Case Study
Importance of Relay Selection in Grid
Connected Industries
Just like all other cases, we bring you one
more actual incident happened recently in
one of the Process Industry, connected with
GRID (State Utility). In our 18 years of service
to industries, we have come across many
abnormalities, incident and have resolved
them. Even we learn while solving the
issues or Tripping incidents but summation
of these many years of experience has
strengthen us to resolve this type of
incidents in time. However, this is the first
time we came across this kind of issue.
www.systemprotection.in +91-265-2225137
On a lighter note, to our knowledge, most of
the abnormalities, Tripping or operational
problems in Industries happens on Sunday
or Holidays only. Keeping legacy alive, this
also occurred on Sunday evening 4 PM in
the month of Feb 2019.
Here under is the summary:
It was planned shutdown from Grid side for adding new 33 kV distribution line to their
substation. Same was informed to all the consumers 2 weeks in advance for this shutdown
which was scheduled for 2-3 hours in continuation.
All goes well as per schedule, Power resumed within 2.5 hours but…………. Connected
Industries failed to start. Reason….? Unhealthy Voltage. And relay blocked Circuit breakers to
close pertaining to Unhealthy Voltage.
Then started troubleshooting:
They checked PT supply, found healthy.
If during shutdown, any modification/s OR Change/s made in the wiring? No, everything
was as it was.
They took all possible measures, but waste. Relay keep issuing tripping command.
Worried about the incident, we got
distressed call from user:
We enquired with them and asked whether all necessary measures have been taken.
We asked them to check in relay configuration, but not necessarily plant people knows it.
We even advised to reboot the relay, if in case it may have hanged.
Then we asked Rare check. To change the phase sequence of Incoming Voltage supply in
relay for all the combinations as RYB, RBY, YRB, YBR, BYR, BRY.
To our surprise!!!!! With combination RBY, relay contact got reset and plant was started.
We also asked them to check with other plant connected to GRID with same feeders and
found:
Their Motors were running in Reverse direction and same has leads to certain issues related
to process. Adding additional down time.
Same was issue with other plants as well.
The problem was identified as change in
Phase sequence mistakenly by GRID side
during shutdown. We advised plant people
to keep the original wiring so that if this
happens again in future than same can be
identify and rectify.
www.systemprotection.in +91-265-2225137
Well, we got their appreciation as System
Protection has been involved in Selection
and Retrofitting of relays. If the plant has
been started with reverse direction more
revenue loss would have registered.
Proper Relay Selection for Equipment’s
play a key role in Protecting your plant
equipment in the best way.
The relay sensed the Phase Reversal as
unhealthy voltage and therefore, was giving
tripping commands. Under pressure,
maintenance engineer Bypassed
Undervoltage protection and charged the
panel as he was concerned about
production lost. But when Relay is at fault
you can't even change or disable setting,
and this is blessing in disguise.
Our team during annual Relay testing in
shutdown (July 2018), suggested and
enabled this setting.
We feel sorry for the other industries who
suffered due to improper relay selection.
Damage has already occurred. To avoid this
we strongly recommend, while selecting
protective relays either in Projects or
retrofitting, all the points must be
considered pertaining to protection and
process perspective.
Just Check in your plants, what are the
protections if anyhow grid power
reverses?
CONTACT INFORMATION
301/2/306, Silverline Complex,Opposite BBC
Tower,Sayajigunj,Vadodara - 390 005,
Gujarat, India.
bdm@systemprotection.in
www.systemprotection.in
+91-265-2225137

More Related Content

What's hot

How an Aluminium tape caused a complete plant stoppage?
How an Aluminium tape caused a complete plant stoppage?How an Aluminium tape caused a complete plant stoppage?
How an Aluminium tape caused a complete plant stoppage?System Protection
 
Case Study - How we saved a Process Plant from break-down
Case Study - How we saved a Process Plant from break-downCase Study - How we saved a Process Plant from break-down
Case Study - How we saved a Process Plant from break-downSystem Protection
 
Case Study | How your Motor Protection should designed when running in parall...
Case Study | How your Motor Protection should designed when running in parall...Case Study | How your Motor Protection should designed when running in parall...
Case Study | How your Motor Protection should designed when running in parall...System Protection
 
Continuity of Supply means Continuity of Production
Continuity of Supply means Continuity of ProductionContinuity of Supply means Continuity of Production
Continuity of Supply means Continuity of ProductionRusty Roar Enterprises
 
Continuity of supply means continuity of production
Continuity of supply means continuity of productionContinuity of supply means continuity of production
Continuity of supply means continuity of productionRusty Roar Enterprises
 
Michael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyMichael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyNSW Environment and Planning
 
A3 predictive maintenance
A3 predictive maintenanceA3 predictive maintenance
A3 predictive maintenanceAmadeo Antonio
 
When I am renovating, do I need to increase the size of my electrical panel?
When I am renovating, do I need to increase the size of my electrical panel?When I am renovating, do I need to increase the size of my electrical panel?
When I am renovating, do I need to increase the size of my electrical panel?supernovaelectric
 
peter cv october 2016 CV
peter cv october 2016 CVpeter cv october 2016 CV
peter cv october 2016 CVpeter thomson
 
A4 Newsletter for Solar Fix Network
A4 Newsletter for Solar Fix NetworkA4 Newsletter for Solar Fix Network
A4 Newsletter for Solar Fix NetworkMark Angus
 
Triz competition 2014 part2
Triz competition 2014 part2Triz competition 2014 part2
Triz competition 2014 part2Chan Xavier
 

What's hot (19)

How an Aluminium tape caused a complete plant stoppage?
How an Aluminium tape caused a complete plant stoppage?How an Aluminium tape caused a complete plant stoppage?
How an Aluminium tape caused a complete plant stoppage?
 
Case Study - How we saved a Process Plant from break-down
Case Study - How we saved a Process Plant from break-downCase Study - How we saved a Process Plant from break-down
Case Study - How we saved a Process Plant from break-down
 
Case Study | How your Motor Protection should designed when running in parall...
Case Study | How your Motor Protection should designed when running in parall...Case Study | How your Motor Protection should designed when running in parall...
Case Study | How your Motor Protection should designed when running in parall...
 
Continuity of Supply means Continuity of Production
Continuity of Supply means Continuity of ProductionContinuity of Supply means Continuity of Production
Continuity of Supply means Continuity of Production
 
Before and After Power Conditioner
Before and After Power ConditionerBefore and After Power Conditioner
Before and After Power Conditioner
 
Ukc Alert 120
Ukc Alert 120Ukc Alert 120
Ukc Alert 120
 
Continuity of supply means continuity of production
Continuity of supply means continuity of productionContinuity of supply means continuity of production
Continuity of supply means continuity of production
 
Michael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyMichael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case study
 
A3 predictive maintenance
A3 predictive maintenanceA3 predictive maintenance
A3 predictive maintenance
 
Research poster
Research posterResearch poster
Research poster
 
When I am renovating, do I need to increase the size of my electrical panel?
When I am renovating, do I need to increase the size of my electrical panel?When I am renovating, do I need to increase the size of my electrical panel?
When I am renovating, do I need to increase the size of my electrical panel?
 
Panel
PanelPanel
Panel
 
SENTHIL.k RESUME
SENTHIL.k RESUMESENTHIL.k RESUME
SENTHIL.k RESUME
 
CV_Parulkar
CV_ParulkarCV_Parulkar
CV_Parulkar
 
peter cv october 2016 CV
peter cv october 2016 CVpeter cv october 2016 CV
peter cv october 2016 CV
 
muhammad Usman CV
muhammad Usman CVmuhammad Usman CV
muhammad Usman CV
 
Wsp data center e
Wsp data center eWsp data center e
Wsp data center e
 
A4 Newsletter for Solar Fix Network
A4 Newsletter for Solar Fix NetworkA4 Newsletter for Solar Fix Network
A4 Newsletter for Solar Fix Network
 
Triz competition 2014 part2
Triz competition 2014 part2Triz competition 2014 part2
Triz competition 2014 part2
 

Similar to Importance of Relay Selection in Grid Connected Industries

Maintenance and Test Equipment Cyber Security
Maintenance and Test Equipment Cyber Security Maintenance and Test Equipment Cyber Security
Maintenance and Test Equipment Cyber Security Michael Toecker
 
Tracking PV module degradation using SolarPulse
Tracking PV module degradation using SolarPulseTracking PV module degradation using SolarPulse
Tracking PV module degradation using SolarPulseMachinePulse
 
Factors to Consider When Perfroming Maint - IEEE Transactions
Factors to Consider When Perfroming Maint - IEEE TransactionsFactors to Consider When Perfroming Maint - IEEE Transactions
Factors to Consider When Perfroming Maint - IEEE TransactionsJim White
 
Case Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenueCase Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenueSystem Protection
 
Part 1: frequently asked electrical engineering interview questions
Part 1: frequently asked electrical engineering interview questionsPart 1: frequently asked electrical engineering interview questions
Part 1: frequently asked electrical engineering interview questionsPoonam Kherde
 
IRJET- Auto Earth System for HV Test Set Up for Transformer in Applicatio...
IRJET-  	  Auto Earth System for HV Test Set Up for Transformer in Applicatio...IRJET-  	  Auto Earth System for HV Test Set Up for Transformer in Applicatio...
IRJET- Auto Earth System for HV Test Set Up for Transformer in Applicatio...IRJET Journal
 
Universal Cables Ltd
Universal Cables LtdUniversal Cables Ltd
Universal Cables LtdAnil Nair
 
Estimating Reliability of Power Factor Correction Circuits: A Comparative Study
Estimating Reliability of Power Factor Correction Circuits: A Comparative StudyEstimating Reliability of Power Factor Correction Circuits: A Comparative Study
Estimating Reliability of Power Factor Correction Circuits: A Comparative StudyIJERA Editor
 
nine steps to_TR reliability_SDMYERS.pdf
nine steps to_TR reliability_SDMYERS.pdfnine steps to_TR reliability_SDMYERS.pdf
nine steps to_TR reliability_SDMYERS.pdfEnriqueMedinaCalvill
 
Siemens Innovation Tools2010
Siemens Innovation Tools2010Siemens Innovation Tools2010
Siemens Innovation Tools2010Kirkdx
 
IRJET- Smart Production Line Industry 4.0 - Leak Testing for Fuel Tank
IRJET-  	  Smart Production Line Industry 4.0 - Leak Testing for Fuel TankIRJET-  	  Smart Production Line Industry 4.0 - Leak Testing for Fuel Tank
IRJET- Smart Production Line Industry 4.0 - Leak Testing for Fuel TankIRJET Journal
 
How to tune pid loops
How to tune pid loopsHow to tune pid loops
How to tune pid loopssaeed shafiei
 
How to tune PID loops
How to tune PID loopsHow to tune PID loops
How to tune PID loopssaeed shafiei
 
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdfblinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdfAssem27
 
UTC Telecom & Technology 2015 - Battery Backup Workshop
UTC Telecom & Technology 2015 - Battery Backup WorkshopUTC Telecom & Technology 2015 - Battery Backup Workshop
UTC Telecom & Technology 2015 - Battery Backup WorkshopDakx Turcotte
 
IRJET- Monitoring of Distribution Transformer and its Theft Protection by...
IRJET-  	  Monitoring of Distribution Transformer and its Theft Protection by...IRJET-  	  Monitoring of Distribution Transformer and its Theft Protection by...
IRJET- Monitoring of Distribution Transformer and its Theft Protection by...IRJET Journal
 

Similar to Importance of Relay Selection in Grid Connected Industries (20)

Maintenance and Test Equipment Cyber Security
Maintenance and Test Equipment Cyber Security Maintenance and Test Equipment Cyber Security
Maintenance and Test Equipment Cyber Security
 
Tracking PV module degradation using SolarPulse
Tracking PV module degradation using SolarPulseTracking PV module degradation using SolarPulse
Tracking PV module degradation using SolarPulse
 
2 power one
2 power one2 power one
2 power one
 
Factors to Consider When Perfroming Maint - IEEE Transactions
Factors to Consider When Perfroming Maint - IEEE TransactionsFactors to Consider When Perfroming Maint - IEEE Transactions
Factors to Consider When Perfroming Maint - IEEE Transactions
 
BATHUSA RESUME 2
BATHUSA RESUME 2BATHUSA RESUME 2
BATHUSA RESUME 2
 
Case Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenueCase Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenue
 
Part 1: frequently asked electrical engineering interview questions
Part 1: frequently asked electrical engineering interview questionsPart 1: frequently asked electrical engineering interview questions
Part 1: frequently asked electrical engineering interview questions
 
IRJET- Auto Earth System for HV Test Set Up for Transformer in Applicatio...
IRJET-  	  Auto Earth System for HV Test Set Up for Transformer in Applicatio...IRJET-  	  Auto Earth System for HV Test Set Up for Transformer in Applicatio...
IRJET- Auto Earth System for HV Test Set Up for Transformer in Applicatio...
 
Universal Cables Ltd
Universal Cables LtdUniversal Cables Ltd
Universal Cables Ltd
 
Ieee pes psrc
Ieee pes psrcIeee pes psrc
Ieee pes psrc
 
Estimating Reliability of Power Factor Correction Circuits: A Comparative Study
Estimating Reliability of Power Factor Correction Circuits: A Comparative StudyEstimating Reliability of Power Factor Correction Circuits: A Comparative Study
Estimating Reliability of Power Factor Correction Circuits: A Comparative Study
 
nine steps to_TR reliability_SDMYERS.pdf
nine steps to_TR reliability_SDMYERS.pdfnine steps to_TR reliability_SDMYERS.pdf
nine steps to_TR reliability_SDMYERS.pdf
 
Siemens Innovation Tools2010
Siemens Innovation Tools2010Siemens Innovation Tools2010
Siemens Innovation Tools2010
 
IRJET- Smart Production Line Industry 4.0 - Leak Testing for Fuel Tank
IRJET-  	  Smart Production Line Industry 4.0 - Leak Testing for Fuel TankIRJET-  	  Smart Production Line Industry 4.0 - Leak Testing for Fuel Tank
IRJET- Smart Production Line Industry 4.0 - Leak Testing for Fuel Tank
 
How to tune pid loops
How to tune pid loopsHow to tune pid loops
How to tune pid loops
 
How to tune PID loops
How to tune PID loopsHow to tune PID loops
How to tune PID loops
 
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdfblinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
 
UTC Telecom & Technology 2015 - Battery Backup Workshop
UTC Telecom & Technology 2015 - Battery Backup WorkshopUTC Telecom & Technology 2015 - Battery Backup Workshop
UTC Telecom & Technology 2015 - Battery Backup Workshop
 
IRJET- Monitoring of Distribution Transformer and its Theft Protection by...
IRJET-  	  Monitoring of Distribution Transformer and its Theft Protection by...IRJET-  	  Monitoring of Distribution Transformer and its Theft Protection by...
IRJET- Monitoring of Distribution Transformer and its Theft Protection by...
 
Power Generation: Coal-Fired
Power Generation: Coal-FiredPower Generation: Coal-Fired
Power Generation: Coal-Fired
 

More from System Protection

Transformer differential protection – SIEMENS Reyrolle 7SR54
Transformer differential protection – SIEMENS Reyrolle 7SR54Transformer differential protection – SIEMENS Reyrolle 7SR54
Transformer differential protection – SIEMENS Reyrolle 7SR54System Protection
 
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your AssetsMastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your AssetsSystem Protection
 
AC Digital Clamp Meter KEW 2204R Overview | System Protection
AC Digital Clamp Meter KEW 2204R Overview | System ProtectionAC Digital Clamp Meter KEW 2204R Overview | System Protection
AC Digital Clamp Meter KEW 2204R Overview | System ProtectionSystem Protection
 
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System ProtectionDigital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System ProtectionSystem Protection
 
DIGITAL MULTIMETERS KEW 1052 | System Protection
DIGITAL MULTIMETERS KEW 1052 | System ProtectionDIGITAL MULTIMETERS KEW 1052 | System Protection
DIGITAL MULTIMETERS KEW 1052 | System ProtectionSystem Protection
 
Kyoritsu Voltage Detector KEW 5711
Kyoritsu Voltage Detector KEW 5711Kyoritsu Voltage Detector KEW 5711
Kyoritsu Voltage Detector KEW 5711System Protection
 
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp TestingEarth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp TestingSystem Protection
 
Kyoritsu Multi-Function Testers | KEW 6016
Kyoritsu Multi-Function Testers | KEW 6016Kyoritsu Multi-Function Testers | KEW 6016
Kyoritsu Multi-Function Testers | KEW 6016System Protection
 
Honeywell | Overcoat | Fabric Composition (Patented)
Honeywell | Overcoat | Fabric Composition (Patented)Honeywell | Overcoat | Fabric Composition (Patented)
Honeywell | Overcoat | Fabric Composition (Patented)System Protection
 
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber MatHONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber MatSystem Protection
 
Salisbury By Honeywell | 51511 Di – Electric Over Shoes
Salisbury By Honeywell | 51511 Di – Electric Over ShoesSalisbury By Honeywell | 51511 Di – Electric Over Shoes
Salisbury By Honeywell | 51511 Di – Electric Over ShoesSystem Protection
 
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kVSalisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kVSystem Protection
 
LOGGER KEW 5020 | KYORITSU | System Protection
LOGGER KEW 5020 | KYORITSU | System ProtectionLOGGER KEW 5020 | KYORITSU | System Protection
LOGGER KEW 5020 | KYORITSU | System ProtectionSystem Protection
 
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System ProtectionPORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System ProtectionSystem Protection
 
RCD TESTER KEW 5410| KYORITSU | System Protection
RCD TESTER KEW 5410| KYORITSU | System ProtectionRCD TESTER KEW 5410| KYORITSU | System Protection
RCD TESTER KEW 5410| KYORITSU | System ProtectionSystem Protection
 
Case Study | How we saved a Generator (in fact two), again!
Case Study | How we saved a Generator (in fact two), again!Case Study | How we saved a Generator (in fact two), again!
Case Study | How we saved a Generator (in fact two), again!System Protection
 
AC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
AC/DC Digital Clamp Meters | KEW 2010 | KyoritsuAC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
AC/DC Digital Clamp Meters | KEW 2010 | KyoritsuSystem Protection
 
Digital Multimeters | KEW 1051 | Kyoritsu
Digital Multimeters | KEW 1051 | KyoritsuDigital Multimeters | KEW 1051 | Kyoritsu
Digital Multimeters | KEW 1051 | KyoritsuSystem Protection
 
Digital Multimeters | KEW 1020R | Kyoritsu
Digital Multimeters | KEW 1020R | KyoritsuDigital Multimeters | KEW 1020R | Kyoritsu
Digital Multimeters | KEW 1020R | KyoritsuSystem Protection
 
Digital Multimeters | KEW 1019R | Kyoritsu
Digital Multimeters | KEW 1019R | KyoritsuDigital Multimeters | KEW 1019R | Kyoritsu
Digital Multimeters | KEW 1019R | KyoritsuSystem Protection
 

More from System Protection (20)

Transformer differential protection – SIEMENS Reyrolle 7SR54
Transformer differential protection – SIEMENS Reyrolle 7SR54Transformer differential protection – SIEMENS Reyrolle 7SR54
Transformer differential protection – SIEMENS Reyrolle 7SR54
 
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your AssetsMastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
Mastering Motor Protection with SIEMENS Reyrolle 7SR17: Safeguarding Your Assets
 
AC Digital Clamp Meter KEW 2204R Overview | System Protection
AC Digital Clamp Meter KEW 2204R Overview | System ProtectionAC Digital Clamp Meter KEW 2204R Overview | System Protection
AC Digital Clamp Meter KEW 2204R Overview | System Protection
 
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System ProtectionDigital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
Digital Multimeter with AC/DC Clamp Sensor KEWMATE 2012RA | System Protection
 
DIGITAL MULTIMETERS KEW 1052 | System Protection
DIGITAL MULTIMETERS KEW 1052 | System ProtectionDIGITAL MULTIMETERS KEW 1052 | System Protection
DIGITAL MULTIMETERS KEW 1052 | System Protection
 
Kyoritsu Voltage Detector KEW 5711
Kyoritsu Voltage Detector KEW 5711Kyoritsu Voltage Detector KEW 5711
Kyoritsu Voltage Detector KEW 5711
 
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp TestingEarth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
Earth Clamp Testing with the KEW 4202 | Ultimate Tool for Earth Clamp Testing
 
Kyoritsu Multi-Function Testers | KEW 6016
Kyoritsu Multi-Function Testers | KEW 6016Kyoritsu Multi-Function Testers | KEW 6016
Kyoritsu Multi-Function Testers | KEW 6016
 
Honeywell | Overcoat | Fabric Composition (Patented)
Honeywell | Overcoat | Fabric Composition (Patented)Honeywell | Overcoat | Fabric Composition (Patented)
Honeywell | Overcoat | Fabric Composition (Patented)
 
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber MatHONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
 
Salisbury By Honeywell | 51511 Di – Electric Over Shoes
Salisbury By Honeywell | 51511 Di – Electric Over ShoesSalisbury By Honeywell | 51511 Di – Electric Over Shoes
Salisbury By Honeywell | 51511 Di – Electric Over Shoes
 
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kVSalisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
 
LOGGER KEW 5020 | KYORITSU | System Protection
LOGGER KEW 5020 | KYORITSU | System ProtectionLOGGER KEW 5020 | KYORITSU | System Protection
LOGGER KEW 5020 | KYORITSU | System Protection
 
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System ProtectionPORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
 
RCD TESTER KEW 5410| KYORITSU | System Protection
RCD TESTER KEW 5410| KYORITSU | System ProtectionRCD TESTER KEW 5410| KYORITSU | System Protection
RCD TESTER KEW 5410| KYORITSU | System Protection
 
Case Study | How we saved a Generator (in fact two), again!
Case Study | How we saved a Generator (in fact two), again!Case Study | How we saved a Generator (in fact two), again!
Case Study | How we saved a Generator (in fact two), again!
 
AC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
AC/DC Digital Clamp Meters | KEW 2010 | KyoritsuAC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
AC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
 
Digital Multimeters | KEW 1051 | Kyoritsu
Digital Multimeters | KEW 1051 | KyoritsuDigital Multimeters | KEW 1051 | Kyoritsu
Digital Multimeters | KEW 1051 | Kyoritsu
 
Digital Multimeters | KEW 1020R | Kyoritsu
Digital Multimeters | KEW 1020R | KyoritsuDigital Multimeters | KEW 1020R | Kyoritsu
Digital Multimeters | KEW 1020R | Kyoritsu
 
Digital Multimeters | KEW 1019R | Kyoritsu
Digital Multimeters | KEW 1019R | KyoritsuDigital Multimeters | KEW 1019R | Kyoritsu
Digital Multimeters | KEW 1019R | Kyoritsu
 

Recently uploaded

Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...allensay1
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Anamikakaur10
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 

Recently uploaded (20)

Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 

Importance of Relay Selection in Grid Connected Industries

  • 1. www.systemprotection.in +91-265-2225137 ISO 9001:2015 ISO 45001:2015 (OH & S) Certified Company Case Study Importance of Relay Selection in Grid Connected Industries
  • 2. Just like all other cases, we bring you one more actual incident happened recently in one of the Process Industry, connected with GRID (State Utility). In our 18 years of service to industries, we have come across many abnormalities, incident and have resolved them. Even we learn while solving the issues or Tripping incidents but summation of these many years of experience has strengthen us to resolve this type of incidents in time. However, this is the first time we came across this kind of issue. www.systemprotection.in +91-265-2225137 On a lighter note, to our knowledge, most of the abnormalities, Tripping or operational problems in Industries happens on Sunday or Holidays only. Keeping legacy alive, this also occurred on Sunday evening 4 PM in the month of Feb 2019. Here under is the summary: It was planned shutdown from Grid side for adding new 33 kV distribution line to their substation. Same was informed to all the consumers 2 weeks in advance for this shutdown which was scheduled for 2-3 hours in continuation. All goes well as per schedule, Power resumed within 2.5 hours but…………. Connected Industries failed to start. Reason….? Unhealthy Voltage. And relay blocked Circuit breakers to close pertaining to Unhealthy Voltage. Then started troubleshooting: They checked PT supply, found healthy. If during shutdown, any modification/s OR Change/s made in the wiring? No, everything was as it was. They took all possible measures, but waste. Relay keep issuing tripping command. Worried about the incident, we got distressed call from user: We enquired with them and asked whether all necessary measures have been taken. We asked them to check in relay configuration, but not necessarily plant people knows it. We even advised to reboot the relay, if in case it may have hanged. Then we asked Rare check. To change the phase sequence of Incoming Voltage supply in relay for all the combinations as RYB, RBY, YRB, YBR, BYR, BRY. To our surprise!!!!! With combination RBY, relay contact got reset and plant was started. We also asked them to check with other plant connected to GRID with same feeders and found: Their Motors were running in Reverse direction and same has leads to certain issues related to process. Adding additional down time. Same was issue with other plants as well.
  • 3. The problem was identified as change in Phase sequence mistakenly by GRID side during shutdown. We advised plant people to keep the original wiring so that if this happens again in future than same can be identify and rectify. www.systemprotection.in +91-265-2225137 Well, we got their appreciation as System Protection has been involved in Selection and Retrofitting of relays. If the plant has been started with reverse direction more revenue loss would have registered. Proper Relay Selection for Equipment’s play a key role in Protecting your plant equipment in the best way. The relay sensed the Phase Reversal as unhealthy voltage and therefore, was giving tripping commands. Under pressure, maintenance engineer Bypassed Undervoltage protection and charged the panel as he was concerned about production lost. But when Relay is at fault you can't even change or disable setting, and this is blessing in disguise. Our team during annual Relay testing in shutdown (July 2018), suggested and enabled this setting. We feel sorry for the other industries who suffered due to improper relay selection. Damage has already occurred. To avoid this we strongly recommend, while selecting protective relays either in Projects or retrofitting, all the points must be considered pertaining to protection and process perspective. Just Check in your plants, what are the protections if anyhow grid power reverses?
  • 4. CONTACT INFORMATION 301/2/306, Silverline Complex,Opposite BBC Tower,Sayajigunj,Vadodara - 390 005, Gujarat, India. bdm@systemprotection.in www.systemprotection.in +91-265-2225137