1. In only a few years, this flooring company
has become the largest residential sheet
vinyl provider in Europe, manufacturing
high quality flexible vinyl flooring. When
the company expanded its operations to
expansions effectively. As a result, the
system includes more than three miles
of piping—ranging from 3 inches to
30 inches in diameter—to heat and
cool the entire facility.
With multiple
mechanical packages
and scopes of work
being performed
concurrently, the project
required McKenney’s
to work in concert with
three other mechanical
contractors. Communi-
cation and teamwork
was also critical among
the several organiza-
tions from multiple
countries working on
the plant construction.
For example, the
McKenney’s project
team realized that the
design for the structure
in the central plant
didn’t account for up to
400,000 pounds of piping and water. They
contacted the general contractor and onsite
project manager immediately. Fortunately, it
was discovered before pipes were installed.
The McKenney’s team also leveraged its
prefabrication and shop drawing skills to
ensure the project was completed quickly, in
only about eight months. Just as important,
the 30-person team completed the work
without a single recordable safety incident.
Manufacturing Facility
Hits the Floor Running
P r o j e c t H i g h l i g h t s
Project Team
žž Engineer: Shepherd,
Harvey & Associates
žž Architects:
Ruark & Wyatt Architects
žž Owner: Vinyl Flooring Company
žž General Contractor:
The Conlan Company
The Challenge
žž Install massive HVAC system
on large, sprawling site
žž Accommodate additional process
piping scope quickly
žž Work with unusual piping
systems and materials
žž Address multiple projects, with
multiple multinational contractors
The Solution
žž Significant pre-planning effort
žž Assess design before work
is implemented
žž Prefabricate piping
žž Open communication with
managers and contractors
The Results
žž Projects completed
on time, on budget, with
no safety incidents
žž Highly efficient systems,
capable of future expansionscontinued on reverse
For more information contact McKenney’s at 404-622-5000.
info@mckenneys.com www.mckenneys.com
the U.S., it wanted the manufacturing facility
to capture the innovative and progressive
spirit that sparked its rapid, steady growth.
Crews began to build the 468,000-square-
foot facility in Dalton, GA, late in 2009.
McKenney’s was selected to install the HVAC
system, including a massive chilled water
plant. Even though only 3,400 tons are used
currently, McKenney’s built a 5,100-ton-
capacity central plant to manage future
Photo provided by IVC US