SlideShare a Scribd company logo
1 of 5
Download to read offline
 
 
 
Backgr
 
 
Finding
‐
 
‐
         
How 
round 
 
t was j
received a
urgently, t
along with
 
On enquir
12 MW, 1
taken  on 
industry, 
warranted
Hearing th
checklist (
we find th
upcoming
 
We imme
by the firs
up and wo
gs‐ at Site 
The initial
that  the  R
normally 
such fault
like last lin
So, such a
extra  vigi
protection
 
 
I
                  
we sav
ust anothe
a call from
they wante
h its relayin
ring about
11 kV got 
rental  ba
Generator
d  extensiv
his, the da
(we’ll see 
he Root Ca
g repaired G
diately dis
st flight ava
orking. 
l forensics 
Relay  (and
a time de
t occurs (st
ne of defen
a surprising
lant.  This 
n system. 
                  
 
 
ved a G
er day and
m a new C
ed us to te
ng, scheme
 such urge
burnt (sta
sis  and  a 
r  failure  is 
ve  and  me
ay went int
it later in a
use and so
Generator 
patched 2 
ailable and
were fou
d  GCB  eve
layed prot
tator failur
nse. 
g observat
warranted
                  
Generat
d another 
Customer i
est and com
es and com
ency, we le
ator) and w
temporary
nothing  le
ethodical  a
to a tizzy a
a diagram)
olve it, this 
too! 
of our eng
d were soo
nd from th
ntually)  w
tection. It 
re), other 
tion just at
d  us  for  i
Authorised
tor (in f
morning o
n Metal Se
mmission a
mplete test
earnt that 
was sent f
y  solution
ess  than  a
analysis  li
and we im
) to find o
rented Ge
gineers alo
on on the jo
he fault re
was  tripped
was a sur
protection
t the start 
n‐depth  a
d Channel 
fact tw
of January 
ector, from
n old 10 M
ing. 
their origi
for repairin
.  As  we  a
an  air‐cras
ke  an  air‐
mmediately
ut the Roo
enerator w
ong with th
ob. In less 
ecords of t
d  on  NPS 
prise, beca
ns take car
of the job
nd  thorou
Partners 
wo), aga
2019, on 
m Chhattis
MW, 11 kV 
inal Gener
ng, this 10
all  know  th
h  and  this
‐crash  inve
y started p
ot Cause. A
was in dang
he test sets
than a day
the Relay. 
protection
ause norm
re, NPS is s
b prompte
ugh  checki
ain! 
which we
sgarh. And
Generator
ator rated
0 MW was
hat  in  our
s  criticality
estigation.
reparing a
And unless
er and the
s required,
y, we were
We learnt
n,  which  is
mally when
something
d us to be
ing  of  the
e 
d 
r 
d 
s 
r 
y 
. 
a 
s 
e 
, 
e 
t 
s 
n 
g 
e 
e 
 
 
‐
‐
 
         
 
 
And  then 
wiring  wa
Protection
Fault sche
 
Following 
Protection
Generator
eventually
operated,
 Seen here
        
                  
  came  the
as  the  culp
n  Engineer
eme checki
actual  im
n (51S) did 
r kept run
y,  NPS  op
 the dama
e is S2 miss
   Stator B
                  
e  moment
prit  for  the
r  so  to  spe
ing). 
mages  clea
not opera
ning on th
peration  o
ge was alre
sing (to Re
Burnt 
 
                  
t  of  recko
e  Generat
eak  (It  wa
arly  show
ate due to n
his serious 
operated  o
eady done
elay)
Authorised
ning,  and 
or  burn‐ou
s  found  w
the  fault.
non‐wiring
a fault wh
on  time  d
. 
   Co
      
d Channel 
you  know
ut!  Least  e
while  carryi
So,  90  %
g of NCT se
hich finally
delay.  But
orrected by
   Disconne
Partners 
w  from  wh
expected  f
ing  out  St
%  Stator  E
econdary S2
y led to he
t  by  the 
y new wirin
ected Wind
here?  NCT
fault  for  a
ator  Earth
arth  Fault
2 to Relay.
eating and
time  NPS
ng 
ding 
T 
a 
h 
t 
. 
d 
S 
‐
‐
‐
‐
‐
‐
‐
NCT, whic
But from 
case  of  St
relevant b
wire. 
Differentia
settings  w
compiled 
ordination
Suppose b
operate a
these are 
this  case, 
because in
Reverse P
Logic was
With  the 
changing t
Similarly, 
Frequency
set  logic 
imagine!  
LBB  Prote
Manual o
other  des
wiring. 
Following 
ch is used f
TB to Rela
tator  E/F, 
breakers. T
al  Protecti
was  not  a
during com
n, Power Sy
both the a
nd genera
Class A pr
it’s  AVR. 
nter‐panel 
Power and 
s so wrong
set  logic,
the logic. 
this  wro
y and Ove
didn’t  let 
Corrected 
ection  trip
f the Gene
signated  fu
Diagram w
for Stator E
ay, wire S2
Relay  wou
This fault w
ion  setting
available,  w
mmissionin
ystem and
bove prote
te alarm a
rotection a
And  you 
wiring wa
Forward P
gly set tha
,  these  pr
ng  logic 
r Frequen
these  pro
by changin
ping  was 
erator Prot
unctions  a
will help us
  
E/F Protect
2 was miss
uldn’t  hav
was simply
g  was  foun
we  recom
ng and to 
 Load Flow
ections, St
and trip sig
and must c
know  wha
s not done
Power Pro
t neither A
rotections 
error  was
cy Protect
otections  g
ng the logi
assigned 
tection Re
nd  not  thi
s understan
Authorised
tion, was w
sing/not co
e  sensed 
y corrected
nd  high,  b
mended  t
carry out t
w. 
ator E/F a
gnals faithf
cut the ve
at  we  foun
e. Correcte
otections w
Alarm cou
were  ren
s  observe
ions. All th
generate  a
c. 
to  Output
elay, this O
is.  Correct
nd this crit
d Channel 
wired up to
onnected o
nor  opera
d by conne
besides,  th
to  furnish 
the fresh S
nd Differe
fully. And a
ry source 
nd?  AVR  c
d and now
were set b
ld be gene
ndered  us
ed  in  Und
hese were
any  Alarm 
t  No.  3,  b
Output No.
ted  by  cha
ical event 
Partners 
o TB in CRP
on Relay. S
ted  nor  tr
ecting a 2.
he  referenc
us  the  O
Studies on
ntial, are a
as we all k
of the fau
ould  not  b
w stands re
ut with wr
erated nor
eless.  Cor
der  Voltag
e set alrigh
or  Trippin
but  as  per 
 3 must be
anging  the
better. 
P correctly.
So even in
ripped  the
5 sq. mm.
ce  for  the
OEM  data,
 Relay Co‐
alright and
now, both
lt. Here in
be  tripped
ctified. 
rong logic.
r Tripping!
rrected  by
ge,  Under
ht, but the
ng  signals,
the  OEM
e used for
  logic  and
. 
n 
e 
. 
e 
, 
‐
d 
h 
n 
d 
. 
 
y 
r 
e 
, 
 
r 
 
        Authorised Channel Partners 
Conclu
‐
‐
‐
‐
‐
usion – How
Not only o
the protec
And  gene
now onwa
By doing 
will be pu
rewinding
Generator
continuou
our effort
in totality
affects  th
And that’s
And  at  la
difference
The above
our  very 
abnormal
to us, we’
And  if  yo
between 
anywhere
w our insig
our team v
ctions ava
erate  a  cor
ards, the w
so, we als
t in place a
g data but m
r  is  an  e
usly runnin
ts are view
. Testing, a
e  end‐resu
s what we 
st,  we  we
e between 
e are in fa
busy  3‐da
ities and c
ll be happy
u’re  lookin
your asset
e.  
ghtful actio
verified tha
ilable, they
rrect  tripp
way a safe a
o ensured
after due r
more or les
expensive 
g plant du
wing the pr
as such, is 
ults  (produ
delivered. 
ere  happy 
symptom‐
ct the maj
ys  (and  n
orrected a
y to save y
ng  for  a  d
ts and you
  
ons helped
at the new
y verified 
ing  sequen
and reliabl
 complete
repairs. Set
ss, the mac
asset  itse
ue to failure
roblems fro
an isolated
uction/rev
to  “wow”
‐solving‐ag
jor problem
ights  too)
as many as
our assets 
edicated  a
ur revenue
Authorised
d the Indus
wly installe
that it ope
nce  too.  N
e protectio
e protectio
ttings need
chine will b
elf,  and  t
e of a Gen
om custom
d job, but w
enue),  the
”  the  custo
gents and p
ms found a
at  site,  w
possible. W
too! 
agency  wh
e, we’ll be 
d Channel 
stry 
ed Generat
erates, and
No  burning
on system 
on of 12 M
d to be ver
be protecte
the  loss  o
nerator can
mers’ point
when it is 
en  it’s  pro
omer,  who
proper Doc
and correc
we  also  ob
Well, to kn
ho  underst
happy to 
Partners 
tor of 10 M
d operates
g  of  Gener
should be.
MW Genera
rified/corre
ed. 
of  produc
n run in to 
t and resol
done in a w
foundly  m
o  learnt  a
ctors. 
cted. Thou
bserved  ma
now more,
tands  the 
assist you
MW has all
s correctly.
rator  from
. 
ator which
ected with
ction  in  a
crores. All
lving them
way which
meaningful.
t  last,  the
gh, during
any  minor
, call/write
direct  link
, anytime,
l 
. 
m 
h 
h 
a 
l 
m 
h 
. 
e 
g 
r 
e 
k 
, 

More Related Content

More from System Protection

Honeywell | Overcoat | Fabric Composition (Patented)
Honeywell | Overcoat | Fabric Composition (Patented)Honeywell | Overcoat | Fabric Composition (Patented)
Honeywell | Overcoat | Fabric Composition (Patented)System Protection
 
Case Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenueCase Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenueSystem Protection
 
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber MatHONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber MatSystem Protection
 
Salisbury By Honeywell | 51511 Di – Electric Over Shoes
Salisbury By Honeywell | 51511 Di – Electric Over ShoesSalisbury By Honeywell | 51511 Di – Electric Over Shoes
Salisbury By Honeywell | 51511 Di – Electric Over ShoesSystem Protection
 
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kVSalisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kVSystem Protection
 
LOGGER KEW 5020 | KYORITSU | System Protection
LOGGER KEW 5020 | KYORITSU | System ProtectionLOGGER KEW 5020 | KYORITSU | System Protection
LOGGER KEW 5020 | KYORITSU | System ProtectionSystem Protection
 
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System ProtectionPORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System ProtectionSystem Protection
 
RCD TESTER KEW 5410| KYORITSU | System Protection
RCD TESTER KEW 5410| KYORITSU | System ProtectionRCD TESTER KEW 5410| KYORITSU | System Protection
RCD TESTER KEW 5410| KYORITSU | System ProtectionSystem Protection
 
Case Study - How we saved a Process Plant from break-down
Case Study - How we saved a Process Plant from break-downCase Study - How we saved a Process Plant from break-down
Case Study - How we saved a Process Plant from break-downSystem Protection
 
Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...
Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...
Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...System Protection
 
Case Study | How your Motor Protection should designed when running in parall...
Case Study | How your Motor Protection should designed when running in parall...Case Study | How your Motor Protection should designed when running in parall...
Case Study | How your Motor Protection should designed when running in parall...System Protection
 
AC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
AC/DC Digital Clamp Meters | KEW 2010 | KyoritsuAC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
AC/DC Digital Clamp Meters | KEW 2010 | KyoritsuSystem Protection
 
Digital Multimeters | KEW 1051 | Kyoritsu
Digital Multimeters | KEW 1051 | KyoritsuDigital Multimeters | KEW 1051 | Kyoritsu
Digital Multimeters | KEW 1051 | KyoritsuSystem Protection
 
Digital Multimeters | KEW 1020R | Kyoritsu
Digital Multimeters | KEW 1020R | KyoritsuDigital Multimeters | KEW 1020R | Kyoritsu
Digital Multimeters | KEW 1020R | KyoritsuSystem Protection
 
Digital Multimeters | KEW 1019R | Kyoritsu
Digital Multimeters | KEW 1019R | KyoritsuDigital Multimeters | KEW 1019R | Kyoritsu
Digital Multimeters | KEW 1019R | KyoritsuSystem Protection
 
Digital Multimeters | KEW 1012 | Kyoritsu
Digital Multimeters | KEW 1012 | KyoritsuDigital Multimeters | KEW 1012 | Kyoritsu
Digital Multimeters | KEW 1012 | KyoritsuSystem Protection
 
High Voltage Insulation Testers | KEW 3025A | Kyoritsu
High Voltage Insulation Testers | KEW 3025A | KyoritsuHigh Voltage Insulation Testers | KEW 3025A | Kyoritsu
High Voltage Insulation Testers | KEW 3025A | KyoritsuSystem Protection
 
No more Rusting/Corrosion! It’s Shock-proof too!
No more Rusting/Corrosion! It’s Shock-proof too!No more Rusting/Corrosion! It’s Shock-proof too!
No more Rusting/Corrosion! It’s Shock-proof too!System Protection
 
Earth Testers | KEW 4105DL | Kyoritsu Products Dealer in Vadodara | India
Earth Testers | KEW 4105DL | Kyoritsu Products Dealer in Vadodara | IndiaEarth Testers | KEW 4105DL | Kyoritsu Products Dealer in Vadodara | India
Earth Testers | KEW 4105DL | Kyoritsu Products Dealer in Vadodara | IndiaSystem Protection
 
Leakage Clamp Meters KEW 2413R | Kyoritsu | System Protection
Leakage Clamp Meters KEW 2413R | Kyoritsu | System ProtectionLeakage Clamp Meters KEW 2413R | Kyoritsu | System Protection
Leakage Clamp Meters KEW 2413R | Kyoritsu | System ProtectionSystem Protection
 

More from System Protection (20)

Honeywell | Overcoat | Fabric Composition (Patented)
Honeywell | Overcoat | Fabric Composition (Patented)Honeywell | Overcoat | Fabric Composition (Patented)
Honeywell | Overcoat | Fabric Composition (Patented)
 
Case Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenueCase Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenue
 
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber MatHONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
HONEYWELL - Electrical Safety Mat | HONEYWELL Insulating Rubber Mat
 
Salisbury By Honeywell | 51511 Di – Electric Over Shoes
Salisbury By Honeywell | 51511 Di – Electric Over ShoesSalisbury By Honeywell | 51511 Di – Electric Over Shoes
Salisbury By Honeywell | 51511 Di – Electric Over Shoes
 
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kVSalisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
Salisbury By Honeywell | 4556 Voltage Detector 240V to 230kV
 
LOGGER KEW 5020 | KYORITSU | System Protection
LOGGER KEW 5020 | KYORITSU | System ProtectionLOGGER KEW 5020 | KYORITSU | System Protection
LOGGER KEW 5020 | KYORITSU | System Protection
 
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System ProtectionPORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
PORTABLE APPLIANCE TESTER KEW 6205 | KYORITSU | System Protection
 
RCD TESTER KEW 5410| KYORITSU | System Protection
RCD TESTER KEW 5410| KYORITSU | System ProtectionRCD TESTER KEW 5410| KYORITSU | System Protection
RCD TESTER KEW 5410| KYORITSU | System Protection
 
Case Study - How we saved a Process Plant from break-down
Case Study - How we saved a Process Plant from break-downCase Study - How we saved a Process Plant from break-down
Case Study - How we saved a Process Plant from break-down
 
Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...
Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...
Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...
 
Case Study | How your Motor Protection should designed when running in parall...
Case Study | How your Motor Protection should designed when running in parall...Case Study | How your Motor Protection should designed when running in parall...
Case Study | How your Motor Protection should designed when running in parall...
 
AC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
AC/DC Digital Clamp Meters | KEW 2010 | KyoritsuAC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
AC/DC Digital Clamp Meters | KEW 2010 | Kyoritsu
 
Digital Multimeters | KEW 1051 | Kyoritsu
Digital Multimeters | KEW 1051 | KyoritsuDigital Multimeters | KEW 1051 | Kyoritsu
Digital Multimeters | KEW 1051 | Kyoritsu
 
Digital Multimeters | KEW 1020R | Kyoritsu
Digital Multimeters | KEW 1020R | KyoritsuDigital Multimeters | KEW 1020R | Kyoritsu
Digital Multimeters | KEW 1020R | Kyoritsu
 
Digital Multimeters | KEW 1019R | Kyoritsu
Digital Multimeters | KEW 1019R | KyoritsuDigital Multimeters | KEW 1019R | Kyoritsu
Digital Multimeters | KEW 1019R | Kyoritsu
 
Digital Multimeters | KEW 1012 | Kyoritsu
Digital Multimeters | KEW 1012 | KyoritsuDigital Multimeters | KEW 1012 | Kyoritsu
Digital Multimeters | KEW 1012 | Kyoritsu
 
High Voltage Insulation Testers | KEW 3025A | Kyoritsu
High Voltage Insulation Testers | KEW 3025A | KyoritsuHigh Voltage Insulation Testers | KEW 3025A | Kyoritsu
High Voltage Insulation Testers | KEW 3025A | Kyoritsu
 
No more Rusting/Corrosion! It’s Shock-proof too!
No more Rusting/Corrosion! It’s Shock-proof too!No more Rusting/Corrosion! It’s Shock-proof too!
No more Rusting/Corrosion! It’s Shock-proof too!
 
Earth Testers | KEW 4105DL | Kyoritsu Products Dealer in Vadodara | India
Earth Testers | KEW 4105DL | Kyoritsu Products Dealer in Vadodara | IndiaEarth Testers | KEW 4105DL | Kyoritsu Products Dealer in Vadodara | India
Earth Testers | KEW 4105DL | Kyoritsu Products Dealer in Vadodara | India
 
Leakage Clamp Meters KEW 2413R | Kyoritsu | System Protection
Leakage Clamp Meters KEW 2413R | Kyoritsu | System ProtectionLeakage Clamp Meters KEW 2413R | Kyoritsu | System Protection
Leakage Clamp Meters KEW 2413R | Kyoritsu | System Protection
 

Case Study | How we saved a Generator (in fact two), again!

  • 1.       Backgr     Finding ‐   ‐           How  round    t was j received a urgently, t along with   On enquir 12 MW, 1 taken  on  industry,  warranted Hearing th checklist ( we find th upcoming   We imme by the firs up and wo gs‐ at Site  The initial that  the  R normally  such fault like last lin So, such a extra  vigi protection     I                    we sav ust anothe a call from they wante h its relayin ring about 11 kV got  rental  ba Generator d  extensiv his, the da (we’ll see  he Root Ca g repaired G diately dis st flight ava orking.  l forensics  Relay  (and a time de t occurs (st ne of defen a surprising lant.  This  n system.                         ved a G er day and m a new C ed us to te ng, scheme  such urge burnt (sta sis  and  a  r  failure  is  ve  and  me ay went int it later in a use and so Generator  patched 2  ailable and were fou d  GCB  eve layed prot tator failur nse.  g observat warranted                    Generat d another  Customer i est and com es and com ency, we le ator) and w temporary nothing  le ethodical  a to a tizzy a a diagram) olve it, this  too!  of our eng d were soo nd from th ntually)  w tection. It  re), other  tion just at d  us  for  i Authorised tor (in f morning o n Metal Se mmission a mplete test earnt that  was sent f y  solution ess  than  a analysis  li and we im ) to find o rented Ge gineers alo on on the jo he fault re was  tripped was a sur protection t the start  n‐depth  a d Channel  fact tw of January  ector, from n old 10 M ing.  their origi for repairin .  As  we  a an  air‐cras ke  an  air‐ mmediately ut the Roo enerator w ong with th ob. In less  ecords of t d  on  NPS  prise, beca ns take car of the job nd  thorou Partners  wo), aga 2019, on  m Chhattis MW, 11 kV  inal Gener ng, this 10 all  know  th h  and  this ‐crash  inve y started p ot Cause. A was in dang he test sets than a day the Relay.  protection ause norm re, NPS is s b prompte ugh  checki ain!  which we sgarh. And Generator ator rated 0 MW was hat  in  our s  criticality estigation. reparing a And unless er and the s required, y, we were We learnt n,  which  is mally when something d us to be ing  of  the e  d  r  d  s  r  y  .  a  s  e  ,  e  t  s  n  g  e  e 
  • 2.     ‐ ‐                 And  then  wiring  wa Protection Fault sche   Following  Protection Generator eventually operated,  Seen here                               came  the as  the  culp n  Engineer eme checki actual  im n (51S) did  r kept run y,  NPS  op  the dama e is S2 miss    Stator B                    e  moment prit  for  the r  so  to  spe ing).  mages  clea not opera ning on th peration  o ge was alre sing (to Re Burnt                       t  of  recko e  Generat eak  (It  wa arly  show ate due to n his serious  operated  o eady done elay) Authorised ning,  and  or  burn‐ou s  found  w the  fault. non‐wiring a fault wh on  time  d .     Co        d Channel  you  know ut!  Least  e while  carryi So,  90  % g of NCT se hich finally delay.  But orrected by    Disconne Partners  w  from  wh expected  f ing  out  St %  Stator  E econdary S2 y led to he t  by  the  y new wirin ected Wind here?  NCT fault  for  a ator  Earth arth  Fault 2 to Relay. eating and time  NPS ng  ding  T  a  h  t  .  d  S 
  • 3. ‐ ‐ ‐ ‐ ‐ ‐ ‐ NCT, whic But from  case  of  St relevant b wire.  Differentia settings  w compiled  ordination Suppose b operate a these are  this  case,  because in Reverse P Logic was With  the  changing t Similarly,  Frequency set  logic  imagine!   LBB  Prote Manual o other  des wiring.  Following  ch is used f TB to Rela tator  E/F,  breakers. T al  Protecti was  not  a during com n, Power Sy both the a nd genera Class A pr it’s  AVR.  nter‐panel  Power and  s so wrong set  logic, the logic.  this  wro y and Ove didn’t  let  Corrected  ection  trip f the Gene signated  fu Diagram w for Stator E ay, wire S2 Relay  wou This fault w ion  setting available,  w mmissionin ystem and bove prote te alarm a rotection a And  you  wiring wa Forward P gly set tha ,  these  pr ng  logic  r Frequen these  pro by changin ping  was  erator Prot unctions  a will help us    E/F Protect 2 was miss uldn’t  hav was simply g  was  foun we  recom ng and to   Load Flow ections, St and trip sig and must c know  wha s not done Power Pro t neither A rotections  error  was cy Protect otections  g ng the logi assigned  tection Re nd  not  thi s understan Authorised tion, was w sing/not co e  sensed  y corrected nd  high,  b mended  t carry out t w.  ator E/F a gnals faithf cut the ve at  we  foun e. Correcte otections w Alarm cou were  ren s  observe ions. All th generate  a c.  to  Output elay, this O is.  Correct nd this crit d Channel  wired up to onnected o nor  opera d by conne besides,  th to  furnish  the fresh S nd Differe fully. And a ry source  nd?  AVR  c d and now were set b ld be gene ndered  us ed  in  Und hese were any  Alarm  t  No.  3,  b Output No. ted  by  cha ical event  Partners  o TB in CRP on Relay. S ted  nor  tr ecting a 2. he  referenc us  the  O Studies on ntial, are a as we all k of the fau ould  not  b w stands re ut with wr erated nor eless.  Cor der  Voltag e set alrigh or  Trippin but  as  per   3 must be anging  the better.  P correctly. So even in ripped  the 5 sq. mm. ce  for  the OEM  data,  Relay Co‐ alright and now, both lt. Here in be  tripped ctified.  rong logic. r Tripping! rrected  by ge,  Under ht, but the ng  signals, the  OEM e used for   logic  and .  n  e  .  e  ,  ‐ d  h  n  d  .    y  r  e  ,    r   
  • 5. Conclu ‐ ‐ ‐ ‐ ‐ usion – How Not only o the protec And  gene now onwa By doing  will be pu rewinding Generator continuou our effort in totality affects  th And that’s And  at  la difference The above our  very  abnormal to us, we’ And  if  yo between  anywhere w our insig our team v ctions ava erate  a  cor ards, the w so, we als t in place a g data but m r  is  an  e usly runnin ts are view . Testing, a e  end‐resu s what we  st,  we  we e between  e are in fa busy  3‐da ities and c ll be happy u’re  lookin your asset e.   ghtful actio verified tha ilable, they rrect  tripp way a safe a o ensured after due r more or les expensive  g plant du wing the pr as such, is  ults  (produ delivered.  ere  happy  symptom‐ ct the maj ys  (and  n orrected a y to save y ng  for  a  d ts and you    ons helped at the new y verified  ing  sequen and reliabl  complete repairs. Set ss, the mac asset  itse ue to failure roblems fro an isolated uction/rev to  “wow” ‐solving‐ag jor problem ights  too) as many as our assets  edicated  a ur revenue Authorised d the Indus wly installe that it ope nce  too.  N e protectio e protectio ttings need chine will b elf,  and  t e of a Gen om custom d job, but w enue),  the ”  the  custo gents and p ms found a at  site,  w possible. W too!  agency  wh e, we’ll be  d Channel  stry  ed Generat erates, and No  burning on system  on of 12 M d to be ver be protecte the  loss  o nerator can mers’ point when it is  en  it’s  pro omer,  who proper Doc and correc we  also  ob Well, to kn ho  underst happy to  Partners  tor of 10 M d operates g  of  Gener should be. MW Genera rified/corre ed.  of  produc n run in to  t and resol done in a w foundly  m o  learnt  a ctors.  cted. Thou bserved  ma now more, tands  the  assist you MW has all s correctly. rator  from .  ator which ected with ction  in  a crores. All lving them way which meaningful. t  last,  the gh, during any  minor , call/write direct  link , anytime, l  .  m  h  h  a  l  m  h  .  e  g  r  e  k  ,