SlideShare a Scribd company logo
Managing Capacity
Transport Forum
Tshepo Kgobe
Senior Executive Manager
Technical Services
Gautrain Management Agency
Contents
• Context
• Passenger Behavior
• Parking & DFDS Capacity
• Considerations and Conclusion
• Recommendation
• ITMP 25
• Extensions
Capacity Problems– Context
Capacity Challenges – Context
• The success of the Gautrain operation – Y11 ridership in Y3
• 20%+ Percentage cumulative year on year growth in
ridership
• AFC System Capacity and Regulatory compliance
• EMV Compliance
• Physical Rail network and Station layouts
• Reduction in headway
• Rail passenger behaviour
• Parking Capacity
• DFDS challenges
Capacity Problems– Context
Ridership Growth
Capacity Problems– Context
Passenger Behavior
0
100
200
300
400
500
600
700
800
900
1000
05:49 06:01 06:13 06:25 06:37 06:49 07:01 07:13 07:25 07:37 07:49 08:01 08:13 08:25 08:37
N-S MR-MB (25-7-2013)
Usage
Capacity (1.31)
Capacity (1.50)
Capacity Problems– Context
Passenger Behavior
0
100
200
300
400
500
600
700
800
900
1000
05:49 06:01 06:13 06:25 06:37 06:49 07:01 07:13 07:25 07:37 07:49 08:01 08:13 08:25 08:37
N-S MR-MB (12-9-2013)
Usage
Capacity (1.31)
Capacity (1.50)
Capacity Problems– Context
Passenger Behavior
0
100
200
300
400
500
600
700
800
900
1000
05:49 06:01 06:13 06:25 06:37 06:49 07:01 07:13 07:25 07:37 07:49 08:01 08:13 08:25 08:37
N-S MR-MB (16-1-2014)
Usage
Capacity (1.31)
Capacity (1.50)
Capacity Problems– Context
Passenger Behavior
0
100
200
300
400
500
600
700
800
900
1000
05:49 06:01 06:13 06:25 06:37 06:49 07:01 07:13 07:25 07:37 07:49 08:01 08:13 08:25 08:37
N-S MR-MB (13-2-2014)
Usage
Capacity (1.31)
Capacity (1.50)
Capacity Problems– Context
Passenger Behavior
Capacity Problems– Context
Passenger Behavior
Capacity Problems– Context
Passenger Behavior
Capacity Problems– Context
Passenger Behavior
Capacity Problems– Context
Parking Capacity
Capacity Problems– Context
Parking Capacity
Parking and DFDS
Capacity
Capacity Problems– Rail
Capacity
• Link loads reach maximum between Centurion and
Sandton
• Highest link load in Midrand – Marlboro section
• Capacity under pressure for about 1½ of the 3 hour
peak period per day
• Counter flow services are underutilised
• Options on current train timetable exhausted
• Rolling stock availability under pressure
• Challenge is how to alleviate capacity constraints
Capacity Problems– Rail Layout
• A double-line section shared by the North-South and
East-West
• Junctions at Marlboro Portal - East-West and North-
South services are merged / diverged.
• Single-line tunnel sections between Sandton and
Rosebank
• An at-grade crossing between Pretoria and Hatfield
• Scheduled crossing in the platforms at Rosebank
Station
• Terminal stations restricted to two platforms each
• No loop lines outside the depot area
• Long signalling blocks
Capacity Problems– Parking &
DFDS
• Parking
• Parking capacity is insufficient - Pretoria, Centurion,
Midrand, Park, Rosebank and Rhodesfield.
• Availability of land at stations
• Cost of development vs Recovery/Cost to customers
• DFDS
• J2 Johannesburg CBD and M3 Sunninghill-
Overcrowding
• Long bus cycle times
• The DFDS bus service footprint
Considerations
&Conclusions
Capacity Problems– Trade-off
Consideration
• Longer trains are more labour efficient
• Shorter trains are more energy efficient
• Pressure on the available line capacity of the network
• • Higher capital and maintenance costs
• The capital cost of doubling of an existing single tunnel
• Higher service levels/ Consequential delays
• Seating Capacity ratio of 1.50 vs. 1.3 vs Cost of service
• Jumper/step back drivers could alleviate capacity
problems on platform and line capacity.
Capacity – Assessment &
Conclusions Rail
• That 84 additional rolling stock coaches - required by 2026
• Longer platforms would be required at OR Tambo - 2013
• The Rosebank to Park Station single tunnel - full capacity
by 2022
• The Sandton to Rosebank single tunnel, full capacity by
2026
• Staging capacity at maintenance depot in Midrand -2016
• The provision of additional line capacity between Marlboro
portal and Sandton - required by 2029
• high level junction capacity at Pretoria station - reach
capacity by 2018.
Assessment & Conclusions
Stations, DFDS & Parking
• The station design capacities under pressure
• OR Tambo Station (from 2013),
• Park station entries (2014),
• Midrand Station entries (2015),
• Sandton Station exits (2016).
• Additional parking would be required at seven of the nine
station in the next 5 years
• Centurion (824),Rhodesfield (535),
• Midrand (363), Pretoria (253),
• Hatfield (187), Rosebank (148) and Park (70).
• Adititonal busses and routes will be required by 2019
Recommendations
Timelines
Capacity – Recommendations
• 48 rolling stock coaches are procured starting 2015
• OR Tambo platform be extended - 2014
• Rosebank to Park and Sandton to Rosebank single tunnels be
doubled - 2021
• New Depot Staging capacity at the depot in Midrand to be
increased
• Line capacity between Marlboro and Sandton is increased by
2018
• Investigate Centurion – Sandton short turn shuttle service
• A full simulation study of the system to determine bottlenecks
• Configure the seats in GPS train sets – 2014
• Shorter headway and the rolling stock implications
Capacity - Future actions
• Network Assessment will be updated on an annual basis
• Integrate land-use strategies for all stations
• Determine the long-term GMA financial implications
• A full transport integration strategy to be finalised
• Prioritise the different activities and create a scheduled
project plan
• Finalise the rolling stock procurement tender
• Finalise the physical infrastructure system optimisation
• Finalise new DFDS routes and add new shuttle services
• Develop a full integrated plan to incorporate NMT and UA
Mobility Paradigm
SUSTAINABLE MOBILITY PARADIGM
TRANSPORT TRENDS
• Sustainable Urban Mobility Planning
• Total Carbon Footprint of Public Transport and Mobility
• The convergence of Public and Personalised Transport
• Smart Mobility
– The First/Last Mile is key in Trip Planning
– Influencing Commuter Behaviour
• Data Centric Mobility
– System Convergence and Standardisation
• Availability of Information
– Information today is pervasive
– Web technologies catalyse instant and standard access
– Smartphones/tablets catalyse personal access
– Open Data
• Designing for Sustainability
– SMRS
– Future Materials
COMMUTER CONNECTIVITY REQUIREMENTS
• Trip planning
• E-commerce – Ticket reloads
• Overall Service Status (Live)
• Next Arrival for Bus and Railway (Scheduled)
• Service maps for bus and train
• Weather reports – Morning and Evening
• Universal Access - Elevator and Escalator Status
• Neighbourhood and station navigation
• Reduced mobility Alerts – Roadworks and Detours
• Emergency messaging
• Advertising/Institutional messages
• Customer Queries
• Camera and microphone for Customer Service - FaceTime
PERSONALISED TRIP INFORMATION REQUIREMENTS
• Provide real-time multimodal information
• Users expectations of a seamless journey with timely traveller
information
• Last mile Connectivity
• Information system data needs to be effectively integrated to make
the information valuable
• User experience
• Intuitive
• Interactive and Adaptive screen
• User Interface – Standardised look and Feel
• Provides a snapshot of various real-time information in default
mode
Thank you

More Related Content

What's hot

Webinar: The flexibility of the bus is both a strength and a weakness in prov...
Webinar: The flexibility of the bus is both a strength and a weakness in prov...Webinar: The flexibility of the bus is both a strength and a weakness in prov...
Webinar: The flexibility of the bus is both a strength and a weakness in prov...
BRTCoE
 
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Webinar: Bus rapid transit system: metro on surface or high performance bus s...Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
BRTCoE
 
Kane County Transit Study Presentation 2010
Kane County Transit Study Presentation  2010Kane County Transit Study Presentation  2010
Kane County Transit Study Presentation 2010
City of Geneva
 
Township of Langley Community Rail Study Council Presentation April 21
Township of Langley Community Rail Study Council Presentation April 21Township of Langley Community Rail Study Council Presentation April 21
Township of Langley Community Rail Study Council Presentation April 21
jgabateman
 
PT Modeling in S'pore [Terence Ng]
PT Modeling in S'pore [Terence Ng]PT Modeling in S'pore [Terence Ng]
PT Modeling in S'pore [Terence Ng]
Terence Ng
 
Securing modal shift to bus FINAL - Nick Phillips, Borough of Poole
Securing modal shift to bus FINAL - Nick Phillips, Borough of PooleSecuring modal shift to bus FINAL - Nick Phillips, Borough of Poole
Securing modal shift to bus FINAL - Nick Phillips, Borough of Poole
Nick Phillips
 
Sustainable bus rapid transit system
Sustainable bus rapid transit systemSustainable bus rapid transit system
Sustainable bus rapid transit system
ashik ks
 
RTPI 2013 Chris Lane
RTPI 2013 Chris LaneRTPI 2013 Chris Lane
RTPI 2013 Chris Lane
Russell Publishing
 
Christchurch (NZ) Transportation Models Update - A Moving Feast
Christchurch (NZ) Transportation Models Update - A Moving FeastChristchurch (NZ) Transportation Models Update - A Moving Feast
Christchurch (NZ) Transportation Models Update - A Moving Feast
JumpingJaq
 
RTPI 2013 Charles Carter
RTPI 2013 Charles CarterRTPI 2013 Charles Carter
RTPI 2013 Charles Carter
Russell Publishing
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015
Norma Nun
 
Using spatial presentation of bus GPS data to identify and justify bus priori...
Using spatial presentation of bus GPS data to identify and justify bus priori...Using spatial presentation of bus GPS data to identify and justify bus priori...
Using spatial presentation of bus GPS data to identify and justify bus priori...
JumpingJaq
 
Integration of mega projects into the existing network – the critical role of...
Integration of mega projects into the existing network – the critical role of...Integration of mega projects into the existing network – the critical role of...
Integration of mega projects into the existing network – the critical role of...
JumpingJaq
 
What PRASA is doing to improve the passenger rail service in the Western Cape
What PRASA is doing to improve the passenger rail service in the Western CapeWhat PRASA is doing to improve the passenger rail service in the Western Cape
What PRASA is doing to improve the passenger rail service in the Western Cape
Tristan Wiggill
 
Maputo corridor: Where to now?
Maputo corridor: Where to now?Maputo corridor: Where to now?
Maputo corridor: Where to now?
Tristan Wiggill
 
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County
 
Mobility Cway - English version
Mobility Cway - English versionMobility Cway - English version
Mobility Cway - English version
Mobility - Enjoy the way
 
Seg Fest Presentation
Seg Fest PresentationSeg Fest Presentation
Seg Fest Presentation
jlspencer
 
Crossrail 2 - Planning for the Future
Crossrail 2 - Planning for the FutureCrossrail 2 - Planning for the Future
Crossrail 2 - Planning for the Future
Institute for Transport Studies (ITS)
 
Upgrading and Extending Passenger Services
Upgrading and Extending Passenger ServicesUpgrading and Extending Passenger Services
Upgrading and Extending Passenger Services
Railways and Harbours
 

What's hot (20)

Webinar: The flexibility of the bus is both a strength and a weakness in prov...
Webinar: The flexibility of the bus is both a strength and a weakness in prov...Webinar: The flexibility of the bus is both a strength and a weakness in prov...
Webinar: The flexibility of the bus is both a strength and a weakness in prov...
 
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Webinar: Bus rapid transit system: metro on surface or high performance bus s...Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
 
Kane County Transit Study Presentation 2010
Kane County Transit Study Presentation  2010Kane County Transit Study Presentation  2010
Kane County Transit Study Presentation 2010
 
Township of Langley Community Rail Study Council Presentation April 21
Township of Langley Community Rail Study Council Presentation April 21Township of Langley Community Rail Study Council Presentation April 21
Township of Langley Community Rail Study Council Presentation April 21
 
PT Modeling in S'pore [Terence Ng]
PT Modeling in S'pore [Terence Ng]PT Modeling in S'pore [Terence Ng]
PT Modeling in S'pore [Terence Ng]
 
Securing modal shift to bus FINAL - Nick Phillips, Borough of Poole
Securing modal shift to bus FINAL - Nick Phillips, Borough of PooleSecuring modal shift to bus FINAL - Nick Phillips, Borough of Poole
Securing modal shift to bus FINAL - Nick Phillips, Borough of Poole
 
Sustainable bus rapid transit system
Sustainable bus rapid transit systemSustainable bus rapid transit system
Sustainable bus rapid transit system
 
RTPI 2013 Chris Lane
RTPI 2013 Chris LaneRTPI 2013 Chris Lane
RTPI 2013 Chris Lane
 
Christchurch (NZ) Transportation Models Update - A Moving Feast
Christchurch (NZ) Transportation Models Update - A Moving FeastChristchurch (NZ) Transportation Models Update - A Moving Feast
Christchurch (NZ) Transportation Models Update - A Moving Feast
 
RTPI 2013 Charles Carter
RTPI 2013 Charles CarterRTPI 2013 Charles Carter
RTPI 2013 Charles Carter
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015
 
Using spatial presentation of bus GPS data to identify and justify bus priori...
Using spatial presentation of bus GPS data to identify and justify bus priori...Using spatial presentation of bus GPS data to identify and justify bus priori...
Using spatial presentation of bus GPS data to identify and justify bus priori...
 
Integration of mega projects into the existing network – the critical role of...
Integration of mega projects into the existing network – the critical role of...Integration of mega projects into the existing network – the critical role of...
Integration of mega projects into the existing network – the critical role of...
 
What PRASA is doing to improve the passenger rail service in the Western Cape
What PRASA is doing to improve the passenger rail service in the Western CapeWhat PRASA is doing to improve the passenger rail service in the Western Cape
What PRASA is doing to improve the passenger rail service in the Western Cape
 
Maputo corridor: Where to now?
Maputo corridor: Where to now?Maputo corridor: Where to now?
Maputo corridor: Where to now?
 
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
 
Mobility Cway - English version
Mobility Cway - English versionMobility Cway - English version
Mobility Cway - English version
 
Seg Fest Presentation
Seg Fest PresentationSeg Fest Presentation
Seg Fest Presentation
 
Crossrail 2 - Planning for the Future
Crossrail 2 - Planning for the FutureCrossrail 2 - Planning for the Future
Crossrail 2 - Planning for the Future
 
Upgrading and Extending Passenger Services
Upgrading and Extending Passenger ServicesUpgrading and Extending Passenger Services
Upgrading and Extending Passenger Services
 

Viewers also liked

Gautrain
GautrainGautrain
Low carbon challenges
Low carbon challengesLow carbon challenges
Low carbon challenges
Tristan Wiggill
 
Manual campus
Manual campusManual campus
Manual campus
dcaroalvare3017952996
 
2017 Space Foundation International Student Art Contest Reflects "Space Throu...
2017 Space Foundation International Student Art Contest Reflects "Space Throu...2017 Space Foundation International Student Art Contest Reflects "Space Throu...
2017 Space Foundation International Student Art Contest Reflects "Space Throu...
Space Foundation
 
Volvo V90 Press Release
Volvo V90 Press ReleaseVolvo V90 Press Release
Volvo V90 Press Release
RushLane
 
Exposicion de informatica
Exposicion de informaticaExposicion de informatica
Exposicion de informatica
Bary Mercedes
 
Luis Fernando Heras Portillo: Cómo se elabora el vino
Luis Fernando Heras Portillo: Cómo se elabora el vinoLuis Fernando Heras Portillo: Cómo se elabora el vino
Luis Fernando Heras Portillo: Cómo se elabora el vino
Luis Fernando Heras Portillo
 
Politica eco bolivia
Politica eco boliviaPolitica eco bolivia
Politica eco bolivia
Cj Gantier
 
Mercedes Maybach S500 S600 India launch - Press Release
Mercedes Maybach S500 S600 India launch - Press ReleaseMercedes Maybach S500 S600 India launch - Press Release
Mercedes Maybach S500 S600 India launch - Press Release
RushLane
 
Carbon nanotubes as Biosensors
Carbon nanotubes as Biosensors Carbon nanotubes as Biosensors
Carbon nanotubes as Biosensors
Adwaith P. Suratkar
 
Mercedes Generation EQ Concept - Press Release
Mercedes Generation EQ Concept - Press ReleaseMercedes Generation EQ Concept - Press Release
Mercedes Generation EQ Concept - Press Release
RushLane
 
LAGHU SANDHYAAVANDANAM
LAGHU SANDHYAAVANDANAMLAGHU SANDHYAAVANDANAM
LAGHU SANDHYAAVANDANAM
madhva_madhu
 
Coffee1 (2)
Coffee1 (2)Coffee1 (2)
Coffee1 (2)
Arfa Salim
 
State of the Word 2011
State of the Word 2011State of the Word 2011
State of the Word 2011
photomatt
 

Viewers also liked (15)

Gautrain
GautrainGautrain
Gautrain
 
Low carbon challenges
Low carbon challengesLow carbon challenges
Low carbon challenges
 
Manual campus
Manual campusManual campus
Manual campus
 
2017 Space Foundation International Student Art Contest Reflects "Space Throu...
2017 Space Foundation International Student Art Contest Reflects "Space Throu...2017 Space Foundation International Student Art Contest Reflects "Space Throu...
2017 Space Foundation International Student Art Contest Reflects "Space Throu...
 
Volvo V90 Press Release
Volvo V90 Press ReleaseVolvo V90 Press Release
Volvo V90 Press Release
 
Ahmed Abouelazm PDF
Ahmed Abouelazm PDFAhmed Abouelazm PDF
Ahmed Abouelazm PDF
 
Exposicion de informatica
Exposicion de informaticaExposicion de informatica
Exposicion de informatica
 
Luis Fernando Heras Portillo: Cómo se elabora el vino
Luis Fernando Heras Portillo: Cómo se elabora el vinoLuis Fernando Heras Portillo: Cómo se elabora el vino
Luis Fernando Heras Portillo: Cómo se elabora el vino
 
Politica eco bolivia
Politica eco boliviaPolitica eco bolivia
Politica eco bolivia
 
Mercedes Maybach S500 S600 India launch - Press Release
Mercedes Maybach S500 S600 India launch - Press ReleaseMercedes Maybach S500 S600 India launch - Press Release
Mercedes Maybach S500 S600 India launch - Press Release
 
Carbon nanotubes as Biosensors
Carbon nanotubes as Biosensors Carbon nanotubes as Biosensors
Carbon nanotubes as Biosensors
 
Mercedes Generation EQ Concept - Press Release
Mercedes Generation EQ Concept - Press ReleaseMercedes Generation EQ Concept - Press Release
Mercedes Generation EQ Concept - Press Release
 
LAGHU SANDHYAAVANDANAM
LAGHU SANDHYAAVANDANAMLAGHU SANDHYAAVANDANAM
LAGHU SANDHYAAVANDANAM
 
Coffee1 (2)
Coffee1 (2)Coffee1 (2)
Coffee1 (2)
 
State of the Word 2011
State of the Word 2011State of the Word 2011
State of the Word 2011
 

Similar to Capacity management in large projects

Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
BRTCoE
 
Caltrain emu procurement sept 2014
Caltrain emu procurement sept 2014Caltrain emu procurement sept 2014
Caltrain emu procurement sept 2014
Adina Levin
 
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Newton Montano
 
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
BRTCoE
 
Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015
Barry Scott
 
Sustainable future through innovation
Sustainable future through innovationSustainable future through innovation
Sustainable future through innovation
Tristan Wiggill
 
Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17
Adina Levin
 
Sam Linke - Session 3: Airport City Design
Sam Linke - Session 3: Airport City DesignSam Linke - Session 3: Airport City Design
Sam Linke - Session 3: Airport City Design
Global Airport Cities
 
Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
Toronto Public Consultation Unit
 
City of virginia beach solid waste collection route optimization waste con
City of virginia beach solid waste collection route optimization waste conCity of virginia beach solid waste collection route optimization waste con
City of virginia beach solid waste collection route optimization waste con
sourabhmehta21
 
Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2
StittsvilleCentral.ca
 
Briefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning UpdateBriefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning Update
Toronto Public Consultation Unit
 
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
JumpingJaq
 
Railway infrastructure construction and upgrading in india and the middle eas...
Railway infrastructure construction and upgrading in india and the middle eas...Railway infrastructure construction and upgrading in india and the middle eas...
Railway infrastructure construction and upgrading in india and the middle eas...
Business Finland
 
Savannah Powerpoint
Savannah PowerpointSavannah Powerpoint
Savannah Powerpoint
jameswford
 
City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...
City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...
City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...
Kevin Callen
 
Cycle 2 Business and Industry Presentation
Cycle 2 Business and Industry PresentationCycle 2 Business and Industry Presentation
Cycle 2 Business and Industry Presentation
directionsto2050
 
RTPI 2013 David Hytch
RTPI 2013 David HytchRTPI 2013 David Hytch
RTPI 2013 David Hytch
Russell Publishing
 
@ UDRI - Traffic & Transportation Plan - Final
@ UDRI - Traffic & Transportation Plan - Final@ UDRI - Traffic & Transportation Plan - Final
@ UDRI - Traffic & Transportation Plan - Final
Altamash Khan
 
Transport poster
Transport posterTransport poster
Transport poster
Gordon Best
 

Similar to Capacity management in large projects (20)

Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
 
Caltrain emu procurement sept 2014
Caltrain emu procurement sept 2014Caltrain emu procurement sept 2014
Caltrain emu procurement sept 2014
 
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
 
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
 
Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015Kp rail visionevent_18nov2015
Kp rail visionevent_18nov2015
 
Sustainable future through innovation
Sustainable future through innovationSustainable future through innovation
Sustainable future through innovation
 
Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17
 
Sam Linke - Session 3: Airport City Design
Sam Linke - Session 3: Airport City DesignSam Linke - Session 3: Airport City Design
Sam Linke - Session 3: Airport City Design
 
Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
 
City of virginia beach solid waste collection route optimization waste con
City of virginia beach solid waste collection route optimization waste conCity of virginia beach solid waste collection route optimization waste con
City of virginia beach solid waste collection route optimization waste con
 
Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2
 
Briefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning UpdateBriefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning Update
 
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
 
Railway infrastructure construction and upgrading in india and the middle eas...
Railway infrastructure construction and upgrading in india and the middle eas...Railway infrastructure construction and upgrading in india and the middle eas...
Railway infrastructure construction and upgrading in india and the middle eas...
 
Savannah Powerpoint
Savannah PowerpointSavannah Powerpoint
Savannah Powerpoint
 
City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...
City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...
City of Virginia Beach Solid Waste Collection Routing Software Consulting Ser...
 
Cycle 2 Business and Industry Presentation
Cycle 2 Business and Industry PresentationCycle 2 Business and Industry Presentation
Cycle 2 Business and Industry Presentation
 
RTPI 2013 David Hytch
RTPI 2013 David HytchRTPI 2013 David Hytch
RTPI 2013 David Hytch
 
@ UDRI - Traffic & Transportation Plan - Final
@ UDRI - Traffic & Transportation Plan - Final@ UDRI - Traffic & Transportation Plan - Final
@ UDRI - Traffic & Transportation Plan - Final
 
Transport poster
Transport posterTransport poster
Transport poster
 

More from Tristan Wiggill

Business Fleet Africa May 2023.pdf
Business Fleet Africa May 2023.pdfBusiness Fleet Africa May 2023.pdf
Business Fleet Africa May 2023.pdf
Tristan Wiggill
 
Business Fleet Africa April 2023.pdf
Business Fleet Africa April 2023.pdfBusiness Fleet Africa April 2023.pdf
Business Fleet Africa April 2023.pdf
Tristan Wiggill
 
Business Fleet Africa March 2023.pdf
Business Fleet Africa March 2023.pdfBusiness Fleet Africa March 2023.pdf
Business Fleet Africa March 2023.pdf
Tristan Wiggill
 
Business Fleet Africa January 2023.pdf
Business Fleet Africa January 2023.pdfBusiness Fleet Africa January 2023.pdf
Business Fleet Africa January 2023.pdf
Tristan Wiggill
 
Business Fleet Africa December 2022.pdf
Business Fleet Africa December 2022.pdfBusiness Fleet Africa December 2022.pdf
Business Fleet Africa December 2022.pdf
Tristan Wiggill
 
Business Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdfBusiness Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdf
Tristan Wiggill
 
Business Fleet Africa October 2022.pdf
Business Fleet Africa October 2022.pdfBusiness Fleet Africa October 2022.pdf
Business Fleet Africa October 2022.pdf
Tristan Wiggill
 
How do we keep Gauteng moving?
How do we keep Gauteng moving?How do we keep Gauteng moving?
How do we keep Gauteng moving?
Tristan Wiggill
 
Gauteng Transport Authority update
Gauteng Transport Authority updateGauteng Transport Authority update
Gauteng Transport Authority update
Tristan Wiggill
 
Road Funding in South Africa
Road Funding in South AfricaRoad Funding in South Africa
Road Funding in South Africa
Tristan Wiggill
 
Self regulation and road funding perspectives from the road transport managem...
Self regulation and road funding perspectives from the road transport managem...Self regulation and road funding perspectives from the road transport managem...
Self regulation and road funding perspectives from the road transport managem...
Tristan Wiggill
 
Roads: So how do we pay for them?
Roads: So how do we pay for them?Roads: So how do we pay for them?
Roads: So how do we pay for them?
Tristan Wiggill
 
Road funding from a freight forwarding and logistics perspective
Road funding from a freight forwarding and logistics perspectiveRoad funding from a freight forwarding and logistics perspective
Road funding from a freight forwarding and logistics perspective
Tristan Wiggill
 
Feedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Feedback on DRiVE: Distance-based Road user charge Voluntary ExperimentFeedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Feedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Tristan Wiggill
 
E-tolls: The Impact on Development in Gauteng
E-tolls: The Impact on Development in GautengE-tolls: The Impact on Development in Gauteng
E-tolls: The Impact on Development in Gauteng
Tristan Wiggill
 
Transport and the economy: Understanding the relationship...and the dangers
Transport and the economy: Understanding the relationship...and the dangersTransport and the economy: Understanding the relationship...and the dangers
Transport and the economy: Understanding the relationship...and the dangers
Tristan Wiggill
 
Sout Africa's fuel price
Sout Africa's fuel priceSout Africa's fuel price
Sout Africa's fuel price
Tristan Wiggill
 
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
Tristan Wiggill
 
Beneficiaries of an optimally designed transportation system
Beneficiaries of an optimally designed transportation system Beneficiaries of an optimally designed transportation system
Beneficiaries of an optimally designed transportation system
Tristan Wiggill
 
Road Funds and Road User Charging in SADC
Road Funds and Road User Charging in SADC Road Funds and Road User Charging in SADC
Road Funds and Road User Charging in SADC
Tristan Wiggill
 

More from Tristan Wiggill (20)

Business Fleet Africa May 2023.pdf
Business Fleet Africa May 2023.pdfBusiness Fleet Africa May 2023.pdf
Business Fleet Africa May 2023.pdf
 
Business Fleet Africa April 2023.pdf
Business Fleet Africa April 2023.pdfBusiness Fleet Africa April 2023.pdf
Business Fleet Africa April 2023.pdf
 
Business Fleet Africa March 2023.pdf
Business Fleet Africa March 2023.pdfBusiness Fleet Africa March 2023.pdf
Business Fleet Africa March 2023.pdf
 
Business Fleet Africa January 2023.pdf
Business Fleet Africa January 2023.pdfBusiness Fleet Africa January 2023.pdf
Business Fleet Africa January 2023.pdf
 
Business Fleet Africa December 2022.pdf
Business Fleet Africa December 2022.pdfBusiness Fleet Africa December 2022.pdf
Business Fleet Africa December 2022.pdf
 
Business Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdfBusiness Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdf
 
Business Fleet Africa October 2022.pdf
Business Fleet Africa October 2022.pdfBusiness Fleet Africa October 2022.pdf
Business Fleet Africa October 2022.pdf
 
How do we keep Gauteng moving?
How do we keep Gauteng moving?How do we keep Gauteng moving?
How do we keep Gauteng moving?
 
Gauteng Transport Authority update
Gauteng Transport Authority updateGauteng Transport Authority update
Gauteng Transport Authority update
 
Road Funding in South Africa
Road Funding in South AfricaRoad Funding in South Africa
Road Funding in South Africa
 
Self regulation and road funding perspectives from the road transport managem...
Self regulation and road funding perspectives from the road transport managem...Self regulation and road funding perspectives from the road transport managem...
Self regulation and road funding perspectives from the road transport managem...
 
Roads: So how do we pay for them?
Roads: So how do we pay for them?Roads: So how do we pay for them?
Roads: So how do we pay for them?
 
Road funding from a freight forwarding and logistics perspective
Road funding from a freight forwarding and logistics perspectiveRoad funding from a freight forwarding and logistics perspective
Road funding from a freight forwarding and logistics perspective
 
Feedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Feedback on DRiVE: Distance-based Road user charge Voluntary ExperimentFeedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Feedback on DRiVE: Distance-based Road user charge Voluntary Experiment
 
E-tolls: The Impact on Development in Gauteng
E-tolls: The Impact on Development in GautengE-tolls: The Impact on Development in Gauteng
E-tolls: The Impact on Development in Gauteng
 
Transport and the economy: Understanding the relationship...and the dangers
Transport and the economy: Understanding the relationship...and the dangersTransport and the economy: Understanding the relationship...and the dangers
Transport and the economy: Understanding the relationship...and the dangers
 
Sout Africa's fuel price
Sout Africa's fuel priceSout Africa's fuel price
Sout Africa's fuel price
 
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
 
Beneficiaries of an optimally designed transportation system
Beneficiaries of an optimally designed transportation system Beneficiaries of an optimally designed transportation system
Beneficiaries of an optimally designed transportation system
 
Road Funds and Road User Charging in SADC
Road Funds and Road User Charging in SADC Road Funds and Road User Charging in SADC
Road Funds and Road User Charging in SADC
 

Recently uploaded

Kirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium PresentationKirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip
 
Science Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around UsScience Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around Us
PennapaKeavsiri
 
IMG_20240615_091110.pdf dpboss guessing
IMG_20240615_091110.pdf dpboss  guessingIMG_20240615_091110.pdf dpboss  guessing
8328958814KALYAN MATKA | MATKA RESULT | KALYAN
8328958814KALYAN MATKA | MATKA RESULT | KALYAN8328958814KALYAN MATKA | MATKA RESULT | KALYAN
8328958814KALYAN MATKA | MATKA RESULT | KALYAN
➑➌➋➑➒➎➑➑➊➍
 
TriStar Gold Corporate Presentation - June 2024
TriStar Gold Corporate Presentation - June 2024TriStar Gold Corporate Presentation - June 2024
TriStar Gold Corporate Presentation - June 2024
Adnet Communications
 
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
IPLTech Electric
 
PDT 99 - $3.5M - Seed - Feel Therapeutics.pdf
PDT 99 - $3.5M - Seed - Feel Therapeutics.pdfPDT 99 - $3.5M - Seed - Feel Therapeutics.pdf
PDT 99 - $3.5M - Seed - Feel Therapeutics.pdf
HajeJanKamps
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
Cover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SUCover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SU
msthrill
 
Enhancing Adoption of AI in Agri-food: Introduction
Enhancing Adoption of AI in Agri-food: IntroductionEnhancing Adoption of AI in Agri-food: Introduction
Enhancing Adoption of AI in Agri-food: Introduction
Cor Verdouw
 
list of states and organizations .pdf
list of  states  and  organizations .pdflist of  states  and  organizations .pdf
list of states and organizations .pdf
Rbc Rbcua
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...
Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...
Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...
dpbossdpboss69
 
The Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac SignThe Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac Sign
my Pandit
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
taqyea
 
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
Herman Kienhuis
 
Lukas Rycek - GreenChemForCE - project structure.pptx
Lukas Rycek - GreenChemForCE - project structure.pptxLukas Rycek - GreenChemForCE - project structure.pptx
Lukas Rycek - GreenChemForCE - project structure.pptx
pavelborek
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 

Recently uploaded (20)

Kirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium PresentationKirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
 
Science Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around UsScience Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around Us
 
IMG_20240615_091110.pdf dpboss guessing
IMG_20240615_091110.pdf dpboss  guessingIMG_20240615_091110.pdf dpboss  guessing
IMG_20240615_091110.pdf dpboss guessing
 
8328958814KALYAN MATKA | MATKA RESULT | KALYAN
8328958814KALYAN MATKA | MATKA RESULT | KALYAN8328958814KALYAN MATKA | MATKA RESULT | KALYAN
8328958814KALYAN MATKA | MATKA RESULT | KALYAN
 
TriStar Gold Corporate Presentation - June 2024
TriStar Gold Corporate Presentation - June 2024TriStar Gold Corporate Presentation - June 2024
TriStar Gold Corporate Presentation - June 2024
 
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
 
PDT 99 - $3.5M - Seed - Feel Therapeutics.pdf
PDT 99 - $3.5M - Seed - Feel Therapeutics.pdfPDT 99 - $3.5M - Seed - Feel Therapeutics.pdf
PDT 99 - $3.5M - Seed - Feel Therapeutics.pdf
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
Cover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SUCover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SU
 
Enhancing Adoption of AI in Agri-food: Introduction
Enhancing Adoption of AI in Agri-food: IntroductionEnhancing Adoption of AI in Agri-food: Introduction
Enhancing Adoption of AI in Agri-food: Introduction
 
list of states and organizations .pdf
list of  states  and  organizations .pdflist of  states  and  organizations .pdf
list of states and organizations .pdf
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...
Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...
Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...
 
The Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac SignThe Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac Sign
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
 
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
 
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
 
Lukas Rycek - GreenChemForCE - project structure.pptx
Lukas Rycek - GreenChemForCE - project structure.pptxLukas Rycek - GreenChemForCE - project structure.pptx
Lukas Rycek - GreenChemForCE - project structure.pptx
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 

Capacity management in large projects

  • 1. Managing Capacity Transport Forum Tshepo Kgobe Senior Executive Manager Technical Services Gautrain Management Agency
  • 2. Contents • Context • Passenger Behavior • Parking & DFDS Capacity • Considerations and Conclusion • Recommendation • ITMP 25 • Extensions
  • 4. Capacity Challenges – Context • The success of the Gautrain operation – Y11 ridership in Y3 • 20%+ Percentage cumulative year on year growth in ridership • AFC System Capacity and Regulatory compliance • EMV Compliance • Physical Rail network and Station layouts • Reduction in headway • Rail passenger behaviour • Parking Capacity • DFDS challenges
  • 6. Capacity Problems– Context Passenger Behavior 0 100 200 300 400 500 600 700 800 900 1000 05:49 06:01 06:13 06:25 06:37 06:49 07:01 07:13 07:25 07:37 07:49 08:01 08:13 08:25 08:37 N-S MR-MB (25-7-2013) Usage Capacity (1.31) Capacity (1.50)
  • 7. Capacity Problems– Context Passenger Behavior 0 100 200 300 400 500 600 700 800 900 1000 05:49 06:01 06:13 06:25 06:37 06:49 07:01 07:13 07:25 07:37 07:49 08:01 08:13 08:25 08:37 N-S MR-MB (12-9-2013) Usage Capacity (1.31) Capacity (1.50)
  • 8. Capacity Problems– Context Passenger Behavior 0 100 200 300 400 500 600 700 800 900 1000 05:49 06:01 06:13 06:25 06:37 06:49 07:01 07:13 07:25 07:37 07:49 08:01 08:13 08:25 08:37 N-S MR-MB (16-1-2014) Usage Capacity (1.31) Capacity (1.50)
  • 9. Capacity Problems– Context Passenger Behavior 0 100 200 300 400 500 600 700 800 900 1000 05:49 06:01 06:13 06:25 06:37 06:49 07:01 07:13 07:25 07:37 07:49 08:01 08:13 08:25 08:37 N-S MR-MB (13-2-2014) Usage Capacity (1.31) Capacity (1.50)
  • 17. Capacity Problems– Rail Capacity • Link loads reach maximum between Centurion and Sandton • Highest link load in Midrand – Marlboro section • Capacity under pressure for about 1½ of the 3 hour peak period per day • Counter flow services are underutilised • Options on current train timetable exhausted • Rolling stock availability under pressure • Challenge is how to alleviate capacity constraints
  • 18. Capacity Problems– Rail Layout • A double-line section shared by the North-South and East-West • Junctions at Marlboro Portal - East-West and North- South services are merged / diverged. • Single-line tunnel sections between Sandton and Rosebank • An at-grade crossing between Pretoria and Hatfield • Scheduled crossing in the platforms at Rosebank Station • Terminal stations restricted to two platforms each • No loop lines outside the depot area • Long signalling blocks
  • 19. Capacity Problems– Parking & DFDS • Parking • Parking capacity is insufficient - Pretoria, Centurion, Midrand, Park, Rosebank and Rhodesfield. • Availability of land at stations • Cost of development vs Recovery/Cost to customers • DFDS • J2 Johannesburg CBD and M3 Sunninghill- Overcrowding • Long bus cycle times • The DFDS bus service footprint
  • 21. Capacity Problems– Trade-off Consideration • Longer trains are more labour efficient • Shorter trains are more energy efficient • Pressure on the available line capacity of the network • • Higher capital and maintenance costs • The capital cost of doubling of an existing single tunnel • Higher service levels/ Consequential delays • Seating Capacity ratio of 1.50 vs. 1.3 vs Cost of service • Jumper/step back drivers could alleviate capacity problems on platform and line capacity.
  • 22. Capacity – Assessment & Conclusions Rail • That 84 additional rolling stock coaches - required by 2026 • Longer platforms would be required at OR Tambo - 2013 • The Rosebank to Park Station single tunnel - full capacity by 2022 • The Sandton to Rosebank single tunnel, full capacity by 2026 • Staging capacity at maintenance depot in Midrand -2016 • The provision of additional line capacity between Marlboro portal and Sandton - required by 2029 • high level junction capacity at Pretoria station - reach capacity by 2018.
  • 23. Assessment & Conclusions Stations, DFDS & Parking • The station design capacities under pressure • OR Tambo Station (from 2013), • Park station entries (2014), • Midrand Station entries (2015), • Sandton Station exits (2016). • Additional parking would be required at seven of the nine station in the next 5 years • Centurion (824),Rhodesfield (535), • Midrand (363), Pretoria (253), • Hatfield (187), Rosebank (148) and Park (70). • Adititonal busses and routes will be required by 2019
  • 25. Capacity – Recommendations • 48 rolling stock coaches are procured starting 2015 • OR Tambo platform be extended - 2014 • Rosebank to Park and Sandton to Rosebank single tunnels be doubled - 2021 • New Depot Staging capacity at the depot in Midrand to be increased • Line capacity between Marlboro and Sandton is increased by 2018 • Investigate Centurion – Sandton short turn shuttle service • A full simulation study of the system to determine bottlenecks • Configure the seats in GPS train sets – 2014 • Shorter headway and the rolling stock implications
  • 26. Capacity - Future actions • Network Assessment will be updated on an annual basis • Integrate land-use strategies for all stations • Determine the long-term GMA financial implications • A full transport integration strategy to be finalised • Prioritise the different activities and create a scheduled project plan • Finalise the rolling stock procurement tender • Finalise the physical infrastructure system optimisation • Finalise new DFDS routes and add new shuttle services • Develop a full integrated plan to incorporate NMT and UA
  • 29. TRANSPORT TRENDS • Sustainable Urban Mobility Planning • Total Carbon Footprint of Public Transport and Mobility • The convergence of Public and Personalised Transport • Smart Mobility – The First/Last Mile is key in Trip Planning – Influencing Commuter Behaviour • Data Centric Mobility – System Convergence and Standardisation • Availability of Information – Information today is pervasive – Web technologies catalyse instant and standard access – Smartphones/tablets catalyse personal access – Open Data • Designing for Sustainability – SMRS – Future Materials
  • 30. COMMUTER CONNECTIVITY REQUIREMENTS • Trip planning • E-commerce – Ticket reloads • Overall Service Status (Live) • Next Arrival for Bus and Railway (Scheduled) • Service maps for bus and train • Weather reports – Morning and Evening • Universal Access - Elevator and Escalator Status • Neighbourhood and station navigation • Reduced mobility Alerts – Roadworks and Detours • Emergency messaging • Advertising/Institutional messages • Customer Queries • Camera and microphone for Customer Service - FaceTime
  • 31. PERSONALISED TRIP INFORMATION REQUIREMENTS • Provide real-time multimodal information • Users expectations of a seamless journey with timely traveller information • Last mile Connectivity • Information system data needs to be effectively integrated to make the information valuable • User experience • Intuitive • Interactive and Adaptive screen • User Interface – Standardised look and Feel • Provides a snapshot of various real-time information in default mode