Presented to:
The Chemical Demilitarization Citizens’ Advisory Commission
Presented by:
Mr. Steven Bird
PCAPP EDS Project Leader
Chemical Materials Activity
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
PCAPP Explosive Destruction System (EDS) Daily Operations Overview 25 June 2014
1. PCAPP Explosive Destruction
System (EDS)
Daily Operations Overview
25 June 2014
Presented to:
The Chemical Demilitarization Citizens’
Advisory Commission
Presented by:
Mr. Steven Bird
PCAPP EDS Project Leader
Chemical Materials Activity
2. A Partnership for Safe Chemical Weapons Destruction
2
Daily Operations Overview
3. A Partnership for Safe Chemical Weapons Destruction
Mission and Overview
Mission: To destroy stored overpacked mustard munitions and
DOT cylinders as well as rejects, leakers and contaminated
bursters from PCAPP operations in a safe and efficient manner
that is protective of human health (workers and residents) and
the environment.
Performers:
PEO ACWA – Oversight
JPM-E (P) – Project Manager
CMA - Execution
PCD – Depot Support
ECBC – EDS Operators
Leidos – Integration Support
Shaw – Waste Management
TVA – Logistical Support
Corps of Engineers – Site Construction
Sandia National Labs – Design and Fabrication
Leidos - Training
JPM-E (P) - Joint Project Manager Elimination
(Provisional)
PCD – Pueblo Chemical Depot
ECBC – Edgewood Chemical Biological Center
TVA – Tennessee Valley Authority
3
5. A Partnership for Safe Chemical Weapons Destruction
Daily Site Activities: Hour 1
5
Collect DAAMS
tubes from
Environmental
Enclosure
Challenge RTAP
Minicams – 6 cycles
Start munition igloo
first entry
monitoring
Challenge
Environmental
Enclosure (EE)
Minicams
Challenge GC/MS’s
Laboratory and monitoring start of work
6. A Partnership for Safe Chemical Weapons Destruction
Daily Site Activities: Hour 2
Weather forecast
Emergency procedures and rally points
Heat and cold stress
Biological, chemical, electrical, and
mechanical hazards
Slips, trips, and falls
PPE levels
Safe Work Practices
Site Access
Communications
Environmental compliance
Review the day’s operations order,
including x-ray of munitions when
available
6
Crew Safety Brief / Daily Operations Order
7. A Partnership for Safe Chemical Weapons Destruction
Daily Site Activities: Hour 3
EDS vessel
Neutralent, water, waste transfer systems
Secondary containment systems
Mechanical handling equipment
Audio and video equipment
Personnel decontamination station
Emergency response equipment
Air monitoring systems
Boiler chiller system
Emergency generators
Cascade air system
Air compressor
Environmental enclosure ventilation
Hazardous waste areas
7
Pre-operational inspection checklist
8. A Partnership for Safe Chemical Weapons Destruction
Daily Site Activities: Hour 3 (continued)
Weather conditions – lightning, snow,
tornado, flooding, high winds
Are required personnel on site?
Are emergency services available?
Are communication systems
operational?
Is security present?
Is power and water available?
Has EDS pre-operational checklist
been completed?
LCO’s must be signed off daily by
RCMD Site Manager and ECBC
Supervisor prior to receiving
munitions
8
Limiting Condition of Operation (LCO)
9. A Partnership for Safe Chemical Weapons Destruction
Daily Site Activities: Hours 3-5
Igloo door opening
Munition Delivery
Munition Unpack
Munition Loading
EDS Door closing
Personnel accountability
Detonation
9
Start of Operations
10. A Partnership for Safe Chemical Weapons Destruction
Daily Site Activities: Hours 5-10
Neutralent pumped into vessel
Vessel rotation
Neutralent sample collected, analyzed
Neutralent drained
Water added to vessel, steam heated
Vessel reaches 100 degrees Celsius,
held for two hours
Water drained
Vessel filled with cold water, rotated
Second water rinse drained
10
Agent Neutralization
11. A Partnership for Safe Chemical Weapons Destruction
Daily Site Activities: Hours 10-12
Air sample collected from vessel
Air sample analyzed
Door opened and contents
inspected
Vessel cleaned out
Preparation for next day
11
Door Opening
13. A Partnership for Safe Chemical Weapons Destruction
For Information on PCAPP EDS
Mr. Steven Bird
U.S. Army Chemical Materials Activity
Recovered Chemical Materiel Directorate
PCAPP EDS Project Lead
Phone - 410.436.4577
steven.t.bird.civ@mail.mil
13