Medical Center case in Chicago
Before and After – WDC power conditioner second installation
History: From the installation of the HiArt at a Medical Center in Chicago, there were a
number of power monitors and investigations into the power. Everything pointed to bad,
unstable power from the facility.
Initial power monitoring showed minor sags in the power. This was signed off and the
installation commenced without correction to the power. Machine was ATP’d and went
clinical.
Right from the beginning, errors were a problem. Never the same error twice. Improved
performance with few to no errors, after treatment hours when the electrical loading was
light. The site started to lose nodes on the cluster. Evaluating the Tripplite monitor on
the Dataserver revealed that power would drop out and fluctuate frequently.
This prompted a second monitor to be installed. The ringing of the 480 Volt was
discovered. A 70 Vp-p wave modulated into the 480 Volt at a low frequency that was
used to sync the hospital clocks and turn on/off the parking lot lights. This induced
transient caused computers, such as the STC to be scrambled and cause connection
problems.
By the beginning of April, three months after going clinical, there was a series of
component failures that prompted management to get involved. Within a week
timeframe a few solid state relays, 3 gun boards and finally a linac were replaced.
The hospital finally did there own power survey and found more issues. Larger problems
were specific to grounding of substations and power sags. They installed TVSS (surge
suppressors), at the recommendation of their contractor, which did nothing to help the
situation.
By the beginning of June the decision was made to install the first WDC power
conditioner. By August, it had arrived and was installed. It was left in bypass. About
two weeks later, the WDC rep arrived to “tune it up” and put it into AUTO. When he put
it in AUTO, it generated a lot of smoke and filled the department. It was never put in
AUTO again.
Several trips by the WDC rep later, it was determined that the unit needed to be replaced.
It was determined that the power conditioner needed to have more front end protection
against the severe transients on the hospital supply.
The second unit was installed mid December. Since then there had been a significantly
noticeable reduction in errors. As an example: December 6, 7, and 10th
there were 84
errors that were either RTT or Linac hardware. Since the installation of the second power
conditioner, a timeframe of Jan 8, 9, 10, 11, 14, and 15 there only 5 RTT events with no
Linac hardware errors.
Over the next few months the degraded components from the bad power were isolated
and replaced.
In summary: a reduction from 84 errors in 3 days to 5 errors in 6 days. Also, a reduction
in the type of errors.
Background information:
The power conditioner that was installed was a WDC without a UPS. Had a UPS been
purchased with the unit, the 5 errors in 6 days would probably been reduced to zero.
The site has phase loss or complete power loss issues.
Below are 2 captures of a power loss associated with this site. The top picture is of
unconditioned power. Needless to say, it creates errors and damage to the machine when
this type of power is applied to the HiArt. The bottom picture is a similar event AFTER
the installation of a power conditioner. The pink line is smaller than the other 2 phases,
indicating a phase loss. Had the site purchased a UPS, the pink waveform would
conform to the other 2 and the event would never have been recorded.
During power outage at the facility before the second power conditioner was installed.
Power outage with the second power conditioner installed.
Below are the uptime reports from ATP through 2009.
Note: Red listed uptimes are below the TomoTherapy goal for that year. Red listed
comments are either confirmed or suspected components damaged and replaced as a
result of facility power.
RTT (labor hours) without a part, indicates that the machine operated properly after the
normal hospital treatment hours.
2007 Uptime percentage (96%
uptime goal)
Comments
1 100
2 100
3 98
4 94 Power losses caused loss of 3
gun boards and linac.
Multiple Solid State Relays.
5 100
6 98
7 97
8 100
9 90 • Status Console
• Gun Board
• Union (not power
related)
10 90 • MLC Errors replaced
• MLC and MLC
Controller
• RTT (6.25hr labor)
• RTT (9.3 hr labor)
• Pulse Shaper
11 92 • Air Conditioning issues
• Artifact
• Machine Hangs on
Startup
• OS issue
• RTT
• Solid State Relay
12 95 • Heater Open/Short
• Facility power losses
• Heater Pulsing Failure
• Linac SSM
• RTT (6.0 hrs labor)
• RTT (12 hrs labor) +
Mag + HVPS Controller
• RTT (3 hrs labor)
• RTT (1 hr labor)
• Pulse Shaper
Working power conditioner
installed Mid December.
Total 96
2008 Uptime percentage (96%
uptime goal)
Comments
1 98
2 100
3 97
4 97
5 89 MLC and Couch issues
6 96
7 99
8 100
9 96
10 96
11 100
12 98
Total 97
2009 Uptime percentage (97.5%
uptime goal)
Comments
1 100
2 100
3 100
4 100
5 100
6 99
7 99
8 99
9 96 Mag failure in morning.
10 100
11 96 11/11 waveguide 11/12 AFC
failure in morning.
12 100
Total 99

More Related Content

What's hot

A3 predictive maintenance
A3 predictive maintenanceA3 predictive maintenance
A3 predictive maintenanceAmadeo Antonio
 
Grid synchronization fail detection on sensing frequency or voltage beyond ra...
Grid synchronization fail detection on sensing frequency or voltage beyond ra...Grid synchronization fail detection on sensing frequency or voltage beyond ra...
Grid synchronization fail detection on sensing frequency or voltage beyond ra...Vivek Bhakta
 
Case Study - Importance of Relay Coordination in Process Industries
Case Study - Importance of Relay Coordination in Process IndustriesCase Study - Importance of Relay Coordination in Process Industries
Case Study - Importance of Relay Coordination in Process IndustriesSystem Protection
 
Importance of Relay Selection in Grid Connected Industries
Importance of Relay Selection in Grid Connected IndustriesImportance of Relay Selection in Grid Connected Industries
Importance of Relay Selection in Grid Connected IndustriesSystem Protection
 
How we saved a Process Plant from break-down
How we saved a Process Plant from break-downHow we saved a Process Plant from break-down
How we saved a Process Plant from break-downSystem Protection
 
Michael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyMichael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyNSW Environment and Planning
 
Mains operated under voltage over voltage trip switch
Mains operated under voltage over voltage trip switchMains operated under voltage over voltage trip switch
Mains operated under voltage over voltage trip switchEdgefxkits & Solutions
 
Complexity in integration high voltage and ventilation systems Warwick Young
Complexity in integration   high voltage and ventilation systems Warwick YoungComplexity in integration   high voltage and ventilation systems Warwick Young
Complexity in integration high voltage and ventilation systems Warwick YoungNSW Environment and Planning
 
MenuOfServices
MenuOfServicesMenuOfServices
MenuOfServicesSYSTAT NOW
 
Dynamic Voltage Regulator
Dynamic Voltage RegulatorDynamic Voltage Regulator
Dynamic Voltage RegulatorRamesh Tholiya
 
Detecting power grid synchronisation failure
Detecting power grid synchronisation failureDetecting power grid synchronisation failure
Detecting power grid synchronisation failureVivek Bhakta
 
Implementation of a Microcontroller Base Single Phase Automatic Changeover
Implementation of a Microcontroller Base Single Phase Automatic Changeover Implementation of a Microcontroller Base Single Phase Automatic Changeover
Implementation of a Microcontroller Base Single Phase Automatic Changeover IJSRED
 
Proper control plan assessment and the impact of high efficiency motors Dav...
Proper control plan assessment and the impact of high efficiency motors   Dav...Proper control plan assessment and the impact of high efficiency motors   Dav...
Proper control plan assessment and the impact of high efficiency motors Dav...NSW Environment and Planning
 
How Auxiliary Contactors mounting may result into Mal-operation & hence tripp...
How Auxiliary Contactors mounting may result into Mal-operation & hence tripp...How Auxiliary Contactors mounting may result into Mal-operation & hence tripp...
How Auxiliary Contactors mounting may result into Mal-operation & hence tripp...System Protection
 

What's hot (20)

A3 predictive maintenance
A3 predictive maintenanceA3 predictive maintenance
A3 predictive maintenance
 
Grid synchronization fail detection on sensing frequency or voltage beyond ra...
Grid synchronization fail detection on sensing frequency or voltage beyond ra...Grid synchronization fail detection on sensing frequency or voltage beyond ra...
Grid synchronization fail detection on sensing frequency or voltage beyond ra...
 
Case Study - Importance of Relay Coordination in Process Industries
Case Study - Importance of Relay Coordination in Process IndustriesCase Study - Importance of Relay Coordination in Process Industries
Case Study - Importance of Relay Coordination in Process Industries
 
Importance of Relay Selection in Grid Connected Industries
Importance of Relay Selection in Grid Connected IndustriesImportance of Relay Selection in Grid Connected Industries
Importance of Relay Selection in Grid Connected Industries
 
How we saved a Process Plant from break-down
How we saved a Process Plant from break-downHow we saved a Process Plant from break-down
How we saved a Process Plant from break-down
 
Michael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyMichael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case study
 
Mains operated under voltage over voltage trip switch
Mains operated under voltage over voltage trip switchMains operated under voltage over voltage trip switch
Mains operated under voltage over voltage trip switch
 
Complexity in integration high voltage and ventilation systems Warwick Young
Complexity in integration   high voltage and ventilation systems Warwick YoungComplexity in integration   high voltage and ventilation systems Warwick Young
Complexity in integration high voltage and ventilation systems Warwick Young
 
MenuOfServices
MenuOfServicesMenuOfServices
MenuOfServices
 
Dynamic Voltage Regulator
Dynamic Voltage RegulatorDynamic Voltage Regulator
Dynamic Voltage Regulator
 
How to install a relay
How to install a relayHow to install a relay
How to install a relay
 
Detecting power grid synchronisation failure
Detecting power grid synchronisation failureDetecting power grid synchronisation failure
Detecting power grid synchronisation failure
 
Implementation of a Microcontroller Base Single Phase Automatic Changeover
Implementation of a Microcontroller Base Single Phase Automatic Changeover Implementation of a Microcontroller Base Single Phase Automatic Changeover
Implementation of a Microcontroller Base Single Phase Automatic Changeover
 
Proper control plan assessment and the impact of high efficiency motors Dav...
Proper control plan assessment and the impact of high efficiency motors   Dav...Proper control plan assessment and the impact of high efficiency motors   Dav...
Proper control plan assessment and the impact of high efficiency motors Dav...
 
Wk105 (1)
Wk105 (1)Wk105 (1)
Wk105 (1)
 
Wsp hospital e
Wsp hospital eWsp hospital e
Wsp hospital e
 
Diagnosis of ups 6&8
Diagnosis of ups 6&8Diagnosis of ups 6&8
Diagnosis of ups 6&8
 
Amar Pradhan: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
Amar Pradhan: 2013 Sandia National Laboratoies Wind Plant Reliability WorkshopAmar Pradhan: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
Amar Pradhan: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
 
Grid inertia
Grid inertiaGrid inertia
Grid inertia
 
How Auxiliary Contactors mounting may result into Mal-operation & hence tripp...
How Auxiliary Contactors mounting may result into Mal-operation & hence tripp...How Auxiliary Contactors mounting may result into Mal-operation & hence tripp...
How Auxiliary Contactors mounting may result into Mal-operation & hence tripp...
 

Viewers also liked

L1P1 lesson 4
L1P1 lesson 4L1P1 lesson 4
L1P1 lesson 4Rlaoshi
 
LACKOVICH combined Microtrain training certs
LACKOVICH combined Microtrain training certsLACKOVICH combined Microtrain training certs
LACKOVICH combined Microtrain training certsMichael Lackovich LSSGB
 
Group S- Final Report
Group S- Final ReportGroup S- Final Report
Group S- Final ReportLarry Chang
 
Award Certificates for Victoria University
Award Certificates for Victoria UniversityAward Certificates for Victoria University
Award Certificates for Victoria UniversityMonica Katherine
 
Sambutan di tingkat daerah
Sambutan di tingkat daerahSambutan di tingkat daerah
Sambutan di tingkat daerahAisyah Rosyidah
 
History and Evolution
History and EvolutionHistory and Evolution
History and EvolutionIrsalaImran
 
Mid term presentation - Schvet-Moura-Mazzotti
Mid term presentation - Schvet-Moura-MazzottiMid term presentation - Schvet-Moura-Mazzotti
Mid term presentation - Schvet-Moura-MazzottiGabriela Moura
 
Parts of Speech : Noun
Parts of Speech : NounParts of Speech : Noun
Parts of Speech : Nounvijaypawar143
 
Sejarah xi kerajaan islam di jawa
Sejarah xi kerajaan islam di jawaSejarah xi kerajaan islam di jawa
Sejarah xi kerajaan islam di jawaAisyah Rosyidah
 
Strategic-Analysis-Newscorp-Fox-[MBA-Project]
Strategic-Analysis-Newscorp-Fox-[MBA-Project]Strategic-Analysis-Newscorp-Fox-[MBA-Project]
Strategic-Analysis-Newscorp-Fox-[MBA-Project]Chamil Hettiarachchi
 

Viewers also liked (13)

L1P1 lesson 4
L1P1 lesson 4L1P1 lesson 4
L1P1 lesson 4
 
LACKOVICH combined Microtrain training certs
LACKOVICH combined Microtrain training certsLACKOVICH combined Microtrain training certs
LACKOVICH combined Microtrain training certs
 
CPA Membership
CPA MembershipCPA Membership
CPA Membership
 
Group S- Final Report
Group S- Final ReportGroup S- Final Report
Group S- Final Report
 
Award Certificates for Victoria University
Award Certificates for Victoria UniversityAward Certificates for Victoria University
Award Certificates for Victoria University
 
Sambutan di tingkat daerah
Sambutan di tingkat daerahSambutan di tingkat daerah
Sambutan di tingkat daerah
 
PDAPaper
PDAPaperPDAPaper
PDAPaper
 
History and Evolution
History and EvolutionHistory and Evolution
History and Evolution
 
Mid term presentation - Schvet-Moura-Mazzotti
Mid term presentation - Schvet-Moura-MazzottiMid term presentation - Schvet-Moura-Mazzotti
Mid term presentation - Schvet-Moura-Mazzotti
 
Periodic table
Periodic tablePeriodic table
Periodic table
 
Parts of Speech : Noun
Parts of Speech : NounParts of Speech : Noun
Parts of Speech : Noun
 
Sejarah xi kerajaan islam di jawa
Sejarah xi kerajaan islam di jawaSejarah xi kerajaan islam di jawa
Sejarah xi kerajaan islam di jawa
 
Strategic-Analysis-Newscorp-Fox-[MBA-Project]
Strategic-Analysis-Newscorp-Fox-[MBA-Project]Strategic-Analysis-Newscorp-Fox-[MBA-Project]
Strategic-Analysis-Newscorp-Fox-[MBA-Project]
 

Similar to Before and After Power Conditioner

Case Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenueCase Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenueSystem Protection
 
Factors to Consider When Perfroming Maint - IEEE Transactions
Factors to Consider When Perfroming Maint - IEEE TransactionsFactors to Consider When Perfroming Maint - IEEE Transactions
Factors to Consider When Perfroming Maint - IEEE TransactionsJim White
 
Condition based monitoring
Condition based monitoringCondition based monitoring
Condition based monitoringNiraj Agrawal
 
Product: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: TechnicalProduct: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: TechnicalStaco Energy
 
VFD Trouble Shooting with Fluke ScopeMeter
VFD Trouble Shooting with Fluke ScopeMeterVFD Trouble Shooting with Fluke ScopeMeter
VFD Trouble Shooting with Fluke ScopeMeterZhaoyi Fang
 
Case Study DC motor ENG
Case Study DC motor ENGCase Study DC motor ENG
Case Study DC motor ENGNikola Laketic
 
Photovoltaic Training Course - Module 4.2 - components to maintain
Photovoltaic Training Course - Module 4.2 - components to maintainPhotovoltaic Training Course - Module 4.2 - components to maintain
Photovoltaic Training Course - Module 4.2 - components to maintainLeonardo ENERGY
 
Power Shaver Energy Saving Systems
Power Shaver Energy Saving SystemsPower Shaver Energy Saving Systems
Power Shaver Energy Saving SystemsLisaKnapp23
 
Fire Pump Engines Overview
Fire Pump Engines OverviewFire Pump Engines Overview
Fire Pump Engines OverviewJames S Nasby
 
Voltage regulators-vs-load-tap-changers-information-td225012en
Voltage regulators-vs-load-tap-changers-information-td225012enVoltage regulators-vs-load-tap-changers-information-td225012en
Voltage regulators-vs-load-tap-changers-information-td225012enKritika sharma
 
Three Mile Island’s new steam generator tubes could fail
Three Mile Island’s new steam generator tubes could failThree Mile Island’s new steam generator tubes could fail
Three Mile Island’s new steam generator tubes could failScott Portzline
 
Controlling Water Hammer with Soft Starters
Controlling Water Hammer with Soft StartersControlling Water Hammer with Soft Starters
Controlling Water Hammer with Soft StartersDan Barr
 
DVARVVO_WPb_0117
DVARVVO_WPb_0117DVARVVO_WPb_0117
DVARVVO_WPb_0117Paul Chang
 
Electric fault at forsmark nuclear power plant
Electric fault at forsmark nuclear power plantElectric fault at forsmark nuclear power plant
Electric fault at forsmark nuclear power plantAbdul Soomro
 
Failure Identification in the engine coolant system of car
Failure Identification in the engine coolant system of carFailure Identification in the engine coolant system of car
Failure Identification in the engine coolant system of carBrundha sholaganga
 
Failure Identification in the engine coolant system of car
Failure Identification in the engine coolant system of carFailure Identification in the engine coolant system of car
Failure Identification in the engine coolant system of carBrundha Sholaganga
 
VFD Maintenance for technicians and supervisors
VFD Maintenance for technicians and supervisorsVFD Maintenance for technicians and supervisors
VFD Maintenance for technicians and supervisorsRenchieCastillanesPa
 

Similar to Before and After Power Conditioner (20)

Thermal Techniques Brochure
Thermal Techniques BrochureThermal Techniques Brochure
Thermal Techniques Brochure
 
Case Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenueCase Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenue
 
Factors to Consider When Perfroming Maint - IEEE Transactions
Factors to Consider When Perfroming Maint - IEEE TransactionsFactors to Consider When Perfroming Maint - IEEE Transactions
Factors to Consider When Perfroming Maint - IEEE Transactions
 
Condition based monitoring
Condition based monitoringCondition based monitoring
Condition based monitoring
 
Product: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: TechnicalProduct: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: Technical
 
VFD Trouble Shooting with Fluke ScopeMeter
VFD Trouble Shooting with Fluke ScopeMeterVFD Trouble Shooting with Fluke ScopeMeter
VFD Trouble Shooting with Fluke ScopeMeter
 
Case Study DC motor ENG
Case Study DC motor ENGCase Study DC motor ENG
Case Study DC motor ENG
 
Photovoltaic Training Course - Module 4.2 - components to maintain
Photovoltaic Training Course - Module 4.2 - components to maintainPhotovoltaic Training Course - Module 4.2 - components to maintain
Photovoltaic Training Course - Module 4.2 - components to maintain
 
Power Shaver Energy Saving Systems
Power Shaver Energy Saving SystemsPower Shaver Energy Saving Systems
Power Shaver Energy Saving Systems
 
PQ_surveys_FFF.pdf
PQ_surveys_FFF.pdfPQ_surveys_FFF.pdf
PQ_surveys_FFF.pdf
 
Fire Pump Engines Overview
Fire Pump Engines OverviewFire Pump Engines Overview
Fire Pump Engines Overview
 
Voltage regulators-vs-load-tap-changers-information-td225012en
Voltage regulators-vs-load-tap-changers-information-td225012enVoltage regulators-vs-load-tap-changers-information-td225012en
Voltage regulators-vs-load-tap-changers-information-td225012en
 
Three Mile Island’s new steam generator tubes could fail
Three Mile Island’s new steam generator tubes could failThree Mile Island’s new steam generator tubes could fail
Three Mile Island’s new steam generator tubes could fail
 
Controlling Water Hammer with Soft Starters
Controlling Water Hammer with Soft StartersControlling Water Hammer with Soft Starters
Controlling Water Hammer with Soft Starters
 
Field Test Kits and Hot Socket Repair Kits
Field Test Kits and Hot Socket Repair KitsField Test Kits and Hot Socket Repair Kits
Field Test Kits and Hot Socket Repair Kits
 
DVARVVO_WPb_0117
DVARVVO_WPb_0117DVARVVO_WPb_0117
DVARVVO_WPb_0117
 
Electric fault at forsmark nuclear power plant
Electric fault at forsmark nuclear power plantElectric fault at forsmark nuclear power plant
Electric fault at forsmark nuclear power plant
 
Failure Identification in the engine coolant system of car
Failure Identification in the engine coolant system of carFailure Identification in the engine coolant system of car
Failure Identification in the engine coolant system of car
 
Failure Identification in the engine coolant system of car
Failure Identification in the engine coolant system of carFailure Identification in the engine coolant system of car
Failure Identification in the engine coolant system of car
 
VFD Maintenance for technicians and supervisors
VFD Maintenance for technicians and supervisorsVFD Maintenance for technicians and supervisors
VFD Maintenance for technicians and supervisors
 

Before and After Power Conditioner

  • 1. Medical Center case in Chicago Before and After – WDC power conditioner second installation History: From the installation of the HiArt at a Medical Center in Chicago, there were a number of power monitors and investigations into the power. Everything pointed to bad, unstable power from the facility. Initial power monitoring showed minor sags in the power. This was signed off and the installation commenced without correction to the power. Machine was ATP’d and went clinical. Right from the beginning, errors were a problem. Never the same error twice. Improved performance with few to no errors, after treatment hours when the electrical loading was light. The site started to lose nodes on the cluster. Evaluating the Tripplite monitor on the Dataserver revealed that power would drop out and fluctuate frequently. This prompted a second monitor to be installed. The ringing of the 480 Volt was discovered. A 70 Vp-p wave modulated into the 480 Volt at a low frequency that was used to sync the hospital clocks and turn on/off the parking lot lights. This induced transient caused computers, such as the STC to be scrambled and cause connection problems. By the beginning of April, three months after going clinical, there was a series of component failures that prompted management to get involved. Within a week timeframe a few solid state relays, 3 gun boards and finally a linac were replaced. The hospital finally did there own power survey and found more issues. Larger problems were specific to grounding of substations and power sags. They installed TVSS (surge suppressors), at the recommendation of their contractor, which did nothing to help the situation. By the beginning of June the decision was made to install the first WDC power conditioner. By August, it had arrived and was installed. It was left in bypass. About two weeks later, the WDC rep arrived to “tune it up” and put it into AUTO. When he put it in AUTO, it generated a lot of smoke and filled the department. It was never put in AUTO again. Several trips by the WDC rep later, it was determined that the unit needed to be replaced. It was determined that the power conditioner needed to have more front end protection against the severe transients on the hospital supply. The second unit was installed mid December. Since then there had been a significantly noticeable reduction in errors. As an example: December 6, 7, and 10th there were 84 errors that were either RTT or Linac hardware. Since the installation of the second power conditioner, a timeframe of Jan 8, 9, 10, 11, 14, and 15 there only 5 RTT events with no Linac hardware errors.
  • 2. Over the next few months the degraded components from the bad power were isolated and replaced. In summary: a reduction from 84 errors in 3 days to 5 errors in 6 days. Also, a reduction in the type of errors. Background information: The power conditioner that was installed was a WDC without a UPS. Had a UPS been purchased with the unit, the 5 errors in 6 days would probably been reduced to zero. The site has phase loss or complete power loss issues. Below are 2 captures of a power loss associated with this site. The top picture is of unconditioned power. Needless to say, it creates errors and damage to the machine when this type of power is applied to the HiArt. The bottom picture is a similar event AFTER the installation of a power conditioner. The pink line is smaller than the other 2 phases, indicating a phase loss. Had the site purchased a UPS, the pink waveform would conform to the other 2 and the event would never have been recorded. During power outage at the facility before the second power conditioner was installed. Power outage with the second power conditioner installed.
  • 3. Below are the uptime reports from ATP through 2009. Note: Red listed uptimes are below the TomoTherapy goal for that year. Red listed comments are either confirmed or suspected components damaged and replaced as a result of facility power. RTT (labor hours) without a part, indicates that the machine operated properly after the normal hospital treatment hours. 2007 Uptime percentage (96% uptime goal) Comments 1 100 2 100 3 98 4 94 Power losses caused loss of 3 gun boards and linac. Multiple Solid State Relays. 5 100 6 98 7 97 8 100 9 90 • Status Console • Gun Board • Union (not power related) 10 90 • MLC Errors replaced • MLC and MLC Controller • RTT (6.25hr labor) • RTT (9.3 hr labor) • Pulse Shaper 11 92 • Air Conditioning issues • Artifact • Machine Hangs on Startup • OS issue • RTT • Solid State Relay 12 95 • Heater Open/Short • Facility power losses • Heater Pulsing Failure • Linac SSM • RTT (6.0 hrs labor) • RTT (12 hrs labor) + Mag + HVPS Controller • RTT (3 hrs labor) • RTT (1 hr labor) • Pulse Shaper Working power conditioner installed Mid December.
  • 4. Total 96 2008 Uptime percentage (96% uptime goal) Comments 1 98 2 100 3 97 4 97 5 89 MLC and Couch issues 6 96 7 99 8 100 9 96 10 96 11 100 12 98 Total 97 2009 Uptime percentage (97.5% uptime goal) Comments 1 100 2 100 3 100 4 100 5 100 6 99 7 99 8 99 9 96 Mag failure in morning. 10 100 11 96 11/11 waveguide 11/12 AFC failure in morning. 12 100 Total 99