The document proposes using RFID technology to improve the traceability of medical instruments between a hospital's Central Sterilization Department and operating rooms. It describes the current process which uses barcodes on crates and instrument sets. A scenario is presented that redesigns the process to continue using barcodes for traceability at the crate level. While this provides some visibility, it does not fully track each instrument. The document explores alternatives using RFID or a hybrid RFID/barcode system to provide more complete traceability of individual instruments throughout the process.