Outline

IWFM Groundwater Process

  Groundwater Budget

  Z-Budget

C2VSim Results
IWFM Groundwater Process
IWFM
IWFM Groundwater Process
IWFM Groundwater Process
Inflows:
  Deep Percolation
  Surface Water
  Storage
IWFM Groundwater Process
Inflows:                 Outflows:
  Deep Percolation        Pumping
                     =
  Surface Water           Surface Water
  Storage                 Storage
IWFM Groundwater Process
• Simulate a combination of confined,
  unconfined, and leaky aquifer layers separated
  by aquitards or aquicludes
• Simulate changing aquifer conditions and
  subsidence
• Employ a quasi 3-D approach
• Use the Galerkin finite element method for the
  numerical solution of the governing equation
IWFM Groundwater Process
Simulate the aquifer as unconfined, leaky and confined aquifers
separated by aquitards or aquicludes
Stratigraphy
       ‘Hangs’ from Ground
       Surface

          250 ft




            60 ft


           -20 ft



          -280 ft
Groundwater Flow Equation
∂Ssh       
    − ∇ ( T ∇h) + IuLu (h − hu ) + IdLd (h − hd ) − Q = 0
 ∂t
Ss      = Storativity, (dimensionless);
h       = Groundwater head, (L);
T       = Transmissivity = Kh, (L2/T);
K       =
        Hydraulic conductivity; (L/T);
hs      =
        Saturated thickness of aquifer, (L);
t       =
        Time (T);
Iu,Id   =
        Indicator functions for top and bottom aquifer, (dimensionless);
hu,hd   =
        Groundwater head at adjacent upper and lower
        aquifer layers, (L/T);
Lu,Ld = Leakage coefficients of adjacent upper and lower
        aquifer layers, (1/T);
Q     = Source/sink term, (L/T).
Groundwater Parameters
Groundwater Parameters
Hydraulic Conductivity
Layer 1         Layer 2
Storage Parameters
Layer 1       Layer 2
Faults
– Battle Creek Fault
– Red Bluff Arch
– Plainfield Ridge
  Anticline
– Pittsburgh – Kirby
  Hills – Vaca Fault
– Vernalis Fault
– Graveley Ford Faults
– Visalia Fault
– Pond-Poso Creek
  Fault
– Edison Fault
– White Wolf Fault
Flow Barrier Parameters




          Red Bluff Arch
Unsaturated Zone
        • Vertical water flow
          between root zone
          and water table
          – In: Deep Percolation
          – Out: Net Deep
            Percolation
        • Divide into two layers
          of equal thickness
Unsaturated Zone Parameters
Groundwater Boundary Conditions
                 x Specified head
                 x Specified flow
                 x General head
                   boundary conditions
                 • Small stream
                   watersheds as
                   dynamically
                   computed flow
                   boundary conditions
Pumping
Pumping by well
– Used when exact location and
  construction details of wells are known
– Pumping at the well is distributed to
  aquifer layers based on the screened
  interval of the well in an aquifer layer

– Well locations described in
  Preprocessor Well Data File

– Well information specified in
  Pumping Specification File
Pumping Specification
     Urban Groundwater Pumping
Pumping
Pumping by element
– Used when detailed well information is
  not available, but pumping amounts
  for an area that is represented by
  multiple finite element cells are known
– Pumping is distributed horizontally to
  cells with respect to developed area in
  each cell (surrogate for water demand)
– In each cell, pumping is distributed to
  aquifer layers based on user specified
  fractions
Pumping Specification
   Agricultural Groundwater Pumping
Pumping Rates
Tile Drains
• Tile drains are simulated as
  general head boundary
  conditions:                              ground surface


     Qtd Ctd  ztd − h
      =      
                           
                              ≤ 0         water table            tile drain
                          

     Qtd   =   tile drain flow, [L3/T]
     Ctd   =   conductance, [L2/T]                h         ztd
     ztd   =   tile drain elevation, [L]
     h     =   groundwater head, [L]                                           datum



•   Tile drain flows can be directed
    into specified stream nodes or
    outside the model area
Tile Drains
11 tile drains – water goes to San Luis Drain outlet
Land Surface Subsidence
Aquifer Subsidence
  •   Optional simulation of elastic and                  CONFINING LAYER
      inelastic compaction of interbed
                                                                                   AQUIFER
      materials
  •   Storage change due to subsidence is              INTERBEDS

      added to the groundwater equation
                                                          CONFINING LAYER

                                                               
                               Ssebo    if h > hc               −∆hSsebo   if h > hc
      ∂h ; S'
= S's =
 qs                            
                                                =  ; ∆b         
                                                               
      ∂t    s
                                                               
                               Ssibo   if h ≤ hc                −∆hSsibo   if h ≤ hc
                                                               

          qs    = rate of inflow or outflow due to subsidence, (L/T)
          Sse   = elastic specific storage, (1/L)
          Ssi   = inelastic specific storage, (1/L)
          bo    = interbed thickness, (L)
          hc    = pre-consolidation head, (L)
          ∆h    = change in groundwater head, (L)
          ∆b    = change interbed thickness, (L)
Subsidence Parameters
Stream Flow and Stream-Aquifer
            Interaction
• Assumption of zero storage at
  a stream node in computing
  stream flows; i.e. total inflow
  equals total outflow
• Fully coupled stream and
  groundwater conservation
  equations
• Simultaneous solution of
  stream and groundwater
  equations results in the
  computation of stream-aquifer
  interaction
Initial Conditions
Initial Conditions
IWFM Groundwater Output
• Groundwater heads at each time step
    – Tabular file
    – Teclot file
•   Hydrographs at specified locations
•   Groundwater Budget Tables
•   Z-Budget Tables
•   Final condition (initial condition format)
Water Table Altitude
                  Produced from IWFM’s TecPlot® output files




October 1, 1921                           September 30, 2009


                                                               35
36
Groundwater Heads
Final Condition
• Initial condition file for future run
Groundwater Hydrographs
Groundwater Hydrographs
                                               Well ID = 26N02W29N001M


            300


            275


            250


            225


            200


            175
Head (ft)




            150


            125


            100


            75
                        Obs
                        BaseSim
            50          ComparisonSim
                        LSE Avg
            25          LSE Max
                        LSE Min

              0
             10/1921   10/1931      10/1941   10/1951    10/1961    10/1971   10/1981   10/1991   10/2001
                                                           Date
Groundwater Hydrographs
                                                   Well ID = 17N04E30R001M


            300


            250


            200


            150


            100
Head (ft)




             50


              0


             -50
                        Obs
                        BaseSim

            -100        ComparisonSim
                        LSE Avg
                        LSE Max
            -150        LSE Min



            -200
              10/1921   10/1931         10/1941   10/1951    10/1961    10/1971   10/1981   10/1991   10/2001
                                                               Date
Groundwater Heads
Groundwater Budget
Column                      Flow     08/31/2004 Process
Deep Percolation             IN          221,215  RZ
Beginning Storage (+)              2,912,112,878
Ending Storage (-)                 2,910,935,231
Net Deep Percolation (+)    IN           354,874  UZ
Gain from Stream (+)        +/-         -107,640  SW
Recharge (+)                IN           218,671  LS
Gain from Lake (+)          +/-           -1,939  SW
Boundary Inflow (+)         IN            90,456 SWS
Subsidence (+)                            32,908
Subsurface Irrigation (+)    IN                0  LS
Tile Drain Outflow (-)      OUT            1,060  SW
Pumping (-)                 OUT        1,763,915  LS
Net Subsurface Inflow (+)   +/-                0 GW
Discrepancy (=)                             0.60
Cumulative Subsidence                 10,492,618
Z-Budget
Column                        Flow     IN          OUT      Process
GW Storage                           1,032,516       93,444
Streams                       +/-      170,660      240,835   SW
Tile Drains                   OUT             0       1,515   SW
Subsidence                              84,392          791
Net Deep Percolation           IN      265,135            0    LS
Small Watershed Baseflow       IN       90,386            0 SWS
Small Watershed Percolation    IN            70           0 SWS
Diversion Recoverable Loss     IN      197,964            0   SW
Bypass Recoverable Loss        IN       29,637            0   SW
Lakes                         +/-        5,140        7,524   SW
Pumping by Element            OUT             0   1,366,092    LS
Pumping by Well               OUT             0     165,699    LS
Overall Zone Error                        -0.42
Z-Budget
Column                        Flow   IN        OUT     Process
GW Storage                           169,453    37,852
Streams                       +/-     94,764   138,619   SW
Tile Drains                   OUT          0         0   SW
Subsidence                               706       220
Net Deep Percolation           IN     74,426         0    LS
Small Watershed Baseflow       IN     68,330         0 SWS
Small Watershed Percolation    IN         70         0 SWS
Diversion Recoverable Loss     IN     58,427         0   SW
Bypass Recoverable Loss        IN          0         0   SW
Lakes                         +/-          0         0   SW
Pumping by Element            OUT          0   247,307    LS
Pumping by Well               OUT          0    41,451    LS
Zones 1 and 2                 +/-      2,448       830
Zones 1 and 3                 +/-        395     2,738
Overall Zone Error                      0.00
Deep Percolation
Groundwater Depletion
Groundwater Depletion
Water Balance
Head Difference, 1922-1965
   Layer 1       Layer 2
Head Difference, 1965-2009
   Layer 1       Layer 2
Groundwater Depletion
        1922-2009
Groundwater Depletion
        2000-2009
Groundwater Pumping
       2000-2009
Recharge and Deep Percolation
Recharge and Deep Percolation
            1922-2009
Groundwater Pumping
Groundwater Pumping
       2000-2009
End

More Related Content

What's hot

Well Logging: 03 SP log 01
Well Logging: 03 SP log 01Well Logging: 03 SP log 01
Well Logging: 03 SP log 01
khaled Zidan
 
Well Logging: 03 SP log 02
Well Logging: 03 SP log 02Well Logging: 03 SP log 02
Well Logging: 03 SP log 02
khaled Zidan
 
Permeability sivakugan (Complete Soil Mech. Undestanding Pakage: ABHAY)
Permeability sivakugan (Complete Soil Mech. Undestanding Pakage: ABHAY)Permeability sivakugan (Complete Soil Mech. Undestanding Pakage: ABHAY)
Permeability sivakugan (Complete Soil Mech. Undestanding Pakage: ABHAY)
Abhay Kumar
 
Draft survey calculation_sheet_2010.1
Draft survey calculation_sheet_2010.1Draft survey calculation_sheet_2010.1
Draft survey calculation_sheet_2010.1
Paulo Ricardo
 
Cairn case study
Cairn case studyCairn case study
Cairn case study
Swapnil Pal
 
well logging tools and exercise_dileep p allavarapu
well logging tools and exercise_dileep p allavarapuwell logging tools and exercise_dileep p allavarapu
well logging tools and exercise_dileep p allavarapu
knigh7
 
Well Log Analysis
Well Log AnalysisWell Log Analysis
Well Log Analysis
Sanjan Das
 
radial flow pumping test
radial flow pumping testradial flow pumping test
radial flow pumping test
Fatonah Munsai
 
Aquifer test and estimation
Aquifer test and estimationAquifer test and estimation
Aquifer test and estimation
Putika Ashfar Khoiri
 
Oslo university basic well log analysis introduction
Oslo university basic well log analysis   introductionOslo university basic well log analysis   introduction
Oslo university basic well log analysis introduction
Javier Espinoza
 
Well Log Interpretation and Petrophysical Analisis in [Autosaved]
Well Log Interpretation and Petrophysical Analisis in [Autosaved]Well Log Interpretation and Petrophysical Analisis in [Autosaved]
Well Log Interpretation and Petrophysical Analisis in [Autosaved]
Ridho Nanda Pratama
 
Wk 2 weight estimate
Wk 2 weight estimateWk 2 weight estimate
Wk 2 weight estimate
Muhammad Adli Bin Ja'affar
 
Sp log
Sp logSp log
Sp log
Shah Naseer
 
SP Log
SP Log SP Log
SP Log
Zubair Kamboh
 
Q921 log lec5 v1
Q921 log lec5 v1Q921 log lec5 v1
Q921 log lec5 v1
AFATous
 
Non equilibrium equation for unsteady radial flow
Non equilibrium equation for unsteady radial flowNon equilibrium equation for unsteady radial flow
Non equilibrium equation for unsteady radial flow
Abhishek Gupta
 
Presantation picket plot
Presantation picket plotPresantation picket plot
Presantation picket plot
Hammad Ahmad Sheikh
 
Archie formula
Archie formulaArchie formula
Archie formula
israr01
 
Well Logging: 01 borehole environment
Well Logging: 01 borehole environmentWell Logging: 01 borehole environment
Well Logging: 01 borehole environment
khaled Zidan
 
Pumping test
Pumping testPumping test
Pumping test
Ajitha Aji
 

What's hot (20)

Well Logging: 03 SP log 01
Well Logging: 03 SP log 01Well Logging: 03 SP log 01
Well Logging: 03 SP log 01
 
Well Logging: 03 SP log 02
Well Logging: 03 SP log 02Well Logging: 03 SP log 02
Well Logging: 03 SP log 02
 
Permeability sivakugan (Complete Soil Mech. Undestanding Pakage: ABHAY)
Permeability sivakugan (Complete Soil Mech. Undestanding Pakage: ABHAY)Permeability sivakugan (Complete Soil Mech. Undestanding Pakage: ABHAY)
Permeability sivakugan (Complete Soil Mech. Undestanding Pakage: ABHAY)
 
Draft survey calculation_sheet_2010.1
Draft survey calculation_sheet_2010.1Draft survey calculation_sheet_2010.1
Draft survey calculation_sheet_2010.1
 
Cairn case study
Cairn case studyCairn case study
Cairn case study
 
well logging tools and exercise_dileep p allavarapu
well logging tools and exercise_dileep p allavarapuwell logging tools and exercise_dileep p allavarapu
well logging tools and exercise_dileep p allavarapu
 
Well Log Analysis
Well Log AnalysisWell Log Analysis
Well Log Analysis
 
radial flow pumping test
radial flow pumping testradial flow pumping test
radial flow pumping test
 
Aquifer test and estimation
Aquifer test and estimationAquifer test and estimation
Aquifer test and estimation
 
Oslo university basic well log analysis introduction
Oslo university basic well log analysis   introductionOslo university basic well log analysis   introduction
Oslo university basic well log analysis introduction
 
Well Log Interpretation and Petrophysical Analisis in [Autosaved]
Well Log Interpretation and Petrophysical Analisis in [Autosaved]Well Log Interpretation and Petrophysical Analisis in [Autosaved]
Well Log Interpretation and Petrophysical Analisis in [Autosaved]
 
Wk 2 weight estimate
Wk 2 weight estimateWk 2 weight estimate
Wk 2 weight estimate
 
Sp log
Sp logSp log
Sp log
 
SP Log
SP Log SP Log
SP Log
 
Q921 log lec5 v1
Q921 log lec5 v1Q921 log lec5 v1
Q921 log lec5 v1
 
Non equilibrium equation for unsteady radial flow
Non equilibrium equation for unsteady radial flowNon equilibrium equation for unsteady radial flow
Non equilibrium equation for unsteady radial flow
 
Presantation picket plot
Presantation picket plotPresantation picket plot
Presantation picket plot
 
Archie formula
Archie formulaArchie formula
Archie formula
 
Well Logging: 01 borehole environment
Well Logging: 01 borehole environmentWell Logging: 01 borehole environment
Well Logging: 01 borehole environment
 
Pumping test
Pumping testPumping test
Pumping test
 

Similar to C2VSim Workshop 4 - C2VSim Groundwater Representation

C2VSim Workshop 5 - C2VSim Surface Water Representation
C2VSim Workshop 5 - C2VSim Surface Water RepresentationC2VSim Workshop 5 - C2VSim Surface Water Representation
C2VSim Workshop 5 - C2VSim Surface Water Representation
Charlie Brush
 
03 darcys law
03 darcys law03 darcys law
03 darcys law
Usama Waly
 
hydro chapter_7_groundwater_by louy Al hami
hydro chapter_7_groundwater_by louy Al hami hydro chapter_7_groundwater_by louy Al hami
hydro chapter_7_groundwater_by louy Al hami
Louy Alhamy
 
Chapter 5 Fetter Ground water flow to wells
Chapter 5 Fetter Ground water flow to wellsChapter 5 Fetter Ground water flow to wells
Chapter 5 Fetter Ground water flow to wells
Bakr Younis /Al-Azhar University – Gaza
 
hydro chapter_11_hydrology_by louy al hami
hydro  chapter_11_hydrology_by louy al hami hydro  chapter_11_hydrology_by louy al hami
hydro chapter_11_hydrology_by louy al hami
Louy Alhamy
 
wells purposes.ppt
wells purposes.pptwells purposes.ppt
wells purposes.ppt
Ali Al-naqa
 
03 darcys law
03 darcys law03 darcys law
03 darcys law
haiifa25
 
Mountain Rivers Hydraul Geom.ppt
Mountain Rivers Hydraul Geom.pptMountain Rivers Hydraul Geom.ppt
Mountain Rivers Hydraul Geom.ppt
ProfPGAgnihotri
 
Darcy´s law
Darcy´s lawDarcy´s law
Darcy´s law
oscar
 
Ch02intro
Ch02introCh02intro
Groundwater hydrology
Groundwater hydrologyGroundwater hydrology
Groundwater hydrology
Anoop Shrestha
 
GIS PROCEDURE FOR PRELIMINARY EVALUATION OF POTENTIAL HYDROPOWER SITES
GIS PROCEDURE FOR PRELIMINARY EVALUATION OF POTENTIAL HYDROPOWER SITESGIS PROCEDURE FOR PRELIMINARY EVALUATION OF POTENTIAL HYDROPOWER SITES
GIS PROCEDURE FOR PRELIMINARY EVALUATION OF POTENTIAL HYDROPOWER SITES
Francis Mitchell
 
FYP Presentation v2.0
FYP Presentation v2.0FYP Presentation v2.0
FYP Presentation v2.0
Bianchi Dy
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
nimcan1
 
Design of barrages
Design of barragesDesign of barrages
Design of barrages
Vishal Jolaniya
 
2018 Leadership Training_Groundwater Hydrology 101
2018 Leadership Training_Groundwater Hydrology 1012018 Leadership Training_Groundwater Hydrology 101
2018 Leadership Training_Groundwater Hydrology 101
Texas Alliance of Groundwater Districts
 
Majid Gw Final Ppt
Majid Gw Final PptMajid Gw Final Ppt
Majid Gw Final Ppt
Majid Khattak
 
Geotechnical Engineering-I [Lec #23: Soil Permeability]
Geotechnical Engineering-I [Lec #23: Soil Permeability]Geotechnical Engineering-I [Lec #23: Soil Permeability]
Geotechnical Engineering-I [Lec #23: Soil Permeability]
Muhammad Irfan
 
Principles of groundwater flow
Principles of groundwater flowPrinciples of groundwater flow
Principles of groundwater flow
Fritz Lejarso
 
Ce 3205-lecture-08-spillways
Ce 3205-lecture-08-spillwaysCe 3205-lecture-08-spillways
Ce 3205-lecture-08-spillways
saibabu48
 

Similar to C2VSim Workshop 4 - C2VSim Groundwater Representation (20)

C2VSim Workshop 5 - C2VSim Surface Water Representation
C2VSim Workshop 5 - C2VSim Surface Water RepresentationC2VSim Workshop 5 - C2VSim Surface Water Representation
C2VSim Workshop 5 - C2VSim Surface Water Representation
 
03 darcys law
03 darcys law03 darcys law
03 darcys law
 
hydro chapter_7_groundwater_by louy Al hami
hydro chapter_7_groundwater_by louy Al hami hydro chapter_7_groundwater_by louy Al hami
hydro chapter_7_groundwater_by louy Al hami
 
Chapter 5 Fetter Ground water flow to wells
Chapter 5 Fetter Ground water flow to wellsChapter 5 Fetter Ground water flow to wells
Chapter 5 Fetter Ground water flow to wells
 
hydro chapter_11_hydrology_by louy al hami
hydro  chapter_11_hydrology_by louy al hami hydro  chapter_11_hydrology_by louy al hami
hydro chapter_11_hydrology_by louy al hami
 
wells purposes.ppt
wells purposes.pptwells purposes.ppt
wells purposes.ppt
 
03 darcys law
03 darcys law03 darcys law
03 darcys law
 
Mountain Rivers Hydraul Geom.ppt
Mountain Rivers Hydraul Geom.pptMountain Rivers Hydraul Geom.ppt
Mountain Rivers Hydraul Geom.ppt
 
Darcy´s law
Darcy´s lawDarcy´s law
Darcy´s law
 
Ch02intro
Ch02introCh02intro
Ch02intro
 
Groundwater hydrology
Groundwater hydrologyGroundwater hydrology
Groundwater hydrology
 
GIS PROCEDURE FOR PRELIMINARY EVALUATION OF POTENTIAL HYDROPOWER SITES
GIS PROCEDURE FOR PRELIMINARY EVALUATION OF POTENTIAL HYDROPOWER SITESGIS PROCEDURE FOR PRELIMINARY EVALUATION OF POTENTIAL HYDROPOWER SITES
GIS PROCEDURE FOR PRELIMINARY EVALUATION OF POTENTIAL HYDROPOWER SITES
 
FYP Presentation v2.0
FYP Presentation v2.0FYP Presentation v2.0
FYP Presentation v2.0
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
Design of barrages
Design of barragesDesign of barrages
Design of barrages
 
2018 Leadership Training_Groundwater Hydrology 101
2018 Leadership Training_Groundwater Hydrology 1012018 Leadership Training_Groundwater Hydrology 101
2018 Leadership Training_Groundwater Hydrology 101
 
Majid Gw Final Ppt
Majid Gw Final PptMajid Gw Final Ppt
Majid Gw Final Ppt
 
Geotechnical Engineering-I [Lec #23: Soil Permeability]
Geotechnical Engineering-I [Lec #23: Soil Permeability]Geotechnical Engineering-I [Lec #23: Soil Permeability]
Geotechnical Engineering-I [Lec #23: Soil Permeability]
 
Principles of groundwater flow
Principles of groundwater flowPrinciples of groundwater flow
Principles of groundwater flow
 
Ce 3205-lecture-08-spillways
Ce 3205-lecture-08-spillwaysCe 3205-lecture-08-spillways
Ce 3205-lecture-08-spillways
 

Recently uploaded

Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems S.M.S.A.
 
Building Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and MilvusBuilding Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and Milvus
Zilliz
 
Choosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptxChoosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptx
Brandon Minnick, MBA
 
Ocean lotus Threat actors project by John Sitima 2024 (1).pptx
Ocean lotus Threat actors project by John Sitima 2024 (1).pptxOcean lotus Threat actors project by John Sitima 2024 (1).pptx
Ocean lotus Threat actors project by John Sitima 2024 (1).pptx
SitimaJohn
 
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUHCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
panagenda
 
Your One-Stop Shop for Python Success: Top 10 US Python Development Providers
Your One-Stop Shop for Python Success: Top 10 US Python Development ProvidersYour One-Stop Shop for Python Success: Top 10 US Python Development Providers
Your One-Stop Shop for Python Success: Top 10 US Python Development Providers
akankshawande
 
Full-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalizationFull-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalization
Zilliz
 
Video Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the FutureVideo Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the Future
Alpen-Adria-Universität
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
Kari Kakkonen
 
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial IntelligenceAI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
IndexBug
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
shyamraj55
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
danishmna97
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc
 
Monitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdfMonitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdf
Tosin Akinosho
 
Generating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and MilvusGenerating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and Milvus
Zilliz
 
AI-Powered Food Delivery Transforming App Development in Saudi Arabia.pdf
AI-Powered Food Delivery Transforming App Development in Saudi Arabia.pdfAI-Powered Food Delivery Transforming App Development in Saudi Arabia.pdf
AI-Powered Food Delivery Transforming App Development in Saudi Arabia.pdf
Techgropse Pvt.Ltd.
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
Matthew Sinclair
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
Safe Software
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
Aftab Hussain
 
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Malak Abu Hammad
 

Recently uploaded (20)

Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
 
Building Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and MilvusBuilding Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and Milvus
 
Choosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptxChoosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptx
 
Ocean lotus Threat actors project by John Sitima 2024 (1).pptx
Ocean lotus Threat actors project by John Sitima 2024 (1).pptxOcean lotus Threat actors project by John Sitima 2024 (1).pptx
Ocean lotus Threat actors project by John Sitima 2024 (1).pptx
 
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUHCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
 
Your One-Stop Shop for Python Success: Top 10 US Python Development Providers
Your One-Stop Shop for Python Success: Top 10 US Python Development ProvidersYour One-Stop Shop for Python Success: Top 10 US Python Development Providers
Your One-Stop Shop for Python Success: Top 10 US Python Development Providers
 
Full-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalizationFull-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalization
 
Video Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the FutureVideo Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the Future
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
 
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial IntelligenceAI 101: An Introduction to the Basics and Impact of Artificial Intelligence
AI 101: An Introduction to the Basics and Impact of Artificial Intelligence
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
 
Monitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdfMonitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdf
 
Generating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and MilvusGenerating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and Milvus
 
AI-Powered Food Delivery Transforming App Development in Saudi Arabia.pdf
AI-Powered Food Delivery Transforming App Development in Saudi Arabia.pdfAI-Powered Food Delivery Transforming App Development in Saudi Arabia.pdf
AI-Powered Food Delivery Transforming App Development in Saudi Arabia.pdf
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
 
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
 

C2VSim Workshop 4 - C2VSim Groundwater Representation

  • 1. The California Central Valley Groundwater-Surface Water Simulation Model Groundwater Process CWEMF C2VSim Workshop January 23, 2013 Charles Brush Modeling Support Branch, Bay-Delta Office California Department of Water Resources, Sacramento, CA
  • 2. Outline IWFM Groundwater Process Groundwater Budget Z-Budget C2VSim Results
  • 6. IWFM Groundwater Process Inflows: Deep Percolation Surface Water Storage
  • 7. IWFM Groundwater Process Inflows: Outflows: Deep Percolation Pumping = Surface Water Surface Water Storage Storage
  • 8. IWFM Groundwater Process • Simulate a combination of confined, unconfined, and leaky aquifer layers separated by aquitards or aquicludes • Simulate changing aquifer conditions and subsidence • Employ a quasi 3-D approach • Use the Galerkin finite element method for the numerical solution of the governing equation
  • 9. IWFM Groundwater Process Simulate the aquifer as unconfined, leaky and confined aquifers separated by aquitards or aquicludes
  • 10. Stratigraphy ‘Hangs’ from Ground Surface 250 ft 60 ft -20 ft -280 ft
  • 11. Groundwater Flow Equation ∂Ssh   − ∇ ( T ∇h) + IuLu (h − hu ) + IdLd (h − hd ) − Q = 0 ∂t Ss = Storativity, (dimensionless); h = Groundwater head, (L); T = Transmissivity = Kh, (L2/T); K = Hydraulic conductivity; (L/T); hs = Saturated thickness of aquifer, (L); t = Time (T); Iu,Id = Indicator functions for top and bottom aquifer, (dimensionless); hu,hd = Groundwater head at adjacent upper and lower aquifer layers, (L/T); Lu,Ld = Leakage coefficients of adjacent upper and lower aquifer layers, (1/T); Q = Source/sink term, (L/T).
  • 16. Faults – Battle Creek Fault – Red Bluff Arch – Plainfield Ridge Anticline – Pittsburgh – Kirby Hills – Vaca Fault – Vernalis Fault – Graveley Ford Faults – Visalia Fault – Pond-Poso Creek Fault – Edison Fault – White Wolf Fault
  • 17. Flow Barrier Parameters Red Bluff Arch
  • 18. Unsaturated Zone • Vertical water flow between root zone and water table – In: Deep Percolation – Out: Net Deep Percolation • Divide into two layers of equal thickness
  • 20. Groundwater Boundary Conditions x Specified head x Specified flow x General head boundary conditions • Small stream watersheds as dynamically computed flow boundary conditions
  • 21. Pumping Pumping by well – Used when exact location and construction details of wells are known – Pumping at the well is distributed to aquifer layers based on the screened interval of the well in an aquifer layer – Well locations described in Preprocessor Well Data File – Well information specified in Pumping Specification File
  • 22. Pumping Specification Urban Groundwater Pumping
  • 23. Pumping Pumping by element – Used when detailed well information is not available, but pumping amounts for an area that is represented by multiple finite element cells are known – Pumping is distributed horizontally to cells with respect to developed area in each cell (surrogate for water demand) – In each cell, pumping is distributed to aquifer layers based on user specified fractions
  • 24. Pumping Specification Agricultural Groundwater Pumping
  • 26. Tile Drains • Tile drains are simulated as general head boundary conditions: ground surface Qtd Ctd  ztd − h =    ≤ 0 water table tile drain   Qtd = tile drain flow, [L3/T] Ctd = conductance, [L2/T] h ztd ztd = tile drain elevation, [L] h = groundwater head, [L] datum • Tile drain flows can be directed into specified stream nodes or outside the model area
  • 27. Tile Drains 11 tile drains – water goes to San Luis Drain outlet
  • 29. Aquifer Subsidence • Optional simulation of elastic and CONFINING LAYER inelastic compaction of interbed AQUIFER materials • Storage change due to subsidence is INTERBEDS added to the groundwater equation CONFINING LAYER   Ssebo if h > hc  −∆hSsebo if h > hc ∂h ; S' = S's = qs  = ; ∆b    ∂t s   Ssibo if h ≤ hc  −∆hSsibo if h ≤ hc   qs = rate of inflow or outflow due to subsidence, (L/T) Sse = elastic specific storage, (1/L) Ssi = inelastic specific storage, (1/L) bo = interbed thickness, (L) hc = pre-consolidation head, (L) ∆h = change in groundwater head, (L) ∆b = change interbed thickness, (L)
  • 31. Stream Flow and Stream-Aquifer Interaction • Assumption of zero storage at a stream node in computing stream flows; i.e. total inflow equals total outflow • Fully coupled stream and groundwater conservation equations • Simultaneous solution of stream and groundwater equations results in the computation of stream-aquifer interaction
  • 34. IWFM Groundwater Output • Groundwater heads at each time step – Tabular file – Teclot file • Hydrographs at specified locations • Groundwater Budget Tables • Z-Budget Tables • Final condition (initial condition format)
  • 35. Water Table Altitude Produced from IWFM’s TecPlot® output files October 1, 1921 September 30, 2009 35
  • 36. 36
  • 38. Final Condition • Initial condition file for future run
  • 40. Groundwater Hydrographs Well ID = 26N02W29N001M 300 275 250 225 200 175 Head (ft) 150 125 100 75 Obs BaseSim 50 ComparisonSim LSE Avg 25 LSE Max LSE Min 0 10/1921 10/1931 10/1941 10/1951 10/1961 10/1971 10/1981 10/1991 10/2001 Date
  • 41. Groundwater Hydrographs Well ID = 17N04E30R001M 300 250 200 150 100 Head (ft) 50 0 -50 Obs BaseSim -100 ComparisonSim LSE Avg LSE Max -150 LSE Min -200 10/1921 10/1931 10/1941 10/1951 10/1961 10/1971 10/1981 10/1991 10/2001 Date
  • 43. Groundwater Budget Column Flow 08/31/2004 Process Deep Percolation IN 221,215 RZ Beginning Storage (+) 2,912,112,878 Ending Storage (-) 2,910,935,231 Net Deep Percolation (+) IN 354,874 UZ Gain from Stream (+) +/- -107,640 SW Recharge (+) IN 218,671 LS Gain from Lake (+) +/- -1,939 SW Boundary Inflow (+) IN 90,456 SWS Subsidence (+) 32,908 Subsurface Irrigation (+) IN 0 LS Tile Drain Outflow (-) OUT 1,060 SW Pumping (-) OUT 1,763,915 LS Net Subsurface Inflow (+) +/- 0 GW Discrepancy (=) 0.60 Cumulative Subsidence 10,492,618
  • 44. Z-Budget Column Flow IN OUT Process GW Storage 1,032,516 93,444 Streams +/- 170,660 240,835 SW Tile Drains OUT 0 1,515 SW Subsidence 84,392 791 Net Deep Percolation IN 265,135 0 LS Small Watershed Baseflow IN 90,386 0 SWS Small Watershed Percolation IN 70 0 SWS Diversion Recoverable Loss IN 197,964 0 SW Bypass Recoverable Loss IN 29,637 0 SW Lakes +/- 5,140 7,524 SW Pumping by Element OUT 0 1,366,092 LS Pumping by Well OUT 0 165,699 LS Overall Zone Error -0.42
  • 45. Z-Budget Column Flow IN OUT Process GW Storage 169,453 37,852 Streams +/- 94,764 138,619 SW Tile Drains OUT 0 0 SW Subsidence 706 220 Net Deep Percolation IN 74,426 0 LS Small Watershed Baseflow IN 68,330 0 SWS Small Watershed Percolation IN 70 0 SWS Diversion Recoverable Loss IN 58,427 0 SW Bypass Recoverable Loss IN 0 0 SW Lakes +/- 0 0 SW Pumping by Element OUT 0 247,307 LS Pumping by Well OUT 0 41,451 LS Zones 1 and 2 +/- 2,448 830 Zones 1 and 3 +/- 395 2,738 Overall Zone Error 0.00
  • 50. Head Difference, 1922-1965 Layer 1 Layer 2
  • 51. Head Difference, 1965-2009 Layer 1 Layer 2
  • 54. Groundwater Pumping 2000-2009
  • 55. Recharge and Deep Percolation
  • 56. Recharge and Deep Percolation 1922-2009
  • 58.
  • 59. Groundwater Pumping 2000-2009
  • 60. End