Using Systems Thinking, Lean, Six Sigma and Theory of Constraints (ToC) Business process improvement -  Doing the right things, effectively and efficiently - First stage of significant improvement Optimise -GB
Knowledge base Lean:  is centred around creating more value with less work by removing waste and increasing efficiencies in business processes. Six Sigma:  seeks to improve the quality of process outputs by identifying and removing the causes of defects (errors) Optimise -GB
Knowledge base Theory of Constraints (TOC ) ...seeks to identify bottlenecks / constraints and restructure the rest of the organisation around it to eliminate it and improve process flow Systems thinking ...views "problems" as parts of an overall system, rather than reacting to specific part through the context of relationships with each other. Systems thinking focuses on cyclical rather than linear cause and effect. Optimise -GB
Six Sigma Process Improvement methodology Optimise -GB
Define  the objectives What do customers want from you? What are their issues? What are the issues you wish to address? What are the Critical To Quality aspects of your business? What are the milestones? What are the key objectives to be achieved? By failing to prepare you are preparing to fail  –  Benjamin Franklin Process Improvement Optimise -GB D M A I C
Process Improvement Project Team Who are the experts?  - who does the day to day activities? Who is going to project manage this work? What are the lines of responsibility and communication? Optimise -GB D M A I C
Process Improvement Stakeholder Identification! What external stakeholders are there? Optimise -GB D M A I C
[object Object],[object Object],[object Object],[object Object],[object Object],Process Improvement Optimise -GB D M A I C
Process map the activities Process Improvement Measure – Phase 1 Who, which department The what Ensure you record the tools / systems used and products / artefacts utilised / created Optimise -GB D M A I C Customer Operations Finance Give order to sales desk Take goods from shelf Produce / print invoice Box goods / Invoice
Spaghetti Diagram (illustration view of process map) Customer Operations Credit Control Phone in order Deliver goods and invoice Pay invoice Requests an invoice to be raised Process Improvement Measure – Phase 1 Optimise -GB D M A I C
[object Object],[object Object],[object Object],Process Improvement Measure – Phase 1 D M A I C
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Process Improvement Optimise -GB D M A I C
Time focuses on how long a piece of work takes to complete. This also focuses on waiting time for others to complete their task. Cost of work including internal and external labour, purchased goods and overheads that are allocated. Process Improvement Measure – Phase 2 Optimise -GB D M A I C
Quality focus looks at the work itself to identify defects / errors and aims to eliminate them before reaching the end customer or the next person in the chain of events Capacity looks at the resources required to complete the job without bottle necks stopping work, such as waiting time on management approval or waiting on other departments to clear their backlog Process Improvement Measure – Phase 2 Optimise -GB D M A I C
Theory of Constraints (ToC) The Theory of Constraints aims to identify and eliminate constraints so that bottle necks do not appear by following 5 steps: 1 – Identify the constraint 2 – Exploit the constraint to maximise production benefit  3 – Subordinate everything else – eliminate non value added work 4 – Elevate the constraint by increasing resources to handle more work 5 – Start again from point 1 to review all other constraints Process Improvement Measure – Phase 2 Optimise -GB D M A I C
Theory of Constraints (ToC) Each completed unit is passed onto the next person / department in the line Can you see where the bottle necks are? Do you ever wait on others to compete their work so you can start yours? Dept A units  Dept B units  Dept C units Dept D units Week 1    10  5  6  6 Week 2  8  11  3  9 Week 3   8  14  4  8  Week 4    8  16  5  9 Department B is the bottle neck in the process. They have more work coming in than they have going out. This causes a delay in the entire process. Add resources or improve efficiency in Department B  Process Improvement Measure – Phase 2 Optimise -GB D M A I C
Control  / Capability Charts Use software to plot the time taken for one process to understand if there is consistency between activities and workers  Process Improvement Measure – Phase 2 Optimise -GB D M A I C
Use statistics to verify the data from the control / capability charts Mean (Average) = 14.5 Days Median (Middle number)  = 15 Days Standard deviation = 2.26 The standard deviation is still greater than 2 but this at least provides a better sample. Therefore the average (baseline) of 14.5 can be assumed for larger samples. Process Improvement Measure – Phase 2 Optimise -GB D M A I C
Prioritisation of focus: Process time If your focus is on process time, a Pareto chart will help to prioritise your improvement focus. In this case Taking goods from Shelves” and Boxing goods and invoice” seems to take the longest time. Process Improvement Measure – Phase 2 Optimise -GB Process Time Take goods from shelf 30 Package goods and invoice 15 Take order 10 Produce Invoice 10 D M A I C
Prioritisation of focus: Quality If your focus is on quality a Pareto chart will help to prioritise your improvement focus. In this case “Taking goods from shelves” and “Taking orders” has the larges defects. Process Improvement Measure – Phase 2 Optimise -GB Process Defects Take goods from shelf 5% Take order 5% Package goods and invoice 4% Produce Invoice 1% D M A I C
Process maps review Identify more to the issues log Process Improvement Measure – Phase 2 ,[object Object],[object Object],[object Object],Optimise -GB D M A I C
[object Object],[object Object],[object Object],[object Object],Process Improvement Measure – Phase 2 D M A I C
Process Improvement ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Optimise -GB D M A I C
Question each activity Is it needed? Does it add value? Can the activity be removed? Reduce time of each activity wherever possible through systems development Process Improvement Optimise -GB Value Added Non-value Added Value enabled Process Take order Take goods from shelf Produce and print invoice Box goods / invoice D M A I C
Process Improvement Use Cause and Effect Trees to get the root cause of the problem Optimise -GB D M A I C Take goods from shelf Writing on form mis-read Writing of poor quality Person was in a rush Writing was smudged Felt tips are used Too much workload Person is carless Paper is greasy No pens in the office No other supplies Lack of training
Identify  Process Waste  Process Improvement Optimise -GB Waste category Office examples 1. Overproducing Printing / working on paperwork before it is needed 2. Inventory Filed in boxes, office supplies, batch processing 3. Waiting System downtime, managers approval, information from others 4. Extra processing Re-entering data, extra copies, excessive reports, budget process, scanning 5. Correction Data entry, design, invoice errors 6. Excess motion Walking to and from printers, other offices, filing 7. Transportation Excessive email attachments, multiple hand offs, approvals, postal services, internal post 8. Under utilised people Limited employee authority, excessive management control D M A I C
[object Object],[object Object],[object Object],Process Improvement D M A I C
Process Improvement ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Optimise -GB D M A I C
Generating solutions:  Good practice ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Process Improvement Optimise- GB D M A I C
Identify the solutions Solution 1 Use post it notes and put the solutions on a blank wall Solution 2 Solution 3 Solution 4 Solution 5 Solution 6 Solution 7 Solution 8 Solution 9 Solution  10 Solution 11 Solution 12 Solution 13 Solution 14 Solution 15 Solution  16 Solution 17 Solution 18 Process Improvement Optimise- GB D M A I C
...Group the solutions to identify duplications Group the post it notes in an affinity diagram to identify common themes Six Sigma  Theme 3 Solution 12 Solution 18 Theme 2 Theme 1 Optimise- GB Solution 1 Solution 2 Solution 3 Solution 4 Solution 5 Solution 7 Solution 8 Solution 9 Solution  10 Solution 11 Solution 13 Solution 14 Solution 15 Solution  16 Solution 17 D M A I C
Evaluate solution Process Improvement Optimise- GB D M A I C Easy to  Implement Big Impact Hard to  implement Small Impact Solution 1 Solution 3 Solution 6 Solution 7 Solution 8 Solution 9 Solution 2 Implement Now Possible Kill Implement Later
Formularise the top 3 solutions Solution 1 Who? What? When? Where? How? Why? Process Improvement Optimise- GB D M A I C
Use mistake  / error proofing to prevent future problems Process Improvement Optimise -GB Use colour and clear help guides for users Use system interfaces to prevent manual working Use drop down lists instead of free text fields Use colourful pictures to show the expected end result D M A I C
Produce an A2/3  project charter to describe what the project is about and what it is to deliver (ex1) Process Improvement Optimise -GB D M A I C
Six Sigma  Control (Business as usual management reviews) Project manage business process improvement activities  Ensure control reports, policy documents, training manuals and schedules are in place to ensure control Optimise -GB D M A I C
Use capability / control charts to notify issues immediately Six Sigma  Unacceptable time to input invoice – managers to immediately address issue System to send email upon work falling outside tolerance levels Optimise -GB D M A I C
Control  – Training manuals: Each process maps should be accompanied by the following documents Six Sigma  Process map of who does what Procedure of how to carry out activity clearly numbered with screen shots What is expected, policies behind work, rules and regulations that apply Examples of what the finished output should look like: example being forms Check list for the activities to confirm completion and sign as authorisation Optimise -GB D M A I C Process map How to guide Policy info Specimen Checklist
Control – staff training: Ensure that  every user  involved in the business process has been given training. Use tests to ensure understanding and ensure  employees sign  to acknowledge that training has been given Do not  allow access to systems or allow person to work in process if they have not been trained Six Sigma  Optimise -GB D M A I C
[object Object],[object Object],[object Object],[object Object],[object Object],Optimise- GB

More Related Content

What's hot

Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase Simon Misiewicz
 
Reducing Resistance to Change
Reducing Resistance to ChangeReducing Resistance to Change
Reducing Resistance to ChangeTKMG, Inc.
 
Basic 8D Problem Solving Tools & Methods - Part 1
Basic 8D Problem Solving Tools & Methods - Part 1Basic 8D Problem Solving Tools & Methods - Part 1
Basic 8D Problem Solving Tools & Methods - Part 1Tony Alvarez
 
Kaizen ~ Continuous Process Improvement (Cpi)
Kaizen ~  Continuous Process Improvement (Cpi)Kaizen ~  Continuous Process Improvement (Cpi)
Kaizen ~ Continuous Process Improvement (Cpi)Anand Subramaniam
 
A3 Management Method Presentation
A3 Management Method PresentationA3 Management Method Presentation
A3 Management Method Presentationkevinjardim
 
Business Process Improvement
Business Process ImprovementBusiness Process Improvement
Business Process ImprovementAnand Subramaniam
 
Clarity First: Process & Performance
Clarity First: Process & PerformanceClarity First: Process & Performance
Clarity First: Process & PerformanceTKMG, Inc.
 
8D Training, Eight Disciplines Training : Tonex Training
8D Training, Eight Disciplines Training : Tonex Training8D Training, Eight Disciplines Training : Tonex Training
8D Training, Eight Disciplines Training : Tonex TrainingBryan Len
 
Business process mapping
Business process mappingBusiness process mapping
Business process mappingDAVIS THOMAS
 
Basic 8D Problem Solving Tools & Methods - Part 2
Basic 8D Problem Solving Tools & Methods - Part 2Basic 8D Problem Solving Tools & Methods - Part 2
Basic 8D Problem Solving Tools & Methods - Part 2Tony Alvarez
 
WEBINAR: Introduction to Lean (ENCORE!)
WEBINAR: Introduction to Lean (ENCORE!)WEBINAR: Introduction to Lean (ENCORE!)
WEBINAR: Introduction to Lean (ENCORE!)GoLeanSixSigma.com
 
Lean management = Learn management par Klaus Beulker
Lean management = Learn management par Klaus Beulker Lean management = Learn management par Klaus Beulker
Lean management = Learn management par Klaus Beulker Institut Lean France
 
Business Process Management Training | By ex-Deloitte & McKinsey Consultants
Business Process Management Training | By ex-Deloitte & McKinsey ConsultantsBusiness Process Management Training | By ex-Deloitte & McKinsey Consultants
Business Process Management Training | By ex-Deloitte & McKinsey ConsultantsAurelien Domont, MBA
 

What's hot (20)

Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase
 
Reducing Resistance to Change
Reducing Resistance to ChangeReducing Resistance to Change
Reducing Resistance to Change
 
Basic 8D Problem Solving Tools & Methods - Part 1
Basic 8D Problem Solving Tools & Methods - Part 1Basic 8D Problem Solving Tools & Methods - Part 1
Basic 8D Problem Solving Tools & Methods - Part 1
 
Kaizen ~ Continuous Process Improvement (Cpi)
Kaizen ~  Continuous Process Improvement (Cpi)Kaizen ~  Continuous Process Improvement (Cpi)
Kaizen ~ Continuous Process Improvement (Cpi)
 
A3 Management Method Presentation
A3 Management Method PresentationA3 Management Method Presentation
A3 Management Method Presentation
 
Process Mapping
Process MappingProcess Mapping
Process Mapping
 
Business Process Improvement
Business Process ImprovementBusiness Process Improvement
Business Process Improvement
 
Business Process Management Approach
Business Process Management Approach  Business Process Management Approach
Business Process Management Approach
 
Process mapping
Process mappingProcess mapping
Process mapping
 
Process Mapping
Process MappingProcess Mapping
Process Mapping
 
Operational Excellence
Operational ExcellenceOperational Excellence
Operational Excellence
 
Lean Process Improvement Techniques
Lean Process Improvement TechniquesLean Process Improvement Techniques
Lean Process Improvement Techniques
 
Clarity First: Process & Performance
Clarity First: Process & PerformanceClarity First: Process & Performance
Clarity First: Process & Performance
 
8D Training, Eight Disciplines Training : Tonex Training
8D Training, Eight Disciplines Training : Tonex Training8D Training, Eight Disciplines Training : Tonex Training
8D Training, Eight Disciplines Training : Tonex Training
 
Business process mapping
Business process mappingBusiness process mapping
Business process mapping
 
Basic 8D Problem Solving Tools & Methods - Part 2
Basic 8D Problem Solving Tools & Methods - Part 2Basic 8D Problem Solving Tools & Methods - Part 2
Basic 8D Problem Solving Tools & Methods - Part 2
 
WEBINAR: Introduction to Lean (ENCORE!)
WEBINAR: Introduction to Lean (ENCORE!)WEBINAR: Introduction to Lean (ENCORE!)
WEBINAR: Introduction to Lean (ENCORE!)
 
Lean management = Learn management par Klaus Beulker
Lean management = Learn management par Klaus Beulker Lean management = Learn management par Klaus Beulker
Lean management = Learn management par Klaus Beulker
 
Business Process Management Training | By ex-Deloitte & McKinsey Consultants
Business Process Management Training | By ex-Deloitte & McKinsey ConsultantsBusiness Process Management Training | By ex-Deloitte & McKinsey Consultants
Business Process Management Training | By ex-Deloitte & McKinsey Consultants
 
8D : Problem Solving Methodology
8D : Problem Solving Methodology8D : Problem Solving Methodology
8D : Problem Solving Methodology
 

Viewers also liked

Business process improvement (special report) presentation
Business process improvement (special report) presentationBusiness process improvement (special report) presentation
Business process improvement (special report) presentationMichael Ligayo
 
5 Minutes to Process Improvement Success
5 Minutes to Process Improvement Success5 Minutes to Process Improvement Success
5 Minutes to Process Improvement SuccessBill Fox
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleAndrew Schwartz
 
Continuous improvement presentation 2014
Continuous improvement presentation 2014Continuous improvement presentation 2014
Continuous improvement presentation 2014mrppittman
 
Continuous process improvement
Continuous process improvementContinuous process improvement
Continuous process improvementhgmisshazel
 
Introduction to BPM, Business Process Management, BPM
Introduction to BPM, Business Process Management, BPMIntroduction to BPM, Business Process Management, BPM
Introduction to BPM, Business Process Management, BPMSarbashrestha Panda
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project ManagementRodolfo Siles
 
The Power of Business Process Improvement
The Power of Business Process ImprovementThe Power of Business Process Improvement
The Power of Business Process ImprovementBusiness Book Summaries
 
Business process design powerpoint presentation slides ppt templates
Business process design powerpoint presentation slides ppt templatesBusiness process design powerpoint presentation slides ppt templates
Business process design powerpoint presentation slides ppt templatesSlideTeam.net
 
Introduction to Business Process Management
Introduction to Business Process ManagementIntroduction to Business Process Management
Introduction to Business Process ManagementAlan McSweeney
 
BPM (Business Process Management), CRM and Cross-Functional Enterprise-Level ...
BPM (Business Process Management), CRM and Cross-Functional Enterprise-Level ...BPM (Business Process Management), CRM and Cross-Functional Enterprise-Level ...
BPM (Business Process Management), CRM and Cross-Functional Enterprise-Level ...Alan McSweeney
 
Customer Journey Mapping and CX Research
Customer Journey Mapping and CX ResearchCustomer Journey Mapping and CX Research
Customer Journey Mapping and CX ResearchMarc Stickdorn
 
Utilize Process Improvement Methodologies to Improve Finance and Accounting ...
Utilize Process Improvement Methodologies to Improve Finance and Accounting  ...Utilize Process Improvement Methodologies to Improve Finance and Accounting  ...
Utilize Process Improvement Methodologies to Improve Finance and Accounting ...TSONDE
 
BUSINESS PROCESS REVIEW-
BUSINESS PROCESS REVIEW-BUSINESS PROCESS REVIEW-
BUSINESS PROCESS REVIEW-Mridu Singh
 
2015 Upload Campaigns Calendar - SlideShare
2015 Upload Campaigns Calendar - SlideShare2015 Upload Campaigns Calendar - SlideShare
2015 Upload Campaigns Calendar - SlideShareSlideShare
 
TD PM Process Map rev1 07.02.09
TD PM Process Map rev1 07.02.09TD PM Process Map rev1 07.02.09
TD PM Process Map rev1 07.02.093MikeRyan
 
What to Upload to SlideShare
What to Upload to SlideShareWhat to Upload to SlideShare
What to Upload to SlideShareSlideShare
 
HR Systems & Process Improvement Manager - Job Description - FINAL
HR Systems & Process Improvement Manager - Job Description - FINALHR Systems & Process Improvement Manager - Job Description - FINAL
HR Systems & Process Improvement Manager - Job Description - FINALRyan Cavanagh
 

Viewers also liked (20)

Business process improvement (special report) presentation
Business process improvement (special report) presentationBusiness process improvement (special report) presentation
Business process improvement (special report) presentation
 
5 Minutes to Process Improvement Success
5 Minutes to Process Improvement Success5 Minutes to Process Improvement Success
5 Minutes to Process Improvement Success
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
 
Business Process
Business ProcessBusiness Process
Business Process
 
What is BPM?
What is BPM?What is BPM?
What is BPM?
 
Continuous improvement presentation 2014
Continuous improvement presentation 2014Continuous improvement presentation 2014
Continuous improvement presentation 2014
 
Continuous process improvement
Continuous process improvementContinuous process improvement
Continuous process improvement
 
Introduction to BPM, Business Process Management, BPM
Introduction to BPM, Business Process Management, BPMIntroduction to BPM, Business Process Management, BPM
Introduction to BPM, Business Process Management, BPM
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
The Power of Business Process Improvement
The Power of Business Process ImprovementThe Power of Business Process Improvement
The Power of Business Process Improvement
 
Business process design powerpoint presentation slides ppt templates
Business process design powerpoint presentation slides ppt templatesBusiness process design powerpoint presentation slides ppt templates
Business process design powerpoint presentation slides ppt templates
 
Introduction to Business Process Management
Introduction to Business Process ManagementIntroduction to Business Process Management
Introduction to Business Process Management
 
BPM (Business Process Management), CRM and Cross-Functional Enterprise-Level ...
BPM (Business Process Management), CRM and Cross-Functional Enterprise-Level ...BPM (Business Process Management), CRM and Cross-Functional Enterprise-Level ...
BPM (Business Process Management), CRM and Cross-Functional Enterprise-Level ...
 
Customer Journey Mapping and CX Research
Customer Journey Mapping and CX ResearchCustomer Journey Mapping and CX Research
Customer Journey Mapping and CX Research
 
Utilize Process Improvement Methodologies to Improve Finance and Accounting ...
Utilize Process Improvement Methodologies to Improve Finance and Accounting  ...Utilize Process Improvement Methodologies to Improve Finance and Accounting  ...
Utilize Process Improvement Methodologies to Improve Finance and Accounting ...
 
BUSINESS PROCESS REVIEW-
BUSINESS PROCESS REVIEW-BUSINESS PROCESS REVIEW-
BUSINESS PROCESS REVIEW-
 
2015 Upload Campaigns Calendar - SlideShare
2015 Upload Campaigns Calendar - SlideShare2015 Upload Campaigns Calendar - SlideShare
2015 Upload Campaigns Calendar - SlideShare
 
TD PM Process Map rev1 07.02.09
TD PM Process Map rev1 07.02.09TD PM Process Map rev1 07.02.09
TD PM Process Map rev1 07.02.09
 
What to Upload to SlideShare
What to Upload to SlideShareWhat to Upload to SlideShare
What to Upload to SlideShare
 
HR Systems & Process Improvement Manager - Job Description - FINAL
HR Systems & Process Improvement Manager - Job Description - FINALHR Systems & Process Improvement Manager - Job Description - FINAL
HR Systems & Process Improvement Manager - Job Description - FINAL
 

Similar to Business Process Improvement - Doing the right things effectively and efficiently

Lean, Six Sigma, ToC using DMAIC project management
Lean, Six Sigma, ToC  using DMAIC project managementLean, Six Sigma, ToC  using DMAIC project management
Lean, Six Sigma, ToC using DMAIC project managementSimon Misiewicz
 
QM-029-Six Sigma Overview
QM-029-Six Sigma OverviewQM-029-Six Sigma Overview
QM-029-Six Sigma Overviewhandbook
 
Business process re-engineering and systems design - implementation
Business process re-engineering and systems design - implementationBusiness process re-engineering and systems design - implementation
Business process re-engineering and systems design - implementationSimon Misiewicz
 
1) 6Sigma - DEFINE MWSI.ppt
1) 6Sigma - DEFINE MWSI.ppt1) 6Sigma - DEFINE MWSI.ppt
1) 6Sigma - DEFINE MWSI.pptKrzysztofKnop1
 
LABP in ASQ Six Sigma Forum
LABP in ASQ Six Sigma ForumLABP in ASQ Six Sigma Forum
LABP in ASQ Six Sigma ForumWilliam Peterson
 
Six Sigma Process Improvement
Six Sigma Process ImprovementSix Sigma Process Improvement
Six Sigma Process Improvementmrt77
 
Process Redesign or Improvement Approach Options
Process Redesign or Improvement Approach OptionsProcess Redesign or Improvement Approach Options
Process Redesign or Improvement Approach OptionsChief Innovation
 
Innovative Engineering Workshop Npi 30march10
Innovative Engineering Workshop   Npi   30march10Innovative Engineering Workshop   Npi   30march10
Innovative Engineering Workshop Npi 30march10mccall1966
 
Six Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltSix Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltRajiv Tiwari
 
M1 Refresher Training Master Final Version non client linkedin
M1 Refresher Training Master Final Version non client linkedinM1 Refresher Training Master Final Version non client linkedin
M1 Refresher Training Master Final Version non client linkedinMichele Levasseur
 
Lean Management
Lean ManagementLean Management
Lean ManagementAshish Dev
 
Five Step Methodology To Implement Bpr
Five Step Methodology To Implement BprFive Step Methodology To Implement Bpr
Five Step Methodology To Implement BprRoy Antony Arnold G
 
TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENTTOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENTReaz Uddin
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Iap Training.(1)
Iap Training.(1)Iap Training.(1)
Iap Training.(1)dbgray00
 
Problem solving techniques
Problem solving techniquesProblem solving techniques
Problem solving techniquesAhsan Saleem
 
Quality improvement
Quality improvementQuality improvement
Quality improvementAdel Younis
 
4 Steps to Drive Process Innovation
4 Steps to Drive Process Innovation4 Steps to Drive Process Innovation
4 Steps to Drive Process InnovationJuran Global
 

Similar to Business Process Improvement - Doing the right things effectively and efficiently (20)

Lean, Six Sigma, ToC using DMAIC project management
Lean, Six Sigma, ToC  using DMAIC project managementLean, Six Sigma, ToC  using DMAIC project management
Lean, Six Sigma, ToC using DMAIC project management
 
QM-029-Six Sigma Overview
QM-029-Six Sigma OverviewQM-029-Six Sigma Overview
QM-029-Six Sigma Overview
 
Business process re-engineering and systems design - implementation
Business process re-engineering and systems design - implementationBusiness process re-engineering and systems design - implementation
Business process re-engineering and systems design - implementation
 
Spc assignment
Spc assignmentSpc assignment
Spc assignment
 
1) 6Sigma - DEFINE MWSI.ppt
1) 6Sigma - DEFINE MWSI.ppt1) 6Sigma - DEFINE MWSI.ppt
1) 6Sigma - DEFINE MWSI.ppt
 
LABP in ASQ Six Sigma Forum
LABP in ASQ Six Sigma ForumLABP in ASQ Six Sigma Forum
LABP in ASQ Six Sigma Forum
 
Six Sigma Process Improvement
Six Sigma Process ImprovementSix Sigma Process Improvement
Six Sigma Process Improvement
 
Process Redesign or Improvement Approach Options
Process Redesign or Improvement Approach OptionsProcess Redesign or Improvement Approach Options
Process Redesign or Improvement Approach Options
 
Innovative Engineering Workshop Npi 30march10
Innovative Engineering Workshop   Npi   30march10Innovative Engineering Workshop   Npi   30march10
Innovative Engineering Workshop Npi 30march10
 
Six Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltSix Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green Belt
 
M1 Refresher Training Master Final Version non client linkedin
M1 Refresher Training Master Final Version non client linkedinM1 Refresher Training Master Final Version non client linkedin
M1 Refresher Training Master Final Version non client linkedin
 
Lean Management
Lean ManagementLean Management
Lean Management
 
Five Step Methodology To Implement Bpr
Five Step Methodology To Implement BprFive Step Methodology To Implement Bpr
Five Step Methodology To Implement Bpr
 
TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENTTOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Iap Training.(1)
Iap Training.(1)Iap Training.(1)
Iap Training.(1)
 
Problem solving techniques
Problem solving techniquesProblem solving techniques
Problem solving techniques
 
Quality improvement
Quality improvementQuality improvement
Quality improvement
 
4 Steps to Drive Process Innovation
4 Steps to Drive Process Innovation4 Steps to Drive Process Innovation
4 Steps to Drive Process Innovation
 

More from Simon Misiewicz

Creative thinking template
Creative thinking templateCreative thinking template
Creative thinking templateSimon Misiewicz
 
Is starting a business right time for you
Is starting a business right time for youIs starting a business right time for you
Is starting a business right time for youSimon Misiewicz
 
Raising finance for your business
Raising finance for your businessRaising finance for your business
Raising finance for your businessSimon Misiewicz
 
Business user requirements for it development
Business user requirements for it developmentBusiness user requirements for it development
Business user requirements for it developmentSimon Misiewicz
 
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...Simon Misiewicz
 
Communicating strategic missions, vision, project progress and celebrate succ...
Communicating strategic missions, vision, project progress and celebrate succ...Communicating strategic missions, vision, project progress and celebrate succ...
Communicating strategic missions, vision, project progress and celebrate succ...Simon Misiewicz
 
Deliver training to suit varying learning styles
Deliver training to suit varying learning stylesDeliver training to suit varying learning styles
Deliver training to suit varying learning stylesSimon Misiewicz
 
4 steps to formulating strategies from the boardroom through to every employee
4 steps to formulating strategies from the boardroom through to every employee 4 steps to formulating strategies from the boardroom through to every employee
4 steps to formulating strategies from the boardroom through to every employee Simon Misiewicz
 
Stakeholder engagement and management
Stakeholder engagement and managementStakeholder engagement and management
Stakeholder engagement and managementSimon Misiewicz
 
Effective Communication for successful working and personal relationships
Effective  Communication for successful working and personal relationships Effective  Communication for successful working and personal relationships
Effective Communication for successful working and personal relationships Simon Misiewicz
 
Strategic improvement through the balanced scorecard and programme management
Strategic improvement through the balanced scorecard and programme managementStrategic improvement through the balanced scorecard and programme management
Strategic improvement through the balanced scorecard and programme managementSimon Misiewicz
 
Programme start up document - Optimised Programme Methodology
Programme start up document - Optimised Programme Methodology Programme start up document - Optimised Programme Methodology
Programme start up document - Optimised Programme Methodology Simon Misiewicz
 
Staff appraisal document - template
Staff appraisal document - template Staff appraisal document - template
Staff appraisal document - template Simon Misiewicz
 
Optimised - Programme start up
Optimised - Programme start upOptimised - Programme start up
Optimised - Programme start upSimon Misiewicz
 
Project End Report - Project Management template
Project End Report - Project Management template Project End Report - Project Management template
Project End Report - Project Management template Simon Misiewicz
 
Lessons learned Report - Project Management template
Lessons learned Report - Project Management template Lessons learned Report - Project Management template
Lessons learned Report - Project Management template Simon Misiewicz
 
Highlight Report - Project Management template
Highlight Report - Project Management template Highlight Report - Project Management template
Highlight Report - Project Management template Simon Misiewicz
 
Exceptions Report - Project Management template
Exceptions Report - Project Management template Exceptions Report - Project Management template
Exceptions Report - Project Management template Simon Misiewicz
 
Project change request - Project Management template
Project change request - Project Management template Project change request - Project Management template
Project change request - Project Management template Simon Misiewicz
 

More from Simon Misiewicz (20)

Creative thinking template
Creative thinking templateCreative thinking template
Creative thinking template
 
Is starting a business right time for you
Is starting a business right time for youIs starting a business right time for you
Is starting a business right time for you
 
Raising finance for your business
Raising finance for your businessRaising finance for your business
Raising finance for your business
 
Business user requirements for it development
Business user requirements for it developmentBusiness user requirements for it development
Business user requirements for it development
 
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...
 
Communicating strategic missions, vision, project progress and celebrate succ...
Communicating strategic missions, vision, project progress and celebrate succ...Communicating strategic missions, vision, project progress and celebrate succ...
Communicating strategic missions, vision, project progress and celebrate succ...
 
Deliver training to suit varying learning styles
Deliver training to suit varying learning stylesDeliver training to suit varying learning styles
Deliver training to suit varying learning styles
 
4 steps to formulating strategies from the boardroom through to every employee
4 steps to formulating strategies from the boardroom through to every employee 4 steps to formulating strategies from the boardroom through to every employee
4 steps to formulating strategies from the boardroom through to every employee
 
Stakeholder engagement and management
Stakeholder engagement and managementStakeholder engagement and management
Stakeholder engagement and management
 
Effective Communication for successful working and personal relationships
Effective  Communication for successful working and personal relationships Effective  Communication for successful working and personal relationships
Effective Communication for successful working and personal relationships
 
Strategic improvement through the balanced scorecard and programme management
Strategic improvement through the balanced scorecard and programme managementStrategic improvement through the balanced scorecard and programme management
Strategic improvement through the balanced scorecard and programme management
 
Programme start up document - Optimised Programme Methodology
Programme start up document - Optimised Programme Methodology Programme start up document - Optimised Programme Methodology
Programme start up document - Optimised Programme Methodology
 
Staff appraisal document - template
Staff appraisal document - template Staff appraisal document - template
Staff appraisal document - template
 
Be proactive
Be proactiveBe proactive
Be proactive
 
Optimised - Programme start up
Optimised - Programme start upOptimised - Programme start up
Optimised - Programme start up
 
Project End Report - Project Management template
Project End Report - Project Management template Project End Report - Project Management template
Project End Report - Project Management template
 
Lessons learned Report - Project Management template
Lessons learned Report - Project Management template Lessons learned Report - Project Management template
Lessons learned Report - Project Management template
 
Highlight Report - Project Management template
Highlight Report - Project Management template Highlight Report - Project Management template
Highlight Report - Project Management template
 
Exceptions Report - Project Management template
Exceptions Report - Project Management template Exceptions Report - Project Management template
Exceptions Report - Project Management template
 
Project change request - Project Management template
Project change request - Project Management template Project change request - Project Management template
Project change request - Project Management template
 

Recently uploaded

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...lizamodels9
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxAbhayThakur200703
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 

Recently uploaded (20)

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptx
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 

Business Process Improvement - Doing the right things effectively and efficiently

  • 1. Using Systems Thinking, Lean, Six Sigma and Theory of Constraints (ToC) Business process improvement - Doing the right things, effectively and efficiently - First stage of significant improvement Optimise -GB
  • 2. Knowledge base Lean: is centred around creating more value with less work by removing waste and increasing efficiencies in business processes. Six Sigma: seeks to improve the quality of process outputs by identifying and removing the causes of defects (errors) Optimise -GB
  • 3. Knowledge base Theory of Constraints (TOC ) ...seeks to identify bottlenecks / constraints and restructure the rest of the organisation around it to eliminate it and improve process flow Systems thinking ...views "problems" as parts of an overall system, rather than reacting to specific part through the context of relationships with each other. Systems thinking focuses on cyclical rather than linear cause and effect. Optimise -GB
  • 4. Six Sigma Process Improvement methodology Optimise -GB
  • 5. Define the objectives What do customers want from you? What are their issues? What are the issues you wish to address? What are the Critical To Quality aspects of your business? What are the milestones? What are the key objectives to be achieved? By failing to prepare you are preparing to fail – Benjamin Franklin Process Improvement Optimise -GB D M A I C
  • 6. Process Improvement Project Team Who are the experts? - who does the day to day activities? Who is going to project manage this work? What are the lines of responsibility and communication? Optimise -GB D M A I C
  • 7. Process Improvement Stakeholder Identification! What external stakeholders are there? Optimise -GB D M A I C
  • 8.
  • 9. Process map the activities Process Improvement Measure – Phase 1 Who, which department The what Ensure you record the tools / systems used and products / artefacts utilised / created Optimise -GB D M A I C Customer Operations Finance Give order to sales desk Take goods from shelf Produce / print invoice Box goods / Invoice
  • 10. Spaghetti Diagram (illustration view of process map) Customer Operations Credit Control Phone in order Deliver goods and invoice Pay invoice Requests an invoice to be raised Process Improvement Measure – Phase 1 Optimise -GB D M A I C
  • 11.
  • 12.
  • 13. Time focuses on how long a piece of work takes to complete. This also focuses on waiting time for others to complete their task. Cost of work including internal and external labour, purchased goods and overheads that are allocated. Process Improvement Measure – Phase 2 Optimise -GB D M A I C
  • 14. Quality focus looks at the work itself to identify defects / errors and aims to eliminate them before reaching the end customer or the next person in the chain of events Capacity looks at the resources required to complete the job without bottle necks stopping work, such as waiting time on management approval or waiting on other departments to clear their backlog Process Improvement Measure – Phase 2 Optimise -GB D M A I C
  • 15. Theory of Constraints (ToC) The Theory of Constraints aims to identify and eliminate constraints so that bottle necks do not appear by following 5 steps: 1 – Identify the constraint 2 – Exploit the constraint to maximise production benefit 3 – Subordinate everything else – eliminate non value added work 4 – Elevate the constraint by increasing resources to handle more work 5 – Start again from point 1 to review all other constraints Process Improvement Measure – Phase 2 Optimise -GB D M A I C
  • 16. Theory of Constraints (ToC) Each completed unit is passed onto the next person / department in the line Can you see where the bottle necks are? Do you ever wait on others to compete their work so you can start yours? Dept A units Dept B units Dept C units Dept D units Week 1 10 5 6 6 Week 2 8 11 3 9 Week 3 8 14 4 8 Week 4 8 16 5 9 Department B is the bottle neck in the process. They have more work coming in than they have going out. This causes a delay in the entire process. Add resources or improve efficiency in Department B Process Improvement Measure – Phase 2 Optimise -GB D M A I C
  • 17. Control / Capability Charts Use software to plot the time taken for one process to understand if there is consistency between activities and workers Process Improvement Measure – Phase 2 Optimise -GB D M A I C
  • 18. Use statistics to verify the data from the control / capability charts Mean (Average) = 14.5 Days Median (Middle number) = 15 Days Standard deviation = 2.26 The standard deviation is still greater than 2 but this at least provides a better sample. Therefore the average (baseline) of 14.5 can be assumed for larger samples. Process Improvement Measure – Phase 2 Optimise -GB D M A I C
  • 19. Prioritisation of focus: Process time If your focus is on process time, a Pareto chart will help to prioritise your improvement focus. In this case Taking goods from Shelves” and Boxing goods and invoice” seems to take the longest time. Process Improvement Measure – Phase 2 Optimise -GB Process Time Take goods from shelf 30 Package goods and invoice 15 Take order 10 Produce Invoice 10 D M A I C
  • 20. Prioritisation of focus: Quality If your focus is on quality a Pareto chart will help to prioritise your improvement focus. In this case “Taking goods from shelves” and “Taking orders” has the larges defects. Process Improvement Measure – Phase 2 Optimise -GB Process Defects Take goods from shelf 5% Take order 5% Package goods and invoice 4% Produce Invoice 1% D M A I C
  • 21.
  • 22.
  • 23.
  • 24. Question each activity Is it needed? Does it add value? Can the activity be removed? Reduce time of each activity wherever possible through systems development Process Improvement Optimise -GB Value Added Non-value Added Value enabled Process Take order Take goods from shelf Produce and print invoice Box goods / invoice D M A I C
  • 25. Process Improvement Use Cause and Effect Trees to get the root cause of the problem Optimise -GB D M A I C Take goods from shelf Writing on form mis-read Writing of poor quality Person was in a rush Writing was smudged Felt tips are used Too much workload Person is carless Paper is greasy No pens in the office No other supplies Lack of training
  • 26. Identify Process Waste Process Improvement Optimise -GB Waste category Office examples 1. Overproducing Printing / working on paperwork before it is needed 2. Inventory Filed in boxes, office supplies, batch processing 3. Waiting System downtime, managers approval, information from others 4. Extra processing Re-entering data, extra copies, excessive reports, budget process, scanning 5. Correction Data entry, design, invoice errors 6. Excess motion Walking to and from printers, other offices, filing 7. Transportation Excessive email attachments, multiple hand offs, approvals, postal services, internal post 8. Under utilised people Limited employee authority, excessive management control D M A I C
  • 27.
  • 28.
  • 29.
  • 30. Identify the solutions Solution 1 Use post it notes and put the solutions on a blank wall Solution 2 Solution 3 Solution 4 Solution 5 Solution 6 Solution 7 Solution 8 Solution 9 Solution 10 Solution 11 Solution 12 Solution 13 Solution 14 Solution 15 Solution 16 Solution 17 Solution 18 Process Improvement Optimise- GB D M A I C
  • 31. ...Group the solutions to identify duplications Group the post it notes in an affinity diagram to identify common themes Six Sigma Theme 3 Solution 12 Solution 18 Theme 2 Theme 1 Optimise- GB Solution 1 Solution 2 Solution 3 Solution 4 Solution 5 Solution 7 Solution 8 Solution 9 Solution 10 Solution 11 Solution 13 Solution 14 Solution 15 Solution 16 Solution 17 D M A I C
  • 32. Evaluate solution Process Improvement Optimise- GB D M A I C Easy to Implement Big Impact Hard to implement Small Impact Solution 1 Solution 3 Solution 6 Solution 7 Solution 8 Solution 9 Solution 2 Implement Now Possible Kill Implement Later
  • 33. Formularise the top 3 solutions Solution 1 Who? What? When? Where? How? Why? Process Improvement Optimise- GB D M A I C
  • 34. Use mistake / error proofing to prevent future problems Process Improvement Optimise -GB Use colour and clear help guides for users Use system interfaces to prevent manual working Use drop down lists instead of free text fields Use colourful pictures to show the expected end result D M A I C
  • 35. Produce an A2/3 project charter to describe what the project is about and what it is to deliver (ex1) Process Improvement Optimise -GB D M A I C
  • 36. Six Sigma Control (Business as usual management reviews) Project manage business process improvement activities Ensure control reports, policy documents, training manuals and schedules are in place to ensure control Optimise -GB D M A I C
  • 37. Use capability / control charts to notify issues immediately Six Sigma Unacceptable time to input invoice – managers to immediately address issue System to send email upon work falling outside tolerance levels Optimise -GB D M A I C
  • 38. Control – Training manuals: Each process maps should be accompanied by the following documents Six Sigma Process map of who does what Procedure of how to carry out activity clearly numbered with screen shots What is expected, policies behind work, rules and regulations that apply Examples of what the finished output should look like: example being forms Check list for the activities to confirm completion and sign as authorisation Optimise -GB D M A I C Process map How to guide Policy info Specimen Checklist
  • 39. Control – staff training: Ensure that every user involved in the business process has been given training. Use tests to ensure understanding and ensure employees sign to acknowledge that training has been given Do not allow access to systems or allow person to work in process if they have not been trained Six Sigma Optimise -GB D M A I C
  • 40.