This document provides a bill of quantities for a proposed photovoltaic solar system project in Gaza. It includes 6 items: 1) 45kW of PV modules, 2) 45kW of grid-tied inverters, 3) 50kW of battery inverters, 4) battery backup system, 5) system installation and training, and 6) 5 years of maintenance. The contractor must provide documentation including design plans, equipment specifications and warranties, testing certificates, and operation/maintenance manuals. The system will use solar power, batteries, and the grid to provide electricity for a school and allow surplus power to be exported or stored.
Here are the details on 300MW Wind Power Project located in the Western Region of India presented by Gensol on the various phases of construction & execution; starting from :
1)Wind resource assessment,
2)Site feasibility studies,
3)Statuary & legal approvals required,
4)Civil & electrical works,
5)Quality & material inspection,
6)Post erection & monitoring etc.
(Click here to read more..)
UNIT - 06 TRANSMISSION LINES AND SUBSTATIONSPremanandDesai
Code of practice for Transmission lines and substations, transmission line materials and their specifications, types of Towers, ACSR conductors and Number of Disc insulators in suspension string, strain string, span and height of towers for 66 KV, 110 KV, 220 KV transmission lines, concept of single circuit and double circuit transmission lines, method of calculating the Quantity of transmission line materials, Prepare the schedule of materials
(only) for 66 KV,110 KV and 220 KV single circuit transmission lines. 66KV/11KV, 5 MVA Substations- Single Line diagram, list of Electrical equipment's/ materials (only) and their
specifications.
Dear Respected Sir,
I am forwarding my CV for a Solar Power Plant Installation / Service in Gujarat State or Any Part of India ( Ready to Travel).
Experienced in Solar power plant Field Work (Total Experience: 4.5 years, 3.5 years in Solar Power Plant Project Engineer ( Electrical) ) . I have great skills in solar Power Plant:commissioning and O&M activities, special 100 KW & more solar Power Plant. I want to work on MW solar power Plant project. Please go through my resume attached with this mail.
I have done graduation in B. E. in Electronics & Communication, I have rich skill in Solar Power Plant Electrical PROJECTS and Electrical Grid Power Commissioning, Inspection with Government Chief Electrical Inspector with CAD Drawings, Electrical Safety Rules, and International Standards ( IS) Rules for Project Approval and Project Commissioning.
Currently, on going Solar Rooftop installation of 220 KW on industrial Tin Roof Structure at two locations in Ahmadabad, Gujarat state.
I have good skills in communication and computer network knowledge.
Current CTC: 2.7
Expected CTC: According to your company standards.
Ready to travel to distant sites for inspection & service. Good communication in English. Willing to relocate and travel international ( Passport Ready)
Interested to work sincerely for the growth of the organization and accept Challenges.
Thanking you
With regards,
Mr. Graceson Jacob
Sector 3D,
GANDHINAGAR,
Gujarat
India.
Mob:09824104095 / 09408707445
Here are the details on 300MW Wind Power Project located in the Western Region of India presented by Gensol on the various phases of construction & execution; starting from :
1)Wind resource assessment,
2)Site feasibility studies,
3)Statuary & legal approvals required,
4)Civil & electrical works,
5)Quality & material inspection,
6)Post erection & monitoring etc.
(Click here to read more..)
UNIT - 06 TRANSMISSION LINES AND SUBSTATIONSPremanandDesai
Code of practice for Transmission lines and substations, transmission line materials and their specifications, types of Towers, ACSR conductors and Number of Disc insulators in suspension string, strain string, span and height of towers for 66 KV, 110 KV, 220 KV transmission lines, concept of single circuit and double circuit transmission lines, method of calculating the Quantity of transmission line materials, Prepare the schedule of materials
(only) for 66 KV,110 KV and 220 KV single circuit transmission lines. 66KV/11KV, 5 MVA Substations- Single Line diagram, list of Electrical equipment's/ materials (only) and their
specifications.
Dear Respected Sir,
I am forwarding my CV for a Solar Power Plant Installation / Service in Gujarat State or Any Part of India ( Ready to Travel).
Experienced in Solar power plant Field Work (Total Experience: 4.5 years, 3.5 years in Solar Power Plant Project Engineer ( Electrical) ) . I have great skills in solar Power Plant:commissioning and O&M activities, special 100 KW & more solar Power Plant. I want to work on MW solar power Plant project. Please go through my resume attached with this mail.
I have done graduation in B. E. in Electronics & Communication, I have rich skill in Solar Power Plant Electrical PROJECTS and Electrical Grid Power Commissioning, Inspection with Government Chief Electrical Inspector with CAD Drawings, Electrical Safety Rules, and International Standards ( IS) Rules for Project Approval and Project Commissioning.
Currently, on going Solar Rooftop installation of 220 KW on industrial Tin Roof Structure at two locations in Ahmadabad, Gujarat state.
I have good skills in communication and computer network knowledge.
Current CTC: 2.7
Expected CTC: According to your company standards.
Ready to travel to distant sites for inspection & service. Good communication in English. Willing to relocate and travel international ( Passport Ready)
Interested to work sincerely for the growth of the organization and accept Challenges.
Thanking you
With regards,
Mr. Graceson Jacob
Sector 3D,
GANDHINAGAR,
Gujarat
India.
Mob:09824104095 / 09408707445
9+ Years of Experience as 7+ years in Electrical Design and Site Engineer for MEP projects as well as 2 years worked as an Assistant Electrical Engineer in 220KV substation.
11 years experience in Residential Villa , Precast structures, Petrol compact stations, Water pipe line project, Industrial projects like ( Thermal power plant, Oil & refinery plant). And Material coordinator & procurement, SAP, Piling, sheet piling,
I am very much interested in applying for the post of Electrical Engineer
Currently I am working for Hamad & Mohamad Al-Futtaim Doha, Qatar as a Electrical engineer since January 2016. My current position responsibilities are LV and ELV services.
I am interested to join in your organization to sharpen my skills and to next level of experience. My strengths include being able to work well with team, to converse with anyone, and to enter easily into new situations with a creative and resourceful attitude. I am very detail oriented, sincere and punctual.
I am confident and assure you that I shall discharge my responsibilities and contribute substantially to the growth of the organization and reputation. I feel that i would be able to make a significant contribution to your organization.
I have attached my resume, which outlines my credentials and experience in detail.
Thanking you,
Warm Regards,
(Abdul Rahiman)
Address for communication:
Abdul Rahiman
Phone: +974 70420084, +974 31208802
abdulrahiman0106@gmail.com
abdulrahiman_eee@yahoo.com
Total Work Exp: 8+ year
Gulf Exp: : 5+year
Current Employer: Hamad & Mohamad Al-Futtaim
Passport No: G4739146
Exp Date : 18/08/2017
Skype Id : abdulrahiman0106
Notice Period: Immediate
Contact No: +97470420084, +974 31208802
9+ Years of Experience as 7+ years in Electrical Design and Site Engineer for MEP projects as well as 2 years worked as an Assistant Electrical Engineer in 220KV substation.
11 years experience in Residential Villa , Precast structures, Petrol compact stations, Water pipe line project, Industrial projects like ( Thermal power plant, Oil & refinery plant). And Material coordinator & procurement, SAP, Piling, sheet piling,
I am very much interested in applying for the post of Electrical Engineer
Currently I am working for Hamad & Mohamad Al-Futtaim Doha, Qatar as a Electrical engineer since January 2016. My current position responsibilities are LV and ELV services.
I am interested to join in your organization to sharpen my skills and to next level of experience. My strengths include being able to work well with team, to converse with anyone, and to enter easily into new situations with a creative and resourceful attitude. I am very detail oriented, sincere and punctual.
I am confident and assure you that I shall discharge my responsibilities and contribute substantially to the growth of the organization and reputation. I feel that i would be able to make a significant contribution to your organization.
I have attached my resume, which outlines my credentials and experience in detail.
Thanking you,
Warm Regards,
(Abdul Rahiman)
Address for communication:
Abdul Rahiman
Phone: +974 70420084, +974 31208802
abdulrahiman0106@gmail.com
abdulrahiman_eee@yahoo.com
Total Work Exp: 8+ year
Gulf Exp: : 5+year
Current Employer: Hamad & Mohamad Al-Futtaim
Passport No: G4739146
Exp Date : 18/08/2017
Skype Id : abdulrahiman0106
Notice Period: Immediate
Contact No: +97470420084, +974 31208802
PV System Basics
Introduction to relevant Codes and Standards
Permit and Field Inspector Guidelines for PV Systems
Summary of Changes in 2005/2008 National Electrical Code
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantHarish Sharma
All the consumers of the State Distribution licensee or PSPCL who intend to encourage solar energy and set up solar PV plants at available places on roof-tops of Individual households, industries, Government or Semi-Government or Local Body offices, commercial establishments, institutions, residential complexes shall be eligible with project capacity ranging from minimum 1 KWp upto 1MWp (AC side) with or without battery back-up support. Consumers may generate solar power for self consumption and may feed excess power into the grid to be adjusted.
TESTING AND COMMISSIONING
OF VSC HVDC SYSTEMS TESTING AND COMMISSIONING
OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING
OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING
OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING
OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING
OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING
OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING
OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING
OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING
OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING
OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING
OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING
OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING
OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING
OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING
OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING
OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING
OF VSC HVDC SYSTEMSTESTING AND COMMISSIONING
OF VSC HVDC SYSTEMS
Securing your Kubernetes cluster_ a step-by-step guide to success !KatiaHIMEUR1
Today, after several years of existence, an extremely active community and an ultra-dynamic ecosystem, Kubernetes has established itself as the de facto standard in container orchestration. Thanks to a wide range of managed services, it has never been so easy to set up a ready-to-use Kubernetes cluster.
However, this ease of use means that the subject of security in Kubernetes is often left for later, or even neglected. This exposes companies to significant risks.
In this talk, I'll show you step-by-step how to secure your Kubernetes cluster for greater peace of mind and reliability.
Accelerate your Kubernetes clusters with Varnish CachingThijs Feryn
A presentation about the usage and availability of Varnish on Kubernetes. This talk explores the capabilities of Varnish caching and shows how to use the Varnish Helm chart to deploy it to Kubernetes.
This presentation was delivered at K8SUG Singapore. See https://feryn.eu/presentations/accelerate-your-kubernetes-clusters-with-varnish-caching-k8sug-singapore-28-2024 for more details.
UiPath Test Automation using UiPath Test Suite series, part 3DianaGray10
Welcome to UiPath Test Automation using UiPath Test Suite series part 3. In this session, we will cover desktop automation along with UI automation.
Topics covered:
UI automation Introduction,
UI automation Sample
Desktop automation flow
Pradeep Chinnala, Senior Consultant Automation Developer @WonderBotz and UiPath MVP
Deepak Rai, Automation Practice Lead, Boundaryless Group and UiPath MVP
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...James Anderson
Effective Application Security in Software Delivery lifecycle using Deployment Firewall and DBOM
The modern software delivery process (or the CI/CD process) includes many tools, distributed teams, open-source code, and cloud platforms. Constant focus on speed to release software to market, along with the traditional slow and manual security checks has caused gaps in continuous security as an important piece in the software supply chain. Today organizations feel more susceptible to external and internal cyber threats due to the vast attack surface in their applications supply chain and the lack of end-to-end governance and risk management.
The software team must secure its software delivery process to avoid vulnerability and security breaches. This needs to be achieved with existing tool chains and without extensive rework of the delivery processes. This talk will present strategies and techniques for providing visibility into the true risk of the existing vulnerabilities, preventing the introduction of security issues in the software, resolving vulnerabilities in production environments quickly, and capturing the deployment bill of materials (DBOM).
Speakers:
Bob Boule
Robert Boule is a technology enthusiast with PASSION for technology and making things work along with a knack for helping others understand how things work. He comes with around 20 years of solution engineering experience in application security, software continuous delivery, and SaaS platforms. He is known for his dynamic presentations in CI/CD and application security integrated in software delivery lifecycle.
Gopinath Rebala
Gopinath Rebala is the CTO of OpsMx, where he has overall responsibility for the machine learning and data processing architectures for Secure Software Delivery. Gopi also has a strong connection with our customers, leading design and architecture for strategic implementations. Gopi is a frequent speaker and well-known leader in continuous delivery and integrating security into software delivery.
Essentials of Automations: Optimizing FME Workflows with ParametersSafe Software
Are you looking to streamline your workflows and boost your projects’ efficiency? Do you find yourself searching for ways to add flexibility and control over your FME workflows? If so, you’re in the right place.
Join us for an insightful dive into the world of FME parameters, a critical element in optimizing workflow efficiency. This webinar marks the beginning of our three-part “Essentials of Automation” series. This first webinar is designed to equip you with the knowledge and skills to utilize parameters effectively: enhancing the flexibility, maintainability, and user control of your FME projects.
Here’s what you’ll gain:
- Essentials of FME Parameters: Understand the pivotal role of parameters, including Reader/Writer, Transformer, User, and FME Flow categories. Discover how they are the key to unlocking automation and optimization within your workflows.
- Practical Applications in FME Form: Delve into key user parameter types including choice, connections, and file URLs. Allow users to control how a workflow runs, making your workflows more reusable. Learn to import values and deliver the best user experience for your workflows while enhancing accuracy.
- Optimization Strategies in FME Flow: Explore the creation and strategic deployment of parameters in FME Flow, including the use of deployment and geometry parameters, to maximize workflow efficiency.
- Pro Tips for Success: Gain insights on parameterizing connections and leveraging new features like Conditional Visibility for clarity and simplicity.
We’ll wrap up with a glimpse into future webinars, followed by a Q&A session to address your specific questions surrounding this topic.
Don’t miss this opportunity to elevate your FME expertise and drive your projects to new heights of efficiency.
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Albert Hoitingh
In this session I delve into the encryption technology used in Microsoft 365 and Microsoft Purview. Including the concepts of Customer Key and Double Key Encryption.
State of ICS and IoT Cyber Threat Landscape Report 2024 previewPrayukth K V
The IoT and OT threat landscape report has been prepared by the Threat Research Team at Sectrio using data from Sectrio, cyber threat intelligence farming facilities spread across over 85 cities around the world. In addition, Sectrio also runs AI-based advanced threat and payload engagement facilities that serve as sinks to attract and engage sophisticated threat actors, and newer malware including new variants and latent threats that are at an earlier stage of development.
The latest edition of the OT/ICS and IoT security Threat Landscape Report 2024 also covers:
State of global ICS asset and network exposure
Sectoral targets and attacks as well as the cost of ransom
Global APT activity, AI usage, actor and tactic profiles, and implications
Rise in volumes of AI-powered cyberattacks
Major cyber events in 2024
Malware and malicious payload trends
Cyberattack types and targets
Vulnerability exploit attempts on CVEs
Attacks on counties – USA
Expansion of bot farms – how, where, and why
In-depth analysis of the cyber threat landscape across North America, South America, Europe, APAC, and the Middle East
Why are attacks on smart factories rising?
Cyber risk predictions
Axis of attacks – Europe
Systemic attacks in the Middle East
Download the full report from here:
https://sectrio.com/resources/ot-threat-landscape-reports/sectrio-releases-ot-ics-and-iot-security-threat-landscape-report-2024/
DevOps and Testing slides at DASA ConnectKari Kakkonen
My and Rik Marselis slides at 30.5.2024 DASA Connect conference. We discuss about what is testing, then what is agile testing and finally what is Testing in DevOps. Finally we had lovely workshop with the participants trying to find out different ways to think about quality and testing in different parts of the DevOps infinity loop.
A tale of scale & speed: How the US Navy is enabling software delivery from l...sonjaschweigert1
Rapid and secure feature delivery is a goal across every application team and every branch of the DoD. The Navy’s DevSecOps platform, Party Barge, has achieved:
- Reduction in onboarding time from 5 weeks to 1 day
- Improved developer experience and productivity through actionable findings and reduction of false positives
- Maintenance of superior security standards and inherent policy enforcement with Authorization to Operate (ATO)
Development teams can ship efficiently and ensure applications are cyber ready for Navy Authorizing Officials (AOs). In this webinar, Sigma Defense and Anchore will give attendees a look behind the scenes and demo secure pipeline automation and security artifacts that speed up application ATO and time to production.
We will cover:
- How to remove silos in DevSecOps
- How to build efficient development pipeline roles and component templates
- How to deliver security artifacts that matter for ATO’s (SBOMs, vulnerability reports, and policy evidence)
- How to streamline operations with automated policy checks on container images
Key Trends Shaping the Future of Infrastructure.pdfCheryl Hung
Keynote at DIGIT West Expo, Glasgow on 29 May 2024.
Cheryl Hung, ochery.com
Sr Director, Infrastructure Ecosystem, Arm.
The key trends across hardware, cloud and open-source; exploring how these areas are likely to mature and develop over the short and long-term, and then considering how organisations can position themselves to adapt and thrive.
Key Trends Shaping the Future of Infrastructure.pdf
BOQ _UN.pptx
1. UNITED NATIONS DEVELOPMENT PROGRAMME
ITB 2016-196
Lot 26
WBS 1150
Bill of Quantities
Programme Title: Right to Education in the Gaza Strip
Project name: Extension and Rehabilitation Works For The Governmental Schools
PAL10- 00094739- LOT 26
Renewable Energy for All – Photovoltaic Cells for Al Fakhoora Schools in Gaza Strip
2. (Bill of Quantities)
1 .The contractor must provide a detailed cost breakdown for each item.
2.The contractor must provide Technical descriptions for each proposed item and sufficient
detail to allow UNDP to determine compliance of Bid with specifications as per Schedule of
Requirements and Technical Specifications of this ITB. The contractor shall indicate all makes
proposed and must attach relevant manufacturer Catalogue/data.
3. The contractor shall submit the Manufacture testing certificate, country of origion, certified
characteristics, test performance curves, spare parts regular (as recommended by manufacturer ,
maintenance manuals and manufacturers warranty for each components of the system for 5
years.
4. All prices/rates quoted must be exclusive of all taxes, since the United Nations, including its
subsidiary organs, is exempt from taxes.
5. In addition to the hard copy, if possible please provide also the information on diskette (IBM
compatible).
5. Inspection Team
The contractor Shall facilitate the attendance of Engineers from the supervision team and the
Recipient to check the materials of the PV Solar eqipments before delivering to Site.
6. On site training
Upon completion of the installation, the contractor shall organize an on site training program
involving nominated employer's staff. Such a program shall be carried out during the
commissioning phase. The cost of the training shall be deemed to have been included in the
tendered rates.
7.Contractor's Documents
The contractor's documents must include all construction documentation required for the
works. They must include all site information, structural and civil drawings, electrical
services drawings at suitable scales showing final design calculations, symbols list, site
plan, and single line diagrams for distribution boards, solar switchboards, and control
systems.
8.Operation and Maintenace Manuals
The contractor must submit two hard copies on standard sized sheets and two electronic
copy in-PDF format of the as built drawings including the wiring diagrams and PV single line
diagrams, DC and AC wiring sizing calculations including cross sectional area of the wires
used and voltage drop calculations, rating of all fuses and circuit breakers, operation and
maintenance manuals for each different site. The manuals must contain PV system description
and catalogues of all PV system components. They shall also contain maintenance schedules,
commissioning data, PV system test certificates, a step by step startup and shut down procedure
for the entire PV system, and description of the type and operation control of the inverter and
charge controller.
The contractor will maintain monthly visits during the maintenance period to carry out the
necessary maintenance processes needed and respond promptly to any emergency needed to
keep the system performance intact and perfect.
3. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
Bill No (1)
Photovoltaic Solar System works
General:
• The system is designed to cover the Essential loads in Jamal Abd Alnasser School
•The system will be grid interactive connected with battery backup system, which will allow many power
sources options. The system will import from the grid when loads are being more than the generated from PV
and supply surplus electricity to the batteries when PV generates more than the loads, the batteries can be
charged from Grid if PV output is not enough for loads and batteries.
•Contractor shall submit shop drawings for all architectural, civil, electrical and a complete photovoltaic solar
system works,including a single line diagram showing all the components of the PV system, DC and AC
distribution boards, PV Arrays lay out and battery backup systems connections and cables, wires cross section
for all the system to be approved by the Engineer before executing the work.
•Contractor shall submit the catalogs of each component showing the requested specifications stated at the
bill of quantity.
•The contractor shall submit the Manufacture testing certificate, country of origion, certified characteristics,
test performance curves, spare parts regular (as recommended by manufacturer , maintenance manuals and
manufacturers warrantyfor each components of the system.
• As-built drawings shall be submitted after handing over the work.
• All junction boxes and DBs will be lockable type.
•Upon completion of the installation, the contractor shall organize an on site training program involving
nominated employer's staff. Such a program shall be carried out during the commissioning phase. The cost of
the training shall be deemed to have been included in the tendered rates.
•The price includes all builders’ works, making good and reinstatement including necessary materials and
workmanship as well as removal of unwanted materials to dump sites approved by the engineer to complete
the job successfully.
• All the following items include supply, install, commission and operate of the complete PV solar system.
• The work includes maintenance period for each device according to BOQ and Specifications.
1
PV Modules – 45 Kwp:
Supply, install, connect and operate Mono Crystalline or Polycrystalline Photovoltaic Solar Modules with all
material needed to have complete job ready for installing high quality PV modules with total arrays capacity to
achieve 45 KWp. The item Includes supply, install &connect the following:
• Water proof PV junction boxes IP65 for each array including DC Fuses, DC switch disconnectors, bus bars
,terminals, ducts or trays, supports &labels suitable to the PV arrays loads.
•Solar DC cables appropriately sized to connect the PV solar cells together and to the inverter directly to have
a complete operational circuit with all conduits, clamps , trays and cable end terminations which shall be DC
plug and socket connectors . The DC cables must be sized in accordance with the installation requirements
applicable on site, the allowable voltage drop for DC cables between PV Arrays and inverter less than 1%.
KWp 45
•The price includes all works, making good and reinstatement including necessary materials and workmanship
as well as removal of unwanted materials to dump sites approved by the engineer to complete the job
successfully.
• Contractor must submit manufacturer warranty for solar panel for a period not less than 20 years.
• Contractor must submit all the required certificates for each PV solar panel from.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
Photovoltaic Solar System for Jamal Abd Alnasser School
4. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
2
Inverters – 45 KW:
Supply, install, connect and operate DC/AC grid tie 3-phase inverter with data communication unit with
Ethernet connection .The inverterwith must be suited to any PV module configuration, and depending on the
system design and installation proposed and for the future extended also. (Type is SMA or equivalent).
The DC max power input rating should be equal or more than 45 KW of the PV modules capacity at standard
test condition. The inverter unit shall be suitable for indoor and outdoor installations with IP65.
The inverter AC nominal power output rating must be equal or greater than 45 KW compatible with the AC
loads design.The inverter must include the safety concepts such as (triple protection with optiprotect, electronic
strings fuses, self-learning string failure detection, DC surge arrestor type 2 ) to ensure max availability. Total
inverter capacity must be devided at least 3 inverters. The price includes :
Unit 1
•Supply, install and connect (monitoring and controlling unit) for all PV solar system installed especially
compatible with the inverters, with all needed accessories, interface modules & data cables and all connections
needed to complete and connect the monitoring system to internet.
•Supply ,install and connect all DC cables appropriately sized in accordance with the installation requirements
and to connect the inverters with PV system designed with all conduits, clamps, trays and cable terminations
end which shall be DC plug and socket connectors to have a complete job, the allowable voltage drop for DC
cables between inverters and PV system not less than 1%.
•Inverters shall allow an adjustable power factor minimum AC output power with all necessary electrical
cables, earthing system, Conduits, trays and all other materials and workmanship needed to connect with the
main distribution panel according to the engineer's instruction and approval and have a complete job.
•The contractor must submit manufacturer warranty for each inverter for a period not less than 5 years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
3
Battery Inverters – 50 KW:
Supply, install, connect and operate Battery Inverters compatible with on grid inverter rated power 50 Kw with
all necessary (Grid-Connect Automatic Transfer Control Box) ,interface modules and connections for
masters & slaves , electrical cables and data communication unit with Ethernet connection, connectable in
parallel and modularly extendable. (Type is SMA or equivalent).
The Battery Inverter must include the following concepts such as (Ac and DC coupling, High efficiency,
intelligent battery management for maximum battery life, charge level calculation, extreme overload
capability, and battery temperature sensing and battery current measurements).Total battery inverters capacity
must be compatible with the number of the inverters.
The price includes:
Unit 1
•Supply, install and connect Remote Control Units (RC Unit) for the installed battery inverters with all data
& communication cables and connection needed to complete the job.
• Supply, install and connect:
DC cables appropriately sized in accordance with the installation requirements to connect the batteryinverters
with DC battery fuses box.
AC electrical cables to connect the battery inverters with the main distribution panel(AC Out).
the works includes all conduits, clamps, trays and cable terminations end and workmanship needed to have a
complete job,
• The allowable voltage drop for DC cables between battery inverter and batteries less than 1%.
•The contractor must submit manufacturer warranty for each battery inverter for a period not less than 5
years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
Photovoltaic Solar System for Jamal Abd Alnasser School
5. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
4
Battery Bank:
Supply, install, connect and operate VRLA tubular design deep cycle batteries, the total demand energy is 270
KWh, @ C10 , 1.8V per cell. The battery bank voltage is 48 Vdc.
The batteries must provide high-quality and achieving superior performance, the manufacturing date must be
new and not more than 6 months, suitable for every type of applications especially for solar renewable energy,
designed Service Life 10 years with low internal resistance, designed to be deeply discharged. The Battery
should provide benefits of being maintenance free, case flame retardant & non-hazardous. The price Includes
supply, install &connect Battery temp. sensor (BTS) and the following:
KWh 270
•All necessary DC cables between the batteries together and to the battery fuse box to have a complete
operational circuit with all bus bars, conduits, clamps, stainless steel bolts, washers and cable end terminations
and all needed materials to complete the job. All DC cables must be sized in accordance with the installation
requirements applicable on site ,the allowable voltage drop must be less than 1%.
•Battery Banks rack from the same manufacturer of the batteries with dividers and all needed accessories to
finish the job. the rack must be enough to carry all the weight of the required batteries for the system.
•The contractor must submit manufacturer warranty for each battery cell for a period 10 years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
5
PV Mounting structure:
Supply and install Module mounting structure from Aluminium profile structures to fix the photovoltaic panels
on the roof including profiles composed of extruded aluminium, rivets with seal of an aluminium body and
shank, a neoprene rubber seal and all accessories and supports.
The structure must be suitable to the dimension of selected PV modules and PV numbers, the mounting
provides a fixed inclination of the modules 30 degree with vertical supports, plates, screws and casting
concrete foundations B250 (0.4*0.3*0.2) m3 for each leg, the structure profile includes bracing and double hot
galvanized angles for dividers.
The mounting structures and the foundations must be designed structurally to be suitable to withstand all static
loads (weight of modules, wind loads etc) that might occur according to the Site conditions. The mounting
structure components are bonded together to guaranty potential equalization.
L.S 1
All works and materials must be according to drawings, specifications and supervisor instructions and
approval.
6
Battery Fuse Box:
Supply, install, connect and operate battery DC fuse box (500*375*225 mm) as an external DC distributor to
protect the battery connections of the inverters . The box must be water proof protection with IP65, simple wall
mounting, suitable connections for three battery inverters and up to six DC connections inlet on the battery
side, the item includes (2 LTL 250/400A , 6 fuses 250A , cable glands, with all necessary DC cables from the
battery bank and to the fuse box and from the fuse box to the batteryinverters to have a complete operational
circuit with all conduits, clamps, stainless steel bolts, washers and cable end terminations needed to fix, all DC
cables must be sized in accordance with the installation requirements applicable on site ,the allowable voltage
drop must be less than 1%.
•The contractor must submit manufacturer warranty for each battery fuse box for a period not less than 3
years.(Type is SMA or equivalent).
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
No 3
Photovoltaic Solar System for Jamal Abd Alnasser School
6. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
7
AC Air Condition:
Supply , install, test and commission air conditioning Inverter type Split Unit, composed of outdoor unit. filled
with environment friendly refrigerant such as (R410, R407c,..) and COP not less than 3.5,Condensing unit
shall be complete with Inverter compressor/s & air cooled condenser with fan, Well supported on hot
galvanized steel base on the roof, indoor unit with plasma filter as indicated on drawings to be tights installed
completed with all necessary supports, hangers, drain pipes from indoor unit to the nearest floor drain, ( PVC
Ø 1"), cupper pipes , sleeves, thermostat , Remote control and including Isolation Switch MOELLER and all
required electrical power cables from SDB to the unit according to drawings and engineers approval.
CAPACITY:(12000 BTU/HR).
(Type is ELECTRA or equivalent ) .
No 1
8
3-Phase Digital KWH Meter:
Supply,install,connect and operate 3-phase digital KWH meter,with all CT's and any other material needed to
have a complete job ,The KWh meter has monitoring LCD with all needed data & interface cables to connect
with the Monitoring System .All works and materials must be according to the drawings, catalogues,
specifications and supervisor engineer instruction’s and approval.
No 2
9
Earthing System For Battery Banks:
Supply,install,connect and operate complete independent earthing system for Battery Banks system, must be
separated of the main earthing system to obtain 2 ohm max resistance. the item includes (2 copper electrodes
15mm2 driven into ground, manholes with iron cover, earth joints, clamps, ducts , conduits and 50 mm2
flexible earthing copper wires and cables from the Negative bus bar in the battery fuse box to the electrode to
complete the system as specifications and supervisor engineer instruction’s and approval.
Unit 1
10
Earthing for PV Solar System:
Supply,install,connect and operate complete independent earthing system for PV solar system, must be
separated of the main earthing system to obtain 2 ohm max resistance.
the item includes (2 copper electrodes 15mm2 driven into ground, manholes with iron cover, earth joints,
clamps, ducts , conduits and 25 mm2 flexible earthing copper wires and cables from the PV system
components to the electrode to complete the system as specifications and supervisor engineer instruction’s and
approval.
Unit 2
Total Of Bill (1) - US$
Photovoltaic Solar System for Jamal Abd Alnasser School
7. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
Bill No (2)
Photovoltaic Solar System works
General:
• The system is designed to cover the Essential loads in Ali Bin Abi Taleb School
•The system will be grid interactive connected with battery backup system, which will allow many power
sources options. The system will import from the grid when loads are being more than the generated from PV
and supply surplus electricity to the batteries when PV generates more than the loads, the batteries can be
charged from Grid if PV output is not enough for loads and batteries.
•Contractor shall submit shop drawings for all architectural, civil, electrical and a complete photovoltaic solar
system works,including a single line diagram showing all the components of the PV system, DC and AC
distribution boards, PV Arrays lay out and battery backup systems connections and cables, wires cross section
for all the system to be approved by the Engineer before executing the work.
•Contractor shall submit the catalogs of each component showing the requested specifications stated at the
bill of quantity.
•The contractor shall submit the Manufacture testing certificate, country of origion, certified characteristics,
test performance curves, spare parts regular (as recommended by manufacturer , maintenance manuals and
manufacturers warranty for each components of the system.
• As-built drawings shall be submitted after handing over the work.
• All junction boxes and DBs will be lockable type.
•Upon completion of the installation, the contractor shall organize an on site training program involving
nominated employer's staff. Such a program shall be carried out during the commissioning phase. The cost of
the training shall be deemed to have been included in the tendered rates.
•The price includes all builders’ works, making good and reinstatement including necessary materials and
workmanship as well as removal of unwanted materials to dump sites approved by the engineer to complete
the job successfully.
• All the following items include supply, install, commission and operate of the complete PV solar system.
• The work includes maintenance period for each device according to BOQ and Specifications.
1
PV Modules – 38 Kwp:
Supply, install, connect and operate Mono Crystalline or Polycrystalline Photovoltaic Solar Modules with all
material needed to have complete job ready for installing high quality PV modules with total arrays capacity to
achieve 38 KWp. The item Includes supply, install &connect the following:
• Water proof PV junction boxes IP65 for each array including DC Fuses, DC switch disconnectors, bus bars
,terminals, ducts or trays, supports &labels suitable to the PV arrays loads.
•Solar DC cables appropriately sized to connect the PV solar cells together and to the inverter directly to have
a complete operational circuit with all conduits, clamps , trays and cable end terminations which shall be DC
plug and socket connectors . The DC cables must be sized in accordance with the installation requirements
applicable on site, the allowable voltage drop for DC cables between PV Arrays and inverter less than 1%.
KWp 38
•The price includes all works, making good and reinstatement including necessary materials and
workmanship as well as removal of unwanted materials to dump sites approved by the engineer to complete
the job successfully.
• Contractor must submit manufacturer warranty for solar panel for a period not less than 20 years.
• Contractor must submit all the required certificates for each PV solar panel from.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
Photovoltaic Solar System for Ali Bin Abi Taleb School
8. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
2
Inverters – 40 KW:
Supply, install, connect and operate DC/AC grid tie 3-phase inverter with data communication unit with
Ethernet connection .The inverterwith must be suited to any PV module configuration, and depending on the
system design and installation proposed and for the future extended also. (Type is SMA or equivalent).
The DC max power input rating should be equal or more than 40 KW of the PV modules capacity at standard
test condition. The inverter unit shall be suitable for indoor and outdoor installations with IP65.
The inverter AC nominal power output rating must be equal or greater than 40 KW compatible with the AC
loads design.The inverter must include the safety concepts such as (triple protection with optiprotect,
electronic strings fuses, self-learning string failure detection, DC surge arrestor type 2 ) to ensure max
availability. Total inverter capacity must be devided at least 3 inverters. The price includes :
Unit 1
•Supply, install and connect (monitoring and controlling unit) for all PV solar system installed especially
compatible with the inverters, with all needed accessories, interface modules & data cables and all connections
needed to complete and connect the monitoring system to internet.
•Supply ,install and connect all DC cables appropriately sized in accordance with the installation requirements
and to connect the inverters with PV system designed with all conduits, clamps, trays and cable terminations
end which shall be DC plug and socket connectors to have a complete job, the allowable voltage drop for DC
cables between inverters and PV system not less than 1%.
•Inverters shall allow an adjustable power factor minimum AC output power with all necessary electrical
cables, earthing system, Conduits, trays and all other materials and workmanship needed to connect with the
main distribution panel according to the engineer's instruction and approval and have a complete job.
•The contractor must submit manufacturer warranty for each inverter for a period not less than 5 years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
3
Battery Inverters – 50 KW:
Supply, install, connect and operate Battery Inverters compatible with on grid inverter rated power 50 Kw with
all necessary (Grid-Connect Automatic Transfer Control Box),interface modules and connections for
masters & slaves , electrical cables and data communication unit with Ethernet connection, connectable in
parallel and modularly extendable. (Type is SMA or equivalent).
The Battery Inverter must include the following concepts such as (Ac and DC coupling, High efficiency,
intelligent battery management for maximum battery life, charge level calculation, extreme overload capability,
and battery temperature sensing and battery current measurements).Total battery inverters capacity must be
compatible with the number of the inverters.
The price includes:
Unit 1
•Supply, install and connect Remote Control Units (RC Unit) for the installed battery inverters with all data
& communication cables and connection needed to complete the job.
• Supply, install and connect:
DC cables appropriately sized in accordance with the installation requirements to connect the battery inverters
with DC battery fuses box.
AC electrical cables to connect the battery inverters with the main distribution panel(AC Out).
the works includes all conduits, clamps, trays and cable terminations end and workmanship needed to have a
complete job,
• The allowable voltage drop for DC cables between battery inverter and batteries less than 1%.
•The contractor must submit manufacturer warranty for each battery inverter for a period not less than 5
years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
Photovoltaic Solar System for Ali Bin Abi Taleb School
9. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
4
Battery Bank :
Supply, install, connect and operate VRLA tubular design deep cycle batteries, the total demand energy is 200
KWh, @ C10 , 1.8V per cell. The battery bank voltage is 48 Vdc.
The batteries must provide high-quality and achieving superior performance, the manufacturing date must be
new and not more than 6 months, suitable for every type of applications especially for solar renewable energy,
designed Service Life 10 years with low internal resistance, designed to be deeply discharged. The Battery
should provide benefits of being maintenance free, case flame retardant & non-hazardous. The price Includes
supply, install &connect Battery temp. sensor (BTS) and the following:
KWh 200
•All necessary DC cables between the batteries together and to the battery fuse box to have a complete
operational circuit with all bus bars, conduits, clamps, stainless steel bolts, washers and cable end terminations
and all needed materials to complete the job. All DC cables must be sized in accordance with the installation
requirements applicable on site ,the allowable voltage drop must be less than 1%.
•Battery Banks rack from the same manufacturer of the batteries with dividers and all needed accessories to
finish the job. the rack must be enough to carry all the weight of the required batteries for the system.
•The contractor must submit manufacturer warranty for each battery cell for a period 10 years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
5
PV Mounting structure:
Supply and install Module mounting structure from hot galvanized steel profile foundation suitable to the
dimension of selected PV modules and PV numbers, the mounting provides a fixed inclination of the modules
30 degree with vertical supports, plates, screws and casting concrete foundations B250 (0.4*0.4*0.2) m3 for
each leg, the structure profile includes bracing and double hot galvanized angles for dividers.
The mounting structures and the foundations must be designed structurally to be suitable to withstand all static
loads (weight of modules, wind loads etc) that might occur according to the Site conditions. The mounting
structure components are bonded together to guaranty potential equalization.
L.S 1
All works and materials must be according to drawings, specifications and supervisor instructions and
approval.
6
Battery Fuse Box:
Supply, install, connect and operate battery DC fuse box (500*375*225 mm) as an external DC distributor to
protect the battery connections of the inverters . The box must be water proof protection with IP65, simple
wall mounting, suitable connections for three battery inverters and up to six DC connections inlet on the
battery side, the item includes (2 LTL 250/400A , 6 fuses 250A , cable glands, with all necessary DC cables
from the battery bank and to the fuse box and from the fuse box to the battery inverters to have a complete
operational circuit with all conduits, clamps, stainless steel bolts, washers and cable end terminations needed to
fix, all DC cables must be sized in accordance with the installation requirements applicable on site ,the
allowable voltage drop must be less than 1%.
•The contractor must submit manufacturer warranty for each battery fuse box for a period not less than 3
years. (Type is SMA or equivalent).
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
No 3
Photovoltaic Solar System for Ali Bin Abi Taleb School
10. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
7
AC Air Condition:
Supply , install, test and commission air conditioning Inverter type Split Unit, composed of outdoor unit. filled
with environment friendly refrigerant such as (R410, R407c,..) and COP not less than 3.5,Condensing unit
shall be complete with Inverter compressor/s & air cooled condenser with fan, Well supported on hot
galvanized steel base on the roof, indoor unit with plasma filter as indicated on drawings to be tights installed
completed with all necessary supports, hangers, drain pipes from indoor unit to the nearest floor drain, ( PVC
Ø 1"), cupper pipes , sleeves, thermostat , Remote control and including Isolation Switch MOELLER and all
required electrical power cables from SDB to the unit according to drawings and engineers approval.
CAPACITY:(12000 BTU/HR).
(Type is ELECTRA or equivalent ) .
No 1
8
3-Phase Digital KWH Meter:
Supply,install,connect and operate 3-phase digital KWH meter,with all CT's and any other material needed to
have a complete job ,The KWh meter has monitoring LCD with all needed data & interface cables to connect
with the Monitoring System .All works and materials must be according to the drawings, catalogues,
specifications and supervisor engineer instruction’s and approval.
No 2
9
Earthing System For Battery Banks:
Supply,install,connect and operate complete independent earthing system for Battery Banks system, must be
separated of the main earthing system to obtain 2 ohm max resistance. the item includes (2 copper electrodes
15mm2 driven into ground, manholes with iron cover, earth joints, clamps, ducts , conduits and 50 mm2
flexible earthing copper wires and cables from the Negative bus bar in the battery fuse box to the electrode to
complete the system as specifications and supervisor engineer instruction’s and approval.
Unit 1
10
Earthing for PV Solar System:
Supply,install,connect and operate complete independent earthing system for PV solar system, must be
separated of the main earthing system to obtain 2 ohm max resistance.
the item includes (2 copper electrodes 15mm2 driven into ground, manholes with iron cover, earth joints,
clamps, ducts , conduits and 25 mm2 flexible earthing copper wires and cables from the PV system
components to the electrode to complete the system as specifications and supervisor engineer instruction’s
and approval.
Unit 2
Total Of Bill (2) - US$
Photovoltaic Solar System for Ali Bin Abi Taleb School
11. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
Bill No (4)
Photovoltaic Solar System works
General:
• The system is designed to cover the Essential loads in KHANYOUNIS SECONDARY GIRLS SCHOOL
•The system will be grid interactive connected with battery backup system, which will allow many power
sources options. The system will import from the grid when loads are being more than the generated from PV
and supply surplus electricity to the batteries when PV generates more than the loads, the batteries can be
charged from Grid if PV output is not enough for loads and batteries.
•Contractor shall submit shop drawings for all architectural, civil, electrical and a complete photovoltaic solar
system works,including a single line diagram showing all the components of the PV system, DC and AC
distribution boards, PV Arrays lay out and battery backup systems connections and cables, wires cross section
for all the system to be approved by the Engineer before executing the work.
•Contractor shall submit the catalogs of each component showing the requested specifications stated at the
bill of quantity.
•The contractor shall submit the Manufacture testing certificate, country of origion, certified characteristics,
test performance curves, spare parts regular (as recommended by manufacturer , maintenance manuals and
manufacturers warrantyfor each components of the system.
• As-built drawings shall be submitted after handing over the work.
• All junction boxes and DBs will be lockable type.
•Upon completion of the installation, the contractor shall organize an on site training program involving
nominated employer's staff. Such a program shall be carried out during the commissioning phase. The cost of
the training shall be deemed to have been included in the tendered rates.
•The price includes all builders’ works, making good and reinstatement including necessary materials and
workmanship as well as removal of unwanted materials to dump sites approved by the engineer to complete
the job successfully.
• All the following items include supply, install, commission and operate of the complete PV solar system.
• The work includes maintenance period for each device according to BOQ and Specifications.
1
PV Modules – 25 Kwp:
Supply, install, connect and operate Mono Crystalline or Polycrystalline Photovoltaic Solar Modules with all
material needed to have complete job ready for installing high quality PV modules with total arrays capacity to
achieve 25 KWp. The item Includes supply, install &connect the following:
• Water proof PV junction boxes IP65 for each array including DC Fuses, DC switch disconnectors, bus bars
,terminals, ducts or trays, supports &labels suitable to the PV arrays loads.
•Solar DC cables appropriately sized to connect the PV solar cells together and to the inverter directly to have
a complete operational circuit with all conduits, clamps , trays and cable end terminations which shall be DC
plug and socket connectors . The DC cables must be sized in accordance with the installation requirements
applicable on site, the allowable voltage drop for DC cables between PV Arrays and inverter less than 1%.
KWp 25
•The price includes all works, making good and reinstatement including necessary materials and workmanship
as well as removal of unwanted materials to dump sites approved by the engineer to complete the job
successfully.
• Contractor must submit manufacturer warranty for solar panel for a period not less than 20 years.
• Contractor must submit all the required certificates for each PV solar panel from.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
Photovoltaic Solar System for KHANYOUNIS SECONDARY GIRLS SCHOOL
12. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
2
Inverters – 30 KW:
Supply, install, connect and operate DC/AC grid tie 3-phase inverter with data communication unit with
Ethernet connection .The inverterwith must be suited to any PV module configuration, and depending on the
system design and installation proposed and for the future extended also. (Type is SMA or equivalent).
The DC max power input rating should be equal or more than 30 KW of the PV modules capacity at standard
test condition. The inverter unit shall be suitable for indoor and outdoor installations with IP65.
The inverter AC nominal power output rating must be equal or greater than 30 KW compatible with the AC
loads design.The inverter must include the safety concepts such as (triple protection with optiprotect, electronic
strings fuses, self-learning string failure detection, DC surge arrestor type 2 ) to ensure max availability. Total
inverter capacity must be devided at least 2 inverters. The price includes :
Unit 1
•Supply, install and connect (monitoring and controlling unit) for all PV solar system installed especially
compatible with the inverters, with all needed accessories, interface modules & data cables and all connections
needed to complete and connect the monitoring system to internet.
•Supply ,install and connect all DC cables appropriately sized in accordance with the installation requirements
and to connect the inverters with PV system designed with all conduits, clamps, trays and cable terminations
end which shall be DC plug and socket connectors to have a complete job, the allowable voltage drop for DC
cables between inverters and PV system not less than 1%.
•Inverters shall allow an adjustable power factor minimum AC output power with all necessary electrical
cables, earthing system, Conduits, trays and all other materials and workmanship needed to connect with the
main distribution panel according to the engineer's instruction and approval and have a complete job.
•The contractor must submit manufacturer warranty for each inverter for a period not less than 5 years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
3
Battery Inverter – 6 KW:
Supply, install, connect and operate Battery Inverter compatible with on grid inverters with total rated power 6
Kw with all necessary interface modules and connections for masters & slaves , electrical cables and data
communication unit,router with Ethernet connection, connectable in parallel and modularly extendable. (Type
is SMA or equivalent).
The Battery Inverter must include the following concepts such as (Ac and DC coupling, High efficiency,
intelligent battery management for maximum battery life, charge level calculation, extreme overload
capability, and batterytemperature sensing and battery current measurements).
The price includes:
No 3
•Supply, install and connect Remote Control Units (RC Unit) for the installed battery inverters with all data
& communication cables and connection needed to complete the job.
• Supply, install and connect:
DC cables appropriately sized in accordance with the installation requirements to connect the batteryinverters
with DC battery fuses box.
AC electrical cables to connect the battery inverters with the main distribution panel(AC Out).
the works includes all conduits, clamps, trays and cable terminations end and workmanship needed to have a
complete job,
• The allowable voltage drop for DC cables between battery inverter and batteries less than 1%.
•The contractor must submit manufacturer warranty for each battery inverter for a period not less than 5
years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
Photovoltaic Solar System for KHANYOUNIS SECONDARY GIRLS SCHOOL
13. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
4
Battery Bank:
Supply, install, connect and operate VRLA tubular design deep cycle batteries, the total demand energy is 120
KWh, @ C10 , 1.8V per cell. The battery bank voltage is 48 Vdc.
The batteries must provide high-quality and achieving superior performance, the manufacturing date must be
new and not more than 6 months, suitable for every type of applications especially for solar renewable energy,
designed Service Life 10 years with low internal resistance, designed to be deeply discharged. The Battery
should provide benefits of being maintenance free, case flame retardant & non-hazardous. The price Includes
supply, install &connect Battery temp. sensor (BTS) and the following:
KWh 120
•All necessary DC cables between the batteries together and to the battery fuse box to have a complete
operational circuit with all bus bars, conduits, clamps, stainless steel bolts, washers and cable end terminations
and all needed materials to complete the job. All DC cables must be sized in accordance with the installation
requirements applicable on site ,the allowable voltage drop must be less than 1%.
•Battery Banks rack from the same manufacturer of the batteries with dividers and all needed accessories to
finish the job. the rack must be enough to carry all the weight of the required batteries for the system.
•The contractor must submit manufacturer warranty for each battery cell for a period 10 years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
5
PV Mounting structure:
Supply and install Module mounting structure from hot galvanized steel profile foundation suitable to the
dimension of selected PV modules and PV numbers, the mounting provides a fixed inclination of the modules
30 degree with vertical supports, plates, screws and casting concrete foundations B250 (0.4*0.4*0.2) m3 for
each leg, the structure profile includes bracing and double hot galvanized angles for dividers.
The mounting structures and the foundations must be designed structurally to be suitable to withstand all static
loads (weight of modules, wind loads etc) that might occur according to the Site conditions. The mounting
structure components are bonded together to guaranty potential equalization.
L.S 1
All works and materials must be according to drawings, specifications and supervisor instructions and
approval.
6
Battery Fuse Box:
Supply, install, connect and operate battery DC fuse box (500*375*225 mm) as an external DC distributor to
protect the battery connections of the inverters . The box must be water proof protection with IP65, simple wall
mounting, suitable connections for three battery inverters and up to six DC connections inlet on the battery
side, the item includes (2 LTL 250/400A , 6 fuses 250A , cable glands, with all necessary DC cables from the
battery bank and to the fuse box and from the fuse box to the batteryinverters to have a complete operational
circuit with all conduits, clamps, stainless steel bolts, washers and cable end terminations needed to fix, all DC
cables must be sized in accordance with the installation requirements applicable on site ,the allowable voltage
drop must be less than 1%.
•The contractor must submit manufacturer warranty for each battery fuse box for a period not less than 3
years. (Type is SMA or equivalent).
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
No 1
Photovoltaic Solar System for KHANYOUNIS SECONDARY GIRLS SCHOOL
14. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
7
Wall mounted exhaust:
Supply, install, connect and operate wall mounted exhaust fan of 8" diameter Capacity (500 cfm) type is
(VENTA or equivalent ) at static pressure 60 Pascal for the battery room , to be tightly installed complete with
all necessary supports ,cover and an louvers, and all required electrical cables, conduits, mcb 10A and needed
to fix, all according engineer’s approval. The price shall include opening duct in the block for the fan,
plastering, painting, repair all damages and all other materials needed to have a complete job ready according
to the engineer's instruction and approval.
No 1
8
3-Phase Digital KWH Meter:
Supply,install,connect and operate 3-phase digital KWH meter,with all CT's and any other material needed to
have a complete job ,The KWh meter has monitoring LCD with all needed data & interface cables to connect
with the Monitoring System .All works and materials must be according to the drawings, catalogues,
specifications and supervisor engineer instruction’s and approval.
No 2
9
Earthing System For Battery Banks:
Supply,install,connect and operate complete independent earthing system for Battery Banks system, must be
separated of the main earthing system to obtain 2 ohm max resistance. the item includes (2 copper electrodes
15mm2 driven into ground, manholes with iron cover, earth joints, clamps, ducts , conduits and 50 mm2
flexible earthing copper wires and cables from the Negative bus bar in the battery fuse box to the electrode to
complete the system as specifications and supervisor engineer instruction’s and approval.
Unit 1
10
Earthing for PV Solar System:
Supply,install,connect and operate complete independent earthing system for PV solar system, must be
separated of the main earthing system to obtain 2 ohm max resistance.
the item includes (2 copper electrodes 15mm2 driven into ground, manholes with iron cover, earth joints,
clamps, ducts , conduits and 25 mm2 flexible earthing copper wires and cables from the PV system
components to the electrode to complete the system as specifications and supervisor engineer instruction’s and
approval.
Unit 2
Total Of Bill (3) - US$
Photovoltaic Solar System for KHANYOUNIS SECONDARY GIRLS SCHOOL
15. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
Bill No (3)
Photovoltaic Solar System works
General:
• The system is designed to cover the Essential loads in ALMOTANABY PRIMARY BOYS SCHOOL
•The system will be grid interactive connected with battery backup system, which will allow many power
sources options. The system will import from the grid when loads are being more than the generated from PV
and supply surplus electricity to the batteries when PV generates more than the loads, the batteries can be
charged from Grid if PV output is not enough for loads and batteries.
•Contractor shall submit shop drawings for all architectural, civil, electrical and a complete photovoltaic solar
system works,including a single line diagram showing all the components of the PV system, DC and AC
distribution boards, PV Arrays lay out and battery backup systems connections and cables, wires cross section
for all the system to be approved by the Engineer before executing the work.
•Contractor shall submit the catalogs of each component showing the requested specifications stated at the
bill of quantity.
•The contractor shall submit the Manufacture testing certificate, country of origion, certified characteristics,
test performance curves, spare parts regular (as recommended by manufacturer , maintenance manuals and
manufacturers warrantyfor each components of the system.
• As-built drawings shall be submitted after handing over the work.
• All junction boxes and DBs will be lockable type.
•Upon completion of the installation, the contractor shall organize an on site training program involving
nominated employer's staff. Such a program shall be carried out during the commissioning phase. The cost of
the training shall be deemed to have been included in the tendered rates.
•The price includes all builders’ works, making good and reinstatement including necessary materials and
workmanship as well as removal of unwanted materials to dump sites approved by the engineer to complete
the job successfully.
• All the following items include supply, install, commission and operate of the complete PV solar system.
• The work includes maintenance period for each device according to BOQ and Specifications.
1
PV Modules – 25 Kwp:
Supply, install, connect and operate Mono Crystalline or Polycrystalline Photovoltaic Solar Modules with all
material needed to have complete job ready for installing high quality PV modules with total arrays capacity to
achieve 25 KWp. The item Includes supply, install &connect the following:
• Water proof PV junction boxes IP65 for each array including DC Fuses, DC switch disconnectors, bus bars
,terminals, ducts or trays, supports &labels suitable to the PV arrays loads.
•Solar DC cables appropriately sized to connect the PV solar cells together and to the inverter directly to have
a complete operational circuit with all conduits, clamps , trays and cable end terminations which shall be DC
plug and socket connectors . The DC cables must be sized in accordance with the installation requirements
applicable on site, the allowable voltage drop for DC cables between PV Arrays and inverter less than 1%.
KWp 25
•The price includes all works, making good and reinstatement including necessary materials and workmanship
as well as removal of unwanted materials to dump sites approved by the engineer to complete the job
successfully.
• Contractor must submit manufacturer warranty for solar panel for a period not less than 20 years.
• Contractor must submit all the required certificates for each PV solar panel from.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
Photovoltaic Solar System for ALMOTANABY PRIMARY BOYS SCHOOL
16. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
2
Inverters – 30 KW:
Supply, install, connect and operate DC/AC grid tie 3-phase inverter with data communication unit with
Ethernet connection .The inverterwith must be suited to any PV module configuration, and depending on the
system design and installation proposed and for the future extended also. (Type is SMA or equivalent).
The DC max power input rating should be equal or more than 30 KW of the PV modules capacity at standard
test condition. The inverter unit shall be suitable for indoor and outdoor installations with IP65.
The inverter AC nominal power output rating must be equal or greater than 30 KW compatible with the AC
loads design.The inverter must include the safety concepts such as (triple protection with optiprotect, electronic
strings fuses, self-learning string failure detection, DC surge arrestor type 2 ) to ensure max availability. Total
inverter capacity must be devided at least 2 inverters. The price includes :
Unit 1
•Supply, install and connect (monitoring and controlling unit) for all PV solar system installed especially
compatible with the inverters, with all needed accessories, interface modules & data cables and all connections
needed to complete and connect the monitoring system to internet.
•Supply ,install and connect all DC cables appropriately sized in accordance with the installation requirements
and to connect the inverters with PV system designed with all conduits, clamps, trays and cable terminations
end which shall be DC plug and socket connectors to have a complete job, the allowable voltage drop for DC
cables between inverters and PV system not less than 1%.
•Inverters shall allow an adjustable power factor minimum AC output power with all necessary electrical
cables, earthing system, Conduits, trays and all other materials and workmanship needed to connect with the
main distribution panel according to the engineer's instruction and approval and have a complete job.
•The contractor must submit manufacturer warranty for each inverter for a period not less than 5 years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
3
Battery Inverter – 6 KW:
Supply, install, connect and operate Battery Inverter compatible with on grid inverters with total rated power 6
Kw with all necessary interface modules and connections for masters & slaves , electrical cables and data
communication unit,router with Ethernet connection, connectable in parallel and modularly extendable. (Type
is SMA or equivalent).
The Battery Inverter must include the following concepts such as (Ac and DC coupling, High efficiency,
intelligent battery management for maximum battery life, charge level calculation, extreme overload
capability, and batterytemperature sensing and battery current measurements).
The price includes:
No 3
•Supply, install and connect Remote Control Units (RC Unit) for the installed battery inverters with all data
& communication cables and connection needed to complete the job.
• Supply, install and connect:
DC cables appropriately sized in accordance with the installation requirements to connect the batteryinverters
with DC battery fuses box.
AC electrical cables to connect the battery inverters with the main distribution panel(AC Out).
the works includes all conduits, clamps, trays and cable terminations end and workmanship needed to have a
complete job,
• The allowable voltage drop for DC cables between battery inverter and batteries less than 1%.
•The contractor must submit manufacturer warranty for each battery inverter for a period not less than 5
years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
Photovoltaic Solar System for ALMOTANABY PRIMARY BOYS SCHOOL
17. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
4
Battery Bank:
Supply, install, connect and operate VRLA tubular design deep cycle batteries, the total demand energy is 120
KWh, @ C10 , 1.8V per cell. The battery bank voltage is 48 Vdc.
The batteries must provide high-quality and achieving superior performance, the manufacturing date must be
new and not more than 6 months, suitable for every type of applications especially for solar renewable energy,
designed Service Life 10 years with low internal resistance, designed to be deeply discharged. The Battery
should provide benefits of being maintenance free, case flame retardant & non-hazardous. The price Includes
supply, install &connect Battery temp. sensor (BTS) and the following:
KWh 120
•All necessary DC cables between the batteries together and to the battery fuse box to have a complete
operational circuit with all bus bars, conduits, clamps, stainless steel bolts, washers and cable end terminations
and all needed materials to complete the job. All DC cables must be sized in accordance with the installation
requirements applicable on site ,the allowable voltage drop must be less than 1%.
•Battery Banks rack from the same manufacturer of the batteries with dividers and all needed accessories to
finish the job. the rack must be enough to carry all the weight of the required batteries for the system.
•The contractor must submit manufacturer warranty for each battery cell for a period 10 years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
5
PV Mounting structure:
Supply and install Module mounting structure from hot galvanized steel profile foundation suitable to the
dimension of selected PV modules and PV numbers, the mounting provides a fixed inclination of the modules
30 degree with vertical supports, plates, screws and casting concrete foundations B250 (0.4*0.4*0.2) m3 for
each leg, the structure profile includes bracing and double hot galvanized angles for dividers.
The mounting structures and the foundations must be designed structurally to be suitable to withstand all static
loads (weight of modules, wind loads etc) that might occur according to the Site conditions. The mounting
structure components are bonded together to guaranty potential equalization.
L.S 1
All works and materials must be according to drawings, specifications and supervisor instructions and
approval.
6
Battery Fuse Box:
Supply, install, connect and operate battery DC fuse box (500*375*225 mm) as an external DC distributor to
protect the battery connections of the inverters . The box must be water proof protection with IP65, simple wall
mounting, suitable connections for three battery inverters and up to six DC connections inlet on the battery
side, the item includes (2 LTL 250/400A , 6 fuses 250A , cable glands, with all necessary DC cables from the
battery bank and to the fuse box and from the fuse box to the batteryinverters to have a complete operational
circuit with all conduits, clamps, stainless steel bolts, washers and cable end terminations needed to fix, all DC
cables must be sized in accordance with the installation requirements applicable on site ,the allowable voltage
drop must be less than 1%.
•The contractor must submit manufacturer warranty for each battery fuse box for a period not less than 3
years. (Type is SMA or equivalent).
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
No 1
Photovoltaic Solar System for ALMOTANABY PRIMARY BOYS SCHOOL
18. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
7
Wall mounted exhaust:
Supply, install, connect and operate wall mounted exhaust fan of 8" diameter Capacity (500 cfm) type is
(VENTA or equivalent ) at static pressure 60 Pascal for the battery room , to be tightly installed complete with
all necessary supports ,cover and an louvers, and all required electrical cables, conduits, mcb 10A and needed
to fix, all according engineer’s approval. The price shall include opening duct in the block for the fan,
plastering, painting, repair all damages and all other materials needed to have a complete job ready according
to the engineer's instruction and approval.
No 1
8
3-Phase Digital KWH Meter:
Supply,install,connect and operate 3-phase digital KWH meter,with all CT's and any other material needed to
have a complete job ,The KWh meter has monitoring LCD with all needed data & interface cables to connect
with the Monitoring System .All works and materials must be according to the drawings, catalogues,
specifications and supervisor engineer instruction’s and approval.
No 2
9
Earthing System For Battery Banks:
Supply,install,connect and operate complete independent earthing system for Battery Banks system, must be
separated of the main earthing system to obtain 2 ohm max resistance. the item includes (2 copper electrodes
15mm2 driven into ground, manholes with iron cover, earth joints, clamps, ducts , conduits and 50 mm2
flexible earthing copper wires and cables from the Negative bus bar in the battery fuse box to the electrode to
complete the system as specifications and supervisor engineer instruction’s and approval.
Unit 1
10
Earthing for PV Solar System:
Supply,install,connect and operate complete independent earthing system for PV solar system, must be
separated of the main earthing system to obtain 2 ohm max resistance.
the item includes (2 copper electrodes 15mm2 driven into ground, manholes with iron cover, earth joints,
clamps, ducts , conduits and 25 mm2 flexible earthing copper wires and cables from the PV system
components to the electrode to complete the system as specifications and supervisor engineer instruction’s and
approval.
Unit 2
Total Of Bill (4) - US$
Photovoltaic Solar System for ALMOTANABY PRIMARY BOYS SCHOOL
19. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
Bill No (5)
Photovoltaic Solar System works
General:
• The system is designed to cover the Essential loads in Al Ma'ari Primary Boys School
•The system will be grid interactive connected with battery backup system, which will allow many power
sources options. The system will import from the grid when loads are being more than the generated from PV
and supply surplus electricity to the batteries when PV generates more than the loads, the batteries can be
charged from Grid if PV output is not enough for loads and batteries.
•Contractor shall submit shop drawings for all architectural, civil, electrical and a complete photovoltaic solar
system works,including a single line diagram showing all the components of the PV system, DC and AC
distribution boards, PV Arrays lay out and battery backup systems connections and cables, wires cross section
for all the system to be approved by the Engineer before executing the work.
•Contractor shall submit the catalogs of each component showing the requested specifications stated at the
bill of quantity.
•The contractor shall submit the Manufacture testing certificate, country of origion, certified characteristics,
test performance curves, spare parts regular (as recommended by manufacturer , maintenance manuals and
manufacturers warrantyfor each components of the system.
• As-built drawings shall be submitted after handing over the work.
• All junction boxes and DBs will be lockable type.
•Upon completion of the installation, the contractor shall organize an on site training program involving
nominated employer's staff. Such a program shall be carried out during the commissioning phase. The cost of
the training shall be deemed to have been included in the tendered rates.
•The price includes all builders’ works, making good and reinstatement including necessary materials and
workmanship as well as removal of unwanted materials to dump sites approved by the engineer to complete
the job successfully.
• All the following items include supply, install, commission and operate of the complete PV solar system.
• The work includes maintenance period for each device according to BOQ and Specifications.
1
PV Modules – 25 Kwp:
Supply, install, connect and operate Mono Crystalline or Polycrystalline Photovoltaic Solar Modules with all
material needed to have complete job ready for installing high quality PV modules with total arrays capacity to
achieve 25 KWp. The item Includes supply, install &connect the following:
• Water proof PV junction boxes IP65 for each array including DC Fuses, DC switch disconnectors, bus bars
,terminals, ducts or trays, supports &labels suitable to the PV arrays loads.
•Solar DC cables appropriately sized to connect the PV solar cells together and to the inverter directly to have
a complete operational circuit with all conduits, clamps , trays and cable end terminations which shall be DC
plug and socket connectors . The DC cables must be sized in accordance with the installation requirements
applicable on site, the allowable voltage drop for DC cables between PV Arrays and inverter less than 1%.
KWp 25
•The price includes all works, making good and reinstatement including necessary materials and workmanship
as well as removal of unwanted materials to dump sites approved by the engineer to complete the job
successfully.
• Contractor must submit manufacturer warranty for solar panel for a period not less than 20 years.
• Contractor must submit all the required certificates for each PV solar panel from.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
Photovoltaic Solar System for Al Ma'ari Primary Boys School
20. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
2
Inverters – 30 KW:
Supply, install, connect and operate DC/AC grid tie 3-phase inverter with data communication unit with
Ethernet connection .The inverterwith must be suited to any PV module configuration, and depending on the
system design and installation proposed and for the future extended also. (Type is SMA or equivalent).
The DC max power input rating should be equal or more than 30 KW of the PV modules capacity at standard
test condition. The inverter unit shall be suitable for indoor and outdoor installations with IP65.
The inverter AC nominal power output rating must be equal or greater than 30 KW compatible with the AC
loads design.The inverter must include the safety concepts such as (triple protection with optiprotect, electronic
strings fuses, self-learning string failure detection, DC surge arrestor type 2 ) to ensure max availability. Total
inverter capacity must be devided at least 2 inverters. The price includes :
Unit 1
•Supply, install and connect (monitoring and controlling unit) for all PV solar system installed especially
compatible with the inverters, with all needed accessories, interface modules & data cables and all connections
needed to complete and connect the monitoring system to internet.
•Supply ,install and connect all DC cables appropriately sized in accordance with the installation requirements
and to connect the inverters with PV system designed with all conduits, clamps, trays and cable terminations
end which shall be DC plug and socket connectors to have a complete job, the allowable voltage drop for DC
cables between inverters and PV system not less than 1%.
•Inverters shall allow an adjustable power factor minimum AC output power with all necessary electrical
cables, earthing system, Conduits, trays and all other materials and workmanship needed to connect with the
main distribution panel according to the engineer's instruction and approval and have a complete job.
•The contractor must submit manufacturer warranty for each inverter for a period not less than 5 years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
3
Battery Inverter – 6 KW:
Supply, install, connect and operate Battery Inverter compatible with on grid inverters with total rated power 6
Kw with all necessary interface modules and connections for masters & slaves , electrical cables and data
communication unit,router with Ethernet connection, connectable in parallel and modularly extendable. (Type
is SMA or equivalent).
The Battery Inverter must include the following concepts such as (Ac and DC coupling, High efficiency,
intelligent battery management for maximum battery life, charge level calculation, extreme overload
capability, and batterytemperature sensing and battery current measurements).
The price includes:
No 3
•Supply, install and connect Remote Control Units (RC Unit) for the installed battery inverters with all data
& communication cables and connection needed to complete the job.
• Supply, install and connect:
DC cables appropriately sized in accordance with the installation requirements to connect the batteryinverters
with DC battery fuses box.
AC electrical cables to connect the battery inverters with the main distribution panel(AC Out).
the works includes all conduits, clamps, trays and cable terminations end and workmanship needed to have a
complete job,
• The allowable voltage drop for DC cables between battery inverter and batteries less than 1%.
•The contractor must submit manufacturer warranty for each battery inverter for a period not less than 5
years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
Photovoltaic Solar System for Al Ma'ari Primary Boys School
21. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
4
Battery Bank:
Supply, install, connect and operate VRLA tubular design deep cycle batteries, the total demand energy is 120
KWh, @ C10 , 1.8V per cell. The battery bank voltage is 48 Vdc.
The batteries must provide high-quality and achieving superior performance, the manufacturing date must be
new and not more than 6 months, suitable for every type of applications especially for solar renewable energy,
designed Service Life 10 years with low internal resistance, designed to be deeply discharged. The Battery
should provide benefits of being maintenance free, case flame retardant & non-hazardous. The price Includes
supply, install &connect Battery temp. sensor (BTS) and the following:
KWh 120
•All necessary DC cables between the batteries together and to the battery fuse box to have a complete
operational circuit with all bus bars, conduits, clamps, stainless steel bolts, washers and cable end terminations
and all needed materials to complete the job. All DC cables must be sized in accordance with the installation
requirements applicable on site ,the allowable voltage drop must be less than 1%.
•Battery Banks rack from the same manufacturer of the batteries with dividers and all needed accessories to
finish the job. the rack must be enough to carry all the weight of the required batteries for the system.
•The contractor must submit manufacturer warranty for each battery cell for a period 10 years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
5
PV Mounting structure:
Supply and install Module mounting structure from hot galvanized steel profile foundation suitable to the
dimension of selected PV modules and PV numbers, the mounting provides a fixed inclination of the modules
30 degree with vertical supports, plates, screws and casting concrete foundations B250 (0.4*0.4*0.2) m3 for
each leg, the structure profile includes bracing and double hot galvanized angles for dividers.
The mounting structures and the foundations must be designed structurally to be suitable to withstand all static
loads (weight of modules, wind loads etc) that might occur according to the Site conditions. The mounting
structure components are bonded together to guaranty potential equalization.
L.S 1
All works and materials must be according to drawings, specifications and supervisor instructions and
approval.
6
Battery Fuse Box:
Supply, install, connect and operate battery DC fuse box (500*375*225 mm) as an external DC distributor to
protect the battery connections of the inverters . The box must be water proof protection with IP65, simple wall
mounting, suitable connections for three battery inverters and up to six DC connections inlet on the battery
side, the item includes (2 LTL 250/400A , 6 fuses 250A , cable glands, with all necessary DC cables from the
battery bank and to the fuse box and from the fuse box to the batteryinverters to have a complete operational
circuit with all conduits, clamps, stainless steel bolts, washers and cable end terminations needed to fix, all DC
cables must be sized in accordance with the installation requirements applicable on site ,the allowable voltage
drop must be less than 1%.
•The contractor must submit manufacturer warranty for each battery fuse box for a period not less than 3
years. (Type is SMA or equivalent).
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
No 1
Photovoltaic Solar System for Al Ma'ari Primary Boys School
22. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
7
Wall mounted exhaust:
Supply, install, connect and operate wall mounted exhaust fan of 8" diameter Capacity (500 cfm) type is
(VENTA or equivalent ) at static pressure 60 Pascal for the battery room , to be tightly installed complete with
all necessary supports ,cover and an louvers, and all required electrical cables, conduits, mcb 10A and needed
to fix, all according engineer’s approval. The price shall include opening duct in the block for the fan,
plastering, painting, repair all damages and all other materials needed to have a complete job ready according
to the engineer's instruction and approval.
No 1
8
3-Phase Digital KWH Meter:
Supply,install,connect and operate 3-phase digital KWH meter,with all CT's and any other material needed to
have a complete job ,The KWh meter has monitoring LCD with all needed data & interface cables to connect
with the Monitoring System .All works and materials must be according to the drawings, catalogues,
specifications and supervisor engineer instruction’s and approval.
No 2
9
Earthing System For Battery Banks:
Supply,install,connect and operate complete independent earthing system for Battery Banks system, must be
separated of the main earthing system to obtain 2 ohm max resistance. the item includes (2 copper electrodes
15mm2 driven into ground, manholes with iron cover, earth joints, clamps, ducts , conduits and 50 mm2
flexible earthing copper wires and cables from the Negative bus bar in the battery fuse box to the electrode to
complete the system as specifications and supervisor engineer instruction’s and approval.
Unit 1
10
Earthing for PV Solar System:
Supply,install,connect and operate complete independent earthing system for PV solar system, must be
separated of the main earthing system to obtain 2 ohm max resistance.
the item includes (2 copper electrodes 15mm2 driven into ground, manholes with iron cover, earth joints,
clamps, ducts , conduits and 25 mm2 flexible earthing copper wires and cables from the PV system
components to the electrode to complete the system as specifications and supervisor engineer instruction’s and
approval.
Unit 2
Total Of Bill (5) - US$
Photovoltaic Solar System for Al Ma'ari Primary Boys School
23. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
Bill No (6)
Photovoltaic Solar System works
General:
• The system is designed to cover the Essential loads in SHEJAIAA PRIMARY BOYS SCHOOL
•The system will be grid interactive connected with battery backup system, which will allow many power
sources options. The system will import from the grid when loads are being more than the generated from PV
and supply surplus electricity to the batteries when PV generates more than the loads, the batteries can be
charged from Grid if PV output is not enough for loads and batteries.
•Contractor shall submit shop drawings for all architectural, civil, electrical and a complete photovoltaic solar
system works,including a single line diagram showing all the components of the PV system, DC and AC
distribution boards, PV Arrays lay out and battery backup systems connections and cables, wires cross section
for all the system to be approved by the Engineer before executing the work.
•Contractor shall submit the catalogs of each component showing the requested specifications stated at the
bill of quantity.
•The contractor shall submit the Manufacture testing certificate, country of origion, certified characteristics,
test performance curves, spare parts regular (as recommended by manufacturer , maintenance manuals and
manufacturers warrantyfor each components of the system.
• As-built drawings shall be submitted after handing over the work.
• All junction boxes and DBs will be lockable type.
•Upon completion of the installation, the contractor shall organize an on site training program involving
nominated employer's staff. Such a program shall be carried out during the commissioning phase. The cost of
the training shall be deemed to have been included in the tendered rates.
•The price includes all builders’ works, making good and reinstatement including necessary materials and
workmanship as well as removal of unwanted materials to dump sites approved by the engineer to complete
the job successfully.
• All the following items include supply, install, commission and operate of the complete PV solar system.
• The work includes maintenance period for each device according to BOQ and Specifications.
1
PV Modules – 25 Kwp:
Supply, install, connect and operate Mono Crystalline or Polycrystalline Photovoltaic Solar Modules with all
material needed to have complete job ready for installing high quality PV modules with total arrays capacity to
achieve 25 KWp. The item Includes supply, install &connect the following:
• Water proof PV junction boxes IP65 for each array including DC Fuses, DC switch disconnectors, bus bars
,terminals, ducts or trays, supports &labels suitable to the PV arrays loads.
•Solar DC cables appropriately sized to connect the PV solar cells together and to the inverter directly to have
a complete operational circuit with all conduits, clamps , trays and cable end terminations which shall be DC
plug and socket connectors . The DC cables must be sized in accordance with the installation requirements
applicable on site, the allowable voltage drop for DC cables between PV Arrays and inverter less than 1%.
KWp 25
•The price includes all works, making good and reinstatement including necessary materials and workmanship
as well as removal of unwanted materials to dump sites approved by the engineer to complete the job
successfully.
• Contractor must submit manufacturer warranty for solar panel for a period not less than 20 years.
• Contractor must submit all the required certificates for each PV solar panel from.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
Photovoltaic Solar System for SHEJAIAA PRIMARY BOYS SCHOOL
24. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
2
Inverters – 30 KW:
Supply, install, connect and operate DC/AC grid tie 3-phase inverter with data communication unit with
Ethernet connection .The inverterwith must be suited to any PV module configuration, and depending on the
system design and installation proposed and for the future extended also. (Type is SMA or equivalent).
The DC max power input rating should be equal or more than 30 KW of the PV modules capacity at standard
test condition. The inverter unit shall be suitable for indoor and outdoor installations with IP65.
The inverter AC nominal power output rating must be equal or greater than 30 KW compatible with the AC
loads design.The inverter must include the safety concepts such as (triple protection with optiprotect, electronic
strings fuses, self-learning string failure detection, DC surge arrestor type 2 ) to ensure max availability. Total
inverter capacity must be devided at least 2 inverters. The price includes :
Unit 1
•Supply, install and connect (monitoring and controlling unit) for all PV solar system installed especially
compatible with the inverters, with all needed accessories, interface modules & data cables and all connections
needed to complete and connect the monitoring system to internet.
•Supply ,install and connect all DC cables appropriately sized in accordance with the installation requirements
and to connect the inverters with PV system designed with all conduits, clamps, trays and cable terminations
end which shall be DC plug and socket connectors to have a complete job, the allowable voltage drop for DC
cables between inverters and PV system not less than 1%.
•Inverters shall allow an adjustable power factor minimum AC output power with all necessary electrical
cables, earthing system, Conduits, trays and all other materials and workmanship needed to connect with the
main distribution panel according to the engineer's instruction and approval and have a complete job.
•The contractor must submit manufacturer warranty for each inverter for a period not less than 5 years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
3
Battery Inverter – 6 KW:
Supply, install, connect and operate Battery Inverter compatible with on grid inverters with total rated power 6
Kw with all necessary interface modules and connections for masters & slaves , electrical cables and data
communication unit,router with Ethernet connection, connectable in parallel and modularly extendable. (Type
is SMA or equivalent).
The Battery Inverter must include the following concepts such as (Ac and DC coupling, High efficiency,
intelligent battery management for maximum battery life, charge level calculation, extreme overload
capability, and batterytemperature sensing and battery current measurements).
The price includes:
No 3
•Supply, install and connect Remote Control Units (RC Unit) for the installed battery inverters with all data
& communication cables and connection needed to complete the job.
• Supply, install and connect:
DC cables appropriately sized in accordance with the installation requirements to connect the batteryinverters
with DC battery fuses box.
AC electrical cables to connect the battery inverters with the main distribution panel(AC Out).
the works includes all conduits, clamps, trays and cable terminations end and workmanship needed to have a
complete job,
• The allowable voltage drop for DC cables between battery inverter and batteries less than 1%.
•The contractor must submit manufacturer warranty for each battery inverter for a period not less than 5
years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
Photovoltaic Solar System for SHEJAIAA PRIMARY BOYS SCHOOL
25. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
4
Battery Bank:
Supply, install, connect and operate VRLA tubular design deep cycle batteries, the total demand energy is 120
KWh, @ C10 , 1.8V per cell. The battery bank voltage is 48 Vdc.
The batteries must provide high-quality and achieving superior performance, the manufacturing date must be
new and not more than 6 months, suitable for every type of applications especially for solar renewable energy,
designed Service Life 10 years with low internal resistance, designed to be deeply discharged. The Battery
should provide benefits of being maintenance free, case flame retardant & non-hazardous. The price Includes
supply, install &connect Battery temp. sensor (BTS) and the following:
KWh 120
•All necessary DC cables between the batteries together and to the battery fuse box to have a complete
operational circuit with all bus bars, conduits, clamps, stainless steel bolts, washers and cable end terminations
and all needed materials to complete the job. All DC cables must be sized in accordance with the installation
requirements applicable on site ,the allowable voltage drop must be less than 1%.
•Battery Banks rack from the same manufacturer of the batteries with dividers and all needed accessories to
finish the job. the rack must be enough to carry all the weight of the required batteries for the system.
•The contractor must submit manufacturer warranty for each battery cell for a period 10 years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
5
PV Mounting structure:
Supply and install Module mounting structure from hot galvanized steel profile foundation suitable to the
dimension of selected PV modules and PV numbers, the mounting provides a fixed inclination of the modules
30 degree with vertical supports, plates, screws and casting concrete foundations B250 (0.4*0.4*0.2) m3 for
each leg, the structure profile includes bracing and double hot galvanized angles for dividers.
The mounting structures and the foundations must be designed structurally to be suitable to withstand all static
loads (weight of modules, wind loads etc) that might occur according to the Site conditions. The mounting
structure components are bonded together to guaranty potential equalization.
L.S 1
All works and materials must be according to drawings, specifications and supervisor instructions and
approval.
6
Battery Fuse Box:
Supply, install, connect and operate battery DC fuse box (500*375*225 mm) as an external DC distributor to
protect the battery connections of the inverters . The box must be water proof protection with IP65, simple wall
mounting, suitable connections for three battery inverters and up to six DC connections inlet on the battery
side, the item includes (2 LTL 250/400A , 6 fuses 250A , cable glands, with all necessary DC cables from the
battery bank and to the fuse box and from the fuse box to the batteryinverters to have a complete operational
circuit with all conduits, clamps, stainless steel bolts, washers and cable end terminations needed to fix, all DC
cables must be sized in accordance with the installation requirements applicable on site ,the allowable voltage
drop must be less than 1%.
•The contractor must submit manufacturer warranty for each battery fuse box for a period not less than 3
years. (Type is SMA or equivalent).
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
No 1
Photovoltaic Solar System for SHEJAIAA PRIMARY BOYS SCHOOL
26. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
7
Wall mounted exhaust:
Supply, install, connect and operate wall mounted exhaust fan of 8" diameter Capacity (500 cfm) type is
(VENTA or equivalent ) at static pressure 60 Pascal for the battery room , to be tightly installed complete with
all necessary supports ,cover and an louvers, and all required electrical cables, conduits, mcb 10A and needed
to fix, all according engineer’s approval. The price shall include opening duct in the block for the fan,
plastering, painting, repair all damages and all other materials needed to have a complete job ready according
to the engineer's instruction and approval.
No 1
8
3-Phase Digital KWH Meter:
Supply,install,connect and operate 3-phase digital KWH meter,with all CT's and any other material needed to
have a complete job ,The KWh meter has monitoring LCD with all needed data & interface cables to connect
with the Monitoring System .All works and materials must be according to the drawings, catalogues,
specifications and supervisor engineer instruction’s and approval.
No 2
9
Earthing System For Battery Banks:
Supply,install,connect and operate complete independent earthing system for Battery Banks system, must be
separated of the main earthing system to obtain 2 ohm max resistance. the item includes (2 copper electrodes
15mm2 driven into ground, manholes with iron cover, earth joints, clamps, ducts , conduits and 50 mm2
flexible earthing copper wires and cables from the Negative bus bar in the battery fuse box to the electrode to
complete the system as specifications and supervisor engineer instruction’s and approval.
Unit 1
10
Earthing for PV Solar System:
Supply,install,connect and operate complete independent earthing system for PV solar system, must be
separated of the main earthing system to obtain 2 ohm max resistance.
the item includes (2 copper electrodes 15mm2 driven into ground, manholes with iron cover, earth joints,
clamps, ducts , conduits and 25 mm2 flexible earthing copper wires and cables from the PV system
components to the electrode to complete the system as specifications and supervisor engineer instruction’s and
approval.
Unit 2
Total Of Bill (6) - US$
Photovoltaic Solar System for SHEJAIAA PRIMARY BOYS SCHOOL
27. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
Bill No (7)
Photovoltaic Solar System works
General:
• The system is designed to cover the Essential loads in ABU TAMMAM PRIMARY BOYS SCHOOL
•The system will be grid interactive connected with battery backup system, which will allow many power
sources options. The system will import from the grid when loads are being more than the generated from PV
and supply surplus electricity to the batteries when PV generates more than the loads, the batteries can be
charged from Grid if PV output is not enough for loads and batteries.
•Contractor shall submit shop drawings for all architectural, civil, electrical and a complete photovoltaic solar
system works,including a single line diagram showing all the components of the PV system, DC and AC
distribution boards, PV Arrays lay out and battery backup systems connections and cables, wires cross section
for all the system to be approved by the Engineer before executing the work.
•Contractor shall submit the catalogs of each component showing the requested specifications stated at the
bill of quantity.
•The contractor shall submit the Manufacture testing certificate, country of origion, certified characteristics,
test performance curves, spare parts regular (as recommended by manufacturer , maintenance manuals and
manufacturers warrantyfor each components of the system.
• As-built drawings shall be submitted after handing over the work.
• All junction boxes and DBs will be lockable type.
•Upon completion of the installation, the contractor shall organize an on site training program involving
nominated employer's staff. Such a program shall be carried out during the commissioning phase. The cost of
the training shall be deemed to have been included in the tendered rates.
•The price includes all builders’ works, making good and reinstatement including necessary materials and
workmanship as well as removal of unwanted materials to dump sites approved by the engineer to complete
the job successfully.
• All the following items include supply, install, commission and operate of the complete PV solar system.
• The work includes maintenance period for each device according to BOQ and Specifications.
1
PV Modules – 25 Kwp:
Supply, install, connect and operate Mono Crystalline or Polycrystalline Photovoltaic Solar Modules with all
material needed to have complete job ready for installing high quality PV modules with total arrays capacity to
achieve 25 KWp. The item Includes supply, install &connect the following:
• Water proof PV junction boxes IP65 for each array including DC Fuses, DC switch disconnectors, bus bars
,terminals, ducts or trays, supports &labels suitable to the PV arrays loads.
•Solar DC cables appropriately sized to connect the PV solar cells together and to the inverter directly to have
a complete operational circuit with all conduits, clamps , trays and cable end terminations which shall be DC
plug and socket connectors . The DC cables must be sized in accordance with the installation requirements
applicable on site, the allowable voltage drop for DC cables between PV Arrays and inverter less than 1%.
KWp 25
•The price includes all works, making good and reinstatement including necessary materials and workmanship
as well as removal of unwanted materials to dump sites approved by the engineer to complete the job
successfully.
• Contractor must submit manufacturer warranty for solar panel for a period not less than 20 years.
• Contractor must submit all the required certificates for each PV solar panel from.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
Photovoltaic Solar System for ABU TAMMAM PRIMARY BOYS SCHOOL
28. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
2
Inverters – 30 KW:
Supply, install, connect and operate DC/AC grid tie 3-phase inverter with data communication unit with
Ethernet connection .The inverterwith must be suited to any PV module configuration, and depending on the
system design and installation proposed and for the future extended also. (Type is SMA or equivalent).
The DC max power input rating should be equal or more than 30 KW of the PV modules capacity at standard
test condition. The inverter unit shall be suitable for indoor and outdoor installations with IP65.
The inverter AC nominal power output rating must be equal or greater than 30 KW compatible with the AC
loads design.The inverter must include the safety concepts such as (triple protection with optiprotect, electronic
strings fuses, self-learning string failure detection, DC surge arrestor type 2 ) to ensure max availability. Total
inverter capacity must be devided at least 2 inverters. The price includes :
Unit 1
•Supply, install and connect (monitoring and controlling unit) for all PV solar system installed especially
compatible with the inverters, with all needed accessories, interface modules & data cables and all connections
needed to complete and connect the monitoring system to internet.
•Supply ,install and connect all DC cables appropriately sized in accordance with the installation requirements
and to connect the inverters with PV system designed with all conduits, clamps, trays and cable terminations
end which shall be DC plug and socket connectors to have a complete job, the allowable voltage drop for DC
cables between inverters and PV system not less than 1%.
•Inverters shall allow an adjustable power factor minimum AC output power with all necessary electrical
cables, earthing system, Conduits, trays and all other materials and workmanship needed to connect with the
main distribution panel according to the engineer's instruction and approval and have a complete job.
•The contractor must submit manufacturer warranty for each inverter for a period not less than 5 years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
3
Battery Inverter – 6 KW:
Supply, install, connect and operate Battery Inverter compatible with on grid inverters with total rated power 6
Kw with all necessary interface modules and connections for masters & slaves , electrical cables and data
communication unit,router with Ethernet connection, connectable in parallel and modularly extendable. (Type
is SMA or equivalent).
The Battery Inverter must include the following concepts such as (Ac and DC coupling, High efficiency,
intelligent battery management for maximum battery life, charge level calculation, extreme overload
capability, and batterytemperature sensing and battery current measurements).
The price includes:
No 3
•Supply, install and connect Remote Control Units (RC Unit) for the installed battery inverters with all data
& communication cables and connection needed to complete the job.
• Supply, install and connect:
DC cables appropriately sized in accordance with the installation requirements to connect the batteryinverters
with DC battery fuses box.
AC electrical cables to connect the battery inverters with the main distribution panel(AC Out).
the works includes all conduits, clamps, trays and cable terminations end and workmanship needed to have a
complete job,
• The allowable voltage drop for DC cables between battery inverter and batteries less than 1%.
•The contractor must submit manufacturer warranty for each battery inverter for a period not less than 5
years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
Photovoltaic Solar System for ABU TAMMAM PRIMARY BOYS SCHOOL
29. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
4
Battery Bank:
Supply, install, connect and operate VRLA tubular design deep cycle batteries, the total demand energy is 120
KWh, @ C10 , 1.8V per cell. The battery bank voltage is 48 Vdc.
The batteries must provide high-quality and achieving superior performance, the manufacturing date must be
new and not more than 6 months, suitable for every type of applications especially for solar renewable energy,
designed Service Life 10 years with low internal resistance, designed to be deeply discharged. The Battery
should provide benefits of being maintenance free, case flame retardant & non-hazardous. The price Includes
supply, install &connect Battery temp. sensor (BTS) and the following:
KWh 120
•All necessary DC cables between the batteries together and to the battery fuse box to have a complete
operational circuit with all bus bars, conduits, clamps, stainless steel bolts, washers and cable end terminations
and all needed materials to complete the job. All DC cables must be sized in accordance with the installation
requirements applicable on site ,the allowable voltage drop must be less than 1%.
•Battery Banks rack from the same manufacturer of the batteries with dividers and all needed accessories to
finish the job. the rack must be enough to carry all the weight of the required batteries for the system.
•The contractor must submit manufacturer warranty for each battery cell for a period 10 years.
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
5
PV Mounting structure:
Supply and install Module mounting structure from hot galvanized steel profile foundation suitable to the
dimension of selected PV modules and PV numbers, the mounting provides a fixed inclination of the modules
30 degree with vertical supports, plates, screws and casting concrete foundations B250 (0.4*0.4*0.2) m3 for
each leg, the structure profile includes bracing and double hot galvanized angles for dividers.
The mounting structures and the foundations must be designed structurally to be suitable to withstand all static
loads (weight of modules, wind loads etc) that might occur according to the Site conditions. The mounting
structure components are bonded together to guaranty potential equalization.
L.S 1
All works and materials must be according to drawings, specifications and supervisor instructions and
approval.
6
Battery Fuse Box:
Supply, install, connect and operate battery DC fuse box (500*375*225 mm) as an external DC distributor to
protect the battery connections of the inverters . The box must be water proof protection with IP65, simple wall
mounting, suitable connections for three battery inverters and up to six DC connections inlet on the battery
side, the item includes (2 LTL 250/400A , 6 fuses 250A , cable glands, with all necessary DC cables from the
battery bank and to the fuse box and from the fuse box to the batteryinverters to have a complete operational
circuit with all conduits, clamps, stainless steel bolts, washers and cable end terminations needed to fix, all DC
cables must be sized in accordance with the installation requirements applicable on site ,the allowable voltage
drop must be less than 1%.
•The contractor must submit manufacturer warranty for each battery fuse box for a period not less than 3
years. (Type is SMA or equivalent).
All works and materials must be according to the drawings, specifications and supervisor engineer
instruction’s and approval.
No 1
Photovoltaic Solar System for ABU TAMMAM PRIMARY BOYS SCHOOL
30. Item
No.
Description Unit Quantity
Unit Rate
US $
(Numbers)
Total
Amount
US $
7
Wall mounted exhaust:
Supply, install, connect and operate wall mounted exhaust fan of 8" diameter Capacity (500 cfm) type is
(VENTA or equivalent ) at static pressure 60 Pascal for the battery room , to be tightly installed complete with
all necessary supports ,cover and an louvers, and all required electrical cables, conduits, mcb 10A and needed
to fix, all according engineer’s approval. The price shall include opening duct in the block for the fan,
plastering, painting, repair all damages and all other materials needed to have a complete job ready according
to the engineer's instruction and approval.
No 1
8
3-Phase Digital KWH Meter:
Supply,install,connect and operate 3-phase digital KWH meter,with all CT's and any other material needed to
have a complete job ,The KWh meter has monitoring LCD with all needed data & interface cables to connect
with the Monitoring System .All works and materials must be according to the drawings, catalogues,
specifications and supervisor engineer instruction’s and approval.
No 2
9
Earthing System For Battery Banks:
Supply,install,connect and operate complete independent earthing system for Battery Banks system, must be
separated of the main earthing system to obtain 2 ohm max resistance. the item includes (2 copper electrodes
15mm2 driven into ground, manholes with iron cover, earth joints, clamps, ducts , conduits and 50 mm2
flexible earthing copper wires and cables from the Negative bus bar in the battery fuse box to the electrode to
complete the system as specifications and supervisor engineer instruction’s and approval.
Unit 1
10
Earthing for PV Solar System:
Supply,install,connect and operate complete independent earthing system for PV solar system, must be
separated of the main earthing system to obtain 2 ohm max resistance.
the item includes (2 copper electrodes 15mm2 driven into ground, manholes with iron cover, earth joints,
clamps, ducts , conduits and 25 mm2 flexible earthing copper wires and cables from the PV system
components to the electrode to complete the system as specifications and supervisor engineer instruction’s and
approval.
Unit 2
Total Of Bill (7) - US$
Photovoltaic Solar System for ABU TAMMAM PRIMARY BOYS SCHOOL