ADMINISTRATION
Presented by:
Phil Laney
Assistant City Manager
CHAPTER 5 AMENDMENT FOR
DEMOLITION REVIEW PROCEDURES
ITEM # 8 & 9
JUNE 10, 2024
SUMMARY
Proposing changes to demolition review procedures to
provide more information
Current procedure allows review of demolitions for
significance without a review of proposed new/
renovated replacement structure
Proposal would require demolition review request to
also include review of proposed replacement structure
BACKGROUND
 Chapter 5 – Buildings and Building Regulations, Article IX – Demolitions
oversees demolition review procedures
 Significance review – for proposed demolitions, Architectural Review Board & Council
to determine if structure has significance
 Compatibility review – for proposed structures/renovations, ARB & Council to
determine if structure demonstrates compatibility with other surrounding structures
 Per Code, demolition review process intended to complete both the
significance of existing structures proposed for demolition and the
compatibility review of any replacement structures within the same
process
 By Code, significance (demolition) and compatibility (replacement
structure) may be completed in separate processes if requested by
owner
BACKGROUND
 Concern expressed that demolition review to
determine a structure’s significance made more
difficult without seeing proposed replacement
structure
 Staff report & feedback received
 April 9th – City Council staff report
 May 21st - ARB
BACKGROUND
 Amends demolition review procedures so significance and
compatibility processes may not be completed in separate
processes
 Demolition review application would also include all
compatibility review materials for the replacement structure
 Both ARB & Council demolition review would include replacement
structure proposal
 If replacement structure deemed incompatible or the
replacement structure not proposed, demolition delay may be
necessary to revise and/or develop design
POLICY ANALYSIS
 Demolition review procedures defined in Chapter
5, Building and Building Regulations, Article IX –
Demolition
 City’s interest to ensure relevant information is
made available when considering demolition
proposals
COORDINATION & FISCAL IMPACT
 Coordination
 City Attorney & City Manager
 Fiscal Impact – no fiscal impact

More Related Content

Similar to PPT Item # 8&9 - Demolition Code Amendments

Neda contractor performance evaluation system
Neda contractor performance evaluation system Neda contractor performance evaluation system
Neda contractor performance evaluation system
Mabelle Gaytano
 
VA Cx Presentation_SRE Training 2013 Final_v2
VA Cx Presentation_SRE Training 2013 Final_v2VA Cx Presentation_SRE Training 2013 Final_v2
VA Cx Presentation_SRE Training 2013 Final_v2
Jerry Bauers
 
Item # 13 - PPT Plan Review Process Revisions
Item # 13 - PPT Plan Review Process RevisionsItem # 13 - PPT Plan Review Process Revisions
Item # 13 - PPT Plan Review Process Revisions
ahcitycouncil
 
Tiêu chuẩn BSI BS 1192_4_2014
Tiêu chuẩn BSI BS 1192_4_2014Tiêu chuẩn BSI BS 1192_4_2014
Tiêu chuẩn BSI BS 1192_4_2014
Huytraining
 
BSI BS 1192_4_2014
BSI BS 1192_4_2014BSI BS 1192_4_2014
BSI BS 1192_4_2014
Nguyen Manh Tuan
 
BS 1192-4 fulfilling employer’s information exchange requirements using COBie...
BS 1192-4 fulfilling employer’s information exchange requirements using COBie...BS 1192-4 fulfilling employer’s information exchange requirements using COBie...
BS 1192-4 fulfilling employer’s information exchange requirements using COBie...
Applecore Designs Limited
 
Singapore Building Accessibility Code 2007
Singapore Building Accessibility Code 2007Singapore Building Accessibility Code 2007
Singapore Building Accessibility Code 2007
Scott Rains
 
Business basis of design
Business basis of design Business basis of design
Business basis of design
Bob Prieto
 
ConstrManagement.pdf
ConstrManagement.pdfConstrManagement.pdf
ConstrManagement.pdf
VeevThummuri
 
Appendix and Introduction
Appendix and IntroductionAppendix and Introduction
Appendix and Introduction
VancityInstitute
 
National building codes 2005 history overview
National building codes 2005 history overviewNational building codes 2005 history overview
National building codes 2005 history overview
Shourya Puri
 
Eot claims due to scope change under fidic contracts
Eot claims due to scope change under fidic contractsEot claims due to scope change under fidic contracts
Eot claims due to scope change under fidic contracts
Essam Lotffy, PMP®, CCP®
 
Module 5 understaning disability access provisions
Module 5   understaning disability access provisionsModule 5   understaning disability access provisions
Module 5 understaning disability access provisions
Michael Farrugia
 
Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017
DarrenTofu
 
Design architecture heritage_part1_slides
Design architecture heritage_part1_slidesDesign architecture heritage_part1_slides
Design architecture heritage_part1_slides
inchicoreontrack
 
2.6 sustainability
2.6 sustainability2.6 sustainability
2.6 sustainability
HumzaAlam1
 
2.6 sustainability (1)
2.6 sustainability (1)2.6 sustainability (1)
2.6 sustainability (1)
HumzaAlam1
 
WPL BIM Specs D Mac P
WPL BIM Specs D Mac PWPL BIM Specs D Mac P
WPL BIM Specs D Mac P
DMacP
 
Comparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode II
Comparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode IIComparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode II
Comparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode II
ijtsrd
 
HM hub and NPD first masterclass seminar 6.10.15
HM hub and NPD first masterclass seminar 6.10.15HM hub and NPD first masterclass seminar 6.10.15
HM hub and NPD first masterclass seminar 6.10.15
Euan Pirie
 

Similar to PPT Item # 8&9 - Demolition Code Amendments (20)

Neda contractor performance evaluation system
Neda contractor performance evaluation system Neda contractor performance evaluation system
Neda contractor performance evaluation system
 
VA Cx Presentation_SRE Training 2013 Final_v2
VA Cx Presentation_SRE Training 2013 Final_v2VA Cx Presentation_SRE Training 2013 Final_v2
VA Cx Presentation_SRE Training 2013 Final_v2
 
Item # 13 - PPT Plan Review Process Revisions
Item # 13 - PPT Plan Review Process RevisionsItem # 13 - PPT Plan Review Process Revisions
Item # 13 - PPT Plan Review Process Revisions
 
Tiêu chuẩn BSI BS 1192_4_2014
Tiêu chuẩn BSI BS 1192_4_2014Tiêu chuẩn BSI BS 1192_4_2014
Tiêu chuẩn BSI BS 1192_4_2014
 
BSI BS 1192_4_2014
BSI BS 1192_4_2014BSI BS 1192_4_2014
BSI BS 1192_4_2014
 
BS 1192-4 fulfilling employer’s information exchange requirements using COBie...
BS 1192-4 fulfilling employer’s information exchange requirements using COBie...BS 1192-4 fulfilling employer’s information exchange requirements using COBie...
BS 1192-4 fulfilling employer’s information exchange requirements using COBie...
 
Singapore Building Accessibility Code 2007
Singapore Building Accessibility Code 2007Singapore Building Accessibility Code 2007
Singapore Building Accessibility Code 2007
 
Business basis of design
Business basis of design Business basis of design
Business basis of design
 
ConstrManagement.pdf
ConstrManagement.pdfConstrManagement.pdf
ConstrManagement.pdf
 
Appendix and Introduction
Appendix and IntroductionAppendix and Introduction
Appendix and Introduction
 
National building codes 2005 history overview
National building codes 2005 history overviewNational building codes 2005 history overview
National building codes 2005 history overview
 
Eot claims due to scope change under fidic contracts
Eot claims due to scope change under fidic contractsEot claims due to scope change under fidic contracts
Eot claims due to scope change under fidic contracts
 
Module 5 understaning disability access provisions
Module 5   understaning disability access provisionsModule 5   understaning disability access provisions
Module 5 understaning disability access provisions
 
Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017
 
Design architecture heritage_part1_slides
Design architecture heritage_part1_slidesDesign architecture heritage_part1_slides
Design architecture heritage_part1_slides
 
2.6 sustainability
2.6 sustainability2.6 sustainability
2.6 sustainability
 
2.6 sustainability (1)
2.6 sustainability (1)2.6 sustainability (1)
2.6 sustainability (1)
 
WPL BIM Specs D Mac P
WPL BIM Specs D Mac PWPL BIM Specs D Mac P
WPL BIM Specs D Mac P
 
Comparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode II
Comparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode IIComparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode II
Comparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode II
 
HM hub and NPD first masterclass seminar 6.10.15
HM hub and NPD first masterclass seminar 6.10.15HM hub and NPD first masterclass seminar 6.10.15
HM hub and NPD first masterclass seminar 6.10.15
 

More from ahcitycouncil

PPT Item # 10 - New student parking @ AHHS
PPT Item # 10 - New student parking @ AHHSPPT Item # 10 - New student parking @ AHHS
PPT Item # 10 - New student parking @ AHHS
ahcitycouncil
 
PPT Item # 9 - Ratify Ord. # 1326 3way stop
PPT Item # 9 - Ratify Ord. # 1326 3way stopPPT Item # 9 - Ratify Ord. # 1326 3way stop
PPT Item # 9 - Ratify Ord. # 1326 3way stop
ahcitycouncil
 
PPT Item # 8 - Advanced Water Well Technologies improv.
PPT Item # 8 - Advanced Water Well Technologies improv.PPT Item # 8 - Advanced Water Well Technologies improv.
PPT Item # 8 - Advanced Water Well Technologies improv.
ahcitycouncil
 
PPT Item # 7 - 4821 Broadway final design rev.
PPT Item # 7 - 4821 Broadway final design rev.PPT Item # 7 - 4821 Broadway final design rev.
PPT Item # 7 - 4821 Broadway final design rev.
ahcitycouncil
 
PPT Item # 6 - 318 Tuxedo Avenue compt. review
PPT Item # 6 - 318 Tuxedo Avenue compt. reviewPPT Item # 6 - 318 Tuxedo Avenue compt. review
PPT Item # 6 - 318 Tuxedo Avenue compt. review
ahcitycouncil
 
PPT Item # 5 - 434 College Boulevard compt. review
PPT Item # 5 - 434 College Boulevard compt. reviewPPT Item # 5 - 434 College Boulevard compt. review
PPT Item # 5 - 434 College Boulevard compt. review
ahcitycouncil
 
PPT Item # 4 - 440 Normandy Avenue compt. review
PPT Item # 4 - 440 Normandy Avenue compt. reviewPPT Item # 4 - 440 Normandy Avenue compt. review
PPT Item # 4 - 440 Normandy Avenue compt. review
ahcitycouncil
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
ahcitycouncil
 
Item # 10 -- New Student Parking at AHHS
Item # 10 -- New Student Parking at AHHSItem # 10 -- New Student Parking at AHHS
Item # 10 -- New Student Parking at AHHS
ahcitycouncil
 
Item # 9 - Ratify Ord. # 1326 3-way Stop
Item # 9 - Ratify Ord. # 1326 3-way StopItem # 9 - Ratify Ord. # 1326 3-way Stop
Item # 9 - Ratify Ord. # 1326 3-way Stop
ahcitycouncil
 
Item # 8 - Advanced Water Well Technologies improv.
Item # 8 - Advanced Water Well Technologies improv.Item # 8 - Advanced Water Well Technologies improv.
Item # 8 - Advanced Water Well Technologies improv.
ahcitycouncil
 
Item # 7 - 4821 Broadway Final Design Review
Item # 7 - 4821 Broadway Final Design ReviewItem # 7 - 4821 Broadway Final Design Review
Item # 7 - 4821 Broadway Final Design Review
ahcitycouncil
 
Item # 6 - 318 Tuxedo Ave. compat. review
Item # 6 - 318 Tuxedo Ave. compat. reviewItem # 6 - 318 Tuxedo Ave. compat. review
Item # 6 - 318 Tuxedo Ave. compat. review
ahcitycouncil
 
Item # 5 - 434 College Blvd. compat. review
Item # 5 - 434 College Blvd. compat. reviewItem # 5 - 434 College Blvd. compat. review
Item # 5 - 434 College Blvd. compat. review
ahcitycouncil
 
Item # 4 - 440 Normandy Ave. compat. rev.
Item # 4 - 440 Normandy Ave. compat. rev.Item # 4 - 440 Normandy Ave. compat. rev.
Item # 4 - 440 Normandy Ave. compat. rev.
ahcitycouncil
 
Item # 1b - June 13, 2024 SAP WS Minutes
Item # 1b - June 13, 2024 SAP WS MinutesItem # 1b - June 13, 2024 SAP WS Minutes
Item # 1b - June 13, 2024 SAP WS Minutes
ahcitycouncil
 
Item # 1a - June 10, 2024 CC Meeting Minutes
Item # 1a - June 10, 2024 CC Meeting MinutesItem # 1a - June 10, 2024 CC Meeting Minutes
Item # 1a - June 10, 2024 CC Meeting Minutes
ahcitycouncil
 
PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)
ahcitycouncil
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
ahcitycouncil
 
PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)
ahcitycouncil
 

More from ahcitycouncil (20)

PPT Item # 10 - New student parking @ AHHS
PPT Item # 10 - New student parking @ AHHSPPT Item # 10 - New student parking @ AHHS
PPT Item # 10 - New student parking @ AHHS
 
PPT Item # 9 - Ratify Ord. # 1326 3way stop
PPT Item # 9 - Ratify Ord. # 1326 3way stopPPT Item # 9 - Ratify Ord. # 1326 3way stop
PPT Item # 9 - Ratify Ord. # 1326 3way stop
 
PPT Item # 8 - Advanced Water Well Technologies improv.
PPT Item # 8 - Advanced Water Well Technologies improv.PPT Item # 8 - Advanced Water Well Technologies improv.
PPT Item # 8 - Advanced Water Well Technologies improv.
 
PPT Item # 7 - 4821 Broadway final design rev.
PPT Item # 7 - 4821 Broadway final design rev.PPT Item # 7 - 4821 Broadway final design rev.
PPT Item # 7 - 4821 Broadway final design rev.
 
PPT Item # 6 - 318 Tuxedo Avenue compt. review
PPT Item # 6 - 318 Tuxedo Avenue compt. reviewPPT Item # 6 - 318 Tuxedo Avenue compt. review
PPT Item # 6 - 318 Tuxedo Avenue compt. review
 
PPT Item # 5 - 434 College Boulevard compt. review
PPT Item # 5 - 434 College Boulevard compt. reviewPPT Item # 5 - 434 College Boulevard compt. review
PPT Item # 5 - 434 College Boulevard compt. review
 
PPT Item # 4 - 440 Normandy Avenue compt. review
PPT Item # 4 - 440 Normandy Avenue compt. reviewPPT Item # 4 - 440 Normandy Avenue compt. review
PPT Item # 4 - 440 Normandy Avenue compt. review
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
 
Item # 10 -- New Student Parking at AHHS
Item # 10 -- New Student Parking at AHHSItem # 10 -- New Student Parking at AHHS
Item # 10 -- New Student Parking at AHHS
 
Item # 9 - Ratify Ord. # 1326 3-way Stop
Item # 9 - Ratify Ord. # 1326 3-way StopItem # 9 - Ratify Ord. # 1326 3-way Stop
Item # 9 - Ratify Ord. # 1326 3-way Stop
 
Item # 8 - Advanced Water Well Technologies improv.
Item # 8 - Advanced Water Well Technologies improv.Item # 8 - Advanced Water Well Technologies improv.
Item # 8 - Advanced Water Well Technologies improv.
 
Item # 7 - 4821 Broadway Final Design Review
Item # 7 - 4821 Broadway Final Design ReviewItem # 7 - 4821 Broadway Final Design Review
Item # 7 - 4821 Broadway Final Design Review
 
Item # 6 - 318 Tuxedo Ave. compat. review
Item # 6 - 318 Tuxedo Ave. compat. reviewItem # 6 - 318 Tuxedo Ave. compat. review
Item # 6 - 318 Tuxedo Ave. compat. review
 
Item # 5 - 434 College Blvd. compat. review
Item # 5 - 434 College Blvd. compat. reviewItem # 5 - 434 College Blvd. compat. review
Item # 5 - 434 College Blvd. compat. review
 
Item # 4 - 440 Normandy Ave. compat. rev.
Item # 4 - 440 Normandy Ave. compat. rev.Item # 4 - 440 Normandy Ave. compat. rev.
Item # 4 - 440 Normandy Ave. compat. rev.
 
Item # 1b - June 13, 2024 SAP WS Minutes
Item # 1b - June 13, 2024 SAP WS MinutesItem # 1b - June 13, 2024 SAP WS Minutes
Item # 1b - June 13, 2024 SAP WS Minutes
 
Item # 1a - June 10, 2024 CC Meeting Minutes
Item # 1a - June 10, 2024 CC Meeting MinutesItem # 1a - June 10, 2024 CC Meeting Minutes
Item # 1a - June 10, 2024 CC Meeting Minutes
 
PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
 
PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)
 

Recently uploaded

Vadodara Girls Call Vadodara 0X0000000X Unlimited Short Providing Girls Servi...
Vadodara Girls Call Vadodara 0X0000000X Unlimited Short Providing Girls Servi...Vadodara Girls Call Vadodara 0X0000000X Unlimited Short Providing Girls Servi...
Vadodara Girls Call Vadodara 0X0000000X Unlimited Short Providing Girls Servi...
sabanihahanshni
 
2024: The FAR - Federal Acquisition Regulations, Part 48
2024: The FAR - Federal Acquisition Regulations, Part 482024: The FAR - Federal Acquisition Regulations, Part 48
2024: The FAR - Federal Acquisition Regulations, Part 48
JSchaus & Associates
 
Girls Call Noida 9873940964 Provide Best And Top Girl Service And No1 in City
Girls Call Noida 9873940964 Provide Best And Top Girl Service And No1 in CityGirls Call Noida 9873940964 Provide Best And Top Girl Service And No1 in City
Girls Call Noida 9873940964 Provide Best And Top Girl Service And No1 in City
merlinered
 
Pune Girls Call Pune 0X0000000X Payment On Delevery Cash Hot Premium Genuine ...
Pune Girls Call Pune 0X0000000X Payment On Delevery Cash Hot Premium Genuine ...Pune Girls Call Pune 0X0000000X Payment On Delevery Cash Hot Premium Genuine ...
Pune Girls Call Pune 0X0000000X Payment On Delevery Cash Hot Premium Genuine ...
seenaoberoi
 
Coimbatore Girls Call Coimbatore 0X0000000X Payment On Delevery Cash Hot Prem...
Coimbatore Girls Call Coimbatore 0X0000000X Payment On Delevery Cash Hot Prem...Coimbatore Girls Call Coimbatore 0X0000000X Payment On Delevery Cash Hot Prem...
Coimbatore Girls Call Coimbatore 0X0000000X Payment On Delevery Cash Hot Prem...
lavanyatripatihighpr
 
Building Stronger Relationships with BLG Mobile.pptx
Building Stronger Relationships with BLG Mobile.pptxBuilding Stronger Relationships with BLG Mobile.pptx
Building Stronger Relationships with BLG Mobile.pptx
Bloomerang
 
Girls Call Nashik 000XX00000 Girls Service Cash Payment Free Home Delivery
Girls Call Nashik 000XX00000 Girls Service Cash Payment Free Home DeliveryGirls Call Nashik 000XX00000 Girls Service Cash Payment Free Home Delivery
Girls Call Nashik 000XX00000 Girls Service Cash Payment Free Home Delivery
gargkajal2024#G05
 
Women's Empowerment in Agrifood Governance (WEAGov) training course
Women's Empowerment in Agrifood Governance (WEAGov) training courseWomen's Empowerment in Agrifood Governance (WEAGov) training course
Women's Empowerment in Agrifood Governance (WEAGov) training course
jkyle5
 
BBW Girls Call Navi Mumbai 9930245274 Provide Best And Top Girl Service And N...
BBW Girls Call Navi Mumbai 9930245274 Provide Best And Top Girl Service And N...BBW Girls Call Navi Mumbai 9930245274 Provide Best And Top Girl Service And N...
BBW Girls Call Navi Mumbai 9930245274 Provide Best And Top Girl Service And N...
sharonblush
 
Highland Hills Comprehensive Plan Public Meeting #2
Highland Hills Comprehensive Plan Public Meeting #2Highland Hills Comprehensive Plan Public Meeting #2
Highland Hills Comprehensive Plan Public Meeting #2
Cuyahoga County Planning Commission
 
1. B-A.Bryce OECD Path to Economic Resilience.pptx
1. B-A.Bryce OECD Path to Economic Resilience.pptx1. B-A.Bryce OECD Path to Economic Resilience.pptx
1. B-A.Bryce OECD Path to Economic Resilience.pptx
OECDregions
 
Online Girls Call Delhi 9711199171 Provide Best And Top Girl Service And No1 ...
Online Girls Call Delhi 9711199171 Provide Best And Top Girl Service And No1 ...Online Girls Call Delhi 9711199171 Provide Best And Top Girl Service And No1 ...
Online Girls Call Delhi 9711199171 Provide Best And Top Girl Service And No1 ...
AK47
 
Global markets, value chains, livelihoods & cassava production systems: impli...
Global markets, value chains, livelihoods & cassava production systems: impli...Global markets, value chains, livelihoods & cassava production systems: impli...
Global markets, value chains, livelihoods & cassava production systems: impli...
Jonathan Newby
 
UNEP Report: Navigating New Horizons 2024
UNEP Report: Navigating New Horizons 2024UNEP Report: Navigating New Horizons 2024
UNEP Report: Navigating New Horizons 2024
Energy for One World
 
2. Craig Pollett OECD Rural Resilience.pptx
2. Craig Pollett OECD Rural Resilience.pptx2. Craig Pollett OECD Rural Resilience.pptx
2. Craig Pollett OECD Rural Resilience.pptx
OECDregions
 
Ahmedabad Girls Call Ahmedabad 0X0000000X Payment On Delevery Cash Hot Premiu...
Ahmedabad Girls Call Ahmedabad 0X0000000X Payment On Delevery Cash Hot Premiu...Ahmedabad Girls Call Ahmedabad 0X0000000X Payment On Delevery Cash Hot Premiu...
Ahmedabad Girls Call Ahmedabad 0X0000000X Payment On Delevery Cash Hot Premiu...
seenaoberoi
 
Connaught Place @Girls @Call WhatsApp Numbers 🫦0000XX0000🫦 List For Friendshi...
Connaught Place @Girls @Call WhatsApp Numbers 🫦0000XX0000🫦 List For Friendshi...Connaught Place @Girls @Call WhatsApp Numbers 🫦0000XX0000🫦 List For Friendshi...
Connaught Place @Girls @Call WhatsApp Numbers 🫦0000XX0000🫦 List For Friendshi...
paridubey2024#G05
 
2024: The FAR - Federal Acquisition Regulations, Part 47
2024: The FAR - Federal Acquisition Regulations, Part 472024: The FAR - Federal Acquisition Regulations, Part 47
2024: The FAR - Federal Acquisition Regulations, Part 47
JSchaus & Associates
 
How to Save a Place: Understand Local, State, and Federal Preservation Groups
How to Save a Place: Understand Local, State, and Federal Preservation GroupsHow to Save a Place: Understand Local, State, and Federal Preservation Groups
How to Save a Place: Understand Local, State, and Federal Preservation Groups
National Trust for Historic Preservation
 
Critical AI Literacy for Higher Ed Stakeholders
Critical AI Literacy for Higher Ed StakeholdersCritical AI Literacy for Higher Ed Stakeholders
Critical AI Literacy for Higher Ed Stakeholders
arlindno
 

Recently uploaded (20)

Vadodara Girls Call Vadodara 0X0000000X Unlimited Short Providing Girls Servi...
Vadodara Girls Call Vadodara 0X0000000X Unlimited Short Providing Girls Servi...Vadodara Girls Call Vadodara 0X0000000X Unlimited Short Providing Girls Servi...
Vadodara Girls Call Vadodara 0X0000000X Unlimited Short Providing Girls Servi...
 
2024: The FAR - Federal Acquisition Regulations, Part 48
2024: The FAR - Federal Acquisition Regulations, Part 482024: The FAR - Federal Acquisition Regulations, Part 48
2024: The FAR - Federal Acquisition Regulations, Part 48
 
Girls Call Noida 9873940964 Provide Best And Top Girl Service And No1 in City
Girls Call Noida 9873940964 Provide Best And Top Girl Service And No1 in CityGirls Call Noida 9873940964 Provide Best And Top Girl Service And No1 in City
Girls Call Noida 9873940964 Provide Best And Top Girl Service And No1 in City
 
Pune Girls Call Pune 0X0000000X Payment On Delevery Cash Hot Premium Genuine ...
Pune Girls Call Pune 0X0000000X Payment On Delevery Cash Hot Premium Genuine ...Pune Girls Call Pune 0X0000000X Payment On Delevery Cash Hot Premium Genuine ...
Pune Girls Call Pune 0X0000000X Payment On Delevery Cash Hot Premium Genuine ...
 
Coimbatore Girls Call Coimbatore 0X0000000X Payment On Delevery Cash Hot Prem...
Coimbatore Girls Call Coimbatore 0X0000000X Payment On Delevery Cash Hot Prem...Coimbatore Girls Call Coimbatore 0X0000000X Payment On Delevery Cash Hot Prem...
Coimbatore Girls Call Coimbatore 0X0000000X Payment On Delevery Cash Hot Prem...
 
Building Stronger Relationships with BLG Mobile.pptx
Building Stronger Relationships with BLG Mobile.pptxBuilding Stronger Relationships with BLG Mobile.pptx
Building Stronger Relationships with BLG Mobile.pptx
 
Girls Call Nashik 000XX00000 Girls Service Cash Payment Free Home Delivery
Girls Call Nashik 000XX00000 Girls Service Cash Payment Free Home DeliveryGirls Call Nashik 000XX00000 Girls Service Cash Payment Free Home Delivery
Girls Call Nashik 000XX00000 Girls Service Cash Payment Free Home Delivery
 
Women's Empowerment in Agrifood Governance (WEAGov) training course
Women's Empowerment in Agrifood Governance (WEAGov) training courseWomen's Empowerment in Agrifood Governance (WEAGov) training course
Women's Empowerment in Agrifood Governance (WEAGov) training course
 
BBW Girls Call Navi Mumbai 9930245274 Provide Best And Top Girl Service And N...
BBW Girls Call Navi Mumbai 9930245274 Provide Best And Top Girl Service And N...BBW Girls Call Navi Mumbai 9930245274 Provide Best And Top Girl Service And N...
BBW Girls Call Navi Mumbai 9930245274 Provide Best And Top Girl Service And N...
 
Highland Hills Comprehensive Plan Public Meeting #2
Highland Hills Comprehensive Plan Public Meeting #2Highland Hills Comprehensive Plan Public Meeting #2
Highland Hills Comprehensive Plan Public Meeting #2
 
1. B-A.Bryce OECD Path to Economic Resilience.pptx
1. B-A.Bryce OECD Path to Economic Resilience.pptx1. B-A.Bryce OECD Path to Economic Resilience.pptx
1. B-A.Bryce OECD Path to Economic Resilience.pptx
 
Online Girls Call Delhi 9711199171 Provide Best And Top Girl Service And No1 ...
Online Girls Call Delhi 9711199171 Provide Best And Top Girl Service And No1 ...Online Girls Call Delhi 9711199171 Provide Best And Top Girl Service And No1 ...
Online Girls Call Delhi 9711199171 Provide Best And Top Girl Service And No1 ...
 
Global markets, value chains, livelihoods & cassava production systems: impli...
Global markets, value chains, livelihoods & cassava production systems: impli...Global markets, value chains, livelihoods & cassava production systems: impli...
Global markets, value chains, livelihoods & cassava production systems: impli...
 
UNEP Report: Navigating New Horizons 2024
UNEP Report: Navigating New Horizons 2024UNEP Report: Navigating New Horizons 2024
UNEP Report: Navigating New Horizons 2024
 
2. Craig Pollett OECD Rural Resilience.pptx
2. Craig Pollett OECD Rural Resilience.pptx2. Craig Pollett OECD Rural Resilience.pptx
2. Craig Pollett OECD Rural Resilience.pptx
 
Ahmedabad Girls Call Ahmedabad 0X0000000X Payment On Delevery Cash Hot Premiu...
Ahmedabad Girls Call Ahmedabad 0X0000000X Payment On Delevery Cash Hot Premiu...Ahmedabad Girls Call Ahmedabad 0X0000000X Payment On Delevery Cash Hot Premiu...
Ahmedabad Girls Call Ahmedabad 0X0000000X Payment On Delevery Cash Hot Premiu...
 
Connaught Place @Girls @Call WhatsApp Numbers 🫦0000XX0000🫦 List For Friendshi...
Connaught Place @Girls @Call WhatsApp Numbers 🫦0000XX0000🫦 List For Friendshi...Connaught Place @Girls @Call WhatsApp Numbers 🫦0000XX0000🫦 List For Friendshi...
Connaught Place @Girls @Call WhatsApp Numbers 🫦0000XX0000🫦 List For Friendshi...
 
2024: The FAR - Federal Acquisition Regulations, Part 47
2024: The FAR - Federal Acquisition Regulations, Part 472024: The FAR - Federal Acquisition Regulations, Part 47
2024: The FAR - Federal Acquisition Regulations, Part 47
 
How to Save a Place: Understand Local, State, and Federal Preservation Groups
How to Save a Place: Understand Local, State, and Federal Preservation GroupsHow to Save a Place: Understand Local, State, and Federal Preservation Groups
How to Save a Place: Understand Local, State, and Federal Preservation Groups
 
Critical AI Literacy for Higher Ed Stakeholders
Critical AI Literacy for Higher Ed StakeholdersCritical AI Literacy for Higher Ed Stakeholders
Critical AI Literacy for Higher Ed Stakeholders
 

PPT Item # 8&9 - Demolition Code Amendments

  • 1. ADMINISTRATION Presented by: Phil Laney Assistant City Manager CHAPTER 5 AMENDMENT FOR DEMOLITION REVIEW PROCEDURES ITEM # 8 & 9 JUNE 10, 2024
  • 2. SUMMARY Proposing changes to demolition review procedures to provide more information Current procedure allows review of demolitions for significance without a review of proposed new/ renovated replacement structure Proposal would require demolition review request to also include review of proposed replacement structure
  • 3. BACKGROUND  Chapter 5 – Buildings and Building Regulations, Article IX – Demolitions oversees demolition review procedures  Significance review – for proposed demolitions, Architectural Review Board & Council to determine if structure has significance  Compatibility review – for proposed structures/renovations, ARB & Council to determine if structure demonstrates compatibility with other surrounding structures  Per Code, demolition review process intended to complete both the significance of existing structures proposed for demolition and the compatibility review of any replacement structures within the same process  By Code, significance (demolition) and compatibility (replacement structure) may be completed in separate processes if requested by owner
  • 4. BACKGROUND  Concern expressed that demolition review to determine a structure’s significance made more difficult without seeing proposed replacement structure  Staff report & feedback received  April 9th – City Council staff report  May 21st - ARB
  • 5. BACKGROUND  Amends demolition review procedures so significance and compatibility processes may not be completed in separate processes  Demolition review application would also include all compatibility review materials for the replacement structure  Both ARB & Council demolition review would include replacement structure proposal  If replacement structure deemed incompatible or the replacement structure not proposed, demolition delay may be necessary to revise and/or develop design
  • 6. POLICY ANALYSIS  Demolition review procedures defined in Chapter 5, Building and Building Regulations, Article IX – Demolition  City’s interest to ensure relevant information is made available when considering demolition proposals
  • 7. COORDINATION & FISCAL IMPACT  Coordination  City Attorney & City Manager  Fiscal Impact – no fiscal impact