SlideShare a Scribd company logo
CEE-312
Structural Analysis and Design Sessional-I
(1.0 credit)
Lecture: 5
Bijit Kumar Banik
Assistant Professor, CEE, SUST
Room No.: 115 (“C” building)
bijit_sustbd@yahoo.com
Department of Civil and Environmental Engineering
Analysis and design of an Industrial roof truss system
6@6 ft = 36 ft
L0
L1 L2 L3 L4 L5
L6
U1
U2
U3
U4
U5
4.54 k2.60 k
(- 1.19) (-1.19) (-0.95) (-3.11) (-5.64) (-5.64)
(5.14)
(5.00)
(4.85) (4.07)
(5.61)
(7.14)
(0)
(-0.13)
(-1.41)
(0)
(-3.07)
(0.35)
(0.27)
(3.78)
(2.90)
3.24k
L R
0.23k
0.23k
0.12k
0.12k
2.46k
2.46k
1.23k
1.23k
Analysis and design of an Industrial roof truss system
6@6 ft = 36 ft
L0
L1 L2 L3 L4 L5
L6
U1
U2
U3
U4
U5
4.54 k 2.60 k
3.24k
2.46k
2.46k
1.23k
1.23k
0.23k
0.23k
0.12k
0.12k
R L
Analysis and design of an Industrial roof truss system
1
1
∑V = 0
(5/10.3)*L0U1+(9/10.3)*1.23 – 4.54 = 0
L0U1= 7.14 k (T) 5
9
10.3
∑H = 0
L0L1 +(9/10.3)*7.14 +3.24 – (5/10.3)*1.23 =0
L0L1= 8.88 k (C)
4.54 k
1.23k
L0L1
L0U1
1-1
3.24 k
9
5
10.3
6@6 ft = 36 ft
10 ft
L0 L1 L2 L3 L4 L5
L6
U1
U2
U3
U4
U5
R1
R2
H
3@6.86 ft
2.46k
2.46k
1.23k
1.23k
0.23k
0.23k
0.12k
0.12k
5
9
10.3
9
5
10.3
= 3.24k
= 4.54k
= 2.60k
Analysis and design of an Industrial roof truss system
∑V= 0
L1U1 = 0
L1L2 = L0L1 = 8.88k (C)
∑H= 0
6@6 ft = 36 ft
10 ft
L0 L1 L2 L3 L4 L5
L6
U1
U2
U3
U4
U5
R1
R2
H
3@6.86 ft
5
9
10.3
9
5
10.3
= 3.24k
2 2
L1L2
2-2
L0L1=8.88k
L1U1
2.46k
2.46k
1.23k
1.23k
0.23k
0.23k
0.12k
0.12k
= 4.54k
= 2.60k
Analysis and design of an Industrial roof truss system
6@6 ft = 36 ft
10 ft
L0 L1 L2 L3 L4 L5
L6
U1
U2
U3
U4
U5
3@6.86 ft
5
9
10.3
9
5
10.3
3
3
9
510.3
9
5
10.3
9
5
10.3
∑ML0 = 0
– 2.46*6.86+ (5/10.3)*U1L2*6 + (9/10.3)*U1L2*(10/3)= 0
U1L2= 2.90 k (T)
∑V = 0
(9/10.3)*1.23+(9/10.3)*2.46 + (5/10.3)*U1U2
– (5/10.3)*2.90 – 4.54= 0
U1U2= 5.61 k (T)
+ve 3-3
U1
L0 L1 L2
U2
2.46 k
1.23 k
4.54k
(10/3)’
8.88k3.24k
2.46k
2.46k
1.23k
1.23k
0.23k
0.23k
0.12k
0.12k
R1
R2
= 3.24k
= 4.54k
= 2.60k
Analysis and design of an Industrial roof truss system
6@6 ft = 36 ft
10 ft
L0 L1 L2 L3 L4 L5
L6
U1
U2
U3
U4
U5
3@6.86 ft
5
9
10.3
9
5
10.3
4 4
∑H = 0
L2L3= 6.35 k (C)
5
9
10.3
L2L3
4-4
8.88k
L2U2
2.90k
∑V = 0
L2U2 = (5/10.3)*2.90
L2U2= 1.41 k (C)
L2L3 +8.88 – (9/10.3)*2.90 = 0
2.46k
2.46k
1.23k
1.23k
0.23k
0.23k
0.12k
0.12k
R1
R2
= 3.24k
= 4.54k
= 2.60k
Analysis and design of an Industrial roof truss system
6@6 ft = 36 ft
10 ft
L0 L1 L2 L3 L4 L5
L6
U1
U2
U3
U4
U5
3@6.86 ft
5
9
10.3
9
5
10.3
5
5
10
9
13.45
5
9
10.3
∑ML0 = 0
(9/13.45)*U2L3*(20/3)+ (10/13.45)*U2L3*12
– 2.46*6.86 – 2.46*2*6.86 = 0
U2L3= 3.78 k (T)
∑V = 0
(5/10.3)*U2U3+ (9/10.3)*(1.23+2.46+2.46)
– (10/13.45)*3.78 – 4.54 = 0
U2U3= 4.07 k (T)
+ve
9
5
10.3
2.46k
2.46k
1.23k
1.23k
0.23k
0.23k
0.12k
0.12k
R1
R2
= 3.24k
= 4.54k
= 2.60k5-5
L0 L1 L2 L3
U1
U2
U3
1.23 k
4.54 k
2.46 k
6.35 k
2*(10/3)
2.46 k
3.24 k
Analysis and design of an Industrial roof truss system
(5/10.3)*U5L6+(9/10.3)*0.12 – 2.60 = 0
∑V= 0
U5L6 = 5.14k (T)
∑H= 0
L5L6 = 4.43k (C)
6@6 ft = 36 ft
10 ft
L0 L1 L2 L3 L4 L5
L6
U1
U2
U3
U4
U5
3@6.86 ft
5
9
10.3
9
5
10.3
6
6
5
9
10.3
5
9
10.3
2.60 k
U5L6 0.12k
6-6
L5L6(5/10.3)*0.12 – (9/10.3)*5.14 – L5L6= 0
2.46k
2.46k
1.23k
1.23k
0.23k
0.23k
0.12k
0.12k
R1
R2
= 3.24k
= 4.54k
= 2.60k
Analysis and design of an Industrial roof truss system
6@6 ft = 36 ft
10 ft
L0 L1 L2 L3 L4 L5
L6
U1
U2
U3
U4
U5
3@6.86 ft
5
9
10.3
9
5
10.3
7 7
∑H = 0
4.43k
7 – 7
L4L5
L5U5
∑V = 0
L5U5= 0
L4L5 = 4.43k (C)
2.46k
2.46k
1.23k
1.23k
0.23k
0.23k
0.12k
0.12k
R1
R2
= 3.24k
= 4.54k
= 2.60k
Analysis and design of an Industrial roof truss system
6@6 ft = 36 ft
10 ft
L0 L1 L2 L3 L4 L5
L6
U1
U2
U3
U4
U5
3@6.86 ft
5
9
10.3
9
5
10.3 8
8
5
9
10.3
9
510.3
9
5
10.3
∑ML6 = 0
0.23*6.86 – (5/10.3)*U5L4*6
– (9/10.3)*U5L4*(10/3)= 0
U5L4= 0.27 k (T)
∑V = 0
(9/10.3)*0.23+(9/10.3)*0.12 + (5/10.3)*U4U5
– (5/10.3)*0.27 – 2.60= 0
U4U5= 5.0 k (T)
+ve
2.46k
2.46k
1.23k
1.23k
0.23k
0.23k
0.12k
0.12k
R1
R2
= 3.24k
= 4.54k
= 2.60k
L6
U5
L5L4
U4
0.23k
0.12k
2.60k
8-8
Analysis and design of an Industrial roof truss system
6@6 ft = 36 ft
10 ft
L0 L1 L2 L3 L4 L5
L6
U1
U2
U3
U4
U5
3@6.86 ft
5
9
10.3
9
5
10.3
9 9
∑H = 0
L3L4= 4.19 k (C)
∑V = 0
L4U4 = (5/10.3)*0.27
L4U4= 0.13 k (C)
L3L4+ (9/10.3)*0.27 – 4.43 = 0
9
510.3
4.43k
9-9
L4U4
0.27k
L3U4
2.46k
2.46k
1.23k
1.23k
0.23k
0.23k
0.12k
0.12k
R1
R2
= 3.24k
= 4.54k
= 2.60k
Analysis and design of an Industrial roof truss system
6@6 ft = 36 ft
10 ft
L0 L1 L2 L3 L4 L5
L6
U1
U2
U3
U4
U5
3@6.86 ft
5
9
10.3
9
5
10.3
10
10
9
5
10.3
9
10
13.45
9
5
10.3
0.23k
0.23k
0.12k
2.60k
L6L5L4L3
U3
U5
U4
4.19k
10 -10∑ML6 = 0
–(9/13.45)*U4L3*(20/3) – (10/13.45)*U4L3*12
+ 0.23*6.86 +0.23*2*6.86 = 0
U4L3= 0.35 k (T)
∑V = 0
(5/10.3)*U3U4 + (9/10.3)*(0.12+2*0.23)
– (10/13.45)*0.35 – 2.60 = 0
U3U4= 4.85 k (T)
+ve
2.46k
2.46k
1.23k
1.23k
0.23k
0.23k
0.12k
0.12k
R1
R2
= 3.24k
= 4.54k
= 2.60k
Analysis and design of an Industrial roof truss system
6@6 ft = 36 ft
10 ft
L0 L1 L2 L3 L4 L5
L6
U1
U2
U3
U4
U5
3@6.86 ft
5
9
10.3
9
5
10.3
11 11
∑V = 0
9
10
13.45
9
10
13.45
3.11k
11 – 11
0.95k
L3U3
L3
3.78k 0.35k(10/13.45)*3.78 + (10/13.45)*0.35 – L3U3= 0
L3U3= 3.07 k (C)
2.46k
2.46k
1.23k
1.23k
0.23k
0.23k
0.12k
0.12k
R1
R2
= 3.24k
= 4.54k
= 2.60k
Analysis and design of an Industrial roof truss system
(- 8.88) (-8.88) (-6.35) (-4.19) (-4.43) (-4.43)
(7.14)
(5.61)
(4.07) (4.85)
(5.00)
(5.14)
6@6 ft = 36 ft
L0
L1 L2 L3 L4 L5
L6
U1
U2
U3
U4
U5
2.60 k4.54 k
(0)
(-0.13)
(-1.41)
(0)
(-3.07)
(3.78)
(2.90)
(0.35)
(0.27)
3.24k
R L
Analysis and design of an Industrial roof truss system
R L
(- 8.88) (-8.88) (-6.35) (-4.19) (-4.43) (-4.43)
(7.14)
(5.61)
(4.07) (4.85)
(5.00)
(5.14)
6@6 ft = 36 ft
L0 L1 L2 L3 L4 L5
L6
U1
U2
U3
U4
U5
2.60 k4.54 k
(0)
(-0.13)
(-1.41)
(0)
(-3.07)
(3.78)
(2.90)
(0.35)
(0.27)
3.24k
L→R
6@6 ft = 36 ft
L0
L1 L2 L3 L4 L5
L6
U1
U2
U3
U4
U5
4.54 k2.60 k
(- 1.19) (-1.19) (-0.95) (-3.11) (-5.64) (-5.64)
(5.14)
(5.00)
(4.85) (4.07)
(5.61)
(7.14)
(0)
(-0.13)
(-1.41)
(0)
(-3.07)
(0.35)
(0.27)
(3.78)
(2.90)
3.24k
Analysis and design of an Industrial roof truss system
R L
(- 8.88) (-8.88) (-6.35) (-4.19) (-4.43) (-4.43)
(7.14) (5.61) (4.07) (4.85) (5.00) (5.14)
6@6 ft = 36 ft
L0 L1 L2 L3 L4 L5
L6
U1
U2
U3
U4
U5
2.60 k4.54 k
(0)
(-0.13)
(-1.41)
(0)
(-3.07)
(3.78)
(2.90)
(0.35)
(0.27)
3.24k
L→R
6@6 ft = 36 ft
L0 L1 L2 L3 L4 L5
L6
U1
U2
U3
U4
U5
4.54 k2.60 k
(- 1.19) (-1.19) (-0.95) (-3.11) (-5.64) (-5.64)
(5.14) (5.00) (4.85) (4.07) (5.61) (7.14)
(0)
(-0.13)
(-1.41)
(0)
(-3.07)
(0.35)
(0.27)
(3.78)
(2.90)
3.24k
(4.41) (4.41) (3.53) (3.53) (4.41) (4.41)
(- 5.05) (- 4.04) (- 3.03) (- 3.03) (- 4.04) (- 5.05)
6@6 ft = 36 ft
L0 L1 L2 L3 L4 L5
L6
U1
U2
U3
U4
U5
2.94 k2.94 k
(.18)
(0.67)
(0.67)
(.18)
(2.14)
(-1.32)
(- 1.01)
(-1.32)
(- 1.01)
Dead Load
Cee 312(5)(structural analysis)

More Related Content

What's hot

Engineering science lesson 6 1
Engineering science lesson 6 1Engineering science lesson 6 1
Engineering science lesson 6 1
Shahid Aaqil
 
Eurocodes design of members
Eurocodes design of membersEurocodes design of members
Eurocodes design of members
yuri30
 
TALAT Lecture 2301: Design of Members Example 9.2: Beam-column with rectangul...
TALAT Lecture 2301: Design of Members Example 9.2: Beam-column with rectangul...TALAT Lecture 2301: Design of Members Example 9.2: Beam-column with rectangul...
TALAT Lecture 2301: Design of Members Example 9.2: Beam-column with rectangul...
CORE-Materials
 
Design of compression members
Design of compression membersDesign of compression members
Design of compression members
Sabna Thilakan
 
11-Introduction to Axially Compression Members (Steel Structural Design & Pro...
11-Introduction to Axially Compression Members (Steel Structural Design & Pro...11-Introduction to Axially Compression Members (Steel Structural Design & Pro...
11-Introduction to Axially Compression Members (Steel Structural Design & Pro...
Hossam Shafiq II
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )
Hamza Waheed
 
Doubly reinforced beam]
Doubly reinforced beam]Doubly reinforced beam]
Doubly reinforced beam]
raymondsabado2005
 
NSCP 2010 , Volume 1
NSCP 2010 , Volume 1NSCP 2010 , Volume 1
NSCP 2010 , Volume 1
PUP Lopez College of Civil Engg.
 
Chapter 6
Chapter 6Chapter 6
Chapter 6
Neagal Shu
 
21-Design of Simple Shear Connections (Steel Structural Design & Prof. Shehab...
21-Design of Simple Shear Connections (Steel Structural Design & Prof. Shehab...21-Design of Simple Shear Connections (Steel Structural Design & Prof. Shehab...
21-Design of Simple Shear Connections (Steel Structural Design & Prof. Shehab...
Hossam Shafiq II
 
Sasoli1
Sasoli1Sasoli1
Sasoli1
buetk khuzdar
 
Lec06 Analysis and Design of T Beams (Reinforced Concrete Design I & Prof. Ab...
Lec06 Analysis and Design of T Beams (Reinforced Concrete Design I & Prof. Ab...Lec06 Analysis and Design of T Beams (Reinforced Concrete Design I & Prof. Ab...
Lec06 Analysis and Design of T Beams (Reinforced Concrete Design I & Prof. Ab...
Hossam Shafiq II
 
Temperature changes problems
Temperature changes problemsTemperature changes problems
Temperature changes problems
Mahmoud Youssef Abido
 
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
Hossam Shafiq II
 
800
800800
Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...
Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...
Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...
Hossam Shafiq II
 
Tugas 1 & 2 Struktur Beton 1
Tugas 1 & 2 Struktur Beton 1Tugas 1 & 2 Struktur Beton 1
Tugas 1 & 2 Struktur Beton 1
University of Jakarta
 
Rectangular tank example_latest
Rectangular tank example_latestRectangular tank example_latest
Rectangular tank example_latest
Vedachalam Mani
 
Rectangular tank
Rectangular tankRectangular tank
Rectangular tank
JayswalShashank1
 
Doubly reinforced beam design
Doubly reinforced beam   designDoubly reinforced beam   design
Doubly reinforced beam design
Selvakumar Palanisamy
 

What's hot (20)

Engineering science lesson 6 1
Engineering science lesson 6 1Engineering science lesson 6 1
Engineering science lesson 6 1
 
Eurocodes design of members
Eurocodes design of membersEurocodes design of members
Eurocodes design of members
 
TALAT Lecture 2301: Design of Members Example 9.2: Beam-column with rectangul...
TALAT Lecture 2301: Design of Members Example 9.2: Beam-column with rectangul...TALAT Lecture 2301: Design of Members Example 9.2: Beam-column with rectangul...
TALAT Lecture 2301: Design of Members Example 9.2: Beam-column with rectangul...
 
Design of compression members
Design of compression membersDesign of compression members
Design of compression members
 
11-Introduction to Axially Compression Members (Steel Structural Design & Pro...
11-Introduction to Axially Compression Members (Steel Structural Design & Pro...11-Introduction to Axially Compression Members (Steel Structural Design & Pro...
11-Introduction to Axially Compression Members (Steel Structural Design & Pro...
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )
 
Doubly reinforced beam]
Doubly reinforced beam]Doubly reinforced beam]
Doubly reinforced beam]
 
NSCP 2010 , Volume 1
NSCP 2010 , Volume 1NSCP 2010 , Volume 1
NSCP 2010 , Volume 1
 
Chapter 6
Chapter 6Chapter 6
Chapter 6
 
21-Design of Simple Shear Connections (Steel Structural Design & Prof. Shehab...
21-Design of Simple Shear Connections (Steel Structural Design & Prof. Shehab...21-Design of Simple Shear Connections (Steel Structural Design & Prof. Shehab...
21-Design of Simple Shear Connections (Steel Structural Design & Prof. Shehab...
 
Sasoli1
Sasoli1Sasoli1
Sasoli1
 
Lec06 Analysis and Design of T Beams (Reinforced Concrete Design I & Prof. Ab...
Lec06 Analysis and Design of T Beams (Reinforced Concrete Design I & Prof. Ab...Lec06 Analysis and Design of T Beams (Reinforced Concrete Design I & Prof. Ab...
Lec06 Analysis and Design of T Beams (Reinforced Concrete Design I & Prof. Ab...
 
Temperature changes problems
Temperature changes problemsTemperature changes problems
Temperature changes problems
 
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
 
800
800800
800
 
Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...
Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...
Lec05 Design of Rectangular Beams with Tension Steel only (Reinforced Concret...
 
Tugas 1 & 2 Struktur Beton 1
Tugas 1 & 2 Struktur Beton 1Tugas 1 & 2 Struktur Beton 1
Tugas 1 & 2 Struktur Beton 1
 
Rectangular tank example_latest
Rectangular tank example_latestRectangular tank example_latest
Rectangular tank example_latest
 
Rectangular tank
Rectangular tankRectangular tank
Rectangular tank
 
Doubly reinforced beam design
Doubly reinforced beam   designDoubly reinforced beam   design
Doubly reinforced beam design
 

Similar to Cee 312(5)(structural analysis)

Cee 312(4)(structural analysis)
Cee 312(4)(structural analysis)Cee 312(4)(structural analysis)
Cee 312(4)(structural analysis)
apudgr8
 
Cee 312(3)
Cee 312(3)Cee 312(3)
Cee 312(3)
apudgr8
 
Cee 312(6)(structural analysis)
Cee 312(6)(structural analysis)Cee 312(6)(structural analysis)
Cee 312(6)(structural analysis)
apudgr8
 
FYP Structure.pdf
FYP Structure.pdfFYP Structure.pdf
FYP Structure.pdf
Sushrut Gautam
 
Analysis and design of 15 storey office and
Analysis and design of 15 storey office andAnalysis and design of 15 storey office and
Analysis and design of 15 storey office and
Masroor Alam
 
Analysis and design of 15 storey office and
Analysis and design of 15 storey office andAnalysis and design of 15 storey office and
Analysis and design of 15 storey office and
Masroor Alam
 
Baf Shaheen College (B+12) ETABS Dynamic Analysis.pptx
Baf Shaheen College (B+12) ETABS Dynamic Analysis.pptxBaf Shaheen College (B+12) ETABS Dynamic Analysis.pptx
Baf Shaheen College (B+12) ETABS Dynamic Analysis.pptx
DES Engineers Ltd
 
Capítulo 05 deflexão e rigidez
Capítulo 05   deflexão e rigidezCapítulo 05   deflexão e rigidez
Capítulo 05 deflexão e rigidez
Jhayson Carvalho
 
Shi20396 ch10
Shi20396 ch10Shi20396 ch10
Shi20396 ch10
Paralafakyou Mens
 
project designa.docx
project designa.docxproject designa.docx
project designa.docx
Mahamad Jawhar
 
Capítulo 10 mola
Capítulo 10   molaCapítulo 10   mola
Capítulo 10 mola
Jhayson Carvalho
 
Cee 311(4)
Cee 311(4)Cee 311(4)
Cee 311(4)
apudgr8
 
Capítulo 02 considerações estatísticas
Capítulo 02   considerações estatísticasCapítulo 02   considerações estatísticas
Capítulo 02 considerações estatísticas
Jhayson Carvalho
 
On preemptive resume versus non preemtive disciplines relevant to monopoly se...
On preemptive resume versus non preemtive disciplines relevant to monopoly se...On preemptive resume versus non preemtive disciplines relevant to monopoly se...
On preemptive resume versus non preemtive disciplines relevant to monopoly se...
eSAT Publishing House
 
IRJET- Design of Bell-Mouth Spillway at Barvi Dam
IRJET- Design of Bell-Mouth Spillway at Barvi DamIRJET- Design of Bell-Mouth Spillway at Barvi Dam
IRJET- Design of Bell-Mouth Spillway at Barvi Dam
IRJET Journal
 
Shi20396 ch03
Shi20396 ch03Shi20396 ch03
Shi20396 ch03
Paralafakyou Mens
 
gantry crane report
gantry crane reportgantry crane report
gantry crane report
Julia Collins
 
COMPARATIVE STUDY ON ANALYSIS AND DESIGN OF TRUSS USING MANUAL CALCULATIONS A...
COMPARATIVE STUDY ON ANALYSIS AND DESIGN OF TRUSS USING MANUAL CALCULATIONS A...COMPARATIVE STUDY ON ANALYSIS AND DESIGN OF TRUSS USING MANUAL CALCULATIONS A...
COMPARATIVE STUDY ON ANALYSIS AND DESIGN OF TRUSS USING MANUAL CALCULATIONS A...
IRJET Journal
 
Lecture 5 Well Tubulars Casing String 2015.ppt
Lecture 5 Well Tubulars Casing String 2015.pptLecture 5 Well Tubulars Casing String 2015.ppt
Lecture 5 Well Tubulars Casing String 2015.ppt
VikramKumar158086
 
7th Semester (Dec-2015; Jan-2016) Civil Engineering Question Paper
7th Semester (Dec-2015; Jan-2016) Civil Engineering Question Paper7th Semester (Dec-2015; Jan-2016) Civil Engineering Question Paper
7th Semester (Dec-2015; Jan-2016) Civil Engineering Question Paper
BGS Institute of Technology, Adichunchanagiri University (ACU)
 

Similar to Cee 312(5)(structural analysis) (20)

Cee 312(4)(structural analysis)
Cee 312(4)(structural analysis)Cee 312(4)(structural analysis)
Cee 312(4)(structural analysis)
 
Cee 312(3)
Cee 312(3)Cee 312(3)
Cee 312(3)
 
Cee 312(6)(structural analysis)
Cee 312(6)(structural analysis)Cee 312(6)(structural analysis)
Cee 312(6)(structural analysis)
 
FYP Structure.pdf
FYP Structure.pdfFYP Structure.pdf
FYP Structure.pdf
 
Analysis and design of 15 storey office and
Analysis and design of 15 storey office andAnalysis and design of 15 storey office and
Analysis and design of 15 storey office and
 
Analysis and design of 15 storey office and
Analysis and design of 15 storey office andAnalysis and design of 15 storey office and
Analysis and design of 15 storey office and
 
Baf Shaheen College (B+12) ETABS Dynamic Analysis.pptx
Baf Shaheen College (B+12) ETABS Dynamic Analysis.pptxBaf Shaheen College (B+12) ETABS Dynamic Analysis.pptx
Baf Shaheen College (B+12) ETABS Dynamic Analysis.pptx
 
Capítulo 05 deflexão e rigidez
Capítulo 05   deflexão e rigidezCapítulo 05   deflexão e rigidez
Capítulo 05 deflexão e rigidez
 
Shi20396 ch10
Shi20396 ch10Shi20396 ch10
Shi20396 ch10
 
project designa.docx
project designa.docxproject designa.docx
project designa.docx
 
Capítulo 10 mola
Capítulo 10   molaCapítulo 10   mola
Capítulo 10 mola
 
Cee 311(4)
Cee 311(4)Cee 311(4)
Cee 311(4)
 
Capítulo 02 considerações estatísticas
Capítulo 02   considerações estatísticasCapítulo 02   considerações estatísticas
Capítulo 02 considerações estatísticas
 
On preemptive resume versus non preemtive disciplines relevant to monopoly se...
On preemptive resume versus non preemtive disciplines relevant to monopoly se...On preemptive resume versus non preemtive disciplines relevant to monopoly se...
On preemptive resume versus non preemtive disciplines relevant to monopoly se...
 
IRJET- Design of Bell-Mouth Spillway at Barvi Dam
IRJET- Design of Bell-Mouth Spillway at Barvi DamIRJET- Design of Bell-Mouth Spillway at Barvi Dam
IRJET- Design of Bell-Mouth Spillway at Barvi Dam
 
Shi20396 ch03
Shi20396 ch03Shi20396 ch03
Shi20396 ch03
 
gantry crane report
gantry crane reportgantry crane report
gantry crane report
 
COMPARATIVE STUDY ON ANALYSIS AND DESIGN OF TRUSS USING MANUAL CALCULATIONS A...
COMPARATIVE STUDY ON ANALYSIS AND DESIGN OF TRUSS USING MANUAL CALCULATIONS A...COMPARATIVE STUDY ON ANALYSIS AND DESIGN OF TRUSS USING MANUAL CALCULATIONS A...
COMPARATIVE STUDY ON ANALYSIS AND DESIGN OF TRUSS USING MANUAL CALCULATIONS A...
 
Lecture 5 Well Tubulars Casing String 2015.ppt
Lecture 5 Well Tubulars Casing String 2015.pptLecture 5 Well Tubulars Casing String 2015.ppt
Lecture 5 Well Tubulars Casing String 2015.ppt
 
7th Semester (Dec-2015; Jan-2016) Civil Engineering Question Paper
7th Semester (Dec-2015; Jan-2016) Civil Engineering Question Paper7th Semester (Dec-2015; Jan-2016) Civil Engineering Question Paper
7th Semester (Dec-2015; Jan-2016) Civil Engineering Question Paper
 

More from apudgr8

Cee 317 (3) (structural analysis)
Cee 317 (3) (structural analysis)Cee 317 (3) (structural analysis)
Cee 317 (3) (structural analysis)
apudgr8
 
Cee 317 (1)(structural analysis)
Cee 317 (1)(structural analysis)Cee 317 (1)(structural analysis)
Cee 317 (1)(structural analysis)
apudgr8
 
Cee 312(7 & 8)(structural analysis)
Cee 312(7 & 8)(structural analysis)Cee 312(7 & 8)(structural analysis)
Cee 312(7 & 8)(structural analysis)
apudgr8
 
Cee 312(2)
Cee 312(2)Cee 312(2)
Cee 312(2)
apudgr8
 
Cee 312(1)
Cee 312(1)Cee 312(1)
Cee 312(1)
apudgr8
 
Cee311(14)
Cee311(14)Cee311(14)
Cee311(14)
apudgr8
 
Cee311(12&13)
Cee311(12&13)Cee311(12&13)
Cee311(12&13)
apudgr8
 
Cee311(11)
Cee311(11)Cee311(11)
Cee311(11)
apudgr8
 
Cee 311(6)
Cee 311(6)Cee 311(6)
Cee 311(6)
apudgr8
 
Cee 311(5)
Cee 311(5)Cee 311(5)
Cee 311(5)
apudgr8
 
Cee 311(3)
Cee 311(3)Cee 311(3)
Cee 311(3)
apudgr8
 
Cee 311(2)
Cee 311(2)Cee 311(2)
Cee 311(2)
apudgr8
 
Cee 311(1)
Cee 311(1)Cee 311(1)
Cee 311(1)
apudgr8
 
Assignment 1 (bijit sir)
Assignment 1 (bijit sir)Assignment 1 (bijit sir)
Assignment 1 (bijit sir)
apudgr8
 

More from apudgr8 (14)

Cee 317 (3) (structural analysis)
Cee 317 (3) (structural analysis)Cee 317 (3) (structural analysis)
Cee 317 (3) (structural analysis)
 
Cee 317 (1)(structural analysis)
Cee 317 (1)(structural analysis)Cee 317 (1)(structural analysis)
Cee 317 (1)(structural analysis)
 
Cee 312(7 & 8)(structural analysis)
Cee 312(7 & 8)(structural analysis)Cee 312(7 & 8)(structural analysis)
Cee 312(7 & 8)(structural analysis)
 
Cee 312(2)
Cee 312(2)Cee 312(2)
Cee 312(2)
 
Cee 312(1)
Cee 312(1)Cee 312(1)
Cee 312(1)
 
Cee311(14)
Cee311(14)Cee311(14)
Cee311(14)
 
Cee311(12&13)
Cee311(12&13)Cee311(12&13)
Cee311(12&13)
 
Cee311(11)
Cee311(11)Cee311(11)
Cee311(11)
 
Cee 311(6)
Cee 311(6)Cee 311(6)
Cee 311(6)
 
Cee 311(5)
Cee 311(5)Cee 311(5)
Cee 311(5)
 
Cee 311(3)
Cee 311(3)Cee 311(3)
Cee 311(3)
 
Cee 311(2)
Cee 311(2)Cee 311(2)
Cee 311(2)
 
Cee 311(1)
Cee 311(1)Cee 311(1)
Cee 311(1)
 
Assignment 1 (bijit sir)
Assignment 1 (bijit sir)Assignment 1 (bijit sir)
Assignment 1 (bijit sir)
 

Recently uploaded

4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
bijceesjournal
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
shadow0702a
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
aryanpankaj78
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
AjmalKhan50578
 
Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
mahaffeycheryld
 
Engineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdfEngineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdf
edwin408357
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
TIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptxTIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptx
CVCSOfficial
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
PriyankaKilaniya
 
Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...
Prakhyath Rai
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Gas agency management system project report.pdf
Gas agency management system project report.pdfGas agency management system project report.pdf
Gas agency management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
 
Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
 
Engineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdfEngineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdf
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
TIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptxTIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptx
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
 
Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Gas agency management system project report.pdf
Gas agency management system project report.pdfGas agency management system project report.pdf
Gas agency management system project report.pdf
 

Cee 312(5)(structural analysis)

  • 1. CEE-312 Structural Analysis and Design Sessional-I (1.0 credit) Lecture: 5 Bijit Kumar Banik Assistant Professor, CEE, SUST Room No.: 115 (“C” building) bijit_sustbd@yahoo.com Department of Civil and Environmental Engineering
  • 2. Analysis and design of an Industrial roof truss system 6@6 ft = 36 ft L0 L1 L2 L3 L4 L5 L6 U1 U2 U3 U4 U5 4.54 k2.60 k (- 1.19) (-1.19) (-0.95) (-3.11) (-5.64) (-5.64) (5.14) (5.00) (4.85) (4.07) (5.61) (7.14) (0) (-0.13) (-1.41) (0) (-3.07) (0.35) (0.27) (3.78) (2.90) 3.24k L R 0.23k 0.23k 0.12k 0.12k 2.46k 2.46k 1.23k 1.23k
  • 3. Analysis and design of an Industrial roof truss system 6@6 ft = 36 ft L0 L1 L2 L3 L4 L5 L6 U1 U2 U3 U4 U5 4.54 k 2.60 k 3.24k 2.46k 2.46k 1.23k 1.23k 0.23k 0.23k 0.12k 0.12k R L
  • 4. Analysis and design of an Industrial roof truss system 1 1 ∑V = 0 (5/10.3)*L0U1+(9/10.3)*1.23 – 4.54 = 0 L0U1= 7.14 k (T) 5 9 10.3 ∑H = 0 L0L1 +(9/10.3)*7.14 +3.24 – (5/10.3)*1.23 =0 L0L1= 8.88 k (C) 4.54 k 1.23k L0L1 L0U1 1-1 3.24 k 9 5 10.3 6@6 ft = 36 ft 10 ft L0 L1 L2 L3 L4 L5 L6 U1 U2 U3 U4 U5 R1 R2 H 3@6.86 ft 2.46k 2.46k 1.23k 1.23k 0.23k 0.23k 0.12k 0.12k 5 9 10.3 9 5 10.3 = 3.24k = 4.54k = 2.60k
  • 5. Analysis and design of an Industrial roof truss system ∑V= 0 L1U1 = 0 L1L2 = L0L1 = 8.88k (C) ∑H= 0 6@6 ft = 36 ft 10 ft L0 L1 L2 L3 L4 L5 L6 U1 U2 U3 U4 U5 R1 R2 H 3@6.86 ft 5 9 10.3 9 5 10.3 = 3.24k 2 2 L1L2 2-2 L0L1=8.88k L1U1 2.46k 2.46k 1.23k 1.23k 0.23k 0.23k 0.12k 0.12k = 4.54k = 2.60k
  • 6. Analysis and design of an Industrial roof truss system 6@6 ft = 36 ft 10 ft L0 L1 L2 L3 L4 L5 L6 U1 U2 U3 U4 U5 3@6.86 ft 5 9 10.3 9 5 10.3 3 3 9 510.3 9 5 10.3 9 5 10.3 ∑ML0 = 0 – 2.46*6.86+ (5/10.3)*U1L2*6 + (9/10.3)*U1L2*(10/3)= 0 U1L2= 2.90 k (T) ∑V = 0 (9/10.3)*1.23+(9/10.3)*2.46 + (5/10.3)*U1U2 – (5/10.3)*2.90 – 4.54= 0 U1U2= 5.61 k (T) +ve 3-3 U1 L0 L1 L2 U2 2.46 k 1.23 k 4.54k (10/3)’ 8.88k3.24k 2.46k 2.46k 1.23k 1.23k 0.23k 0.23k 0.12k 0.12k R1 R2 = 3.24k = 4.54k = 2.60k
  • 7. Analysis and design of an Industrial roof truss system 6@6 ft = 36 ft 10 ft L0 L1 L2 L3 L4 L5 L6 U1 U2 U3 U4 U5 3@6.86 ft 5 9 10.3 9 5 10.3 4 4 ∑H = 0 L2L3= 6.35 k (C) 5 9 10.3 L2L3 4-4 8.88k L2U2 2.90k ∑V = 0 L2U2 = (5/10.3)*2.90 L2U2= 1.41 k (C) L2L3 +8.88 – (9/10.3)*2.90 = 0 2.46k 2.46k 1.23k 1.23k 0.23k 0.23k 0.12k 0.12k R1 R2 = 3.24k = 4.54k = 2.60k
  • 8. Analysis and design of an Industrial roof truss system 6@6 ft = 36 ft 10 ft L0 L1 L2 L3 L4 L5 L6 U1 U2 U3 U4 U5 3@6.86 ft 5 9 10.3 9 5 10.3 5 5 10 9 13.45 5 9 10.3 ∑ML0 = 0 (9/13.45)*U2L3*(20/3)+ (10/13.45)*U2L3*12 – 2.46*6.86 – 2.46*2*6.86 = 0 U2L3= 3.78 k (T) ∑V = 0 (5/10.3)*U2U3+ (9/10.3)*(1.23+2.46+2.46) – (10/13.45)*3.78 – 4.54 = 0 U2U3= 4.07 k (T) +ve 9 5 10.3 2.46k 2.46k 1.23k 1.23k 0.23k 0.23k 0.12k 0.12k R1 R2 = 3.24k = 4.54k = 2.60k5-5 L0 L1 L2 L3 U1 U2 U3 1.23 k 4.54 k 2.46 k 6.35 k 2*(10/3) 2.46 k 3.24 k
  • 9. Analysis and design of an Industrial roof truss system (5/10.3)*U5L6+(9/10.3)*0.12 – 2.60 = 0 ∑V= 0 U5L6 = 5.14k (T) ∑H= 0 L5L6 = 4.43k (C) 6@6 ft = 36 ft 10 ft L0 L1 L2 L3 L4 L5 L6 U1 U2 U3 U4 U5 3@6.86 ft 5 9 10.3 9 5 10.3 6 6 5 9 10.3 5 9 10.3 2.60 k U5L6 0.12k 6-6 L5L6(5/10.3)*0.12 – (9/10.3)*5.14 – L5L6= 0 2.46k 2.46k 1.23k 1.23k 0.23k 0.23k 0.12k 0.12k R1 R2 = 3.24k = 4.54k = 2.60k
  • 10. Analysis and design of an Industrial roof truss system 6@6 ft = 36 ft 10 ft L0 L1 L2 L3 L4 L5 L6 U1 U2 U3 U4 U5 3@6.86 ft 5 9 10.3 9 5 10.3 7 7 ∑H = 0 4.43k 7 – 7 L4L5 L5U5 ∑V = 0 L5U5= 0 L4L5 = 4.43k (C) 2.46k 2.46k 1.23k 1.23k 0.23k 0.23k 0.12k 0.12k R1 R2 = 3.24k = 4.54k = 2.60k
  • 11. Analysis and design of an Industrial roof truss system 6@6 ft = 36 ft 10 ft L0 L1 L2 L3 L4 L5 L6 U1 U2 U3 U4 U5 3@6.86 ft 5 9 10.3 9 5 10.3 8 8 5 9 10.3 9 510.3 9 5 10.3 ∑ML6 = 0 0.23*6.86 – (5/10.3)*U5L4*6 – (9/10.3)*U5L4*(10/3)= 0 U5L4= 0.27 k (T) ∑V = 0 (9/10.3)*0.23+(9/10.3)*0.12 + (5/10.3)*U4U5 – (5/10.3)*0.27 – 2.60= 0 U4U5= 5.0 k (T) +ve 2.46k 2.46k 1.23k 1.23k 0.23k 0.23k 0.12k 0.12k R1 R2 = 3.24k = 4.54k = 2.60k L6 U5 L5L4 U4 0.23k 0.12k 2.60k 8-8
  • 12. Analysis and design of an Industrial roof truss system 6@6 ft = 36 ft 10 ft L0 L1 L2 L3 L4 L5 L6 U1 U2 U3 U4 U5 3@6.86 ft 5 9 10.3 9 5 10.3 9 9 ∑H = 0 L3L4= 4.19 k (C) ∑V = 0 L4U4 = (5/10.3)*0.27 L4U4= 0.13 k (C) L3L4+ (9/10.3)*0.27 – 4.43 = 0 9 510.3 4.43k 9-9 L4U4 0.27k L3U4 2.46k 2.46k 1.23k 1.23k 0.23k 0.23k 0.12k 0.12k R1 R2 = 3.24k = 4.54k = 2.60k
  • 13. Analysis and design of an Industrial roof truss system 6@6 ft = 36 ft 10 ft L0 L1 L2 L3 L4 L5 L6 U1 U2 U3 U4 U5 3@6.86 ft 5 9 10.3 9 5 10.3 10 10 9 5 10.3 9 10 13.45 9 5 10.3 0.23k 0.23k 0.12k 2.60k L6L5L4L3 U3 U5 U4 4.19k 10 -10∑ML6 = 0 –(9/13.45)*U4L3*(20/3) – (10/13.45)*U4L3*12 + 0.23*6.86 +0.23*2*6.86 = 0 U4L3= 0.35 k (T) ∑V = 0 (5/10.3)*U3U4 + (9/10.3)*(0.12+2*0.23) – (10/13.45)*0.35 – 2.60 = 0 U3U4= 4.85 k (T) +ve 2.46k 2.46k 1.23k 1.23k 0.23k 0.23k 0.12k 0.12k R1 R2 = 3.24k = 4.54k = 2.60k
  • 14. Analysis and design of an Industrial roof truss system 6@6 ft = 36 ft 10 ft L0 L1 L2 L3 L4 L5 L6 U1 U2 U3 U4 U5 3@6.86 ft 5 9 10.3 9 5 10.3 11 11 ∑V = 0 9 10 13.45 9 10 13.45 3.11k 11 – 11 0.95k L3U3 L3 3.78k 0.35k(10/13.45)*3.78 + (10/13.45)*0.35 – L3U3= 0 L3U3= 3.07 k (C) 2.46k 2.46k 1.23k 1.23k 0.23k 0.23k 0.12k 0.12k R1 R2 = 3.24k = 4.54k = 2.60k
  • 15. Analysis and design of an Industrial roof truss system (- 8.88) (-8.88) (-6.35) (-4.19) (-4.43) (-4.43) (7.14) (5.61) (4.07) (4.85) (5.00) (5.14) 6@6 ft = 36 ft L0 L1 L2 L3 L4 L5 L6 U1 U2 U3 U4 U5 2.60 k4.54 k (0) (-0.13) (-1.41) (0) (-3.07) (3.78) (2.90) (0.35) (0.27) 3.24k R L
  • 16. Analysis and design of an Industrial roof truss system R L (- 8.88) (-8.88) (-6.35) (-4.19) (-4.43) (-4.43) (7.14) (5.61) (4.07) (4.85) (5.00) (5.14) 6@6 ft = 36 ft L0 L1 L2 L3 L4 L5 L6 U1 U2 U3 U4 U5 2.60 k4.54 k (0) (-0.13) (-1.41) (0) (-3.07) (3.78) (2.90) (0.35) (0.27) 3.24k L→R 6@6 ft = 36 ft L0 L1 L2 L3 L4 L5 L6 U1 U2 U3 U4 U5 4.54 k2.60 k (- 1.19) (-1.19) (-0.95) (-3.11) (-5.64) (-5.64) (5.14) (5.00) (4.85) (4.07) (5.61) (7.14) (0) (-0.13) (-1.41) (0) (-3.07) (0.35) (0.27) (3.78) (2.90) 3.24k
  • 17. Analysis and design of an Industrial roof truss system R L (- 8.88) (-8.88) (-6.35) (-4.19) (-4.43) (-4.43) (7.14) (5.61) (4.07) (4.85) (5.00) (5.14) 6@6 ft = 36 ft L0 L1 L2 L3 L4 L5 L6 U1 U2 U3 U4 U5 2.60 k4.54 k (0) (-0.13) (-1.41) (0) (-3.07) (3.78) (2.90) (0.35) (0.27) 3.24k L→R 6@6 ft = 36 ft L0 L1 L2 L3 L4 L5 L6 U1 U2 U3 U4 U5 4.54 k2.60 k (- 1.19) (-1.19) (-0.95) (-3.11) (-5.64) (-5.64) (5.14) (5.00) (4.85) (4.07) (5.61) (7.14) (0) (-0.13) (-1.41) (0) (-3.07) (0.35) (0.27) (3.78) (2.90) 3.24k (4.41) (4.41) (3.53) (3.53) (4.41) (4.41) (- 5.05) (- 4.04) (- 3.03) (- 3.03) (- 4.04) (- 5.05) 6@6 ft = 36 ft L0 L1 L2 L3 L4 L5 L6 U1 U2 U3 U4 U5 2.94 k2.94 k (.18) (0.67) (0.67) (.18) (2.14) (-1.32) (- 1.01) (-1.32) (- 1.01) Dead Load