CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCrosstown TO
This is a meeting invite for the Brentcliffe-Victoria Park CLC (Construction Liaison Committee) Monthly Meeting, covering the Brentcliffe Portal, Sunnybrook Park, Science Centre, Aga Khan, Wynford, Sloane and O’ Connor Stops.
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCrosstown TO
Construction updates for the following locations/stops: Brentcliffe Portal, Sunnybrook Park, Science Centre, Aga Khan Park & Museum, Wynford, Sloane and O'Connor.
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
Many ways to support street children.pptxSERUDS INDIA
By raising awareness, providing support, advocating for change, and offering assistance to children in need, individuals can play a crucial role in improving the lives of street children and helping them realize their full potential
Donate Us
https://serudsindia.org/how-individuals-can-support-street-children-in-india/
#donatefororphan, #donateforhomelesschildren, #childeducation, #ngochildeducation, #donateforeducation, #donationforchildeducation, #sponsorforpoorchild, #sponsororphanage #sponsororphanchild, #donation, #education, #charity, #educationforchild, #seruds, #kurnool, #joyhome
Understanding the Challenges of Street ChildrenSERUDS INDIA
By raising awareness, providing support, advocating for change, and offering assistance to children in need, individuals can play a crucial role in improving the lives of street children and helping them realize their full potential
Donate Us
https://serudsindia.org/how-individuals-can-support-street-children-in-india/
#donatefororphan, #donateforhomelesschildren, #childeducation, #ngochildeducation, #donateforeducation, #donationforchildeducation, #sponsorforpoorchild, #sponsororphanage #sponsororphanchild, #donation, #education, #charity, #educationforchild, #seruds, #kurnool, #joyhome
ZGB - The Role of Generative AI in Government transformation.pdfSaeed Al Dhaheri
This keynote was presented during the the 7th edition of the UAE Hackathon 2024. It highlights the role of AI and Generative AI in addressing government transformation to achieve zero government bureaucracy
A process server is a authorized person for delivering legal documents, such as summons, complaints, subpoenas, and other court papers, to peoples involved in legal proceedings.
Russian anarchist and anti-war movement in the third year of full-scale warAntti Rautiainen
Anarchist group ANA Regensburg hosted my online-presentation on 16th of May 2024, in which I discussed tactics of anti-war activism in Russia, and reasons why the anti-war movement has not been able to make an impact to change the course of events yet. Cases of anarchists repressed for anti-war activities are presented, as well as strategies of support for political prisoners, and modest successes in supporting their struggles.
Thumbnail picture is by MediaZona, you may read their report on anti-war arson attacks in Russia here: https://en.zona.media/article/2022/10/13/burn-map
Links:
Autonomous Action
http://Avtonom.org
Anarchist Black Cross Moscow
http://Avtonom.org/abc
Solidarity Zone
https://t.me/solidarity_zone
Memorial
https://memopzk.org/, https://t.me/pzk_memorial
OVD-Info
https://en.ovdinfo.org/antiwar-ovd-info-guide
RosUznik
https://rosuznik.org/
Uznik Online
http://uznikonline.tilda.ws/
Russian Reader
https://therussianreader.com/
ABC Irkutsk
https://abc38.noblogs.org/
Send mail to prisoners from abroad:
http://Prisonmail.online
YouTube: https://youtu.be/c5nSOdU48O8
Spotify: https://podcasters.spotify.com/pod/show/libertarianlifecoach/episodes/Russian-anarchist-and-anti-war-movement-in-the-third-year-of-full-scale-war-e2k8ai4
2. What Are We Building
• 15 underground stations and 10 surface stops – 9 km below ground and 10 km
above ground
• A maintenance and storage facility
• A 19-kilometre route separated from regular traffic
• Transit communications system
• Links to 54 bus routes, three subway stations,
GO Transit, and a new UP Express station
3. How We’re Building: Surface Stops
• Sequential road widening will be implemented to allow traffic flow to be maintained
during construction.
• The track where the trains will run is at the same level of the roadway on concrete pad
foundations, approximately 100 meters long.
• Example of a Cross Section (Pharmacy Stop)
• U-turns are permitted at intersections due to
unavailability of mid-block left turns
4. Unique Design Concepts: Surface Stops
•Clean, rectilinear form. Intuitive and
easy to use
•Transparent, to ensure clear sightlines
to the street and to maximize the
sense of the security to the passenger
•Provides protection from rain/snow
and splash from the street
Shelter Design
7. At-Grade Artist Renderings
Aga Khan (Ferrand) Stop Aerial
Aga Khan (Ferrand) Stop Platform
Renderings are an illustrative example and subject to change
11. West At-Grade (Brentcliffe Portal to O’Connor Stop) –
Activities Completed and Upcoming
Completed to Date
Median Removals mid-block between Pharmacy Avenue and the DVP
Ongoing
Installation of Temporary Traffic Signals along Eglinton Avenue East
Street furniture removals between Brentcliffe Road and Ionview Road
Subsurface Utility Engineering
Geotechnical Investigations
Median Removals within the intersections along Eglinton Avenue East
Resumption of Tree Protection and Removals between Don Avon and Victoria
Park Avenue
Upcoming
Utility Relocations between Brentcliffe Road and Birchmount Road, where not
currently underway
12. West At-Grade (Brentcliffe Portal to Victoria Park Stop) –
Activities
Brentcliffe Portal
• Preparatory works continue where necessary
– Geotechnical Investigations
– Subsurface Utility Investigations
– Tree Protection and Removals
• Support of Excavation ongoing
West At-Grade
• Preparatory works continue where necessary
– Geotechnical Investigations
– Subsurface Utility Investigations
– Tree Protection and Removals
• Median Removal works almost complete; intersections underway.
• Utility relocations between Sloane and Victoria Park underway
• Hydro relocations between Brentcliffe and Victoria Park scheduled to begin
within the next couple of weeks.
14. How we’re building Science Centre Station
Cut and Cover Methodology at Science Centre Station
15. Science Centre Aerial View (90%)
Main Entrance
Bus Terminal and Secondary Entrance
Renderings are an illustrative example and subject to change
16. Science Centre West Portal (90%)
Located west of Don Mills Road and Eglinton Avenue East intersection
Rendering is an illustrative example and subject to change
17. Science Centre Station East Portal (90%)
Located east of Don Mills Road and Eglinton Avenue East intersection
Rendering is an illustrative example and subject to change
18. Science Centre Main Entrance Plaza (90%)
Rendering is an illustrative example and subject to change
19. Science Centre Main Entrance Dusk (90%)
Rendering is an illustrative example and subject to change
20. Science Centre Bus Terminal (90%)
Rendering is an illustrative example and subject to change
21. Science Centre Secondary Entrance/Bus Terminal (90%)
Rendering is an illustrative example and subject to change
22. Science Centre Bus Terminal Interior (90%)
Rendering is an illustrative example and subject to change
23. Science Centre Station– Activities Completed and Upcoming
Completed to Date
Piling (part of support of excavation) installation complete for current
traffic stage
First tower crane installed within work zone on west side of Don Mills
Ongoing
Work on the East/West Transmission Main (watermain) continues. City of
Toronto work to facilitate connection to existing infrastructure underway.
• Excavation of the Main Station Box underway and piling on the western
side of the intersection is complete allowing for traffic decking to start.
• Once decking is in place, traffic can be flipped to the next stage, allowing
piling to begin on the east side of the intersection.
Upcoming
Excavation for main station box in the center of Eglinton Avenue East
Traffic Reconfiguration to Stage 7 to support of excavation work on the east
side of the Don Mills and Eglinton Ave East intersection expected to occur
mid-late May.
24. Current Traffic Staging at Don Mills & Eglinton
Traffic flip took place late-October and is expected to continue to be in place
until approximately mid-May 2018
26. Construction Progress Pictures: Science Centre Station
Science Centre: Arrival and installation of first Tower Crane
Science Centre: Main entrance invert pour
28. 416-782-8118 or 416-482-7411
24 hours/7days a week
www.thecrosstown.ca
crosstown@metrolinx.com
facebook.com/thecrosstown
twitter.com/crosstownTO
instagram.com/eglinton_crosstown
Crosstown West Office
1848 Eglinton Ave W (at Dufferin)
Crosstown East Office
660 Eglinton Ave E (at Bayview)
Stay in Touch