The document provides updates on construction activities for Sections 3 and 4 of the Eglinton Crosstown LRT project from O'Connor Station to Kennedy Station in July 2021. It notes that finishing work is largely complete at stops along this section and vehicle testing is ongoing between Brentcliffe and Kennedy through December 2021. Road restoration between these points is scheduled from August 2021 through fall 2021. It also provides details on watermain relocation work occurring at Kennedy Station from June to September 2021 and the temporary relocation of the west GO platform and pedestrian detour at Kennedy Station through August 2022.
The document provides a construction update for the Eglinton Crosstown LRT project in Toronto. It summarizes that from March to April 2021, light pole and shelter finishing activities will occur at several stops between O'Connor station and Ionview station. It also details that until April 2021, crews will continue backfilling and minor paving activities after completing a culvert replacement near Massey Creek. Finally, it outlines ongoing and planned construction activities at Kennedy station through 2021, including track work, station entrance work, and platform and tunnel construction.
Eglinton & Mt pleasant CLC - November Crosstown TO
The document provides updates on construction activities for the Eglinton Crosstown LRT project, including:
- Extended hours for station box construction at Eglinton Station through early 2022.
- Berwick portal construction and a laneway closure at Berwick Avenue on November 15th for 5 hours.
- TTC works at Eglinton Station and an upcoming closure from November 13-14, 2021.
- A planned traffic configuration change at Yonge Street in late November 2021 for approximately 6 months.
- Ongoing station box, main entrance, and secondary entrance construction at Mount Pleasant Station through 2021.
The document provides updates on construction activities for Sections 3 and 4 of the Eglinton Crosstown LRT project from O'Connor Station to Kennedy Station in July 2021. It notes that finishing work is largely complete at stops along this section and vehicle testing is ongoing between Brentcliffe and Kennedy through December 2021. Road restoration between these points is scheduled from August 2021 through fall 2021. It also provides details on watermain relocation work occurring at Kennedy Station from June to September 2021 and the temporary relocation of the west GO platform and pedestrian detour at Kennedy Station through August 2022.
The document provides a construction update for the Eglinton Crosstown LRT project in Toronto. It summarizes that from March to April 2021, light pole and shelter finishing activities will occur at several stops between O'Connor station and Ionview station. It also details that until April 2021, crews will continue backfilling and minor paving activities after completing a culvert replacement near Massey Creek. Finally, it outlines ongoing and planned construction activities at Kennedy station through 2021, including track work, station entrance work, and platform and tunnel construction.
Eglinton & Mt pleasant CLC - November Crosstown TO
The document provides updates on construction activities for the Eglinton Crosstown LRT project, including:
- Extended hours for station box construction at Eglinton Station through early 2022.
- Berwick portal construction and a laneway closure at Berwick Avenue on November 15th for 5 hours.
- TTC works at Eglinton Station and an upcoming closure from November 13-14, 2021.
- A planned traffic configuration change at Yonge Street in late November 2021 for approximately 6 months.
- Ongoing station box, main entrance, and secondary entrance construction at Mount Pleasant Station through 2021.
Cedarvale & Forest Hill Construction Update (September 29, 2021)Crosstown TO
This construction update provides details on progress at the Cedarvale and Forest Hill stations on the Eglinton Crosstown LRT. At Cedarvale Station, major concrete pours, pedestrian tunnel construction, and mechanical works are underway through 2021. Traffic configuration on Eglinton Avenue West will also be impacted through 2021 as entrance construction continues. Forest Hill Station works include main entrance construction and secondary entrance architectural works through 2021, with the pedestrian route to be closed as of October 5, 2021 for structural activities.
Avenue & Chaplin CLC - Construction Update: November 4, 2020Crosstown TO
The document provides updates on construction progress and planned activities at Chaplin Station on the Eglinton Crosstown LRT. Construction will continue into 2021 with activities like station box construction, concrete pours, and utility works taking place. This may cause noise, lane reductions and temporary road closures. Photos show ongoing rebar installation and waterproofing work at the station.
Fairbank-Oakwood Construction Update - November 2021Crosstown TO
The document provides a construction progress update for the Fairbank and Oakwood stations on the Eglinton Crosstown LRT project. For Fairbank station, elevator, escalator, and floor installations were completed in October. Wall, ceiling, and lighting installations are ongoing through 2021. Sidewalk restoration along Eglinton Avenue is also ongoing. For Oakwood station, architectural finishes and mechanical/electrical works are underway in the station box through 2021. Main and secondary entrance construction is also progressing with architectural installations. The traffic configuration around both stations will continue through 2021 as construction progresses.
Avenue & Chaplin CLC - Construction Update: January 5, 2022Crosstown TO
The document provides updates on construction activities at Chaplin Station and Avenue Station of the Eglinton Crosstown LRT. At Chaplin Station, work is underway on the tertiary, main, and secondary entrances and the station box through winter 2022, with Chaplin Road expected to close for one month starting January 15th. At Avenue Station, work continues on the station box, main entrance, and secondary entrance through winter 2022. Eglinton Connects streetscape work between Eastbourne and Duplex Avenues will also continue into 2022, reducing traffic to one lane in each direction.
Fairbank-Oakwood Construction Update - September 2021Crosstown TO
Construction is ongoing at the Fairbank and Oakwood stations on the Fairbank-Oakwood subway extension project. At Fairbank Station, structural work is complete and interior finishes are ongoing at the station box and service building through 2021. Temporary sidewalk closures are in effect along Eglinton Avenue. At Oakwood Station, work on the station box, main entrance, and secondary entrance is underway through 2021, with periodic laneway closures. Traffic configurations are subject to change as construction progresses at both stations.
Construction is ongoing at multiple locations along Section One of the Eglinton Crosstown LRT. At Leaside Station, final works are underway at the station box and entrances through early 2021. At Laird Station, works are continuing on the main and secondary entrances through late 2020. Along the at-grade portion, duct bank installation under the West Don River Bridge will occur for six weeks in October, and a pedestrian staircase is being installed at Eglinton and Leslie through November. Rehabilitation of the CP Bridge east of Leslie will take place until late November.
The document provides updates on construction activities for the Eglinton Crosstown LRT project in sections 3 and 4 from O'Connor Station to Kennedy Station in November and December 2020. It outlines concrete works, sidewalk construction, track works, and other activities taking place at stops along the route. It also discusses traffic changes and pedestrian detours planned at Kennedy Station in early December 2020 and August 2020 respectively to accommodate GO Transit platform relocation works. Construction is ongoing at stations and is expected to continue through late 2020.
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)Crosstown TO
The document provides updates on construction activities for Section One and Section Two of the at-grade portion of the Eglinton Crosstown LRT project. For Section One from Brentcliffe Road to Sunnybrook Park Stop, work includes installing light poles and sidewalks, excavating for a retaining wall, and restoring areas around bridges. For Section Two from Aga Khan Park & Museum Stop to O'Connor Stop, work includes platform installation, guideway wall construction, and sidewalk/curb/driveway work between Bermondsey Rd and Victoria Park Ave. The Science Centre Station update outlines work like mechanical installation, deck removal, and tunnel/terminal construction.
Metrolinx is a transportation agency that oversees various transit services in the Greater Toronto and Hamilton Area (GTHA) including GO Transit, UP Express, and PRESTO fare payment. Their mission is to connect communities through transportation. Key projects mentioned include the Eglinton Crosstown LRT, which will be a 19km light rail line running mostly underground along Eglinton Avenue. The document provides details on the scope and status of construction for various sections of the project, including upcoming traffic restrictions to facilitate guideway and track installation at intersections along Eglinton Avenue East.
Pharmacy to Kennedy - November meeting Crosstown TO
The document provides an update on construction activities along Section Three and Four of the Eglinton Crosstown LRT project from O'Connor Station to Ionview Station. Road restoration from Brentcliffe Road to Kennedy Road is ongoing and will continue through winter 2021 and 2022. Testing and commissioning of light rail vehicles is also ongoing east of Brentcliffe Road. Construction at Kennedy Station is progressing with the main entrance works nearing completion in November 2021. Road configuration changes are planned at Kennedy Station in December 2021 and Transway Crescent will be closed for approximately two months for road restoration works.
Final central east open house oct282020Crosstown TO
The document provides a project update and summaries of work completed and remaining for 2020-2021 at various stations on the Eglinton Crosstown LRT project in Toronto. It notes that as of the end of 2020, three stations will be largely complete and 69% of track has been installed. Summaries are provided for each of Eglinton, Mount Pleasant, Leaside, Laird, Sunnybrook Park and Science Centre stations outlining progress to date and work still to be done. It also outlines the project's commitments to community benefits through hiring and local business spending.
The document provides an update on construction activities for several sections and stops of the Eglinton Crosstown LRT project from January to April 2021. Key activities include the completion of shelter installations at multiple stops, ongoing concrete works at pedestrian crossings and waiting areas, and the filling of the old Massey Creek culvert. At Kennedy Station, work continues on the main entrance, concourse level, and relocation of the GO west platform over the next year.
Brentcliffe to Victoria Park - March 4, 2021Crosstown TO
This document provides updates on construction progress for Section One and Section Two of the at-grade portion of the Eglinton Crosstown LRT. For Section One between Brentcliffe Road and Victoria Park Avenue, work is ongoing on retaining walls, track wiring installation, multi-use path construction, and pedestrian staircases. For Section Two between Aga Khan Park and Museum Stop and O'Connor Stop, work continues on station shelters, retaining walls, road widening, and track wiring with expected completion by March/April 2021. Progress photos show ongoing work at various sites including Science Centre Station.
The document provides a project update on the Eglinton Crosstown LRT in Toronto. It discusses that the project is now 70% complete, with three stations largely finished by the end of 2020. It outlines progress made in 2020 such as track installation and details remaining work for 2020 and 2021, including completing stations, installing signaling equipment, and landscaping. It also discusses community benefits from the project like supporting local businesses and hiring from disadvantaged groups.
Western Works CLC - Construction Update: January 18, 2022Crosstown TO
The document provides updates on construction progress for various stations and sections of the Eglinton Crosstown LRT project. Caledonia, Keelesdale, and Mount Dennis stations are undergoing finishing work like tiling, signage installation, and landscaping through 2022. Rail corridor construction between stations includes concrete pours, utility work, and track installation. LRVs are being tested and commissioned in single and coupled configurations between Mount Dennis and Caledonia stations to ensure safety and reliability before revenue service begins.
The following construction update for Pharmacy to Kennedy stations has been updated as recently as November 30, 2021. You can view the presentation here:
Cedarvale & Forest Hill Construction Update (September 29, 2021)Crosstown TO
This construction update provides details on progress at the Cedarvale and Forest Hill stations on the Eglinton Crosstown LRT. At Cedarvale Station, major concrete pours, pedestrian tunnel construction, and mechanical works are underway through 2021. Traffic configuration on Eglinton Avenue West will also be impacted through 2021 as entrance construction continues. Forest Hill Station works include main entrance construction and secondary entrance architectural works through 2021, with the pedestrian route to be closed as of October 5, 2021 for structural activities.
Avenue & Chaplin CLC - Construction Update: November 4, 2020Crosstown TO
The document provides updates on construction progress and planned activities at Chaplin Station on the Eglinton Crosstown LRT. Construction will continue into 2021 with activities like station box construction, concrete pours, and utility works taking place. This may cause noise, lane reductions and temporary road closures. Photos show ongoing rebar installation and waterproofing work at the station.
Fairbank-Oakwood Construction Update - November 2021Crosstown TO
The document provides a construction progress update for the Fairbank and Oakwood stations on the Eglinton Crosstown LRT project. For Fairbank station, elevator, escalator, and floor installations were completed in October. Wall, ceiling, and lighting installations are ongoing through 2021. Sidewalk restoration along Eglinton Avenue is also ongoing. For Oakwood station, architectural finishes and mechanical/electrical works are underway in the station box through 2021. Main and secondary entrance construction is also progressing with architectural installations. The traffic configuration around both stations will continue through 2021 as construction progresses.
Avenue & Chaplin CLC - Construction Update: January 5, 2022Crosstown TO
The document provides updates on construction activities at Chaplin Station and Avenue Station of the Eglinton Crosstown LRT. At Chaplin Station, work is underway on the tertiary, main, and secondary entrances and the station box through winter 2022, with Chaplin Road expected to close for one month starting January 15th. At Avenue Station, work continues on the station box, main entrance, and secondary entrance through winter 2022. Eglinton Connects streetscape work between Eastbourne and Duplex Avenues will also continue into 2022, reducing traffic to one lane in each direction.
Fairbank-Oakwood Construction Update - September 2021Crosstown TO
Construction is ongoing at the Fairbank and Oakwood stations on the Fairbank-Oakwood subway extension project. At Fairbank Station, structural work is complete and interior finishes are ongoing at the station box and service building through 2021. Temporary sidewalk closures are in effect along Eglinton Avenue. At Oakwood Station, work on the station box, main entrance, and secondary entrance is underway through 2021, with periodic laneway closures. Traffic configurations are subject to change as construction progresses at both stations.
Construction is ongoing at multiple locations along Section One of the Eglinton Crosstown LRT. At Leaside Station, final works are underway at the station box and entrances through early 2021. At Laird Station, works are continuing on the main and secondary entrances through late 2020. Along the at-grade portion, duct bank installation under the West Don River Bridge will occur for six weeks in October, and a pedestrian staircase is being installed at Eglinton and Leslie through November. Rehabilitation of the CP Bridge east of Leslie will take place until late November.
The document provides updates on construction activities for the Eglinton Crosstown LRT project in sections 3 and 4 from O'Connor Station to Kennedy Station in November and December 2020. It outlines concrete works, sidewalk construction, track works, and other activities taking place at stops along the route. It also discusses traffic changes and pedestrian detours planned at Kennedy Station in early December 2020 and August 2020 respectively to accommodate GO Transit platform relocation works. Construction is ongoing at stations and is expected to continue through late 2020.
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)Crosstown TO
The document provides updates on construction activities for Section One and Section Two of the at-grade portion of the Eglinton Crosstown LRT project. For Section One from Brentcliffe Road to Sunnybrook Park Stop, work includes installing light poles and sidewalks, excavating for a retaining wall, and restoring areas around bridges. For Section Two from Aga Khan Park & Museum Stop to O'Connor Stop, work includes platform installation, guideway wall construction, and sidewalk/curb/driveway work between Bermondsey Rd and Victoria Park Ave. The Science Centre Station update outlines work like mechanical installation, deck removal, and tunnel/terminal construction.
Metrolinx is a transportation agency that oversees various transit services in the Greater Toronto and Hamilton Area (GTHA) including GO Transit, UP Express, and PRESTO fare payment. Their mission is to connect communities through transportation. Key projects mentioned include the Eglinton Crosstown LRT, which will be a 19km light rail line running mostly underground along Eglinton Avenue. The document provides details on the scope and status of construction for various sections of the project, including upcoming traffic restrictions to facilitate guideway and track installation at intersections along Eglinton Avenue East.
Pharmacy to Kennedy - November meeting Crosstown TO
The document provides an update on construction activities along Section Three and Four of the Eglinton Crosstown LRT project from O'Connor Station to Ionview Station. Road restoration from Brentcliffe Road to Kennedy Road is ongoing and will continue through winter 2021 and 2022. Testing and commissioning of light rail vehicles is also ongoing east of Brentcliffe Road. Construction at Kennedy Station is progressing with the main entrance works nearing completion in November 2021. Road configuration changes are planned at Kennedy Station in December 2021 and Transway Crescent will be closed for approximately two months for road restoration works.
Final central east open house oct282020Crosstown TO
The document provides a project update and summaries of work completed and remaining for 2020-2021 at various stations on the Eglinton Crosstown LRT project in Toronto. It notes that as of the end of 2020, three stations will be largely complete and 69% of track has been installed. Summaries are provided for each of Eglinton, Mount Pleasant, Leaside, Laird, Sunnybrook Park and Science Centre stations outlining progress to date and work still to be done. It also outlines the project's commitments to community benefits through hiring and local business spending.
The document provides an update on construction activities for several sections and stops of the Eglinton Crosstown LRT project from January to April 2021. Key activities include the completion of shelter installations at multiple stops, ongoing concrete works at pedestrian crossings and waiting areas, and the filling of the old Massey Creek culvert. At Kennedy Station, work continues on the main entrance, concourse level, and relocation of the GO west platform over the next year.
Brentcliffe to Victoria Park - March 4, 2021Crosstown TO
This document provides updates on construction progress for Section One and Section Two of the at-grade portion of the Eglinton Crosstown LRT. For Section One between Brentcliffe Road and Victoria Park Avenue, work is ongoing on retaining walls, track wiring installation, multi-use path construction, and pedestrian staircases. For Section Two between Aga Khan Park and Museum Stop and O'Connor Stop, work continues on station shelters, retaining walls, road widening, and track wiring with expected completion by March/April 2021. Progress photos show ongoing work at various sites including Science Centre Station.
The document provides a project update on the Eglinton Crosstown LRT in Toronto. It discusses that the project is now 70% complete, with three stations largely finished by the end of 2020. It outlines progress made in 2020 such as track installation and details remaining work for 2020 and 2021, including completing stations, installing signaling equipment, and landscaping. It also discusses community benefits from the project like supporting local businesses and hiring from disadvantaged groups.
Western Works CLC - Construction Update: January 18, 2022Crosstown TO
The document provides updates on construction progress for various stations and sections of the Eglinton Crosstown LRT project. Caledonia, Keelesdale, and Mount Dennis stations are undergoing finishing work like tiling, signage installation, and landscaping through 2022. Rail corridor construction between stations includes concrete pours, utility work, and track installation. LRVs are being tested and commissioned in single and coupled configurations between Mount Dennis and Caledonia stations to ensure safety and reliability before revenue service begins.
The following construction update for Pharmacy to Kennedy stations has been updated as recently as November 30, 2021. You can view the presentation here:
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)Crosstown TO
The document provides updates on construction activities for Sections One and Two of the Eglinton Crosstown LRT project. For Section One between Brentcliffe Road and Victoria Park Avenue, work includes road widening, retaining wall construction, bridge rehabilitation, and multi-use path building. Section Two between Aga Khan Park and O'Connor sees road work, sidewalk construction, track laying, and shelter installation at O'Connor station. Construction is ongoing at Science Centre station with mechanical and electrical work as well as entrance building.
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)Crosstown TO
The document provides updates on construction activities for Sections One and Two of the Eglinton Crosstown LRT project. For Section One between Brentcliffe Road and Victoria Park Avenue, work includes road widening, retaining wall construction, bridge rehabilitation, and multi-use path building. Section Two between Aga Khan Park and O'Connor sees road work, sidewalk construction, track laying, and shelter installation at O'Connor station. Construction is ongoing at Science Centre station with mechanical and electrical work as well as entrance building.
CLC Deck - Brentcliffe to Victoria Park - May 5 2022.pdfCrosstown TO
Construction updates for the following locations/stops: Brentcliffe Portal, Sunnybrook Park, Science Centre, Aga Khan Park & Museum, Wynford, Sloane and O'Connor.
Brentcliffe to Victoria Park - CLC construction update January 2021Crosstown TO
The document provides updates on construction activities for Sections One and Two of the Eglinton Crosstown LRT project from Brentcliffe Road to Victoria Park Avenue. In Section One, work is ongoing on platform construction, retaining walls, and pedestrian infrastructure installation through early 2021. For Section Two, concrete works are continuing on shelters and platforms, with track works scheduled for OCS wiring in mid-January over 11 days.
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdfCrosstown TO
The document provides updates on construction activities for different sections of the Eglinton Crosstown LRT project from September 2022. Vehicle testing is ongoing from Brentcliffe to Kennedy. Road and sidewalk restoration is ongoing from Brentcliffe to Don Mills through summer 2022. Landscaping along Eglinton is also ongoing through summer 2022. Finishing work at various stations including Science Centre station is ongoing through summer 2022 with periodic lane closures on Eglinton and Don Mills for inspections.
Avenue & Chaplin CLC - Construction Update: September 1, 2021Crosstown TO
The document provides updates on construction activities at Chaplin Station and Avenue Station of the Eglinton Crosstown LRT. At Chaplin Station, work is underway on the tertiary, main, and secondary entrances as well as station box construction through fall 2021, with activities such as concrete work, steel installations, and utility works expected to cause noise and lane reductions. At Avenue Station, similar construction is ongoing on the station box, main and secondary entrances through 2021, with deliveries, concrete pours, and crane use impacting traffic. Eglinton Connects streetscape work between Lascelles Blvd and Duplex Ave will begin as early as September 7th, reducing traffic to one lane in each direction for approximately two
Avenue & Chaplin CLC - Construction Update: November 3, 2021Crosstown TO
This document provides updates on construction progress for the Chaplin Station and Avenue Station of the Eglinton Crosstown LRT. At Chaplin Station, work continues on the tertiary, main, and secondary entrances through winter 2021, with activities like concrete works, steel installations, and mechanical works. At Avenue Station, station box construction and entrance work will continue through 2021, with potential impacts like overnight deliveries and occasional lane closures. Construction is also underway on the Eglinton Connects Streetscape and Cycle Track between Eastbourne and Duplex Avenues through 2021.
Avenue & Chaplin CLC - Construction Update: July 7, 2021Crosstown TO
The document provides an update on construction progress and activities at Chaplin Station and Avenue Station on the Eglinton Crosstown LRT. At Chaplin Station, work is underway on the tertiary, main, and secondary entrances as well as the station box through fall 2021, with activities including concrete works, mechanical and electrical installations, and utility work. At Avenue Station, construction of the station box, main entrance, and secondary entrance is ongoing through 2021 beneath and around Eglinton Avenue between Avenue Road and Lascelles Boulevard, and streetscape work on Eglinton Avenue between Lascelles Boulevard and Duplex Avenue will continue into mid-2021. Traffic configurations on Eglinton Avenue will be adjusted during construction.
Avenue & Chaplin CLC - Construction Update: May 5, 2021Crosstown TO
Construction updates were provided for the Chaplin Station and Avenue Station of the Eglinton Crosstown LRT. At Chaplin Station, work is underway on the tertiary, main, and secondary entrances through fall 2021, which will involve noise from activities like concrete work. At Avenue Station, final lining, concrete pours, and structural steel installation are underway through 2021, reducing Eglinton Avenue to one lane between Lascelles Blvd and Duplex Ave. The Eglinton Connects streetscape and cycle track project between those intersections is also continuing through mid-2021.
Avenue & Chaplin CLC - Construction Update: September 9, 2020Crosstown TO
The document provides updates on construction activities for the Chaplin Station and Avenue Station of the Eglinton Crosstown LRT. It details the delivery of a dewatering system tank, ongoing construction of station entrances and the station box, and work on the Eglinton Connects streetscape project between September 2020 and 2021. Construction will include concrete pours, utility work and installation of street furnishings. Traffic reductions on Eglinton Avenue are expected during this time period.
CLC Pharmacy to Kennedy - March 29, 2022 Compressed.pptxCrosstown TO
This document summarizes construction activities for the Eglinton Crosstown LRT project from Pharmacy Station to Kennedy Station in 3 paragraphs or less:
Construction is ongoing at various stations along the route to complete platform ramps, wayfinding tiles, architectural finishes and electrical work through April 2022. Testing of light rail vehicles is also continuing between Brentcliffe Road and Kennedy Road through Spring 2022. At Kennedy Station, work continues on the main entrance, station box, GO platforms and mechanical/electrical systems and is expected to wrap up in Spring 2022. Various road restoration activities are also ongoing along Eglinton Avenue and at Kennedy Intersection through April 2022 to accommodate the construction.
CLC Deck - Brentcliffe to Victoria Park - July 7 2022.pdfCrosstown TO
Construction updates for the following locations/stops: Brentcliffe Portal, Sunnybrook Park, Science Centre, Aga Khan Park & Museum, Wynford and O’Connor.
Pharmacy to Kennedy Construction Liaison Meeting - July 2020Crosstown TO
The document provides updates on construction activities for the Eglinton Crosstown LRT project in July and August 2020. It summarizes that at various stops concrete, rebar installation, and shelter installation will occur. It also outlines roadwork and sidewalk installation between Birchmount Road and Kennedy Road in August. Finally, it details ongoing work at Kennedy Station, including structural activities and relocation of the GO Transit platform in mid-August for approximately one year.
Avenue & Chaplin CLC - Construction Update: July 8, 2020Crosstown TO
The document provides updates on construction activities for the Eglinton Crosstown LRT project in the Chaplin and Avenue station areas in July 2020. At Chaplin station, work will continue on the tertiary and main entrances through winter 2021, including rebar installation, concrete works, and station box construction. Chaplin Crescent will remain closed until July 31 for bridge removal works. At Avenue station, final lining, waterproofing and mechanical works will continue through late 2020, with concrete pours three times per week. Eglinton Connects streetscape work is underway between Lascelles Blvd and Duplex Ave and will continue into early 2021. Traffic configurations will be implemented in stages through this period.
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxCrosstown TO
Metrolinx acknowledges that the Eglinton Crosstown LRT operates on Indigenous land and is committed to meaningful reconciliation. Construction is underway at Avenue Station with utility works planned for March 21st requiring lane reductions for 8 weeks. At Chaplin Station, the tertiary entrance and demolition of 6 Gilgorm Road are ongoing with Chaplin Crescent closed for 2 weeks. Eglinton Connects streetscape work between Eastbourne and Duplex Avenues continues through 2022 with one lane of traffic in each direction.
Fairbank-Oakwood Construction Update - July 2021Crosstown TO
The document provides updates on construction activities at the Fairbank and Oakwood stations on the Eglinton Crosstown LRT project. At Fairbank Station, work is ongoing on insulation, precast panels, dewatering wells, masonry, and electrical/mechanical installations. A pedestrian detour on Eglinton Ave W is in place until mid-July. At Oakwood Station, work continues on the station box, main entrance, secondary entrance and dewatering wells. The laneway behind the main entrance may close periodically and utility work on Eglinton Ave is planned for July-September.
Similar to Brentcliffe-Victoria Park CLC Meeting (20)
Western Works CLC - January 17, 2023.pdfCrosstown TO
The document provides updates on construction progress for the Eglinton Crosstown LRT project. It summarizes work completed in December 2022 and ongoing work at Caledonia Station, Keelesdale Station, and Mount Dennis Station. It also discusses track installation in the rail corridor, testing of light rail vehicles at the Eglinton Maintenance and Storage Facility, and lane reductions planned for heat trace installation works. Construction and testing activities are expected to continue through early 2023 and into 2023.
The document provides updates on construction activities for the Eglinton Crosstown LRT. Work is ongoing at Caledonia, Keelesdale, and Mount Dennis stations, and in the rail corridor, and will continue through spring 2023. This includes finishing works, system testing, and commissioning of trains. Lane reductions will occur between Weston Rd and Black Creek Dr in March for heat trace installation works. LRVs are being tested on the mainline in preparation for passenger service.
The document provides updates on construction progress for the Eglinton Crosstown LRT project, including at Leaside and Laird stations. At Leaside Station, architectural finishes, mechanical and electrical works are underway with station box and entrance construction expected to be complete in spring 2023. At Laird Station, similar finishing works are ongoing with the main and secondary entrances projected to be finished in early 2023. Utility works and asphalt restoration requiring periodic lane closures on Eglinton Avenue are also outlined.
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfCrosstown TO
The document provides updates on construction activities for the Eglinton Crosstown LRT project. It notes that work will continue through spring 2023 at Eglinton Station to finish architectural details, mechanical, electrical and testing. It also provides details on construction progress photos and updates for Mount Pleasant Station, including ongoing work on the station box and entrances through spring 2023. Traffic impacts are noted at both locations through late May 2023 for line painting and other works.
Chaplin-Avenue CLC - May 3 2023 Updated.pptxCrosstown TO
The document provides updates on construction progress for the Eglinton Crosstown LRT Chaplin Station and Avenue Station. For Chaplin Station, work is underway on the station entrances, station box, and Chaplin Parkette through Spring 2023. For Avenue Station, construction is ongoing on the station box, main and secondary entrances, and Eglinton Avenue streetscape through Summer 2023. Traffic configurations and lane closures are also outlined.
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCrosstown TO
The document provides updates on construction activities for the Eglinton Crosstown LRT project from Brentcliffe Road to O'Connor Drive. It notes that vehicle testing is ongoing from Brentcliffe to Kennedy, and that landscaping will continue through the summer. It also summarizes specific utility works, platform works, traffic restrictions and closures taking place between April and May 2023 at various locations along the route. Photos show examples of construction progress such as Presto machine installations and work at Aga Khan Park Station.
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxCrosstown TO
The document provides updates on construction activities for the Eglinton Crosstown LRT project from Pharmacy Station to Kennedy Station. It notes that vehicle testing and landscaping work will continue through spring 2023 between Brentcliffe and Kennedy stations. Between O'Connor and Ionview stops, traffic sign installation and line painting will take place through late spring. Sidewalk repairs are scheduled along Eglinton Ave East from mid-March 2023. Testing and commissioning activities are ongoing at Kennedy Station and will continue into early 2023. GO train platform service at Kennedy Station will shift east through 2023 with accessibility shuttle services provided.
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCrosstown TO
The document provides an update on construction activities for the Eglinton Crosstown LRT project from Pharmacy Station to Kennedy Station. It summarizes that testing and commissioning of light rail vehicles is ongoing between Brentcliffe Road and Kennedy Road through 2023. It also outlines ongoing construction and finishing work at multiple stations along the route including O'Connor, Pharmacy, Golden Mile, Birchmount, Ionview and Kennedy stations. Temporary traffic and pedestrian configurations are in place at 1995 Eglinton Avenue East and Kennedy Station during construction activities.
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCrosstown TO
The document provides updates on construction progress for different sections of the Eglinton Crosstown LRT project. Section One details work between Brentcliffe Portal to Sunnybrook Park Stop including vehicle testing, noise barrier removal, landscaping and utility works. Section Two details work from Aga Khan Park & Museum Stop to O'Connor Stop including vehicle testing, station finishes, and upcoming watermain restoration works. Science Centre Station work includes finishing activities and ongoing traffic configuration. Photos show ongoing signage, electrical and landscaping work throughout the alignment.
Chaplin-Avenue CLC - March 1, 2023.pptxCrosstown TO
The document provides updates on construction progress for the Chaplin Station and Avenue Station of the Eglinton Crosstown LRT. For Chaplin Station, work is underway on the station entrances, station box, and Chaplin Parkette through Spring 2023, with periodic lane closures on Chaplin Cres. For Avenue Station, construction is ongoing on the station box, entrances, and Eglinton Avenue streetscape/cycle track between Avenue Rd and Duplex Ave, with the traffic configuration shifting and lane reductions expected by March 2, 2023. Periodic lane and sidewalk closures as well as pedestrian rerouting will occur.
Leaside-Laird CLC - March 13, 2023.pdfCrosstown TO
The document provides updates on construction progress for the Eglinton Crosstown LRT project. It summarizes work happening at Leaside Station, including finishing the station box, main entrance, and secondary entrance through spring 2023. It also summarizes work at Laird Station, including main and secondary entrance construction through early 2023. Utility and road work is occurring through spring 2023 at both stations.
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCrosstown TO
The document provides updates on construction progress for different sections of the Eglinton Crosstown LRT project. Section One details work happening from Brentcliffe Portal to Sunnybrook Park Stop, including vehicle testing, noise barrier removal, landscaping, and overnight utility works. Section Two details work from Aga Khan Park & Museum Stop to O'Connor Stop, including vehicle testing, landscaping, station finishes, and upcoming watermain restoration works. Science Centre Station work includes finishing activities and ongoing traffic configuration. Photos show ongoing signage, electrical, and landscaping works.
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfCrosstown TO
The document provides updates on construction activities for the Eglinton Crosstown LRT project. It acknowledges that the project is taking place on Indigenous land and discusses the importance of reconciliation. It then details construction timelines and plans for the Eglinton and Mount Pleasant stations, including extended work hours, entrance construction, traffic shifts, and anticipated completion dates in spring 2023. Photos show progress on the station structures and entrances.
Chaplin-Avenue CLC - November 2 2022 compressed.pptxCrosstown TO
The document provides updates on construction progress at the Chaplin Station and Avenue Station sites of the Eglinton Crosstown LRT. At Chaplin Station, work is underway on the main, secondary, and tertiary entrances through December 2022, along with station box construction and road closures. At Avenue Station, station box construction and work on the main and secondary entrances is progressing through December 2022, along with Eglinton Avenue streetscape and cycle track construction between Eastbourne and Duplex Avenues. Construction photos depict ongoing work.
Chaplin-Avenue CLC - January 11 2023 (002).pptxCrosstown TO
The document provides updates on construction progress for the Chaplin Station and Avenue Station of the Eglinton Crosstown LRT. For Chaplin Station, construction of the main, secondary and tertiary entrances and Chaplin Parkette are underway through Spring 2023. Station box construction and intersection reinstatement at Chaplin Cres and Eglinton Ave are also progressing. For Avenue Station, station box construction, main and secondary entrance construction, and Eglinton Avenue streetscape work are underway through Spring 2023, with a traffic configuration change expected in early February 2023. Construction photos depict progress at station boxes, entrances and connections to local trails.
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCrosstown TO
This is a meeting invite for the Brentcliffe-Victoria Park CLC (Construction Liaison Committee) Monthly Meeting, covering the Brentcliffe Portal, Sunnybrook Park, Science Centre, Aga Khan, Wynford, Sloane and O’ Connor Stops.
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfCrosstown TO
The document provides updates on construction progress for the Eglinton Crosstown LRT project. It discusses ongoing work at Eglinton Station including extended hours for station box construction and main entrance construction. It also discusses ongoing work at Mount Pleasant Station including station box construction and main and secondary entrance construction. Traffic configuration changes at Mount Pleasant are also noted as completed. Construction progress photos of station box work are included.
Leaside-Laird CLC - January 9, 2023.pdfCrosstown TO
The document provides updates on construction progress at the Eglinton Crosstown LRT Leaside and Laird stations. At Leaside Station, work is underway on the station box, main entrance, secondary entrance, and utility and road works, with sidewalk restoration planned for January 9-11, 2023. At Laird Station, work continues on the main entrance, secondary entrance, and station box, with sidewalk restoration and monitoring well decommissioning requiring periodic lane reductions into early-mid 2023. Photos show ongoing construction and finishing works at both stations.
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCrosstown TO
Construction updates for the following locations/stops: Brentcliffe Portal, Sunnybrook Park, Science Centre, Aga Khan Park & Museum, Wynford, Sloane and O'Connor.
About Potato, The scientific name of the plant is Solanum tuberosum (L).Christina Parmionova
The potato is a starchy root vegetable native to the Americas that is consumed as a staple food in many parts of the world. Potatoes are tubers of the plant Solanum tuberosum, a perennial in the nightshade family Solanaceae. Wild potato species can be found from the southern United States to southern Chile
Synopsis (short abstract) In December 2023, the UN General Assembly proclaimed 30 May as the International Day of Potato.
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".Christina Parmionova
The program will expand our perspectives and appreciation for our blue planet, build new foundations for our relationship to the ocean, and ignite a wave of action toward necessary change.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.Christina Parmionova
The best available, up-to-date information on all fishing and related vessels that appear on the illegal, unregulated, and unreported (IUU) fishing vessel lists published by Regional Fisheries Management Organisations (RFMOs) and related organisations. The aim of the site is to improve the effectiveness of the original IUU lists as a tool for a wide variety of stakeholders to better understand and combat illegal fishing and broader fisheries crime.
To date, the following regional organisations maintain or share lists of vessels that have been found to carry out or support IUU fishing within their own or adjacent convention areas and/or species of competence:
Commission for the Conservation of Antarctic Marine Living Resources (CCAMLR)
Commission for the Conservation of Southern Bluefin Tuna (CCSBT)
General Fisheries Commission for the Mediterranean (GFCM)
Inter-American Tropical Tuna Commission (IATTC)
International Commission for the Conservation of Atlantic Tunas (ICCAT)
Indian Ocean Tuna Commission (IOTC)
Northwest Atlantic Fisheries Organisation (NAFO)
North East Atlantic Fisheries Commission (NEAFC)
North Pacific Fisheries Commission (NPFC)
South East Atlantic Fisheries Organisation (SEAFO)
South Pacific Regional Fisheries Management Organisation (SPRFMO)
Southern Indian Ocean Fisheries Agreement (SIOFA)
Western and Central Pacific Fisheries Commission (WCPFC)
The Combined IUU Fishing Vessel List merges all these sources into one list that provides a single reference point to identify whether a vessel is currently IUU listed. Vessels that have been IUU listed in the past and subsequently delisted (for example because of a change in ownership, or because the vessel is no longer in service) are also retained on the site, so that the site contains a full historic record of IUU listed fishing vessels.
Unlike the IUU lists published on individual RFMO websites, which may update vessel details infrequently or not at all, the Combined IUU Fishing Vessel List is kept up to date with the best available information regarding changes to vessel identity, flag state, ownership, location, and operations.
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
The Antyodaya Saral Haryana Portal is a pioneering initiative by the Government of Haryana aimed at providing citizens with seamless access to a wide range of government services
AHMR is an interdisciplinary peer-reviewed online journal created to encourage and facilitate the study of all aspects (socio-economic, political, legislative and developmental) of Human Mobility in Africa. Through the publication of original research, policy discussions and evidence research papers AHMR provides a comprehensive forum devoted exclusively to the analysis of contemporaneous trends, migration patterns and some of the most important migration-related issues.
3. SECTION ONE AT-GRADE UPDATE
3
Activity Location Approx. Date & Duration
Vehicle Testing Brentcliffe – Kennedy Ongoing through December 2021
Road Restoration Brentcliffe – Kennedy Late July 2021 – Fall 2021
Noise Barrier and Soil Nail Wall removal Brentcliffe – SE side August 2021 – September 2021
Brentcliffe Retaining Wall construction
North side of Eglinton Ave, east of
Brentcliffe Rd
Ongoing through Summer 2021
Waterproofing West Don River Bridge Completed June 2021
• Shelter finishing activities
• Handrail installation
• Platform ramps & curbs
• Electrical finishes
Sunnybrook Park Stop
• Largely completed June 2021
•
• Ongoing through Summer 2021
•
Multi-use path construction: backfill and
compaction
Landscaping works
Serena Gundy Park – West of Leslie St.
Ongoing through July 2021
Fall 2021
Concrete and road works Don Mills Rd & Eglinton Ave E Ongoing through 2021
4. EAST TESTING & COMMISSIONING
4
• On May 25, 26, 27, 31 and June 1 and 2, 6 light
rail vehicles (LRVs) were delivered to the east
end of the alignment.
• Testing and commissioning activities will be
conducted between Brentcliffe Road and
Kennedy Road through December 2021
• The LRVs will run mainly on the surface along a
track in the center of Eglinton Avenue.
5. RETAINING WALL CONSTRUCTION
NORTH SIDE OF EGLINTON AVENUE
EAST OF BRENTCLIFFE ROAD
5
• This retaining wall is required to hold the embankment created from
the widened Eglinton Ave.
• Retaining wall construction continues and is expected to be
complete in late Summer 2021
• Monitoring of the slope continues and there have been no recent
issues with the movement. Residents on Thursfield Crescent have full
use of their backyards.
• The City provided revised comments on the restoration design and approved planting trees in soil depths
that are less than the by-law requirements, which means trees will be included in the restoration plan.
• CTS has reviewed and incorporated the City’s comments; the final restoration plan is now with the City. CTS
expects approval shortly.
• CTS will share the restoration plan with Elected Officials and Thursfield residents upon completion.
• CTS expects to begin the restoration works in Fall 2021.
6. FINAL ROAD RESTORATION
BRENTCLIFFE – KENNEDY
6
• Final Road Restoration works will begin in Summer 2021 and last through Fall 2021
• The approximate timeline for road restoration of the At-Grade is:
o Late July 2021: Sloane – Victoria Park
o July – August 2021: Victoria Park – Birchmount
o September – October 2021: Sloane – Leslie
o October 2021: West of Leslie & east of Birchmount
• More specific details regarding the dates and locations of road restoration works will
be communicated to the public as they become available
7. NOISE BARRIER WALL AND SOIL NAIL WALL REMOVAL
7
• The noise barrier and soil nail walls, located on
the south side of Eglinton Avenue East, east of
Brentcliffe Rd., were erected in 2014 to facilitate
the construction of the east portal.
• As early as August 2021, CTS will begin
removing the noise barrier wall and exposed
segment of the soil nail wall. This work is
expected to last approximately one (1) month
• More detailed information about this work will
be communicated to the residents before the
work begins.
8. RAMP CONSTRUCTION, WEST OF LESLIE STREET
MULTI-USE PATH CONNECTING EGLINTON AVE E TO SERENA GUNDY PARK
8
• Excavation work is complete
• Final backfilling activities are underway, and are expected to be completed in July 2021
• After backfilling activities are completed, installation of topsoil, sodding, and landscaping works will take place in
Fall 2021as part of the final restoration plan
Mid-July 2020 through July 2021
11. SCIENCE CENTRE STATION UPDATE
11
Activity Location Approx. Date & Duration
Vehicle Testing Brentcliffe – Kennedy Ongoing through December 2021
Road Restoration Brentcliffe – Kennedy Late July 2021 – Fall 2021
Door Installation Main Entrance – retail space Completed June 2021
Finishing Activities:
• Floor tiling, ceiling grid & tile
installation, mechanical and electrical
finishes, handrail installation
Station Box Ongoing through July 2021
Finishing Activities:
• Wall & floor tiling, ceiling grid & tile
installation, electrical finishes, sliding
door finishes, canopy Installation
Bus Terminal Ongoing through July 2021
Finishing Activities:
• Floor tiling, ceiling grid & tile
installation, electrical finishes, sliding
door finishes
Main Entrance Ongoing through July 2021
12. EAST TESTING & COMMISSIONING
12
• On May 25, 26, 27, 31 and June 1 and 2, 6 light
rail vehicles (LRVs) were delivered to the east
end of the alignment.
• Testing and commissioning activities will be
conducted between Brentcliffe Road and
Kennedy Road through December 2021
• The LRVs will run mainly on the surface along a
track in the center of Eglinton Avenue.
17. SECTION TWO AT-GRADE UPDATE
17
Activity Location Approx. Date & Duration
Vehicle Testing Brentcliffe – Kennedy Ongoing through December 2021
Road Restoration Brentcliffe – Kennedy Late July 2021 – Fall 2021
Waterproofing East Don River Bridge Completed June 2021
• Shelter finishing activities
• Handrail installation
• Platform ramps & curbs
• Electrical finishes
Aga Khan Park & Museum Stop
• Largely completed June 2021
•
• Ongoing through Summer 2021
•
• Shelter finishing activities
• Handrail installation
• Platform ramps & curbs
• Electrical finishes
Sloane Stop
• Largely completed June 2021
•
• Ongoing through Summer 2021
•
• Shelter finishing activities
• Handrail installation
• Platform ramps & curbs
• Electrical finishes
O’Connor Stop
• Largely completed June 2021
•
• Ongoing through Summer 2021
•
18. EAST TESTING & COMMISSIONING
18
• On May 25, 26, 27, 31 and June 1 and 2, 6 light
rail vehicles (LRVs) were delivered to the east
end of the alignment.
• Testing and commissioning activities will be
conducted between Brentcliffe Road and
Kennedy Road through December 2021
• The LRVs will run mainly on the surface along a
track in the center of Eglinton Avenue.