lower Churchill, a phased project to build two hydroelectric facilities in Canada. Plus Boston Consulting Group presented on key trends and process improvements in the construction industry.
Kevin focuses on sustainable design, energy optimization and building physics for laboratory, educational, commercial and healthcare projects. He has participated in large-scale and complex projects across Canada, the United States, the UAE and China. Kevin is a principal at B+H Architects; and situated in their Shanghai office. He studied architecture at the University of Waterloo and studied Building Science at the University of Toronto. He is a licensed architect, Building Science Specialist of Ontario (BSSO) and a LEED accredited professional. He served on the CaGBC Energy & Engineering Technical Advisory Group and on the UN Sustainable Buildings & Climate Initiative Task Force.
In this talk Kevin talks about Chinese and Canadian Sustainable Design Practices compared through optimized HVAC.
McKenney’s was responsible for a tight project schedule, which required management of several major subcontractors performing work concurrently and coordination of material storage at a congested job site.
Mastering a New System - IEC HVAC InstallationMcKenney's Inc
McKenney's installed an atypical HVAC system at a Fortune 100 company's data center for their first project with this customer. The team faced rigid quality requirements and had to plan extensively to install the cutting-edge indirect evaporative cooling system on time. Through pre-planning, coordination, and dedicating additional project management, the team exceeded quality standards, project milestones, and built a good relationship with the new customer.
2016 Harry H. Mellon Awards in Job Order Contracting | GordianGordian
Gordian's Harry H. Mellon Awards in Job Order Contracting honor building owners, managers and contractors who use JOC best practices to complete construction projects. The annual awards recognize Job Order Contracting construction procurement innovation. Read case studies from 2016 award winners.
Calibre Consulting was engaged by Cassidy Construction to replace the roof of the Pinehill Reservoir in Auckland, New Zealand. The project involved designing and documenting a new steel roof structure to replace the existing domed concrete roof. Calibre Consulting worked closely with the contractor to ensure the tight six week construction deadline was met and any risks were mitigated. The new roof was completed on time and under budget to the satisfaction of the client.
McKenney’s provided a turnkey design/build solution to replace an outdated chiller plant in the operating classroom complex of a government training center.
The document discusses three converter replacement projects for sulphuric acid plants. It describes the technology changes over time from carbon steel to stainless steel converters with internal heat exchangers. It then provides details on three specific projects - one each in Canada, the USA and Brazil - including the motivations for replacement, scopes of work and outcomes.
Richard Russell has over 35 years of experience in property management, facilities management, project management, construction, and operations. He is a results-oriented leader with a track record of successfully completing multi-million dollar projects on time and on budget, including replacing electrical systems, installing backup power generators, and replacing windows after a hurricane. He motivates teams and consistently meets corporate objectives.
Software Advice BuyerView: Construction Software Report 2014Software Advice
Construction companies are evaluating new software primarily to increase efficiency of processes. Project management and estimating applications are most frequently requested. While most buyers do not have a preference for cloud-based or on-premise software, those that do prefer cloud-based options. Specialty contractors represent the largest segment of buyers.
This is a stellar example of a construction business proposal created by DC Building. Quote Roller allows them and you to create, send, track and get electronically signed impressive proposals in a matter of minutes. Here is a PDF version of their proposal.
Cutting Approval Cycles from 30 Days to Ten - Webinar, September 29, 2015Aconex
In this webinar, we heard from Victoria Stanford on how Nalcor uses Aconex to efficiently manage reviews and approvals on workflows like RFI's, design reviews and submittals. As an example, see how Nalcor was able to reduce turnaround times of technical documents from 30 days to only 10 on Lower Churchill, a phased project to build two hydroelectric facilities in Canada. Plus Boston Consulting Group presented on key trends and process improvements in the construction industry.
Kevin focuses on sustainable design, energy optimization and building physics for laboratory, educational, commercial and healthcare projects. He has participated in large-scale and complex projects across Canada, the United States, the UAE and China. Kevin is a principal at B+H Architects; and situated in their Shanghai office. He studied architecture at the University of Waterloo and studied Building Science at the University of Toronto. He is a licensed architect, Building Science Specialist of Ontario (BSSO) and a LEED accredited professional. He served on the CaGBC Energy & Engineering Technical Advisory Group and on the UN Sustainable Buildings & Climate Initiative Task Force.
In this talk Kevin talks about Chinese and Canadian Sustainable Design Practices compared through optimized HVAC.
McKenney’s was responsible for a tight project schedule, which required management of several major subcontractors performing work concurrently and coordination of material storage at a congested job site.
Mastering a New System - IEC HVAC InstallationMcKenney's Inc
McKenney's installed an atypical HVAC system at a Fortune 100 company's data center for their first project with this customer. The team faced rigid quality requirements and had to plan extensively to install the cutting-edge indirect evaporative cooling system on time. Through pre-planning, coordination, and dedicating additional project management, the team exceeded quality standards, project milestones, and built a good relationship with the new customer.
2016 Harry H. Mellon Awards in Job Order Contracting | GordianGordian
Gordian's Harry H. Mellon Awards in Job Order Contracting honor building owners, managers and contractors who use JOC best practices to complete construction projects. The annual awards recognize Job Order Contracting construction procurement innovation. Read case studies from 2016 award winners.
Renovation Project at Chick-fil-A’s Corporate Campus in College ParkMcKenney's Inc
McKenney's construction team renovated a 77,000 square foot parking deck warehouse at Chick-fil-A's corporate campus into office and computer lab space. They maintained the industrial aesthetic while coordinating installation with aesthetics. McKenney's engineering and automation teams provided value engineering options to achieve the design within budget. Through 3D modeling, field experience, and coordination, McKenney's delivered the HVAC and plumbing systems on time and under budget, seamlessly integrating them with the architectural design.
Demand Control Ventilation Reduces HVAC Load, Saves CostMcKenney's Inc
Columbia Property Trust implemented a demand control ventilation system at one of its office buildings in Atlanta to improve HVAC efficiency and reduce costs. McKenney's Automation & Control Solutions team recommended installing CO2 monitors and a DCV system to automatically adjust outside air ventilation based on occupancy levels. This lowered the HVAC load by an estimated 70 tons and energy usage by 65,000 kWh per month while maintaining comfort. The project achieved a return on investment of less than four months.
Central Utility Plant Design and ConstructionMcKenney's Inc
McKenney’s leveraged in-house design, BIM, prefabrication and turnkey project management to turn over a sophisticated, fully operational Central Utility Plant (CUP) with automated controls.
McKenney's designed and installed a new HVAC system with wireless controls at an Atlanta charter school to replace old window units and radiant heat. The new variable refrigerant flow system significantly reduces energy consumption to meet requirements for an energy grant. Occupancy sensors and WiFi thermostats track use and control temperatures remotely. The project was completed on time over the summer for the start of the school year.
McKenney’s installed HVAC ductwork and piping at a nanotechnology research and training facility under renovation at the Georgia Institute of Technology.
Similar to Success Through Innovation - Build-to-Suit Call Center HVAC Installation (20)
CRAC Units Installation for a Data Center Project in Alpharetta, GAMcKenney's Inc
McKenney’s installed very complex, industry-leading computer room air conditioning (CRAC) units at a new data center under construction in Alpharetta, Georgia.
Generating a Reliable Backup Plan - Data Center Retrofit ProjectMcKenney's Inc
The McKenney's team replaced scrubbers for generators at a large data center to help the facility meet new emission standards on an expedited schedule. They devised an assembly line approach to efficiently remove each generator enclosure and install the new scrubbers and piping. This allowed them to complete the work in 7 months instead of 11 months, saving costs for the customer while keeping the backup generators operational throughout the project.
Blowing the Lid Off City Hall - Energy Savings Performance ContractingMcKenney's Inc
McKenney's developed energy conservation measures and overhauled the HVAC system of a landmark municipal building. They replaced hard-to-access air handling units and chillers after hours to ensure no disruptions. Over 30 ECMs were developed and the customer selected projects providing the best ROI. Replacements were done safely, on schedule and budget and the ECMs are beginning to pay for themselves through utility savings.
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)McKenney's Inc
A zero-energy building (ZEB) produces enough renewable energy to meet its own annual energy consumption requirements by using all cost-effective measures to reduce energy usage through energy efficiency. Learn more at http://blog.mckenneys.com/2018/06/reducing-building-energy-consumption-in-zero-energy-buildings-zeb/
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectMcKenney's Inc
Through an energy savings performance contract, McKenney’s Building Performance Solutions provided a turnkey solution to an aging, inefficient heating system at a large maximum security prison in Georgia.
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney's Inc
McKenney’s, Inc. Critical Systems offers a comprehensive approach for constructing or renovating high-quality mechanical systems for data centers and operations centers that meet the most exacting demands and schedules.
Efficient Solutions for Rainwater and Condensate HarvestingMcKenney's Inc
McKenney’s is the right choice for reliable, well-designed rainwater and condensate harvesting systems because they bring a powerful combination of experience, commitment and innovation.
Plumbing Preventive Maintenance in Commercial BuildingsMcKenney's Inc
Protect your investment and consider a plumbing preventive maintenance program for your facility. Check out our plumbing services page for more information at http://plumbing.mckenneys.com/
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney's Inc
McKenney’s Interiors & Special Projects (ISP) team responds quickly to a wide range of mechanical needs, including interior renovations, infrastructure repairs, replacements and retrocommissioning projects.
Creating a Showstopper in Charlotte - Mechanical Systems InstallationMcKenney's Inc
McKenney's installed mechanical systems at a high-rise office building in downtown Charlotte that faced a tight schedule for completion. Extensive planning and coordination allowed McKenney's to sequence the work and overcome equipment issues to finish installation on time, allowing the owners to lease spaces as scheduled. The project team worked creatively within the compressed timeline for startup and commissioning of key mechanical equipment.
McKenney’s is building a wide range of energy-efficient mechanical systems using green practices for the 325,000-square-foot medical center in Braselton, Georgia.
Discover innovative uses of Revit in urban planning and design, enhancing city landscapes with advanced architectural solutions. Understand how architectural firms are using Revit to transform how processes and outcomes within urban planning and design fields look. They are supplementing work and putting in value through speed and imagination that the architects and planners are placing into composing progressive urban areas that are not only colorful but also pragmatic.
Profiles of Iconic Fashion Personalities.pdfTTop Threads
The fashion industry is dynamic and ever-changing, continuously sculpted by trailblazing visionaries who challenge norms and redefine beauty. This document delves into the profiles of some of the most iconic fashion personalities whose impact has left a lasting impression on the industry. From timeless designers to modern-day influencers, each individual has uniquely woven their thread into the rich fabric of fashion history, contributing to its ongoing evolution.
Digital Marketing with a Focus on Sustainabilitysssourabhsharma
Digital Marketing best practices including influencer marketing, content creators, and omnichannel marketing for Sustainable Brands at the Sustainable Cosmetics Summit 2024 in New York
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Final ank Satta Matka Dpbos Final ank Satta Matta Matka 143 Kalyan Matka Guessing Final Matka Final ank Today Matka 420 Satta Batta Satta 143 Kalyan Chart Main Bazar Chart vip Matka Guessing Dpboss 143 Guessing Kalyan night
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...BBPMedia1
Nathalie zal delen hoe DEI en ESG een fundamentele rol kunnen spelen in je merkstrategie en je de juiste aansluiting kan creëren met je doelgroep. Door middel van voorbeelden en simpele handvatten toont ze hoe dit in jouw organisatie toegepast kan worden.
[To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
This presentation is a curated compilation of PowerPoint diagrams and templates designed to illustrate 20 different digital transformation frameworks and models. These frameworks are based on recent industry trends and best practices, ensuring that the content remains relevant and up-to-date.
Key highlights include Microsoft's Digital Transformation Framework, which focuses on driving innovation and efficiency, and McKinsey's Ten Guiding Principles, which provide strategic insights for successful digital transformation. Additionally, Forrester's framework emphasizes enhancing customer experiences and modernizing IT infrastructure, while IDC's MaturityScape helps assess and develop organizational digital maturity. MIT's framework explores cutting-edge strategies for achieving digital success.
These materials are perfect for enhancing your business or classroom presentations, offering visual aids to supplement your insights. Please note that while comprehensive, these slides are intended as supplementary resources and may not be complete for standalone instructional purposes.
Frameworks/Models included:
Microsoft’s Digital Transformation Framework
McKinsey’s Ten Guiding Principles of Digital Transformation
Forrester’s Digital Transformation Framework
IDC’s Digital Transformation MaturityScape
MIT’s Digital Transformation Framework
Gartner’s Digital Transformation Framework
Accenture’s Digital Strategy & Enterprise Frameworks
Deloitte’s Digital Industrial Transformation Framework
Capgemini’s Digital Transformation Framework
PwC’s Digital Transformation Framework
Cisco’s Digital Transformation Framework
Cognizant’s Digital Transformation Framework
DXC Technology’s Digital Transformation Framework
The BCG Strategy Palette
McKinsey’s Digital Transformation Framework
Digital Transformation Compass
Four Levels of Digital Maturity
Design Thinking Framework
Business Model Canvas
Customer Journey Map
SATTA MATKA SATTA FAST RESULT KALYAN TOP MATKA RESULT KALYAN SATTA MATKA FAST RESULT MILAN RATAN RAJDHANI MAIN BAZAR MATKA FAST TIPS RESULT MATKA CHART JODI CHART PANEL CHART FREE FIX GAME SATTAMATKA ! MATKA MOBI SATTA 143 spboss.in TOP NO1 RESULT FULL RATE MATKA ONLINE GAME PLAY BY APP SPBOSS
Storytelling is an incredibly valuable tool to share data and information. To get the most impact from stories there are a number of key ingredients. These are based on science and human nature. Using these elements in a story you can deliver information impactfully, ensure action and drive change.
The Most Inspiring Entrepreneurs to Follow in 2024.pdfthesiliconleaders
In a world where the potential of youth innovation remains vastly untouched, there emerges a guiding light in the form of Norm Goldstein, the Founder and CEO of EduNetwork Partners. His dedication to this cause has earned him recognition as a Congressional Leadership Award recipient.
[To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
This PowerPoint compilation offers a comprehensive overview of 20 leading innovation management frameworks and methodologies, selected for their broad applicability across various industries and organizational contexts. These frameworks are valuable resources for a wide range of users, including business professionals, educators, and consultants.
Each framework is presented with visually engaging diagrams and templates, ensuring the content is both informative and appealing. While this compilation is thorough, please note that the slides are intended as supplementary resources and may not be sufficient for standalone instructional purposes.
This compilation is ideal for anyone looking to enhance their understanding of innovation management and drive meaningful change within their organization. Whether you aim to improve product development processes, enhance customer experiences, or drive digital transformation, these frameworks offer valuable insights and tools to help you achieve your goals.
INCLUDED FRAMEWORKS/MODELS:
1. Stanford’s Design Thinking
2. IDEO’s Human-Centered Design
3. Strategyzer’s Business Model Innovation
4. Lean Startup Methodology
5. Agile Innovation Framework
6. Doblin’s Ten Types of Innovation
7. McKinsey’s Three Horizons of Growth
8. Customer Journey Map
9. Christensen’s Disruptive Innovation Theory
10. Blue Ocean Strategy
11. Strategyn’s Jobs-To-Be-Done (JTBD) Framework with Job Map
12. Design Sprint Framework
13. The Double Diamond
14. Lean Six Sigma DMAIC
15. TRIZ Problem-Solving Framework
16. Edward de Bono’s Six Thinking Hats
17. Stage-Gate Model
18. Toyota’s Six Steps of Kaizen
19. Microsoft’s Digital Transformation Framework
20. Design for Six Sigma (DFSS)
To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations
Best practices for project execution and deliveryCLIVE MINCHIN
A select set of project management best practices to keep your project on-track, on-cost and aligned to scope. Many firms have don't have the necessary skills, diligence, methods and oversight of their projects; this leads to slippage, higher costs and longer timeframes. Often firms have a history of projects that simply failed to move the needle. These best practices will help your firm avoid these pitfalls but they require fortitude to apply.
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...APCO
The Radar reflects input from APCO’s teams located around the world. It distils a host of interconnected events and trends into insights to inform operational and strategic decisions. Issues covered in this edition include:
Navigating the world of forex trading can be challenging, especially for beginners. To help you make an informed decision, we have comprehensively compared the best forex brokers in India for 2024. This article, reviewed by Top Forex Brokers Review, will cover featured award winners, the best forex brokers, featured offers, the best copy trading platforms, the best forex brokers for beginners, the best MetaTrader brokers, and recently updated reviews. We will focus on FP Markets, Black Bull, EightCap, IC Markets, and Octa.
Starting a business is like embarking on an unpredictable adventure. It’s a journey filled with highs and lows, victories and defeats. But what if I told you that those setbacks and failures could be the very stepping stones that lead you to fortune? Let’s explore how resilience, adaptability, and strategic thinking can transform adversity into opportunity.
IMPACT Silver is a pure silver zinc producer with over $260 million in revenue since 2008 and a large 100% owned 210km Mexico land package - 2024 catalysts includes new 14% grade zinc Plomosas mine and 20,000m of fully funded exploration drilling.
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Tastemy Pandit
Know what your zodiac sign says about your taste in food! Explore how the 12 zodiac signs influence your culinary preferences with insights from MyPandit. Dive into astrology and flavors!