SlideShare a Scribd company logo
1 of 79
Download to read offline
• Background
• Role of Metrorail in Public Transport
• Challenges facing Metrorail
• Modernisation
• Stakeholder support
• Conclusion
Contents
2
Background
33
PRASA GROUP
PRASA RAIL
INTERSITE
INVESTMENTS
AUTOPAX
(Long distance
coach)
METRORAIL
(Suburban)
S-MEYL
(Long distance)
•Translux
•City to City
PRASA CRES
•Real Estate Solutions
•Facilities Management
PRASA
TECHNICAL
•R/Stock engineering
and maintenance
•Capital Projects
•Leverage investment on
assets
The Primary object of PRASA in terms of the Legal Succession SATS Act is to:
• Provide Urban Rail Commuter Services in the public interest
• Provide Long Haul Passenger Rail Services
• Provide Long Haul Bus Services
The Secondary object of PRASA is to:
• Generate income from the exploitation of assets acquired by PRASA
Background
4
PRASA Organisational Structure
5
Legislative Mandate
Legislative Mandate
• The Primary objective of PRASA according to the Legal Succession Act is to:
– Provide Urban Rail Commuter Services at the request of National
Government
– Provide Long Haul Passenger Services (road and rail)
• The Secondary objective of PRASA according to the Legal Succession Act is to:
– Generate income from the exploitation of assets acquired by PRASA – giving
due regard to National Governments Socio-Economic and Transport
Objectives
• Responsibilities of PRASA
– To effectively develop and manage rail and rail related transport
infrastructure to provide efficient rail and road based passenger transport
within, to and from Urban and Rural areas.
– A further requirement is that, in carrying out its mandate, PRASA shall have
due regard to key Governmental, social, economic and transport policy
objectives
PRASA designated as the force behind Government’s
intention to:
• Develop and drive Public Transport
• Contribute to the good of Integrated Public Transport
• Champion transformation of Public Transport in South
Africa
Government Intention
6
PRASA Rail – Summary Fact Sheet
Total Rail Network 22 300 Km
Commuter Rail Network 2 230 km electrified track
Number of Metro Coaches 4 638
Number of MLPS coaches 1 223 Coaches and 124 Locos
Number of Buses 458 Mercedes Benz, Man 109 and Old Fleet 150
Passenger Numbers Metrorail – 550 million passenger trips
Bus Service – 3.1 million passengers
SMEYL – 1.5 million passengers
Total Number of Employees ±16 000
Stations 498 stations
Value of Assets R36bn
7
Metrorail Western Cape
8
Metrorail Western Cape – Summary fact sheet
9
• Operations
― Operates 702 trains per week day, 360 Saturdays and 230
Sundays)
― Across 6 municipalities (Cape Town, Drakenstein,
Winelands, Breede River, Swartland & Helderberg)
― Train frequency between 3 minutes and 15 minutes in
peak
― Covering +/- 75% of residential areas
― Fleet of 88 train sets plus 6 spare
― Present train punctuality average 78%
― Servicing 14,5 million passengers journeys monthly
― With market share of about 60% public transport
― ISO 9001 accredited
― Member of the International Suburban Rail Benchmarking
Group (ISBeRG)
Metrorail Western Cape – Summary fact sheet
10
• Asset base
― Stations: 128 (132
registered, 128 used of which 94 are manned)
― Track: 489 km (PRASA
owned – 308 route km)
― Reserve: 10400 ha
― Turn outs running lines: 610
― Level crossings: 70
― Demarcated rail reserve: 320 km
― Bridges: 96
― Foot bridges: 19
― Culverts: 380
― Sea walls: 9 km
• Priority Corridor A
– Cape Town to Chris Hani to Kapteinsklip
– Cape Town to Wellington via Mutual, Monte Vista,
Bellville, Kraaifontein
– Cape Town to Simons Town via Retreat via Southfield
• Priority Corridor B
– Bellville to Strand
• Priority Corridor C
– Muldersvlei to Eerste River via Stellenbosch
– Wellington to Worcester
– Kraaifontein to Malmesbury
• Note – Multi Criteria matrix used to determine the relative classification of the corridors
Priority Corridors Western Cape
– existing corridors
11
Metrorail Western Cape
12
Benefits of rail – mode choice
15
Mode Choice Peak
Capacity / h
System Life
(years)
Infra Cost
R mil /km
Ops cost
R/km
Regular Bus 2,500 –
6,000
8 – 14 0,8 - 4 1.06
Bus Rapid
Transit (BRT)
4,000 –
10,000
8 – 14 35 - 60 1.06
Guided Bus 4,000 –
10,000
8 – 14 35 – 200 1.06
Street Tram 12,000 –
20,000
25 - 50 67 - 330 1,88
Light Rapid
Transit (LRT)
12,000 –
20,000
25 - 50 67 - 330 1,88
Tram Train 6,000 –
12,000
25 - 50 67 - 330 1,88
Heavy Rail 20,000 –
60,000
25 - 50 50 - 500 0,5 – 3,0
16
Urbanisation and Rail Revival
16
• Rail benefits cannot be ignored; capacity,
environmental, less land required, permanence /
attract investment, reduce car & fuel reliance etc.
The Public Transport problem can
only be solved though an effective
integrated public transport system
with rail (PRASA) being the
backbone
18
19
Cape Town Global City – Rail City
• Rate of urbanisation and growth projections for SA cities
highlights the need for sustainable transport solutions
• Current trends indicate increase in car trips and ownership.
― the doubling of vehicle ownership since 1994
• There is still significant road based public transport (buses and
taxis) – the increasing congestion on the road network
contributes to an ineffective public transport system
• Urban sprawl contributing to the cost of providing transport
• For cities to work - public transport primary basis for
movement with rail as backbone.
• Passenger rail network as the backbone of the system - key
intervention for integrated transport.
• Investment in Rail – recognition of the importance of rail in
SA.
20
Suburban Rail Priorities
• Rail renewal and modernisation
• Transformational timetable changes (frequency and
speed) to strengthened off-peak services
• Introduction of a more user friendly / “clock-face”
timetable,
• More flexible ticketing with a revised premium offer
• Better modal integration to support land use growth
• Infrastructure enhancements including higher speed
running
• Creation of an enhanced and customer focussed ‘Metro’
service
• Strengthened passenger security and enhanced station
facilities
• Aligning PRASA planning with broader stakeholder
priorities
• Potential network extensions where rail is the most
appropriate
Historically, there has been a lack of investment in the Rail Industry;
however, there are large capital projects planned going forward
Projected Expenditure by Freight and Passenger Rail
during 2013-2023
Historic Capital Spend in the Rail Industry (1991-
2009)1
 The average spend on capital projects
during 1991 – 2009 was ~R 740mil.pa
 Total capital spend was ~R 14bn over 19
years
 Freight Rail has a forecasted spend of ~R 300bn
towards large capital investment programmes
over the next 10 years
 Passenger Rail is estimating to invest
~R 172.3bn on key capital programmes over
the next 10 years
 Transport mega infrastructure investment
estimated over the next 10 years is ~R 823bn;
which is ~5800% greater than the period
1991 – 2009 (19 years)
R 823bn
Total Transport
Mega Projects1
Freight Rail2
R 300bn
R 172.3bn
Passenger Rail3
21
Challenges facing Rail due
to decades of underinvestment
22
 Railway infrastructure, rolling stock and technology
has reached the end of its design lifespan
 Poor levels of reliability and predictability
 High costs of maintenance
 Failure to contribute to an efficient transport system
 Overcrowding, slow journey times, poor modal
integration
 Inability to support economic activity
 Limited access to socio-economic opportunities for
rural and urban poor.
 Open System – Settlements on the rail reserve.
 Economic and Structural Viability, factors include
long distances, low densities and low income
commuters
 The last train sets were purchased in the mid 1980s
 Technology is old and inherently obsolete - 1950s
22
 Bold strategy to:
 Modernise rail to meet travel demand & customer
expectation
 Create a modern public entity with
 Human;
 Financial;
 Technical; and
 Operational capacity
 Deliver quality passenger services on a sustainable and
affordable basis
 Acquire 600 new trains (3600 coaches)
 Gazetted April 2014 (Government funding of R51b)
PRASA’s Strategic Role
23
– Impact of under investment over a number of
years
What faces Metrorail ?
24
Operating environment
25
Operating environment: Mother Nature
26
Obsolescence and age
28
Response: Replace vs. Refurbish
29
30
Response: Replace vs. Refurbish
– Impact of under investment over a number of
years
– Severe retaliation from our Community at large
What faces Metrorail ?
31
User behaviour
32
Vandalism
33
Operating environment
34
– Impact of under investment over a number of
years
– Severe retaliation from our users
– Unprecedented onslaught by criminal elements
What faces Metrorail ?
35
Operating environment
36
Response : Target hardening
37
– Impact of under investment over a number of
years
– Severe retaliation from our users
– Unprecedented onslaught by criminal elements
– Increasing vulnerability of our environment
What faces Metrorail ?
38
Socio-economic environment
39
– Impact of under investment over a number of
years
– Severe retaliation from our users
– Unprecedented onslaught by criminal elements
– Increasing vulnerability of our environment
– Still share the network with Transnet
What faces Metrorail ?
40
41
Modernisation
WHAT is MODERNISATION???
42
Modernisation
– Changing the “Psychological Makeup ” of the
organisation to become focussed on compliance with
the customers requirements and service delivery
– Entrench modern human capital development
practices and techniques to ensure that employees
reach there maximum potential to ensure consistent
service delivery
– Use technology to its best potential to achieve
optimal performance of assets and the operational
systems
– Be comparatively aligned with international
performance norms - ISBERG
Media Coverage
43
PRASA’s Capital Investment Outlook
PRASA3
R 172.3bn
Other
Transport
Mega
Projects2
R 650.7bn
Total
Transport
Mega
Projects2
R 823.0 bn
Capital Project Breakdown for Key Programmes in PRASA’s Capital investment portfolio
(2013 – 2023)1
R 2.0bn
R 2.9bn
R 3.0bn
R 3.1bn
R 3.3bn
R 3.8bn
R 4.0bn
R 4.0bn
R 4.8bn
R 5.6bn
R 8.5bn
R 15.2bn
R 21.0bn
R 26.2bn
R 64.9bn
R 172.3bn
44
• Rolling Stock Fleet Renewal Program - R 54,2 Billion
• General Overhaul of Metrorail Coaches - R 26,2 Billion
• Signals and Telecommunication Renewal Program - R 21 Billion
• Station Improvement and Facilities Upgrade Program - R 15,2 Billion
• Depot Infrastructure and Equipment Upgrade - R 9,5 Billion
• Capital Intervention program (Minor Works, Safety, SNP) - R 5,6 Billion
• New Locomotives and refurbishment of Mail Line Passenger Service Fleet- R 4,8 Billion
• Electrical Program – Substations, Transmission Lines, OHTE - R 4 Billion
• 120km/h Perway upgrade program - R 4 Billion
• ICT System upgrades and improvements - R 2,8Billion
• National Speed Gate Program - R 2,2 Billion
• Corridor Optimisation and Upgrades - R 2,1
Billion
• Asset Protection Program - R 2 Billion
• Rolling Stock Facilities - R 2 Billion
• Station Modernisation Program – 134 Stations - R 2 Billion
• TOTAL - R 172,2 Billion
PRASA’s Capital Investment Outlook and
Modernisation Program
45
46
Rail Modernisation
47
Corridor Modernisation – Priority
• Modernisation to take place at three levels
– Operational efficiency and effectiveness
• 5 Point Plan and Operational Turn Around and
recovery
– Modernisation Projects
• Mega Projects
• Supplementary Projects
• Property Development Projects
• Shared and 3rd Party Projects
• Expansion to the network
– Continuous Operational Improvement and Viability
Metrorail Western Cape
Modernisation Program
48
49
Execution
5-Point Improvement Plan
Service redesign Rolling stock
deployment
Infrastructure
rehabilitation
Security Operational
Safety
• Timetable
improvement
• Overcrowding
minimization
• Reduction in journey
times
• Strategic
deployment of
rolling stock
• Alignment of
capacity to demand
(train sets and
configuration)
• Allocate Technicians
as backup to
corridors
• Ability to manage
current risks and
constraints
• Reduction of speed
restrictions
• Execution of
maintenance plans
• Supply Chain
Management
support (enabler)
• Acquire appropriate
tools and
equipment
• Strategic deployment
of resources to
protect assets,
employees and
commuters.
• Zero tolerance to
safety and security
breach
• Appropriate
resources, tools and
equipment
• Uniform clothing
• Compliance to
Human Factors
Management
• Reduction of
SPADs and
collisions
• Visible safety
campaigns
(closing doors;
level crossing;
platform
marshals)
• MEGA Projects
• Rolling Stock Recapitalisation
o Depot Modernisation Program
• Signalling Recapitalisation
o Replacement of Trunk Radio
• Priority Corridor Modernisation and Improvement
• Supplementary Projects
• Safety Related Projects (Capital Intervention Program (CIP))
• Operational improvements
• Property development
• National Station Precinct Development Program
• Shared funded projects
• City of Cape Town
• Provincial Government of Western Cape
• Tri Party
• Private Sector
• Network expansions
PRASA Investment Plan and Modernisation Projects
50
• MEGA Projects
• Rolling Stock Recapitalisation
o Depot Modernisation Program
PRASA Investment Plan and Modernisation Projects
56
Rolling Stock Fleet Renewal Programme
57
Rolling Stock
Fleet Renewal
Programme
Modern Fleet
• PRASA wants to migrate from
1950’s technology to a modern
fleet which is up to world
standards
Programme Requirements
• New Fleet requirement ~7224
procurement at ~360 coaches per
year for two x 10 year contracts
• Total ~R123.5bn over 20 year period
Job Creation
• Creating ~65 000 direct and
indirect jobs
Industrialisation
• Focus on industrialisation through
long term procurement aiming for
above 65% of the value of a coach to
be produced locally
57
59
Dream
60
ExteriorReality
61
Reality
62
• R123bn programme over 20 year period
• First coaches 2016
• Phase 1: Gibela Rail Transport Consortium
• 3600 coaches: roll-out over 10 years
• R51bn
• BEE partner appointed
• Financial / Commercial Close – April 2014
• Localisation (min 65%) and job creation
(±60 000)
Rollout program
-
1 000
2 000
3 000
4 000
5 000
6 000
7 000
8 000
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
Number
8M Salvaged5M Salvaged10M 5M 5MGO 5MGO C2 10M 10MGO 10MGO C2 NewRS
– Rolling Stock Recapitalisation
• Scope
– Replace full Metrorail fleet include additional capacity over 18 year
period
– Phase 1 (2015 – 2025)
» 3600 vehicles
» Metro – 1215 passengers per 6 coach module
» Metro Express – 1025 passengers per 6 coach module
» SNP accessible
» 120 km/hour
» Internal Communications and security systems
» Automatic Train Protection
• Status
– Phase 1 - completed and preferred supplier appointed – Gibela Rail
Transport Consortium (ALSTOM the technology partner)
– Delivery of first test trains expected 2015/16
– Deployment to regions 2016 onwards
– First train sets to be manufactured in Brazil, main production to take
place in South Africa
63
PRASA Investment program - MEGA projects
6464
• R123bn programme over 20 year period
• First coaches 2016
• Phase 1: Gibela Rail Transport Consortium
• 3600 coaches: roll-out over 10 years
• R51bn
• BEE partner appointed
• Financial / Commercial Close – April 2014
• Localisation (min 65%) and job creation (±60
000)
New Generation Rolling Stock
-
1 000
2 000
3 000
4 000
5 000
6 000
7 000
8 000
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
Number
8M Salvaged 5M Salvaged 10M 5M 5MGO 5MGO C2 10M 10MGO 10MGO C2 New RS
Key Features of a Modern Train (1/3)
Right for the PRASA railway of the future:
• 3 600 vehicles – 600 Trains (6 coach modules)
• 1,346 passengers per 6-car train (Metro)
• 1,186 passengers per 6-car train (Metro Express)
• Commitment to PRASA reliability targets
• 31% energy saving compared to 8M Stock
• Design life of 40 years
• Real time diagnostic data for maintenance planning
• Passenger counting for operations planning
65
66
Salt River Depot Upgrade
67
Design and construct (5) fully functional
modern maintenance depots that will be able
to support and service:
– PRASA’s new metro train sets by the time the
first new train sets are delivered in 2016.
– PRASA’s existing metro train sets up until 2034.
– MTEF R1.9bn
68
www.prasa.com
70
71
• MEGA Projects
• Rolling Stock Recapitalisation
o Depot Modernisation Program
• Signalling Recapitalisation
o Replacement of Trunk Radio
PRASA Investment Plan and Modernisation Projects
72
Signaling Renewal
73
• Current Signaling: Only 14% not exceeded design life; obsolete technology; challenge
with maintenance and spares
• Commencing immediately with building blocks towards
– envisioned signaling system (in cab):
– Replace current signaling (interlocking).
– New train control centres.
– Increase operational safety, capacity and train performance.
– Align first phase signaling installation with new rolling stock delivery program.
• Phase 1: ± R7 billion
ACTION COST (R x bn) ANTICIPATED COMPLETION
Gauteng 1 R1.1 11/04/2016
Durban region R1.3 13/05/2018
W Cape region R1.8 22/05/2018
Gauteng 2 R2.7 30/06/2020
73
Resignalling Project
74
• MEGA Projects
• Rolling Stock Recapitalisation
o Depot Modernisation Program
• Signalling Recapitalisation
o Replacement of Trunk Radio
• Priority Corridor Modernisation and Improvement
PRASA Investment Plan and Modernisation Projects
75
Station Modernisation (including ISAMS Project)
76
• 135 stations prioritised for upgrade
• Phase 1: 27 Stations
• Construction to commence on 14 stations -
2014/15
• Cape Town – Philippi and Nolungile stations
• Station building
• Integrated Station Access Management
Solutions (ISAMS)
• Speed gates
• Electronic information displays
• PA systems
• CCTV
• Intermodal facilities, walkways / NMT
• Commercial opportunities
• MTEF – R1.5bn
77
New stations
Philippi
Mandalay
78
New stations
Philippi
Mandalay
Nolungile
Bonteheuwel
79
New stations
Philippi
Mandalay
Lentegeur
Stock Road
Philippi Station
80
PHILIPPI CONCOURSE: New Station
Building
81
PHILIPPI CONCOURSE: New Station
Building
82
PHILIPPI CONCOURSE: New Station
Building
83
PHILIPPI CONCOURSE: New Station
Building
84
• MEGA Projects
• Rolling Stock Recapitalisation
o Depot Modernisation Program
• Signalling Recapitalisation
o Replacement of Trunk Radio
• Priority Corridor Modernisation and Improvement
• Supplementary Projects
• Safety Related Projects (Capital Intervention Program (CIP))
• Operational improvements
PRASA Investment Plan and Modernisation Projects
85
• MEGA Projects
• Rolling Stock Recapitalisation
o Depot Modernisation Program
• Signalling Recapitalisation
o Replacement of Trunk Radio
• Priority Corridor Modernisation and Improvement
• Supplementary Projects
• Safety Related Projects (Capital Intervention Program (CIP))
o Perway rehabilitation
o Electrical upgrades
o Telecommunications
o Rolling Stock
o ICT
PRASA Investment Plan and Modernisation Projects
86
87
120 km/h Perway & Electrical Programme
• The upgrade of line speeds for PRASA network to
120km/h (160km/h for express trains on priority lines
where possible)
• Replacement of rails, turnouts, sleepers etc.
• Drainage upgrading, ballast screening, refurbish rails via
grinding,
• Re-alignment of track and capacity improvements
• Upgrade of OHTE and Traction Substations
• MTEF – R1.6bn
Sleeper & Rail Replacement Machine Catenary Maintenance Vehicle Ballast Screening Machine
Phase 1
• Philippi Station
Phase 2a
• Nolungile Station
• Lentegeur Station
• Bonteheuwel Station
• Mandalay Station
• Stock Road Station
Phase 2b
• Khayelitsha Station
• Nonkqubela Station
• Mutual Station
• Bellville Station
• Heideveld Station
• Pinelands Station
• Ndabeni Station
• Maitland Station
• Koeberg Road Station
• Salt River Station
• Netreg Station
• Ysterplaat Station
• Esplanade Station
• Nyanga Station
• Woodstock Station
• Kuyasa Station
• Chris Hani Station
• Kapteinsklip Station
Station Upgrade
88
Conclusions
• Assets of Metrorail are reaching the end of
their life cycle
• Metrorail is facing serious external challenges
• PRASA has a positive response to this matter
• “The Future is Here”
• Significant progress on key projects
• Stakeholder Ownership
89
THANK YOU ENKOSI DANKIE
92

More Related Content

What's hot

PPP in public bus transport - Why and Models
PPP in public bus transport - Why and ModelsPPP in public bus transport - Why and Models
PPP in public bus transport - Why and ModelsJalpa Jain
 
Traffic control system and its management
Traffic control system and its managementTraffic control system and its management
Traffic control system and its managementMdMahbuburRahamanMur
 
Analysis of Impact of East West Metro Corridor on Land Use
Analysis of Impact of East West Metro Corridor on Land UseAnalysis of Impact of East West Metro Corridor on Land Use
Analysis of Impact of East West Metro Corridor on Land UseAnirban Mahajan
 
Presentation on research proposal on traffic jam in dhaka city by Md. Litan M...
Presentation on research proposal on traffic jam in dhaka city by Md. Litan M...Presentation on research proposal on traffic jam in dhaka city by Md. Litan M...
Presentation on research proposal on traffic jam in dhaka city by Md. Litan M...Md. Litan Mia
 
MUMBAI METRO TRAIN
MUMBAI METRO TRAINMUMBAI METRO TRAIN
MUMBAI METRO TRAINNithy Anand
 
Makkah Metro - Makkah Mass Rail Project (MMRP)
Makkah Metro - Makkah Mass Rail Project (MMRP)Makkah Metro - Makkah Mass Rail Project (MMRP)
Makkah Metro - Makkah Mass Rail Project (MMRP)Ibrahim Al-Hudhaif
 
India Logistics Infrastructure
India Logistics InfrastructureIndia Logistics Infrastructure
India Logistics Infrastructurerajeevchopra
 
Presentation_(CST) Metro Rail an overview of Dhaka
Presentation_(CST) Metro Rail an overview of DhakaPresentation_(CST) Metro Rail an overview of Dhaka
Presentation_(CST) Metro Rail an overview of DhakaSumiya Rahman Anha
 
Smart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of DelhiSmart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of DelhiJaspal Singh
 
Impact of Different Types of Land Use on Transportation System of Dhaka City ...
Impact of Different Types of Land Use on Transportation System of Dhaka City ...Impact of Different Types of Land Use on Transportation System of Dhaka City ...
Impact of Different Types of Land Use on Transportation System of Dhaka City ...Shahadat Hossain Shakil
 
Indian railway logistics1 aaditya 12mt07ind001
Indian railway logistics1 aaditya 12mt07ind001Indian railway logistics1 aaditya 12mt07ind001
Indian railway logistics1 aaditya 12mt07ind001samjune
 
Freight transport systems
Freight transport systemsFreight transport systems
Freight transport systemsPeanakyMridha
 

What's hot (20)

PPP in public bus transport - Why and Models
PPP in public bus transport - Why and ModelsPPP in public bus transport - Why and Models
PPP in public bus transport - Why and Models
 
Traffic control system and its management
Traffic control system and its managementTraffic control system and its management
Traffic control system and its management
 
04 transport modelling
04 transport modelling04 transport modelling
04 transport modelling
 
Analysis of Impact of East West Metro Corridor on Land Use
Analysis of Impact of East West Metro Corridor on Land UseAnalysis of Impact of East West Metro Corridor on Land Use
Analysis of Impact of East West Metro Corridor on Land Use
 
Railway budget
Railway budget  Railway budget
Railway budget
 
Presentation on research proposal on traffic jam in dhaka city by Md. Litan M...
Presentation on research proposal on traffic jam in dhaka city by Md. Litan M...Presentation on research proposal on traffic jam in dhaka city by Md. Litan M...
Presentation on research proposal on traffic jam in dhaka city by Md. Litan M...
 
PPT on Monorail
PPT on MonorailPPT on Monorail
PPT on Monorail
 
Sustainable Transportation
Sustainable TransportationSustainable Transportation
Sustainable Transportation
 
Cmrl ppt
Cmrl pptCmrl ppt
Cmrl ppt
 
MUMBAI METRO TRAIN
MUMBAI METRO TRAINMUMBAI METRO TRAIN
MUMBAI METRO TRAIN
 
Bullet Train in India
Bullet Train in IndiaBullet Train in India
Bullet Train in India
 
Makkah Metro - Makkah Mass Rail Project (MMRP)
Makkah Metro - Makkah Mass Rail Project (MMRP)Makkah Metro - Makkah Mass Rail Project (MMRP)
Makkah Metro - Makkah Mass Rail Project (MMRP)
 
India Logistics Infrastructure
India Logistics InfrastructureIndia Logistics Infrastructure
India Logistics Infrastructure
 
TRAINING ON METRO TRAIN
TRAINING ON METRO TRAINTRAINING ON METRO TRAIN
TRAINING ON METRO TRAIN
 
Presentation_(CST) Metro Rail an overview of Dhaka
Presentation_(CST) Metro Rail an overview of DhakaPresentation_(CST) Metro Rail an overview of Dhaka
Presentation_(CST) Metro Rail an overview of Dhaka
 
Smart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of DelhiSmart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of Delhi
 
Impact of Different Types of Land Use on Transportation System of Dhaka City ...
Impact of Different Types of Land Use on Transportation System of Dhaka City ...Impact of Different Types of Land Use on Transportation System of Dhaka City ...
Impact of Different Types of Land Use on Transportation System of Dhaka City ...
 
Indian railway logistics1 aaditya 12mt07ind001
Indian railway logistics1 aaditya 12mt07ind001Indian railway logistics1 aaditya 12mt07ind001
Indian railway logistics1 aaditya 12mt07ind001
 
Freight transport systems
Freight transport systemsFreight transport systems
Freight transport systems
 
GCC Railway
GCC RailwayGCC Railway
GCC Railway
 

Viewers also liked

Unido rythm working group presentation prasa 2010
Unido rythm working group presentation prasa 2010Unido rythm working group presentation prasa 2010
Unido rythm working group presentation prasa 2010UNIDO SA
 
Road safety legal/litigation issues in South Africa
Road safety legal/litigation issues in South AfricaRoad safety legal/litigation issues in South Africa
Road safety legal/litigation issues in South AfricaTristan Wiggill
 
S45C-616021508210
S45C-616021508210S45C-616021508210
S45C-616021508210Daniel S
 
Key responsibilities and applied skills
Key responsibilities and applied skillsKey responsibilities and applied skills
Key responsibilities and applied skillsHussein Fahmy
 
PayPal coverage report_New Monday_14dec12
PayPal coverage report_New Monday_14dec12PayPal coverage report_New Monday_14dec12
PayPal coverage report_New Monday_14dec12PayPalHK
 
Rendicion cuentas
Rendicion cuentasRendicion cuentas
Rendicion cuentascejotaz
 
Zonal constructores de paz
Zonal constructores de pazZonal constructores de paz
Zonal constructores de pazcejotaz
 
Inhibition of bacterial soft rot (Poster)
Inhibition of bacterial soft rot (Poster)Inhibition of bacterial soft rot (Poster)
Inhibition of bacterial soft rot (Poster)Tony Ng
 
Factory presentation
Factory presentationFactory presentation
Factory presentationShelly Xu
 
IRCTC,Indian Railway Catering and Tourism Corporation
IRCTC,Indian Railway Catering and Tourism CorporationIRCTC,Indian Railway Catering and Tourism Corporation
IRCTC,Indian Railway Catering and Tourism CorporationMicky Lyf
 
3 Powerful CEOs in the Philanthropic World
3 Powerful CEOs in the Philanthropic World3 Powerful CEOs in the Philanthropic World
3 Powerful CEOs in the Philanthropic WorldJohn Partilla
 
Development theories
Development theoriesDevelopment theories
Development theoriesSteven Heath
 
Modernization and Role of Education in the Process of Modernization
Modernization and Role of Education in the Process of ModernizationModernization and Role of Education in the Process of Modernization
Modernization and Role of Education in the Process of ModernizationVijayalakshmi Murugesan
 

Viewers also liked (20)

Unido rythm working group presentation prasa 2010
Unido rythm working group presentation prasa 2010Unido rythm working group presentation prasa 2010
Unido rythm working group presentation prasa 2010
 
Road safety legal/litigation issues in South Africa
Road safety legal/litigation issues in South AfricaRoad safety legal/litigation issues in South Africa
Road safety legal/litigation issues in South Africa
 
S45C-616021508210
S45C-616021508210S45C-616021508210
S45C-616021508210
 
Stephanie Scott Resume
Stephanie Scott ResumeStephanie Scott Resume
Stephanie Scott Resume
 
Vol VCA
Vol VCAVol VCA
Vol VCA
 
Key responsibilities and applied skills
Key responsibilities and applied skillsKey responsibilities and applied skills
Key responsibilities and applied skills
 
PayPal coverage report_New Monday_14dec12
PayPal coverage report_New Monday_14dec12PayPal coverage report_New Monday_14dec12
PayPal coverage report_New Monday_14dec12
 
PhD seminar
PhD seminarPhD seminar
PhD seminar
 
Rendicion cuentas
Rendicion cuentasRendicion cuentas
Rendicion cuentas
 
Gustav CV
Gustav CVGustav CV
Gustav CV
 
Drug
DrugDrug
Drug
 
Zonal constructores de paz
Zonal constructores de pazZonal constructores de paz
Zonal constructores de paz
 
Inhibition of bacterial soft rot (Poster)
Inhibition of bacterial soft rot (Poster)Inhibition of bacterial soft rot (Poster)
Inhibition of bacterial soft rot (Poster)
 
Resume - Beulah
Resume - BeulahResume - Beulah
Resume - Beulah
 
Factory presentation
Factory presentationFactory presentation
Factory presentation
 
IRCTC,Indian Railway Catering and Tourism Corporation
IRCTC,Indian Railway Catering and Tourism CorporationIRCTC,Indian Railway Catering and Tourism Corporation
IRCTC,Indian Railway Catering and Tourism Corporation
 
3 Powerful CEOs in the Philanthropic World
3 Powerful CEOs in the Philanthropic World3 Powerful CEOs in the Philanthropic World
3 Powerful CEOs in the Philanthropic World
 
Development theories
Development theoriesDevelopment theories
Development theories
 
Modernization and Role of Education in the Process of Modernization
Modernization and Role of Education in the Process of ModernizationModernization and Role of Education in the Process of Modernization
Modernization and Role of Education in the Process of Modernization
 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare ppt
 

Similar to What PRASA is doing to improve the passenger rail service in the Western Cape

Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...BRTCoE
 
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...BRTCoE
 
Defining public transport routes for tod 8 october 2013 daisy dwango
Defining public transport routes for tod 8 october 2013 daisy dwangoDefining public transport routes for tod 8 october 2013 daisy dwango
Defining public transport routes for tod 8 october 2013 daisy dwangoReaVaya_KM
 
Fbe Transport presentation
Fbe Transport presentationFbe Transport presentation
Fbe Transport presentationFBE Manchester
 
Transforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
Transforming Urban Mobility in Africa: A Strong Institution, a PrerequisiteTransforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
Transforming Urban Mobility in Africa: A Strong Institution, a PrerequisiteWRI Ross Center for Sustainable Cities
 
Department of Transport update on transport corridors
Department of Transport update on transport corridorsDepartment of Transport update on transport corridors
Department of Transport update on transport corridorsTristan Wiggill
 
Vision plan spur 11.30 presentation - hires
Vision plan   spur 11.30 presentation - hiresVision plan   spur 11.30 presentation - hires
Vision plan spur 11.30 presentation - hiresAdina Levin
 
Upgrading and Extending Passenger Services
Upgrading and Extending Passenger ServicesUpgrading and Extending Passenger Services
Upgrading and Extending Passenger ServicesRailways and Harbours
 
London's Crossrail Scheme - its evolution, governance, financing and challenges
London's Crossrail Scheme  - its evolution, governance, financing and challengesLondon's Crossrail Scheme  - its evolution, governance, financing and challenges
London's Crossrail Scheme - its evolution, governance, financing and challengesInstitute for Transport Studies (ITS)
 
Network Rail - passengers and freight
Network Rail - passengers and freightNetwork Rail - passengers and freight
Network Rail - passengers and freightBogdan Ciocoiu
 
Draft Feasibility report of the railway system in Karachi
Draft Feasibility report of the railway system in KarachiDraft Feasibility report of the railway system in Karachi
Draft Feasibility report of the railway system in KarachiUmer Mover
 
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...SMART Infrastructure Facility
 
Policy conundrums in urban transport
Policy conundrums in urban transportPolicy conundrums in urban transport
Policy conundrums in urban transportTristan Wiggill
 
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveHigh Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveRajesh Prasad
 
The public transport integration challenge: what role for the fiscal system?
The public transport integration challenge: what role for the fiscal system?The public transport integration challenge: what role for the fiscal system?
The public transport integration challenge: what role for the fiscal system?Tristan Wiggill
 
Feasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik CityFeasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik CityIRJET Journal
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015Norma Nun
 

Similar to What PRASA is doing to improve the passenger rail service in the Western Cape (20)

Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
 
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
 
Defining public transport routes for tod 8 october 2013 daisy dwango
Defining public transport routes for tod 8 october 2013 daisy dwangoDefining public transport routes for tod 8 october 2013 daisy dwango
Defining public transport routes for tod 8 october 2013 daisy dwango
 
Brett herron
Brett herronBrett herron
Brett herron
 
Fbe Transport presentation
Fbe Transport presentationFbe Transport presentation
Fbe Transport presentation
 
Transforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
Transforming Urban Mobility in Africa: A Strong Institution, a PrerequisiteTransforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
Transforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
 
Department of Transport update on transport corridors
Department of Transport update on transport corridorsDepartment of Transport update on transport corridors
Department of Transport update on transport corridors
 
Vision plan spur 11.30 presentation - hires
Vision plan   spur 11.30 presentation - hiresVision plan   spur 11.30 presentation - hires
Vision plan spur 11.30 presentation - hires
 
Upgrading and Extending Passenger Services
Upgrading and Extending Passenger ServicesUpgrading and Extending Passenger Services
Upgrading and Extending Passenger Services
 
London's Crossrail Scheme - its evolution, governance, financing and challenges
London's Crossrail Scheme  - its evolution, governance, financing and challengesLondon's Crossrail Scheme  - its evolution, governance, financing and challenges
London's Crossrail Scheme - its evolution, governance, financing and challenges
 
Network Rail - passengers and freight
Network Rail - passengers and freightNetwork Rail - passengers and freight
Network Rail - passengers and freight
 
Draft Feasibility report of the railway system in Karachi
Draft Feasibility report of the railway system in KarachiDraft Feasibility report of the railway system in Karachi
Draft Feasibility report of the railway system in Karachi
 
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...
 
MyCiTi Cape Town IRT System
MyCiTi Cape Town IRT SystemMyCiTi Cape Town IRT System
MyCiTi Cape Town IRT System
 
Innovation in Transnet
Innovation in TransnetInnovation in Transnet
Innovation in Transnet
 
Policy conundrums in urban transport
Policy conundrums in urban transportPolicy conundrums in urban transport
Policy conundrums in urban transport
 
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveHigh Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
 
The public transport integration challenge: what role for the fiscal system?
The public transport integration challenge: what role for the fiscal system?The public transport integration challenge: what role for the fiscal system?
The public transport integration challenge: what role for the fiscal system?
 
Feasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik CityFeasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik City
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015
 

More from Tristan Wiggill

Business Fleet Africa May 2023.pdf
Business Fleet Africa May 2023.pdfBusiness Fleet Africa May 2023.pdf
Business Fleet Africa May 2023.pdfTristan Wiggill
 
Business Fleet Africa April 2023.pdf
Business Fleet Africa April 2023.pdfBusiness Fleet Africa April 2023.pdf
Business Fleet Africa April 2023.pdfTristan Wiggill
 
Business Fleet Africa March 2023.pdf
Business Fleet Africa March 2023.pdfBusiness Fleet Africa March 2023.pdf
Business Fleet Africa March 2023.pdfTristan Wiggill
 
Business Fleet Africa January 2023.pdf
Business Fleet Africa January 2023.pdfBusiness Fleet Africa January 2023.pdf
Business Fleet Africa January 2023.pdfTristan Wiggill
 
Business Fleet Africa December 2022.pdf
Business Fleet Africa December 2022.pdfBusiness Fleet Africa December 2022.pdf
Business Fleet Africa December 2022.pdfTristan Wiggill
 
Business Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdfBusiness Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdfTristan Wiggill
 
Business Fleet Africa October 2022.pdf
Business Fleet Africa October 2022.pdfBusiness Fleet Africa October 2022.pdf
Business Fleet Africa October 2022.pdfTristan Wiggill
 
How do we keep Gauteng moving?
How do we keep Gauteng moving?How do we keep Gauteng moving?
How do we keep Gauteng moving?Tristan Wiggill
 
Gauteng Transport Authority update
Gauteng Transport Authority updateGauteng Transport Authority update
Gauteng Transport Authority updateTristan Wiggill
 
Road Funding in South Africa
Road Funding in South AfricaRoad Funding in South Africa
Road Funding in South AfricaTristan Wiggill
 
Self regulation and road funding perspectives from the road transport managem...
Self regulation and road funding perspectives from the road transport managem...Self regulation and road funding perspectives from the road transport managem...
Self regulation and road funding perspectives from the road transport managem...Tristan Wiggill
 
Roads: So how do we pay for them?
Roads: So how do we pay for them?Roads: So how do we pay for them?
Roads: So how do we pay for them?Tristan Wiggill
 
Road funding from a freight forwarding and logistics perspective
Road funding from a freight forwarding and logistics perspectiveRoad funding from a freight forwarding and logistics perspective
Road funding from a freight forwarding and logistics perspectiveTristan Wiggill
 
Feedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Feedback on DRiVE: Distance-based Road user charge Voluntary ExperimentFeedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Feedback on DRiVE: Distance-based Road user charge Voluntary ExperimentTristan Wiggill
 
E-tolls: The Impact on Development in Gauteng
E-tolls: The Impact on Development in GautengE-tolls: The Impact on Development in Gauteng
E-tolls: The Impact on Development in GautengTristan Wiggill
 
Transport and the economy: Understanding the relationship...and the dangers
Transport and the economy: Understanding the relationship...and the dangersTransport and the economy: Understanding the relationship...and the dangers
Transport and the economy: Understanding the relationship...and the dangersTristan Wiggill
 
Sout Africa's fuel price
Sout Africa's fuel priceSout Africa's fuel price
Sout Africa's fuel priceTristan Wiggill
 
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...Tristan Wiggill
 
Beneficiaries of an optimally designed transportation system
Beneficiaries of an optimally designed transportation system Beneficiaries of an optimally designed transportation system
Beneficiaries of an optimally designed transportation system Tristan Wiggill
 
Road Funds and Road User Charging in SADC
Road Funds and Road User Charging in SADC Road Funds and Road User Charging in SADC
Road Funds and Road User Charging in SADC Tristan Wiggill
 

More from Tristan Wiggill (20)

Business Fleet Africa May 2023.pdf
Business Fleet Africa May 2023.pdfBusiness Fleet Africa May 2023.pdf
Business Fleet Africa May 2023.pdf
 
Business Fleet Africa April 2023.pdf
Business Fleet Africa April 2023.pdfBusiness Fleet Africa April 2023.pdf
Business Fleet Africa April 2023.pdf
 
Business Fleet Africa March 2023.pdf
Business Fleet Africa March 2023.pdfBusiness Fleet Africa March 2023.pdf
Business Fleet Africa March 2023.pdf
 
Business Fleet Africa January 2023.pdf
Business Fleet Africa January 2023.pdfBusiness Fleet Africa January 2023.pdf
Business Fleet Africa January 2023.pdf
 
Business Fleet Africa December 2022.pdf
Business Fleet Africa December 2022.pdfBusiness Fleet Africa December 2022.pdf
Business Fleet Africa December 2022.pdf
 
Business Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdfBusiness Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdf
 
Business Fleet Africa October 2022.pdf
Business Fleet Africa October 2022.pdfBusiness Fleet Africa October 2022.pdf
Business Fleet Africa October 2022.pdf
 
How do we keep Gauteng moving?
How do we keep Gauteng moving?How do we keep Gauteng moving?
How do we keep Gauteng moving?
 
Gauteng Transport Authority update
Gauteng Transport Authority updateGauteng Transport Authority update
Gauteng Transport Authority update
 
Road Funding in South Africa
Road Funding in South AfricaRoad Funding in South Africa
Road Funding in South Africa
 
Self regulation and road funding perspectives from the road transport managem...
Self regulation and road funding perspectives from the road transport managem...Self regulation and road funding perspectives from the road transport managem...
Self regulation and road funding perspectives from the road transport managem...
 
Roads: So how do we pay for them?
Roads: So how do we pay for them?Roads: So how do we pay for them?
Roads: So how do we pay for them?
 
Road funding from a freight forwarding and logistics perspective
Road funding from a freight forwarding and logistics perspectiveRoad funding from a freight forwarding and logistics perspective
Road funding from a freight forwarding and logistics perspective
 
Feedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Feedback on DRiVE: Distance-based Road user charge Voluntary ExperimentFeedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Feedback on DRiVE: Distance-based Road user charge Voluntary Experiment
 
E-tolls: The Impact on Development in Gauteng
E-tolls: The Impact on Development in GautengE-tolls: The Impact on Development in Gauteng
E-tolls: The Impact on Development in Gauteng
 
Transport and the economy: Understanding the relationship...and the dangers
Transport and the economy: Understanding the relationship...and the dangersTransport and the economy: Understanding the relationship...and the dangers
Transport and the economy: Understanding the relationship...and the dangers
 
Sout Africa's fuel price
Sout Africa's fuel priceSout Africa's fuel price
Sout Africa's fuel price
 
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
 
Beneficiaries of an optimally designed transportation system
Beneficiaries of an optimally designed transportation system Beneficiaries of an optimally designed transportation system
Beneficiaries of an optimally designed transportation system
 
Road Funds and Road User Charging in SADC
Road Funds and Road User Charging in SADC Road Funds and Road User Charging in SADC
Road Funds and Road User Charging in SADC
 

Recently uploaded

Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 

Recently uploaded (20)

Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 

What PRASA is doing to improve the passenger rail service in the Western Cape

  • 1. • Background • Role of Metrorail in Public Transport • Challenges facing Metrorail • Modernisation • Stakeholder support • Conclusion Contents 2
  • 2. Background 33 PRASA GROUP PRASA RAIL INTERSITE INVESTMENTS AUTOPAX (Long distance coach) METRORAIL (Suburban) S-MEYL (Long distance) •Translux •City to City PRASA CRES •Real Estate Solutions •Facilities Management PRASA TECHNICAL •R/Stock engineering and maintenance •Capital Projects •Leverage investment on assets The Primary object of PRASA in terms of the Legal Succession SATS Act is to: • Provide Urban Rail Commuter Services in the public interest • Provide Long Haul Passenger Rail Services • Provide Long Haul Bus Services The Secondary object of PRASA is to: • Generate income from the exploitation of assets acquired by PRASA
  • 4. 5 Legislative Mandate Legislative Mandate • The Primary objective of PRASA according to the Legal Succession Act is to: – Provide Urban Rail Commuter Services at the request of National Government – Provide Long Haul Passenger Services (road and rail) • The Secondary objective of PRASA according to the Legal Succession Act is to: – Generate income from the exploitation of assets acquired by PRASA – giving due regard to National Governments Socio-Economic and Transport Objectives • Responsibilities of PRASA – To effectively develop and manage rail and rail related transport infrastructure to provide efficient rail and road based passenger transport within, to and from Urban and Rural areas. – A further requirement is that, in carrying out its mandate, PRASA shall have due regard to key Governmental, social, economic and transport policy objectives
  • 5. PRASA designated as the force behind Government’s intention to: • Develop and drive Public Transport • Contribute to the good of Integrated Public Transport • Champion transformation of Public Transport in South Africa Government Intention 6
  • 6. PRASA Rail – Summary Fact Sheet Total Rail Network 22 300 Km Commuter Rail Network 2 230 km electrified track Number of Metro Coaches 4 638 Number of MLPS coaches 1 223 Coaches and 124 Locos Number of Buses 458 Mercedes Benz, Man 109 and Old Fleet 150 Passenger Numbers Metrorail – 550 million passenger trips Bus Service – 3.1 million passengers SMEYL – 1.5 million passengers Total Number of Employees ±16 000 Stations 498 stations Value of Assets R36bn 7
  • 8. Metrorail Western Cape – Summary fact sheet 9 • Operations ― Operates 702 trains per week day, 360 Saturdays and 230 Sundays) ― Across 6 municipalities (Cape Town, Drakenstein, Winelands, Breede River, Swartland & Helderberg) ― Train frequency between 3 minutes and 15 minutes in peak ― Covering +/- 75% of residential areas ― Fleet of 88 train sets plus 6 spare ― Present train punctuality average 78% ― Servicing 14,5 million passengers journeys monthly ― With market share of about 60% public transport ― ISO 9001 accredited ― Member of the International Suburban Rail Benchmarking Group (ISBeRG)
  • 9. Metrorail Western Cape – Summary fact sheet 10 • Asset base ― Stations: 128 (132 registered, 128 used of which 94 are manned) ― Track: 489 km (PRASA owned – 308 route km) ― Reserve: 10400 ha ― Turn outs running lines: 610 ― Level crossings: 70 ― Demarcated rail reserve: 320 km ― Bridges: 96 ― Foot bridges: 19 ― Culverts: 380 ― Sea walls: 9 km
  • 10. • Priority Corridor A – Cape Town to Chris Hani to Kapteinsklip – Cape Town to Wellington via Mutual, Monte Vista, Bellville, Kraaifontein – Cape Town to Simons Town via Retreat via Southfield • Priority Corridor B – Bellville to Strand • Priority Corridor C – Muldersvlei to Eerste River via Stellenbosch – Wellington to Worcester – Kraaifontein to Malmesbury • Note – Multi Criteria matrix used to determine the relative classification of the corridors Priority Corridors Western Cape – existing corridors 11
  • 12. Benefits of rail – mode choice 15 Mode Choice Peak Capacity / h System Life (years) Infra Cost R mil /km Ops cost R/km Regular Bus 2,500 – 6,000 8 – 14 0,8 - 4 1.06 Bus Rapid Transit (BRT) 4,000 – 10,000 8 – 14 35 - 60 1.06 Guided Bus 4,000 – 10,000 8 – 14 35 – 200 1.06 Street Tram 12,000 – 20,000 25 - 50 67 - 330 1,88 Light Rapid Transit (LRT) 12,000 – 20,000 25 - 50 67 - 330 1,88 Tram Train 6,000 – 12,000 25 - 50 67 - 330 1,88 Heavy Rail 20,000 – 60,000 25 - 50 50 - 500 0,5 – 3,0
  • 13. 16 Urbanisation and Rail Revival 16 • Rail benefits cannot be ignored; capacity, environmental, less land required, permanence / attract investment, reduce car & fuel reliance etc.
  • 14. The Public Transport problem can only be solved though an effective integrated public transport system with rail (PRASA) being the backbone 18
  • 15. 19 Cape Town Global City – Rail City • Rate of urbanisation and growth projections for SA cities highlights the need for sustainable transport solutions • Current trends indicate increase in car trips and ownership. ― the doubling of vehicle ownership since 1994 • There is still significant road based public transport (buses and taxis) – the increasing congestion on the road network contributes to an ineffective public transport system • Urban sprawl contributing to the cost of providing transport • For cities to work - public transport primary basis for movement with rail as backbone. • Passenger rail network as the backbone of the system - key intervention for integrated transport. • Investment in Rail – recognition of the importance of rail in SA.
  • 16. 20 Suburban Rail Priorities • Rail renewal and modernisation • Transformational timetable changes (frequency and speed) to strengthened off-peak services • Introduction of a more user friendly / “clock-face” timetable, • More flexible ticketing with a revised premium offer • Better modal integration to support land use growth • Infrastructure enhancements including higher speed running • Creation of an enhanced and customer focussed ‘Metro’ service • Strengthened passenger security and enhanced station facilities • Aligning PRASA planning with broader stakeholder priorities • Potential network extensions where rail is the most appropriate
  • 17. Historically, there has been a lack of investment in the Rail Industry; however, there are large capital projects planned going forward Projected Expenditure by Freight and Passenger Rail during 2013-2023 Historic Capital Spend in the Rail Industry (1991- 2009)1  The average spend on capital projects during 1991 – 2009 was ~R 740mil.pa  Total capital spend was ~R 14bn over 19 years  Freight Rail has a forecasted spend of ~R 300bn towards large capital investment programmes over the next 10 years  Passenger Rail is estimating to invest ~R 172.3bn on key capital programmes over the next 10 years  Transport mega infrastructure investment estimated over the next 10 years is ~R 823bn; which is ~5800% greater than the period 1991 – 2009 (19 years) R 823bn Total Transport Mega Projects1 Freight Rail2 R 300bn R 172.3bn Passenger Rail3 21
  • 18. Challenges facing Rail due to decades of underinvestment 22  Railway infrastructure, rolling stock and technology has reached the end of its design lifespan  Poor levels of reliability and predictability  High costs of maintenance  Failure to contribute to an efficient transport system  Overcrowding, slow journey times, poor modal integration  Inability to support economic activity  Limited access to socio-economic opportunities for rural and urban poor.  Open System – Settlements on the rail reserve.  Economic and Structural Viability, factors include long distances, low densities and low income commuters  The last train sets were purchased in the mid 1980s  Technology is old and inherently obsolete - 1950s 22
  • 19.  Bold strategy to:  Modernise rail to meet travel demand & customer expectation  Create a modern public entity with  Human;  Financial;  Technical; and  Operational capacity  Deliver quality passenger services on a sustainable and affordable basis  Acquire 600 new trains (3600 coaches)  Gazetted April 2014 (Government funding of R51b) PRASA’s Strategic Role 23
  • 20. – Impact of under investment over a number of years What faces Metrorail ? 24
  • 24. Response: Replace vs. Refurbish 29
  • 26. – Impact of under investment over a number of years – Severe retaliation from our Community at large What faces Metrorail ? 31
  • 30. – Impact of under investment over a number of years – Severe retaliation from our users – Unprecedented onslaught by criminal elements What faces Metrorail ? 35
  • 32. Response : Target hardening 37
  • 33. – Impact of under investment over a number of years – Severe retaliation from our users – Unprecedented onslaught by criminal elements – Increasing vulnerability of our environment What faces Metrorail ? 38
  • 35. – Impact of under investment over a number of years – Severe retaliation from our users – Unprecedented onslaught by criminal elements – Increasing vulnerability of our environment – Still share the network with Transnet What faces Metrorail ? 40
  • 37. 42 Modernisation – Changing the “Psychological Makeup ” of the organisation to become focussed on compliance with the customers requirements and service delivery – Entrench modern human capital development practices and techniques to ensure that employees reach there maximum potential to ensure consistent service delivery – Use technology to its best potential to achieve optimal performance of assets and the operational systems – Be comparatively aligned with international performance norms - ISBERG
  • 39. PRASA’s Capital Investment Outlook PRASA3 R 172.3bn Other Transport Mega Projects2 R 650.7bn Total Transport Mega Projects2 R 823.0 bn Capital Project Breakdown for Key Programmes in PRASA’s Capital investment portfolio (2013 – 2023)1 R 2.0bn R 2.9bn R 3.0bn R 3.1bn R 3.3bn R 3.8bn R 4.0bn R 4.0bn R 4.8bn R 5.6bn R 8.5bn R 15.2bn R 21.0bn R 26.2bn R 64.9bn R 172.3bn 44
  • 40. • Rolling Stock Fleet Renewal Program - R 54,2 Billion • General Overhaul of Metrorail Coaches - R 26,2 Billion • Signals and Telecommunication Renewal Program - R 21 Billion • Station Improvement and Facilities Upgrade Program - R 15,2 Billion • Depot Infrastructure and Equipment Upgrade - R 9,5 Billion • Capital Intervention program (Minor Works, Safety, SNP) - R 5,6 Billion • New Locomotives and refurbishment of Mail Line Passenger Service Fleet- R 4,8 Billion • Electrical Program – Substations, Transmission Lines, OHTE - R 4 Billion • 120km/h Perway upgrade program - R 4 Billion • ICT System upgrades and improvements - R 2,8Billion • National Speed Gate Program - R 2,2 Billion • Corridor Optimisation and Upgrades - R 2,1 Billion • Asset Protection Program - R 2 Billion • Rolling Stock Facilities - R 2 Billion • Station Modernisation Program – 134 Stations - R 2 Billion • TOTAL - R 172,2 Billion PRASA’s Capital Investment Outlook and Modernisation Program 45
  • 43. • Modernisation to take place at three levels – Operational efficiency and effectiveness • 5 Point Plan and Operational Turn Around and recovery – Modernisation Projects • Mega Projects • Supplementary Projects • Property Development Projects • Shared and 3rd Party Projects • Expansion to the network – Continuous Operational Improvement and Viability Metrorail Western Cape Modernisation Program 48
  • 44. 49 Execution 5-Point Improvement Plan Service redesign Rolling stock deployment Infrastructure rehabilitation Security Operational Safety • Timetable improvement • Overcrowding minimization • Reduction in journey times • Strategic deployment of rolling stock • Alignment of capacity to demand (train sets and configuration) • Allocate Technicians as backup to corridors • Ability to manage current risks and constraints • Reduction of speed restrictions • Execution of maintenance plans • Supply Chain Management support (enabler) • Acquire appropriate tools and equipment • Strategic deployment of resources to protect assets, employees and commuters. • Zero tolerance to safety and security breach • Appropriate resources, tools and equipment • Uniform clothing • Compliance to Human Factors Management • Reduction of SPADs and collisions • Visible safety campaigns (closing doors; level crossing; platform marshals)
  • 45. • MEGA Projects • Rolling Stock Recapitalisation o Depot Modernisation Program • Signalling Recapitalisation o Replacement of Trunk Radio • Priority Corridor Modernisation and Improvement • Supplementary Projects • Safety Related Projects (Capital Intervention Program (CIP)) • Operational improvements • Property development • National Station Precinct Development Program • Shared funded projects • City of Cape Town • Provincial Government of Western Cape • Tri Party • Private Sector • Network expansions PRASA Investment Plan and Modernisation Projects 50
  • 46. • MEGA Projects • Rolling Stock Recapitalisation o Depot Modernisation Program PRASA Investment Plan and Modernisation Projects 56
  • 47. Rolling Stock Fleet Renewal Programme 57 Rolling Stock Fleet Renewal Programme Modern Fleet • PRASA wants to migrate from 1950’s technology to a modern fleet which is up to world standards Programme Requirements • New Fleet requirement ~7224 procurement at ~360 coaches per year for two x 10 year contracts • Total ~R123.5bn over 20 year period Job Creation • Creating ~65 000 direct and indirect jobs Industrialisation • Focus on industrialisation through long term procurement aiming for above 65% of the value of a coach to be produced locally 57
  • 51. 62 • R123bn programme over 20 year period • First coaches 2016 • Phase 1: Gibela Rail Transport Consortium • 3600 coaches: roll-out over 10 years • R51bn • BEE partner appointed • Financial / Commercial Close – April 2014 • Localisation (min 65%) and job creation (±60 000) Rollout program - 1 000 2 000 3 000 4 000 5 000 6 000 7 000 8 000 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Number 8M Salvaged5M Salvaged10M 5M 5MGO 5MGO C2 10M 10MGO 10MGO C2 NewRS
  • 52. – Rolling Stock Recapitalisation • Scope – Replace full Metrorail fleet include additional capacity over 18 year period – Phase 1 (2015 – 2025) » 3600 vehicles » Metro – 1215 passengers per 6 coach module » Metro Express – 1025 passengers per 6 coach module » SNP accessible » 120 km/hour » Internal Communications and security systems » Automatic Train Protection • Status – Phase 1 - completed and preferred supplier appointed – Gibela Rail Transport Consortium (ALSTOM the technology partner) – Delivery of first test trains expected 2015/16 – Deployment to regions 2016 onwards – First train sets to be manufactured in Brazil, main production to take place in South Africa 63 PRASA Investment program - MEGA projects
  • 53. 6464 • R123bn programme over 20 year period • First coaches 2016 • Phase 1: Gibela Rail Transport Consortium • 3600 coaches: roll-out over 10 years • R51bn • BEE partner appointed • Financial / Commercial Close – April 2014 • Localisation (min 65%) and job creation (±60 000) New Generation Rolling Stock - 1 000 2 000 3 000 4 000 5 000 6 000 7 000 8 000 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Number 8M Salvaged 5M Salvaged 10M 5M 5MGO 5MGO C2 10M 10MGO 10MGO C2 New RS
  • 54. Key Features of a Modern Train (1/3) Right for the PRASA railway of the future: • 3 600 vehicles – 600 Trains (6 coach modules) • 1,346 passengers per 6-car train (Metro) • 1,186 passengers per 6-car train (Metro Express) • Commitment to PRASA reliability targets • 31% energy saving compared to 8M Stock • Design life of 40 years • Real time diagnostic data for maintenance planning • Passenger counting for operations planning 65
  • 56. 67 Design and construct (5) fully functional modern maintenance depots that will be able to support and service: – PRASA’s new metro train sets by the time the first new train sets are delivered in 2016. – PRASA’s existing metro train sets up until 2034. – MTEF R1.9bn
  • 57. 68
  • 59. 70
  • 60. 71
  • 61. • MEGA Projects • Rolling Stock Recapitalisation o Depot Modernisation Program • Signalling Recapitalisation o Replacement of Trunk Radio PRASA Investment Plan and Modernisation Projects 72
  • 62. Signaling Renewal 73 • Current Signaling: Only 14% not exceeded design life; obsolete technology; challenge with maintenance and spares • Commencing immediately with building blocks towards – envisioned signaling system (in cab): – Replace current signaling (interlocking). – New train control centres. – Increase operational safety, capacity and train performance. – Align first phase signaling installation with new rolling stock delivery program. • Phase 1: ± R7 billion ACTION COST (R x bn) ANTICIPATED COMPLETION Gauteng 1 R1.1 11/04/2016 Durban region R1.3 13/05/2018 W Cape region R1.8 22/05/2018 Gauteng 2 R2.7 30/06/2020 73
  • 64. • MEGA Projects • Rolling Stock Recapitalisation o Depot Modernisation Program • Signalling Recapitalisation o Replacement of Trunk Radio • Priority Corridor Modernisation and Improvement PRASA Investment Plan and Modernisation Projects 75
  • 65. Station Modernisation (including ISAMS Project) 76 • 135 stations prioritised for upgrade • Phase 1: 27 Stations • Construction to commence on 14 stations - 2014/15 • Cape Town – Philippi and Nolungile stations • Station building • Integrated Station Access Management Solutions (ISAMS) • Speed gates • Electronic information displays • PA systems • CCTV • Intermodal facilities, walkways / NMT • Commercial opportunities • MTEF – R1.5bn
  • 70. PHILIPPI CONCOURSE: New Station Building 81
  • 71. PHILIPPI CONCOURSE: New Station Building 82
  • 72. PHILIPPI CONCOURSE: New Station Building 83
  • 73. PHILIPPI CONCOURSE: New Station Building 84
  • 74. • MEGA Projects • Rolling Stock Recapitalisation o Depot Modernisation Program • Signalling Recapitalisation o Replacement of Trunk Radio • Priority Corridor Modernisation and Improvement • Supplementary Projects • Safety Related Projects (Capital Intervention Program (CIP)) • Operational improvements PRASA Investment Plan and Modernisation Projects 85
  • 75. • MEGA Projects • Rolling Stock Recapitalisation o Depot Modernisation Program • Signalling Recapitalisation o Replacement of Trunk Radio • Priority Corridor Modernisation and Improvement • Supplementary Projects • Safety Related Projects (Capital Intervention Program (CIP)) o Perway rehabilitation o Electrical upgrades o Telecommunications o Rolling Stock o ICT PRASA Investment Plan and Modernisation Projects 86
  • 76. 87 120 km/h Perway & Electrical Programme • The upgrade of line speeds for PRASA network to 120km/h (160km/h for express trains on priority lines where possible) • Replacement of rails, turnouts, sleepers etc. • Drainage upgrading, ballast screening, refurbish rails via grinding, • Re-alignment of track and capacity improvements • Upgrade of OHTE and Traction Substations • MTEF – R1.6bn Sleeper & Rail Replacement Machine Catenary Maintenance Vehicle Ballast Screening Machine
  • 77. Phase 1 • Philippi Station Phase 2a • Nolungile Station • Lentegeur Station • Bonteheuwel Station • Mandalay Station • Stock Road Station Phase 2b • Khayelitsha Station • Nonkqubela Station • Mutual Station • Bellville Station • Heideveld Station • Pinelands Station • Ndabeni Station • Maitland Station • Koeberg Road Station • Salt River Station • Netreg Station • Ysterplaat Station • Esplanade Station • Nyanga Station • Woodstock Station • Kuyasa Station • Chris Hani Station • Kapteinsklip Station Station Upgrade 88
  • 78. Conclusions • Assets of Metrorail are reaching the end of their life cycle • Metrorail is facing serious external challenges • PRASA has a positive response to this matter • “The Future is Here” • Significant progress on key projects • Stakeholder Ownership 89
  • 79. THANK YOU ENKOSI DANKIE 92