PROJECT PROFILE
PROJECT PROFILE
Product /Services Energy Solutions (Personal Services)
Potential customers Energy Consuming Industries
Deliverables Energy Conservation Potentials
Strategic Partners ABB, WEG, SIEMENS etc.
Contingencies Not frequent
Business Type Small Business (Sole proprietorship)
Planning Requirement Daily basis
Competitive Strategy Cost effectiveness and Quality
Business Emergence Corridor Principle
Field Experience 3 Years in IMEIP US-AID
Team Span 3 to 5 Members
PROJECT SCOPE
PROJECT SCOPE
Industrial Energy Conservation is the need of
the hour
With increasing energy prices and shortfall we
need to conserve and generate more
The deliverable include the identification of
areas where energy savings are possible
Replacements of old, less efficient motors and
other instruments would be suggested
Saving potentials would be calculated and
discussed with the customers
HOW THE IDEA EMERGED ?
Idea Germination
I was doing Energy auditing since last two years
during which the idea emerged
I often thought that there is an empty market
niche which can be exploited
Preparation
I started gathering information which would be
required to start a new business
I gathered knowledge from where ever possible
and help was taken from seniors
HOW THE IDEA EMERGED ?
Incubation
During the last few months I saw an increasing
potential for this sort of business
Illumination
I prepared the feasibilities of the idea and the finances
associated with it and it came out to be a good
business venture
Verification
Now I am planning to execute the business plan which
would verify its validity
WHAT CREATES THE
MARKET NICHE ?
WHAT CREATES THE MARKET NICHE ?
Energy Crisis in the country
Increasing Environmental Problems
Declining Fossil Fuels
Increasing Energy Prices
Energy Efficient Motors
Energy Policies Establishment
VFD Technology Emergence
WHAT CREATES THE MARKET NICHE ?
ISO 50001 implementation
US-AID Energy initiative
New Process Designs
Evolution in Lighting Technology
Increasing use of Renewable Energy
Global Warming
Energy Crisis in the country
The energy demand is increasing in the country
with every passing day
Due to the lack of planning by the previous
governments Pakistan is facing a serious energy
crisis
Currently Pakistan is facing a shortfall of 4,000 to
5,000 MW
So the need of the hour is that apart from
increasing the energy generation we must also
focus on conserving it
The energy prices in the countries have increased
by 100% since 2000
ARRIVAL OF NEW TECHNOLOGY
Energy Efficient Motors
New energy efficient motors (IE1, IE2, IE3 and
IE4) are in the markets with IE4 having the
highest efficiency of almost 96%
Evolution in Lighting Technology
The new LVD lights consume 50% less energy
and provide 37 % more luminosity compared
to a normal light in operation
EFFICIENCY GRAPH
LVD vs. Older Technology
ARRIVAL OF NEW TECHNOLOGY
VFD Technology Emergence
Employing a VFD and reducing the RPM of a
motor can easily result into about 20% energy
saving
Previously dampers have been employed which
does not reduce the energy consumption but in
fact dampens the energy delivered
10 reduction in RPM means 22% reduction in
energy consumption and 20% reduction in RPM
means 44% reduction
US-AID INITIATIVE
US-AID was providing 50% subsidy on the
purchase of new motors and VFDs in their IMEIP
project
Old inefficient motors were replaced by New high
efficiency motors and new VFDs were installed to
increase the energy savings
The 3rd phase and the biggest of this project is
due within a year or so
Almost 70 industries all over the Pakistan
benefitted from this project and 90% of them
were highly satisfied with the energy savings
MARKET ANALYSIS
5 C
Customers
Energy Consuming Industries
Company
IECoS Pvt. Ltd.
Competitors
Few Individuals
Collaboration
ABB and WEG Pakistan
Context
Energy Conservation is the need of the hour with the
increasing energy prices and shortfall.
4 P
Product/Services
Energy Services
Promotion
Website, Pamphlets and Brochure
Place
Industries all over the Pakistan
Pricing
Industries would be charged Rs. 20 per KW
STRENGTHS ANALYSIS
 During the last 2 to 3 years I have been auditing the
industries which are ready for investment in the energy
sector
 These are my ready potential customers and I have all the
contact details available with me
 I have the N.P.O. auditor certificate which will be helping me
in training the junior engineers and in gaining the contracts
 The vendor companies (ABB, WEG, SIEMENS etc) are my
natural alliances and will be doing the marketing for me
 The technologies are calling for the change and it is easy to
convince the clients regarding the saving potentials
MARKETING ANALYSIS
 As the 3rd phase of US-AID IMEIP project is due within
six months and the industries are interested in seeking
the potential replacement
We would be providing them with saving potentials
before the start of the 3rd phase so they can place their
orders accordingly
There are almost 58 potential customers which are in
contact with me and are willing to invest in energy
sector
Industries which missed the chance of getting registered
in the previous two phases are lurking for the 3rd phase
and would be easy to convince
MARKETING
An attractive website would be made and emails
regarding services would be forwarded to the
industries
Energy Conservation Pamphlets would be made
and mailed
Motors, VFDs and Lighting vendors would be
contacted for support
Engineers in their spare time would be visiting
the industries and giving presentations to high
officials
SWOT Analysis
SWOT Analysis
STRENGTHS
Vendor’s Interest
3rd IMEIP US-AID Phase
Negligible Competition
3 years of field experience
WEAKNESSES
No data for help available
Low competition, Low Motivation
Lack of Awareness
SWOT Analysis
Opportunities
Solar Panels for Industries
Waste Heat Exchangers
Machine Spare parts Services
Threats
GIZ, NEC starts similar services
Customers low motivation
No energy left to conserve
GROWTH STAGES
GROWTH STAGES
PRE-START UP GROWTH
The instruments required would be purchase from
Makkays Pvt. Ltd.
The Engineers would be hired (1-3 years experienced)
and trained for EA
Marketing would be done by the website and
Pamphlets
START –UP GROWTH
During the initial phase maximum audits would be
done and reports would be then compiled
Energy audit results would be verified with the
customers
GROWTH STAGES
 EARLY GROWTH
 Rapid response is expected so new teams can be
hired on contract and project basis
 Competitors may arrive, cost effectiveness would
be the weapon to use
 LATER GROWTH
 Industrial instrument installation services
 Erection support would be provided to industries
 Solar system installation is also a possibility
POTENTIAL CUSTOMERS
POTENTIAL CUSTOMERS
Sr. No. Facility Name Address Disco District
1
Sapphire Finishing
Mills Limited
Sapphire Finishing
Mills Ltd. 3.5 Km,
Raiwind Manga Road,
Raiwind
LESCO Kasur
2
Crescent Steel And
Allied Products Ltd.
A/25 S.I.T.E Nooriabad.
District Jam Shoro
Sindh, Pakistan
HESCO Jamshoro
3 Al Noor Sugar Mills
Shah Pur Jaharian
Taulaka, Doulat Pur
District Benazirabad
Sindh Pakistan Sukhar
SEPCO Benazirabad
4
Thatta Cement
Company Limited
Makli Ghulam Ullah
Road District Thatta,
Sindh
HESCO Thatta
5 Pak-Arab Fertilizer
Disposal Workshop Pak
Arab Fartilizer Kwl
Road Khad Factory
MEPCO Multan
6 Nestle Pakistan Limited
Nestle Pakistan Limited,
Sheikhupura Road,
Sheikhupura.
LESCO Sheikhupura
7
Dalda Foods Private
Limited
F 33 Site Hub River
Road Karachi
KESC Karachi
8
Unilever Pakistan
Limited.
Unilever Pakistan
Limited,Tea
Factory,Chak # 88-A 10
R,Khanewal
MEPCO Khanewal
9
Thal Limited (Jute
Division)
Dg Khan Road
Muzafargarh MEPCO Muzaffargarh
10
Hazara Phosphate
Fertilizer Pvt.Ltd
Hazara Phosphate (Pvt)
Ltd Hattar Road,
Haripur.
PESCO Haripur
11 Ici Soda Ash Khewra
Ici Soda Ash Plant
Khewra IESCO Jhelum
12
Maple Leaf Cement
Factory Ltd.
Maple Leaf Cement
Factory Ltd.
Iskandarabad, Mianwali. FESCO Mianwali
13
Anjum Textile Mills
(Private) Limited
42 Km Sheikhupura
Road Faisalabad FESCO Faisalabad
14 Bilal Fibres Mills
38-Km Sheikhupura
Road Faisalabad FESCO Faisalabad
15
Al-Abbas Cement
Industries Limited
Nooriabad Industrial
Area, Kalo Koher District
Jamshoroo Sindh HESCO Jamshoro
ENRGY AUDITING TEAM
ENERGY AUDITING TEAM
Team Lead
Environmental
Analyst
Electrical
Engineer
Mechanical
Engineer
Chemical
Engineer
WBS OF PROJECT
Every team member is expected to work
individually
All the data collection would be done with the
help of the industrial representative
Data collected would be shared with the
customer before analysis
The final analysis and report compilation would
be done by the Team Lead
Final audit results would then be submitted to
the esteemed customer in hard form
ENRGY AUDITING TEAM
Electrical Engineer
Motor Sizing
Motor Drives
Lightning
HVAC
Mechanical Engineer
 Machinery Maintenance
 Compressors
 Thermography
ENRGY AUDITING TEAM
Chemical Engineer
 Carbon Emission
 Waste Heat
 Supply &Waste Water
Environmental Engineer
 Health and balance of Environment
 Energy Management Standards
 Carbon Footprints
FINANCIAL DETAILS
FINANCIAL DETAILS
Industrial
Equipment
Energy
Analyzer
Thermal
Analyzer
Tachometer Vibrometer
Funds Allocated = Rs. 1000, 000/-
FINANCIAL DETAILS
Office
Equipment
Furniture
& AC etc.
Laptops
Stationary &
Advertising
Printer and
Scanner
Funds Allocated = Rs. 1200, 000/-
OFFICE RENT AND EXPENSES
An amount of Rs. 500, 000/- would be submitted
as advance for the rent place
Monthly Rent = Rs. 80, 000/-
Office Expenses = Rs. 70, 000/- per month
(Photocopies + Print + Office Boy Pay + Tea etc.)
Advertisement = Rs. 20, 000/- per month
Total Office Expenses = Rs. 170, 000/-
FINANCIAL DETAILS
FINANCIAL DETAILS
TEAM SALARIES
I myself would be working as the team lead and
engineer who would be experienced up to 2 years
would be hired and trained for their respective roles
Team Lead Rs. 100, 000/-
Electrical Engineer Rs. 50, 000/-
Mechanical Engineer Rs. 50, 000/-
Chemical Engineer Rs. 50, 000/-
Total Salaries Rs. 250, 000/-
FINANCIAL DETAILS
 TRAVELLING EXPENSES
 Car would be taken on rent form the
Lahore Rental Company (Mobile: 0321 90 999 09) from Johar Town
branch Lahore
 The rates were taken from the company for the calculation purpose and
they are detailed below
 Vehicle Charges Rs. 3, 600 per day + Distance dependent cost
 Car Rent (4 days per visit) Rs. 3, 600*4 = Rs. 14, 400/-
(For one visit)
 Distance dependent cost Rs. 17 per KM
 Total Visits per month 5
 Average kilometers travelled 1000 KM
(Per Visit)
 Per month distance expenses 1000*5*17 = Rs. 85, 000/-
 Total Travelling Expenses 85, 000 + (14, 400*5) = Rs. 157, 000/-
(Per Month)
FINANCIAL DETAILS
 AUDIT FEE AND PROFIT
 The audit fee would be charged at per watt basis. In other words we
would be charging the audit fee according to the watts audited in the
industry. Calculation would be done as:
 Average sanction load (From 58 industries record) = 8580 KW
 Total monthly expenses = Rs. 577, 000/-
 At ~48.7 % profit income should be = Rs. 858, 000
 Total KW audited per month (5 audits per month) = 8580*5 = 42900
KW
 So charges for the audit comes out to be Rs. 20 per KW
 This will ensure a profit of almost 48.7 % on the expenses which gives
us a profit of
858, 000- 577, 000 = Rs. 281, 000 per month given that the team
perform 5 audits per month irrespective of the type of the industry.
INCOME STATEMENT
Initial Investment = Rs. 2700, 000/-
Monthly Expenses = Rs. 577, 000/-
Charges = Rs. 20 per KW
Total Monthly Earning = Rs. 858, 000/-
Profit = 858, 000- 577, 000 = Rs. 281, 000/-
Profit on Investment ~ 48.7 %
Payback Period = 2700, 000/ 281, 000
= 9.6 months
EPILOGUE
EPILOGUE
With the reducing fossil fuels this business
plan is the need of the hour
Reduced energy usage will reduce the bills
and environmental pollution as well
Energy Efficiency Program can be expanded to
other disciplines like building audits, home
energy audits
This conserved energy can be used some
where else
1 unit saved= 2 units produced
REFRENCES
http://sharifinternational.net/energy-efficient-
lamps/lvd-lamps-comparison/
http://www.aps-
solutionsforbusiness.com/ProjectCenter/Portals/54/M
otorsFactSheet_WEB090908.pdf
http://www.plantservices.com/articles/2010/06vfdssav
eenergy/?start=1
http://www.iso.org/iso/home/standards/management
-standards/iso50001.htm
http://www.copper.org/environment/sustainable-
energy/electric-motors/education/motor_text.html
THANK YOU FOR LISTENING

More Related Content

What's hot

Energy Storage Systems and Technology
Energy Storage Systems and TechnologyEnergy Storage Systems and Technology
Energy Storage Systems and Technology
Bushveld Energy
 
Energy Storage
Energy StorageEnergy Storage
Energy Storage
Power System Operation
 
energy audit
energy auditenergy audit
energy audit
Karansinh Parmar
 
Battery energy storage systems (BESS) – an overview of the basics
Battery energy storage systems (BESS) – an overview of the basicsBattery energy storage systems (BESS) – an overview of the basics
Battery energy storage systems (BESS) – an overview of the basics
Bushveld Energy
 
Wind Power presentation 2023.pdf
Wind Power presentation 2023.pdfWind Power presentation 2023.pdf
Wind Power presentation 2023.pdf
Navanath6
 
Energy storage
Energy storageEnergy storage
Energy storage
margatecnojaime
 
Renewable Energy Systems
Renewable Energy SystemsRenewable Energy Systems
Renewable Energy Systems
Naveed Rehman
 
SOLAR POWER generation using solar PV and Concentrated solar power technology
SOLAR POWER generation using solar PV and Concentrated solar power technologySOLAR POWER generation using solar PV and Concentrated solar power technology
SOLAR POWER generation using solar PV and Concentrated solar power technology
Praveen Kumar
 
Concentrated Solar Power Technologies (CSP)
Concentrated Solar Power Technologies (CSP)Concentrated Solar Power Technologies (CSP)
Concentrated Solar Power Technologies (CSP)
swapnil_energy
 
Introduction to energy storage
Introduction to energy storageIntroduction to energy storage
Introduction to energy storage
Philip Fischer
 
Energy storage system
Energy storage systemEnergy storage system
Latest in energy storage
Latest in energy storageLatest in energy storage
Latest in energy storage
Loic Charmoille
 
Energy storage introduction
Energy storage introductionEnergy storage introduction
Energy storage introduction
Dr. Shagufta K
 
Market Outlook for Energy Storage in India
Market Outlook for Energy Storage in IndiaMarket Outlook for Energy Storage in India
Market Outlook for Energy Storage in India
Gensol Engineering Limited
 
Case Study of Energy Audit
Case Study of Energy Audit Case Study of Energy Audit
Case Study of Energy Audit
Darshan Vithani
 
Green hydrogen production and distribution
Green hydrogen production and distributionGreen hydrogen production and distribution
Green hydrogen production and distribution
Henrik Steen Pedersen
 
Solar Panel Installation And Maintenance PowerPoint Presentation Slides
Solar Panel Installation And Maintenance PowerPoint Presentation SlidesSolar Panel Installation And Maintenance PowerPoint Presentation Slides
Solar Panel Installation And Maintenance PowerPoint Presentation Slides
SlideTeam
 
An introduction to energy storage technologies
An introduction to energy storage technologies An introduction to energy storage technologies
An introduction to energy storage technologies
Abhinav Bhaskar
 
Energy Efficiency in Thermal System - Case Studies from Nepal
Energy Efficiency in Thermal System - Case Studies from NepalEnergy Efficiency in Thermal System - Case Studies from Nepal
Energy Efficiency in Thermal System - Case Studies from Nepal
eecfncci
 
Report Energy Efficiency in India: PAT Scheme - The Way Ahead
Report Energy Efficiency in India: PAT Scheme - The Way AheadReport Energy Efficiency in India: PAT Scheme - The Way Ahead
Report Energy Efficiency in India: PAT Scheme - The Way Ahead
TATA Strategic Management Group- Chemicals Vertical
 

What's hot (20)

Energy Storage Systems and Technology
Energy Storage Systems and TechnologyEnergy Storage Systems and Technology
Energy Storage Systems and Technology
 
Energy Storage
Energy StorageEnergy Storage
Energy Storage
 
energy audit
energy auditenergy audit
energy audit
 
Battery energy storage systems (BESS) – an overview of the basics
Battery energy storage systems (BESS) – an overview of the basicsBattery energy storage systems (BESS) – an overview of the basics
Battery energy storage systems (BESS) – an overview of the basics
 
Wind Power presentation 2023.pdf
Wind Power presentation 2023.pdfWind Power presentation 2023.pdf
Wind Power presentation 2023.pdf
 
Energy storage
Energy storageEnergy storage
Energy storage
 
Renewable Energy Systems
Renewable Energy SystemsRenewable Energy Systems
Renewable Energy Systems
 
SOLAR POWER generation using solar PV and Concentrated solar power technology
SOLAR POWER generation using solar PV and Concentrated solar power technologySOLAR POWER generation using solar PV and Concentrated solar power technology
SOLAR POWER generation using solar PV and Concentrated solar power technology
 
Concentrated Solar Power Technologies (CSP)
Concentrated Solar Power Technologies (CSP)Concentrated Solar Power Technologies (CSP)
Concentrated Solar Power Technologies (CSP)
 
Introduction to energy storage
Introduction to energy storageIntroduction to energy storage
Introduction to energy storage
 
Energy storage system
Energy storage systemEnergy storage system
Energy storage system
 
Latest in energy storage
Latest in energy storageLatest in energy storage
Latest in energy storage
 
Energy storage introduction
Energy storage introductionEnergy storage introduction
Energy storage introduction
 
Market Outlook for Energy Storage in India
Market Outlook for Energy Storage in IndiaMarket Outlook for Energy Storage in India
Market Outlook for Energy Storage in India
 
Case Study of Energy Audit
Case Study of Energy Audit Case Study of Energy Audit
Case Study of Energy Audit
 
Green hydrogen production and distribution
Green hydrogen production and distributionGreen hydrogen production and distribution
Green hydrogen production and distribution
 
Solar Panel Installation And Maintenance PowerPoint Presentation Slides
Solar Panel Installation And Maintenance PowerPoint Presentation SlidesSolar Panel Installation And Maintenance PowerPoint Presentation Slides
Solar Panel Installation And Maintenance PowerPoint Presentation Slides
 
An introduction to energy storage technologies
An introduction to energy storage technologies An introduction to energy storage technologies
An introduction to energy storage technologies
 
Energy Efficiency in Thermal System - Case Studies from Nepal
Energy Efficiency in Thermal System - Case Studies from NepalEnergy Efficiency in Thermal System - Case Studies from Nepal
Energy Efficiency in Thermal System - Case Studies from Nepal
 
Report Energy Efficiency in India: PAT Scheme - The Way Ahead
Report Energy Efficiency in India: PAT Scheme - The Way AheadReport Energy Efficiency in India: PAT Scheme - The Way Ahead
Report Energy Efficiency in India: PAT Scheme - The Way Ahead
 

Similar to Business Idea: Industrial Energy Conservation Solutions

Ada power presentataion 30.03.2018
Ada  power presentataion  30.03.2018Ada  power presentataion  30.03.2018
Ada power presentataion 30.03.2018
Avanindra Yadav
 
Career Talk for Undergraduates:Energy efficiency industry and career potenti...
Career Talk for Undergraduates:Energy efficiency industry  and career potenti...Career Talk for Undergraduates:Energy efficiency industry  and career potenti...
Career Talk for Undergraduates:Energy efficiency industry and career potenti...
ZAINI ABDUL WAHAB
 
Introduction to Energy Efficiency Industry for Malaysians
Introduction to Energy Efficiency Industry for MalaysiansIntroduction to Energy Efficiency Industry for Malaysians
Introduction to Energy Efficiency Industry for Malaysians
ZAINI ABDUL WAHAB
 
Is Indian Power Sector Ready for Ultra Super Critical Power Plants
Is Indian Power Sector Ready for Ultra Super Critical Power PlantsIs Indian Power Sector Ready for Ultra Super Critical Power Plants
Is Indian Power Sector Ready for Ultra Super Critical Power Plants
Infraline Energy
 
Energy audit and career opportunities -EnSave
Energy audit  and career opportunities -EnSaveEnergy audit  and career opportunities -EnSave
Energy audit and career opportunities -EnSave
Dharmalingam P
 
Investment and business potentials in energy efficiency industry
Investment and business potentials in energy efficiency industry Investment and business potentials in energy efficiency industry
Investment and business potentials in energy efficiency industry
ZAINI ABDUL WAHAB
 
multidisciplinary action project report on e bike
multidisciplinary action project report on e bikemultidisciplinary action project report on e bike
multidisciplinary action project report on e bike
peakrankeryt
 
Access to Clean Energy for the Indian MSMES: Challenges & Opportunities
Access to Clean Energy for the Indian MSMES: Challenges & OpportunitiesAccess to Clean Energy for the Indian MSMES: Challenges & Opportunities
Access to Clean Energy for the Indian MSMES: Challenges & Opportunities
WRI India
 
Wise Energy (2).pdf
Wise Energy (2).pdfWise Energy (2).pdf
Wise Energy (2).pdf
AqibZafar3
 
RENEWABLE ENERGY SECTOR CONSTRAINTS,SOLUTIONS AND FINANCING
RENEWABLE ENERGY  SECTOR CONSTRAINTS,SOLUTIONS AND FINANCINGRENEWABLE ENERGY  SECTOR CONSTRAINTS,SOLUTIONS AND FINANCING
RENEWABLE ENERGY SECTOR CONSTRAINTS,SOLUTIONS AND FINANCING
Nigeria Alternative Energy Expo
 
Indo -Sweden Final
Indo -Sweden FinalIndo -Sweden Final
Indo -Sweden FinalAnkit Sabnis
 
Electric vehicle - strategic plan
Electric vehicle - strategic planElectric vehicle - strategic plan
Electric vehicle - strategic plan
Rishabh Rathi
 
D.Light Design Case Study Ananlysis
D.Light Design Case Study AnanlysisD.Light Design Case Study Ananlysis
D.Light Design Case Study Ananlysis
Cherry Malhotra
 
SSAEL Utility Solar pre bid and post bid consulting services
SSAEL Utility Solar pre bid and post bid consulting servicesSSAEL Utility Solar pre bid and post bid consulting services
SSAEL Utility Solar pre bid and post bid consulting services
Satya Kumar DV
 
Marketing Plan of Suzuki Solar Car
Marketing Plan of Suzuki Solar CarMarketing Plan of Suzuki Solar Car
Marketing Plan of Suzuki Solar CarSaad Mazhar
 
Isde 2
Isde 2Isde 2
Industrial energy efficiency - approaches, technologies and policies, Girish ...
Industrial energy efficiency - approaches, technologies and policies, Girish ...Industrial energy efficiency - approaches, technologies and policies, Girish ...
Industrial energy efficiency - approaches, technologies and policies, Girish ...
ESD UNU-IAS
 
Energy efficient manufacturing plant
Energy efficient manufacturing plantEnergy efficient manufacturing plant
Energy efficient manufacturing plant
inderpreet singh
 

Similar to Business Idea: Industrial Energy Conservation Solutions (20)

200718TS146
200718TS146200718TS146
200718TS146
 
Ada power presentataion 30.03.2018
Ada  power presentataion  30.03.2018Ada  power presentataion  30.03.2018
Ada power presentataion 30.03.2018
 
Career Talk for Undergraduates:Energy efficiency industry and career potenti...
Career Talk for Undergraduates:Energy efficiency industry  and career potenti...Career Talk for Undergraduates:Energy efficiency industry  and career potenti...
Career Talk for Undergraduates:Energy efficiency industry and career potenti...
 
Introduction to Energy Efficiency Industry for Malaysians
Introduction to Energy Efficiency Industry for MalaysiansIntroduction to Energy Efficiency Industry for Malaysians
Introduction to Energy Efficiency Industry for Malaysians
 
Is Indian Power Sector Ready for Ultra Super Critical Power Plants
Is Indian Power Sector Ready for Ultra Super Critical Power PlantsIs Indian Power Sector Ready for Ultra Super Critical Power Plants
Is Indian Power Sector Ready for Ultra Super Critical Power Plants
 
Energy audit and career opportunities -EnSave
Energy audit  and career opportunities -EnSaveEnergy audit  and career opportunities -EnSave
Energy audit and career opportunities -EnSave
 
Investment and business potentials in energy efficiency industry
Investment and business potentials in energy efficiency industry Investment and business potentials in energy efficiency industry
Investment and business potentials in energy efficiency industry
 
multidisciplinary action project report on e bike
multidisciplinary action project report on e bikemultidisciplinary action project report on e bike
multidisciplinary action project report on e bike
 
Access to Clean Energy for the Indian MSMES: Challenges & Opportunities
Access to Clean Energy for the Indian MSMES: Challenges & OpportunitiesAccess to Clean Energy for the Indian MSMES: Challenges & Opportunities
Access to Clean Energy for the Indian MSMES: Challenges & Opportunities
 
Wise Energy (2).pdf
Wise Energy (2).pdfWise Energy (2).pdf
Wise Energy (2).pdf
 
RENEWABLE ENERGY SECTOR CONSTRAINTS,SOLUTIONS AND FINANCING
RENEWABLE ENERGY  SECTOR CONSTRAINTS,SOLUTIONS AND FINANCINGRENEWABLE ENERGY  SECTOR CONSTRAINTS,SOLUTIONS AND FINANCING
RENEWABLE ENERGY SECTOR CONSTRAINTS,SOLUTIONS AND FINANCING
 
asia esco 2010
asia esco 2010asia esco 2010
asia esco 2010
 
Indo -Sweden Final
Indo -Sweden FinalIndo -Sweden Final
Indo -Sweden Final
 
Electric vehicle - strategic plan
Electric vehicle - strategic planElectric vehicle - strategic plan
Electric vehicle - strategic plan
 
D.Light Design Case Study Ananlysis
D.Light Design Case Study AnanlysisD.Light Design Case Study Ananlysis
D.Light Design Case Study Ananlysis
 
SSAEL Utility Solar pre bid and post bid consulting services
SSAEL Utility Solar pre bid and post bid consulting servicesSSAEL Utility Solar pre bid and post bid consulting services
SSAEL Utility Solar pre bid and post bid consulting services
 
Marketing Plan of Suzuki Solar Car
Marketing Plan of Suzuki Solar CarMarketing Plan of Suzuki Solar Car
Marketing Plan of Suzuki Solar Car
 
Isde 2
Isde 2Isde 2
Isde 2
 
Industrial energy efficiency - approaches, technologies and policies, Girish ...
Industrial energy efficiency - approaches, technologies and policies, Girish ...Industrial energy efficiency - approaches, technologies and policies, Girish ...
Industrial energy efficiency - approaches, technologies and policies, Girish ...
 
Energy efficient manufacturing plant
Energy efficient manufacturing plantEnergy efficient manufacturing plant
Energy efficient manufacturing plant
 

Recently uploaded

VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
Norma Mushkat Gaffin
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 

Recently uploaded (20)

VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 

Business Idea: Industrial Energy Conservation Solutions

  • 1. INDUSTRIAL ENERGY CONSERVATION SOLUTIONS BY Aadil Naveed 2013(Fall)-MBA E-004 TO DR. ASIF NAWAZ
  • 3. PROJECT PROFILE Product /Services Energy Solutions (Personal Services) Potential customers Energy Consuming Industries Deliverables Energy Conservation Potentials Strategic Partners ABB, WEG, SIEMENS etc. Contingencies Not frequent Business Type Small Business (Sole proprietorship) Planning Requirement Daily basis Competitive Strategy Cost effectiveness and Quality Business Emergence Corridor Principle Field Experience 3 Years in IMEIP US-AID Team Span 3 to 5 Members
  • 5. PROJECT SCOPE Industrial Energy Conservation is the need of the hour With increasing energy prices and shortfall we need to conserve and generate more The deliverable include the identification of areas where energy savings are possible Replacements of old, less efficient motors and other instruments would be suggested Saving potentials would be calculated and discussed with the customers
  • 6. HOW THE IDEA EMERGED ? Idea Germination I was doing Energy auditing since last two years during which the idea emerged I often thought that there is an empty market niche which can be exploited Preparation I started gathering information which would be required to start a new business I gathered knowledge from where ever possible and help was taken from seniors
  • 7. HOW THE IDEA EMERGED ? Incubation During the last few months I saw an increasing potential for this sort of business Illumination I prepared the feasibilities of the idea and the finances associated with it and it came out to be a good business venture Verification Now I am planning to execute the business plan which would verify its validity
  • 9. WHAT CREATES THE MARKET NICHE ? Energy Crisis in the country Increasing Environmental Problems Declining Fossil Fuels Increasing Energy Prices Energy Efficient Motors Energy Policies Establishment VFD Technology Emergence
  • 10. WHAT CREATES THE MARKET NICHE ? ISO 50001 implementation US-AID Energy initiative New Process Designs Evolution in Lighting Technology Increasing use of Renewable Energy Global Warming
  • 11. Energy Crisis in the country The energy demand is increasing in the country with every passing day Due to the lack of planning by the previous governments Pakistan is facing a serious energy crisis Currently Pakistan is facing a shortfall of 4,000 to 5,000 MW So the need of the hour is that apart from increasing the energy generation we must also focus on conserving it
  • 12. The energy prices in the countries have increased by 100% since 2000
  • 13. ARRIVAL OF NEW TECHNOLOGY Energy Efficient Motors New energy efficient motors (IE1, IE2, IE3 and IE4) are in the markets with IE4 having the highest efficiency of almost 96% Evolution in Lighting Technology The new LVD lights consume 50% less energy and provide 37 % more luminosity compared to a normal light in operation
  • 15. LVD vs. Older Technology
  • 16. ARRIVAL OF NEW TECHNOLOGY VFD Technology Emergence Employing a VFD and reducing the RPM of a motor can easily result into about 20% energy saving Previously dampers have been employed which does not reduce the energy consumption but in fact dampens the energy delivered 10 reduction in RPM means 22% reduction in energy consumption and 20% reduction in RPM means 44% reduction
  • 17. US-AID INITIATIVE US-AID was providing 50% subsidy on the purchase of new motors and VFDs in their IMEIP project Old inefficient motors were replaced by New high efficiency motors and new VFDs were installed to increase the energy savings The 3rd phase and the biggest of this project is due within a year or so Almost 70 industries all over the Pakistan benefitted from this project and 90% of them were highly satisfied with the energy savings
  • 19. 5 C Customers Energy Consuming Industries Company IECoS Pvt. Ltd. Competitors Few Individuals Collaboration ABB and WEG Pakistan Context Energy Conservation is the need of the hour with the increasing energy prices and shortfall.
  • 20. 4 P Product/Services Energy Services Promotion Website, Pamphlets and Brochure Place Industries all over the Pakistan Pricing Industries would be charged Rs. 20 per KW
  • 21. STRENGTHS ANALYSIS  During the last 2 to 3 years I have been auditing the industries which are ready for investment in the energy sector  These are my ready potential customers and I have all the contact details available with me  I have the N.P.O. auditor certificate which will be helping me in training the junior engineers and in gaining the contracts  The vendor companies (ABB, WEG, SIEMENS etc) are my natural alliances and will be doing the marketing for me  The technologies are calling for the change and it is easy to convince the clients regarding the saving potentials
  • 22. MARKETING ANALYSIS  As the 3rd phase of US-AID IMEIP project is due within six months and the industries are interested in seeking the potential replacement We would be providing them with saving potentials before the start of the 3rd phase so they can place their orders accordingly There are almost 58 potential customers which are in contact with me and are willing to invest in energy sector Industries which missed the chance of getting registered in the previous two phases are lurking for the 3rd phase and would be easy to convince
  • 23. MARKETING An attractive website would be made and emails regarding services would be forwarded to the industries Energy Conservation Pamphlets would be made and mailed Motors, VFDs and Lighting vendors would be contacted for support Engineers in their spare time would be visiting the industries and giving presentations to high officials
  • 25. SWOT Analysis STRENGTHS Vendor’s Interest 3rd IMEIP US-AID Phase Negligible Competition 3 years of field experience WEAKNESSES No data for help available Low competition, Low Motivation Lack of Awareness
  • 26. SWOT Analysis Opportunities Solar Panels for Industries Waste Heat Exchangers Machine Spare parts Services Threats GIZ, NEC starts similar services Customers low motivation No energy left to conserve
  • 28. GROWTH STAGES PRE-START UP GROWTH The instruments required would be purchase from Makkays Pvt. Ltd. The Engineers would be hired (1-3 years experienced) and trained for EA Marketing would be done by the website and Pamphlets START –UP GROWTH During the initial phase maximum audits would be done and reports would be then compiled Energy audit results would be verified with the customers
  • 29. GROWTH STAGES  EARLY GROWTH  Rapid response is expected so new teams can be hired on contract and project basis  Competitors may arrive, cost effectiveness would be the weapon to use  LATER GROWTH  Industrial instrument installation services  Erection support would be provided to industries  Solar system installation is also a possibility
  • 31. POTENTIAL CUSTOMERS Sr. No. Facility Name Address Disco District 1 Sapphire Finishing Mills Limited Sapphire Finishing Mills Ltd. 3.5 Km, Raiwind Manga Road, Raiwind LESCO Kasur 2 Crescent Steel And Allied Products Ltd. A/25 S.I.T.E Nooriabad. District Jam Shoro Sindh, Pakistan HESCO Jamshoro 3 Al Noor Sugar Mills Shah Pur Jaharian Taulaka, Doulat Pur District Benazirabad Sindh Pakistan Sukhar SEPCO Benazirabad 4 Thatta Cement Company Limited Makli Ghulam Ullah Road District Thatta, Sindh HESCO Thatta 5 Pak-Arab Fertilizer Disposal Workshop Pak Arab Fartilizer Kwl Road Khad Factory MEPCO Multan 6 Nestle Pakistan Limited Nestle Pakistan Limited, Sheikhupura Road, Sheikhupura. LESCO Sheikhupura 7 Dalda Foods Private Limited F 33 Site Hub River Road Karachi KESC Karachi
  • 32. 8 Unilever Pakistan Limited. Unilever Pakistan Limited,Tea Factory,Chak # 88-A 10 R,Khanewal MEPCO Khanewal 9 Thal Limited (Jute Division) Dg Khan Road Muzafargarh MEPCO Muzaffargarh 10 Hazara Phosphate Fertilizer Pvt.Ltd Hazara Phosphate (Pvt) Ltd Hattar Road, Haripur. PESCO Haripur 11 Ici Soda Ash Khewra Ici Soda Ash Plant Khewra IESCO Jhelum 12 Maple Leaf Cement Factory Ltd. Maple Leaf Cement Factory Ltd. Iskandarabad, Mianwali. FESCO Mianwali 13 Anjum Textile Mills (Private) Limited 42 Km Sheikhupura Road Faisalabad FESCO Faisalabad 14 Bilal Fibres Mills 38-Km Sheikhupura Road Faisalabad FESCO Faisalabad 15 Al-Abbas Cement Industries Limited Nooriabad Industrial Area, Kalo Koher District Jamshoroo Sindh HESCO Jamshoro
  • 34. ENERGY AUDITING TEAM Team Lead Environmental Analyst Electrical Engineer Mechanical Engineer Chemical Engineer
  • 35. WBS OF PROJECT Every team member is expected to work individually All the data collection would be done with the help of the industrial representative Data collected would be shared with the customer before analysis The final analysis and report compilation would be done by the Team Lead Final audit results would then be submitted to the esteemed customer in hard form
  • 36. ENRGY AUDITING TEAM Electrical Engineer Motor Sizing Motor Drives Lightning HVAC Mechanical Engineer  Machinery Maintenance  Compressors  Thermography
  • 37. ENRGY AUDITING TEAM Chemical Engineer  Carbon Emission  Waste Heat  Supply &Waste Water Environmental Engineer  Health and balance of Environment  Energy Management Standards  Carbon Footprints
  • 38.
  • 41. FINANCIAL DETAILS Office Equipment Furniture & AC etc. Laptops Stationary & Advertising Printer and Scanner Funds Allocated = Rs. 1200, 000/-
  • 42. OFFICE RENT AND EXPENSES An amount of Rs. 500, 000/- would be submitted as advance for the rent place Monthly Rent = Rs. 80, 000/- Office Expenses = Rs. 70, 000/- per month (Photocopies + Print + Office Boy Pay + Tea etc.) Advertisement = Rs. 20, 000/- per month Total Office Expenses = Rs. 170, 000/- FINANCIAL DETAILS
  • 43. FINANCIAL DETAILS TEAM SALARIES I myself would be working as the team lead and engineer who would be experienced up to 2 years would be hired and trained for their respective roles Team Lead Rs. 100, 000/- Electrical Engineer Rs. 50, 000/- Mechanical Engineer Rs. 50, 000/- Chemical Engineer Rs. 50, 000/- Total Salaries Rs. 250, 000/-
  • 44. FINANCIAL DETAILS  TRAVELLING EXPENSES  Car would be taken on rent form the Lahore Rental Company (Mobile: 0321 90 999 09) from Johar Town branch Lahore  The rates were taken from the company for the calculation purpose and they are detailed below  Vehicle Charges Rs. 3, 600 per day + Distance dependent cost  Car Rent (4 days per visit) Rs. 3, 600*4 = Rs. 14, 400/- (For one visit)  Distance dependent cost Rs. 17 per KM  Total Visits per month 5  Average kilometers travelled 1000 KM (Per Visit)  Per month distance expenses 1000*5*17 = Rs. 85, 000/-  Total Travelling Expenses 85, 000 + (14, 400*5) = Rs. 157, 000/- (Per Month)
  • 45. FINANCIAL DETAILS  AUDIT FEE AND PROFIT  The audit fee would be charged at per watt basis. In other words we would be charging the audit fee according to the watts audited in the industry. Calculation would be done as:  Average sanction load (From 58 industries record) = 8580 KW  Total monthly expenses = Rs. 577, 000/-  At ~48.7 % profit income should be = Rs. 858, 000  Total KW audited per month (5 audits per month) = 8580*5 = 42900 KW  So charges for the audit comes out to be Rs. 20 per KW  This will ensure a profit of almost 48.7 % on the expenses which gives us a profit of 858, 000- 577, 000 = Rs. 281, 000 per month given that the team perform 5 audits per month irrespective of the type of the industry.
  • 46. INCOME STATEMENT Initial Investment = Rs. 2700, 000/- Monthly Expenses = Rs. 577, 000/- Charges = Rs. 20 per KW Total Monthly Earning = Rs. 858, 000/- Profit = 858, 000- 577, 000 = Rs. 281, 000/- Profit on Investment ~ 48.7 % Payback Period = 2700, 000/ 281, 000 = 9.6 months
  • 47.
  • 49. EPILOGUE With the reducing fossil fuels this business plan is the need of the hour Reduced energy usage will reduce the bills and environmental pollution as well Energy Efficiency Program can be expanded to other disciplines like building audits, home energy audits This conserved energy can be used some where else 1 unit saved= 2 units produced