Monthly Status
Briefing
December 2012
Project Background

 The Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) will safely
  destroy 523 tons of chemical agent in rockets and artillery projectiles stored
  at the Blue Grass Army Depot in Richmond, Ky.

 The technology selected by the Department of Defense to destroy the Blue
  Grass chemical weapons stockpile is neutralization followed by supercritical
  water oxidation (SCWO).

 The Program Executive Office, Assembled Chemical Weapons Alternatives
  (PEO ACWA) Program, headquartered at Aberdeen Proving Ground, Md., is
  responsible for managing all aspects of the safe and environmentally sound
  destruction of the chemical weapons stockpiles in both Kentucky and
  Colorado.

 The Bechtel Parsons Blue Grass Team, a joint venture of Bechtel National,
  Inc., and Parsons Government Services Inc., along with teaming partners
  URS Corporation, Battelle, General Atomics and GP Strategies Corporation,
  is the systems contractor selected to design, build, systemize, pilot test,
  operate and close BGCAPP.


                                                                                   2
Destruction Technology

     Neutralization followed by supercritical water oxidation
         will be used to destroy the Kentucky stockpile.




                                                                3
Safety


                                              Occupational Safety and Health Administration
                                                 Voluntary Protection Program Star Status site

    3.9                                       Lost-time injury rate is 81 percent lower and
                                                 recordable injury rate 27 percent lower than
                                                 industry average

          2.85                                As of November 30, 2012, the project has
                                                 completed 16,500 hours and 20 days without a
                                                 lost-time accident


                        1.5




                              0.28
                                            Construction Industry
                                            Bechtel Parsons
Recordable Injuries Lost-Time Injuries   (12-month rolling rate)
                                         Accidents per 200,000 job hours




                                                                                                 4
Continued Safety Focus

 Safety remains a core value of the project workforce
 Management and employees focusing on goal
  of Zero Accidents:
   ― Communicating proper construction housekeeping, its relationship
     to safety excellence and need for continuous improvement
   ― Communicating importance of pre-planning and discussing daily
     work activities; identifying potential safety hazards before work
     begins
 Instilling a Brother’s Keeper mindset to mentor one
  another, remain vigilant and respectfully challenge
  unsafe workplace behaviors




                                                                         5
Current Project Staffing


 Total project
 employment―1,055
 Richmond, Ky.―996
  ― Nonmanual―523
  ― Craft―473

  ― Local hires―57 percent

 Other locations―59
  ― Pasco, Wash.
  ― San Diego, Calif.
  ― Columbus, Ohio
  ― Frederick, Md.

                             There are 473 craft workers at BGCAPP representing
                             10 different building & construction trades.




                                                                                  6
Economic Impact




 Acquisitions to date
  ―   $103.3 million spent with Kentucky companies
  ―   $63.2 million spent in Madison and surrounding counties
 Payroll to date    (includes nonmanual and craft)
  ― $383 million of local payroll paid
  ― $427 million more to be paid during the remainder of project




                                                                   7
Construction Work in Progress



                                           5                4                      3




                                      1                                2




1
   Control and Support Building (CSB)                      3 Utility Building
                                                            •
    • Electrical, piping and fire detection systems           • Exterior pipe rack support steel

    • Heating, ventilation and air conditioning (HVAC)        • Interior electrical and piping systems

    • Facility control system cabinets and infrastructure     • Nitrogen generation plant equipment


2
   Munitions Demilitarization Building (MDB)               4 Supercritical Water Oxidation (SCWO)
                                                            
    • Structural steel, paneling, protective coatings         Process Building (not visible in photo)
    • HVAC, electrical, piping, mechanical systems            • Exterior siding and pipe rack support steel

    • MDB filter area foundations and filters                Laboratory Building (not visible in photo)
                                                            5
                                                               • Construction and systemization complete
                                                               • Systemization and Laboratory personnel
                                                                 occupancy

                                                                                                              8
Control and Support Building (CSB)




Electricians install electrical panel box wiring (above left) inside the CSB. Outside the CSB,
electrical cable tray and conduit (above right) have been installed within support steel which
surrounds the building. The tray and conduit will house the electrical cable needed to power the
CSB during plant operations. Once complete, the CSB will house the control room and the
integrated control system used to operate the plant.




                                                                                                   9
Munitions Demilitarization
  Building (MDB)




Structural steel and exterior paneling (above left) installation continues around the MDB
energetics neutralization system equipment. Next to the energetics neutralization equipment
rooms, a craft worker welds metal deck plating (above right) together. The MDB is where the
chemical weapons will be disassembled, the explosives removed and the agent neutralized.




                                                                                              10
Supercritical Water Oxidation (SCWO) Process
  Building and Hydrolysate Storage Area (HSA)




SCWO Process Building exterior siding installation (above left) continues. At the HSA, workers
have erected the first of five large hydrolysate storage tanks (above right) and prepare to install
the dome. During operations, agent and energetic hydrolysates, byproducts of the neutralization
process, are emptied into HSA holding tanks once agent destruction is verified. The hydrolysate is
transferred to the SCWO Process Building which houses the reactors where agent and energetic
hydrolysates will be subjected to very high temperatures and pressures to destroy their organic
content.




                                                                                                11
Utility Building (UB)




Workers safely lift and install a 100-foot, 40,000-pound section of pipe rack steel (above left)
between the Supercritical Water Oxidation Process Building and the UB. The pipe rack will carry
utilities for plant operations. Adjacent to the UB, workers have installed the nitrogen generation
plant equipment and began excavations (above right) for future support infrastructure. Once
complete, the UB will house equipment to produce steam, compressed air, chilled water and hot
water for operations. The nitrogen generation plant will supply nitrogen, an inert and non-
flammable gas, during plant operations to maintain a combustion-free environment.




                                                                                                 12
Blue Grass Chemical
Agent-Destruction Pilot Plant




                                13

More Related Content

What's hot

Chinh Nguyen Resume
Chinh Nguyen ResumeChinh Nguyen Resume
Chinh Nguyen Resumenguyen_ct
 
IBA Energy &Building Science Services
IBA Energy &Building Science ServicesIBA Energy &Building Science Services
IBA Energy &Building Science Servicestjakab
 
2012 ig cc-overview
2012 ig cc-overview2012 ig cc-overview
2012 ig cc-overviewCal Gov
 
NewsCastle - September 2012
NewsCastle - September 2012NewsCastle - September 2012
NewsCastle - September 2012Dave Palmer
 
Lime Energy Banking Brochure
Lime Energy Banking BrochureLime Energy Banking Brochure
Lime Energy Banking Brochurelimeenergysurveys
 
Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller
 
Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...
Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...
Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...McKenney's Inc
 
Tensioned Building Construction - Requirements Document
Tensioned Building Construction - Requirements DocumentTensioned Building Construction - Requirements Document
Tensioned Building Construction - Requirements DocumentRobert Lewis
 
Bps 5205 sustainability construction and maintainability velpandi & maria
Bps 5205  sustainability construction and maintainability  velpandi & mariaBps 5205  sustainability construction and maintainability  velpandi & maria
Bps 5205 sustainability construction and maintainability velpandi & mariaMaria Archana
 

What's hot (17)

April 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status...
April 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status...April 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status...
April 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status...
 
May 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status B...
May 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status B...May 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status B...
May 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status B...
 
July 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status ...
July 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status ...July 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status ...
July 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status ...
 
BGCAPP Monthly Status Briefing December 2011
BGCAPP Monthly Status Briefing December 2011BGCAPP Monthly Status Briefing December 2011
BGCAPP Monthly Status Briefing December 2011
 
BGCAPP Monthly Status Briefing November 2011
BGCAPP Monthly Status Briefing November 2011BGCAPP Monthly Status Briefing November 2011
BGCAPP Monthly Status Briefing November 2011
 
BGCAPP Monthly Status Briefing - September 2011
BGCAPP Monthly Status Briefing - September 2011BGCAPP Monthly Status Briefing - September 2011
BGCAPP Monthly Status Briefing - September 2011
 
BGCAPP Monthly Status Briefing October 2011
BGCAPP Monthly Status Briefing October 2011BGCAPP Monthly Status Briefing October 2011
BGCAPP Monthly Status Briefing October 2011
 
Chinh Nguyen Resume
Chinh Nguyen ResumeChinh Nguyen Resume
Chinh Nguyen Resume
 
IBA Energy &Building Science Services
IBA Energy &Building Science ServicesIBA Energy &Building Science Services
IBA Energy &Building Science Services
 
2012 ig cc-overview
2012 ig cc-overview2012 ig cc-overview
2012 ig cc-overview
 
NewsCastle - September 2012
NewsCastle - September 2012NewsCastle - September 2012
NewsCastle - September 2012
 
Lime Energy Banking Brochure
Lime Energy Banking BrochureLime Energy Banking Brochure
Lime Energy Banking Brochure
 
Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015
 
Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...
Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...
Warner Robins Air Logistics Center Strives for Energy Efficiency : Energy Ser...
 
Tensioned Building Construction - Requirements Document
Tensioned Building Construction - Requirements DocumentTensioned Building Construction - Requirements Document
Tensioned Building Construction - Requirements Document
 
CE 165 Report Final
CE 165 Report FinalCE 165 Report Final
CE 165 Report Final
 
Bps 5205 sustainability construction and maintainability velpandi & maria
Bps 5205  sustainability construction and maintainability  velpandi & mariaBps 5205  sustainability construction and maintainability  velpandi & maria
Bps 5205 sustainability construction and maintainability velpandi & maria
 

Similar to December 2012 BGCAPP Monthly Status Briefing

8-koi_Construction & Design Engineering_20240209.pdf
8-koi_Construction & Design Engineering_20240209.pdf8-koi_Construction & Design Engineering_20240209.pdf
8-koi_Construction & Design Engineering_20240209.pdf8-koi
 
Project management
Project managementProject management
Project managementMazen Kattan
 
QUILLIN ERBIN DJ RESUME
QUILLIN ERBIN DJ RESUMEQUILLIN ERBIN DJ RESUME
QUILLIN ERBIN DJ RESUMEDJ Quillin
 
Case Study: CBT Architects - Building Performance Modeling
Case Study: CBT Architects - Building Performance ModelingCase Study: CBT Architects - Building Performance Modeling
Case Study: CBT Architects - Building Performance ModelingIES VE
 
Project sequence 07.26.12
Project sequence 07.26.12Project sequence 07.26.12
Project sequence 07.26.12Tobin Booth
 
Clo2 system l stn 001
Clo2 system l stn 001  Clo2 system l stn 001
Clo2 system l stn 001 Ahmad Moharram
 
Post globe 2010 john hollick
Post globe 2010 john hollickPost globe 2010 john hollick
Post globe 2010 john hollickONEIA
 
ZERO ENERGY BUILDING; DESIGN AND SIMULATION
ZERO ENERGY BUILDING; DESIGN AND SIMULATIONZERO ENERGY BUILDING; DESIGN AND SIMULATION
ZERO ENERGY BUILDING; DESIGN AND SIMULATIONIRJET Journal
 
Analysis of Prefabricational Construction And Conventional Construction
Analysis of Prefabricational Construction And Conventional ConstructionAnalysis of Prefabricational Construction And Conventional Construction
Analysis of Prefabricational Construction And Conventional ConstructionIRJET Journal
 
KinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementKinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementRay Salmons
 
Scenario AYou are part of a team that is being consulted over th.docx
Scenario AYou are part of a team that is being consulted over th.docxScenario AYou are part of a team that is being consulted over th.docx
Scenario AYou are part of a team that is being consulted over th.docxanhlodge
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATRommel Siasat
 
INTODUCTION TO CIVIL ENGINEERING
INTODUCTION TO CIVIL ENGINEERINGINTODUCTION TO CIVIL ENGINEERING
INTODUCTION TO CIVIL ENGINEERINGHafiz JUNAID
 

Similar to December 2012 BGCAPP Monthly Status Briefing (19)

BGCAPP Year in Review Dec. 11, 2012
BGCAPP Year in Review Dec. 11, 2012BGCAPP Year in Review Dec. 11, 2012
BGCAPP Year in Review Dec. 11, 2012
 
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
 
8-koi_Construction & Design Engineering_20240209.pdf
8-koi_Construction & Design Engineering_20240209.pdf8-koi_Construction & Design Engineering_20240209.pdf
8-koi_Construction & Design Engineering_20240209.pdf
 
Project management
Project managementProject management
Project management
 
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 4, ...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 4, ...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 4, ...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 4, ...
 
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12, ...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12, ...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12, ...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12, ...
 
QUILLIN ERBIN DJ RESUME
QUILLIN ERBIN DJ RESUMEQUILLIN ERBIN DJ RESUME
QUILLIN ERBIN DJ RESUME
 
Case Study: CBT Architects - Building Performance Modeling
Case Study: CBT Architects - Building Performance ModelingCase Study: CBT Architects - Building Performance Modeling
Case Study: CBT Architects - Building Performance Modeling
 
Project sequence 07.26.12
Project sequence 07.26.12Project sequence 07.26.12
Project sequence 07.26.12
 
Clo2 system l stn 001
Clo2 system l stn 001  Clo2 system l stn 001
Clo2 system l stn 001
 
Post globe 2010 john hollick
Post globe 2010 john hollickPost globe 2010 john hollick
Post globe 2010 john hollick
 
ZERO ENERGY BUILDING; DESIGN AND SIMULATION
ZERO ENERGY BUILDING; DESIGN AND SIMULATIONZERO ENERGY BUILDING; DESIGN AND SIMULATION
ZERO ENERGY BUILDING; DESIGN AND SIMULATION
 
Analysis of Prefabricational Construction And Conventional Construction
Analysis of Prefabricational Construction And Conventional ConstructionAnalysis of Prefabricational Construction And Conventional Construction
Analysis of Prefabricational Construction And Conventional Construction
 
KinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementKinetIQ Solutions Capability Statement
KinetIQ Solutions Capability Statement
 
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
 
Scenario AYou are part of a team that is being consulted over th.docx
Scenario AYou are part of a team that is being consulted over th.docxScenario AYou are part of a team that is being consulted over th.docx
Scenario AYou are part of a team that is being consulted over th.docx
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
INTODUCTION TO CIVIL ENGINEERING
INTODUCTION TO CIVIL ENGINEERINGINTODUCTION TO CIVIL ENGINEERING
INTODUCTION TO CIVIL ENGINEERING
 
BGCAPP Year in Review Dec. 11, 2013
BGCAPP Year in Review Dec. 11, 2013BGCAPP Year in Review Dec. 11, 2013
BGCAPP Year in Review Dec. 11, 2013
 

More from Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)

More from Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA) (20)

CAC/CDCAB Vent Recommendation 5 March 2013
CAC/CDCAB Vent Recommendation 5 March 2013CAC/CDCAB Vent Recommendation 5 March 2013
CAC/CDCAB Vent Recommendation 5 March 2013
 
Secondary Waste Working Group 12 March 2014
Secondary Waste Working Group 12 March 2014Secondary Waste Working Group 12 March 2014
Secondary Waste Working Group 12 March 2014
 
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
 
Blue Grass Chemical Activity M55 Rocket Separation Operation Update 11 June ...
Blue Grass Chemical Activity  M55 Rocket Separation Operation Update 11 June ...Blue Grass Chemical Activity  M55 Rocket Separation Operation Update 11 June ...
Blue Grass Chemical Activity M55 Rocket Separation Operation Update 11 June ...
 
June '13 cdcab
June '13 cdcabJune '13 cdcab
June '13 cdcab
 
M55 Rocket Separation Operation 11 Dec 2013
M55 Rocket Separation Operation 11 Dec 2013M55 Rocket Separation Operation 11 Dec 2013
M55 Rocket Separation Operation 11 Dec 2013
 
2015 ACWA Funding 11 June 2014
2015 ACWA Funding 11 June 20142015 ACWA Funding 11 June 2014
2015 ACWA Funding 11 June 2014
 
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
 
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
 
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
 
Explosive Destruction Working Group Update 11 June 2014
Explosive Destruction Working Group Update 11 June 2014Explosive Destruction Working Group Update 11 June 2014
Explosive Destruction Working Group Update 11 June 2014
 
Economic Development Working Group 11 September 2013
Economic Development Working Group 11 September 2013Economic Development Working Group 11 September 2013
Economic Development Working Group 11 September 2013
 
Chemical Weapons Convention Update 13 June 2012
Chemical Weapons Convention Update 13 June 2012Chemical Weapons Convention Update 13 June 2012
Chemical Weapons Convention Update 13 June 2012
 
OPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
OPCW’s 18th Conference of States Parties to the Chemical Weapons ConventionOPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
OPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
 
CDCAB Working Group Updates 11 December 2012
CDCAB Working Group Updates 11 December 2012CDCAB Working Group Updates 11 December 2012
CDCAB Working Group Updates 11 December 2012
 
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
 
Economic Development Working Group Update
Economic Development Working Group UpdateEconomic Development Working Group Update
Economic Development Working Group Update
 
Blue Grass Chemical Activity Update 12 September 2012
Blue Grass Chemical Activity Update 12 September 2012Blue Grass Chemical Activity Update 12 September 2012
Blue Grass Chemical Activity Update 12 September 2012
 
Explosive Destruction Technologies Summary 23 October 2013
Explosive Destruction Technologies Summary 23 October 2013Explosive Destruction Technologies Summary 23 October 2013
Explosive Destruction Technologies Summary 23 October 2013
 
Blue Grass Chemical Agent-Destruction Pilot Plant Systems Contractor Update ...
Blue Grass Chemical Agent-Destruction Pilot Plant Systems Contractor Update...Blue Grass Chemical Agent-Destruction Pilot Plant Systems Contractor Update...
Blue Grass Chemical Agent-Destruction Pilot Plant Systems Contractor Update ...
 

December 2012 BGCAPP Monthly Status Briefing

  • 2. Project Background  The Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) will safely destroy 523 tons of chemical agent in rockets and artillery projectiles stored at the Blue Grass Army Depot in Richmond, Ky.  The technology selected by the Department of Defense to destroy the Blue Grass chemical weapons stockpile is neutralization followed by supercritical water oxidation (SCWO).  The Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA) Program, headquartered at Aberdeen Proving Ground, Md., is responsible for managing all aspects of the safe and environmentally sound destruction of the chemical weapons stockpiles in both Kentucky and Colorado.  The Bechtel Parsons Blue Grass Team, a joint venture of Bechtel National, Inc., and Parsons Government Services Inc., along with teaming partners URS Corporation, Battelle, General Atomics and GP Strategies Corporation, is the systems contractor selected to design, build, systemize, pilot test, operate and close BGCAPP. 2
  • 3. Destruction Technology Neutralization followed by supercritical water oxidation will be used to destroy the Kentucky stockpile. 3
  • 4. Safety  Occupational Safety and Health Administration Voluntary Protection Program Star Status site 3.9  Lost-time injury rate is 81 percent lower and recordable injury rate 27 percent lower than industry average 2.85  As of November 30, 2012, the project has completed 16,500 hours and 20 days without a lost-time accident 1.5 0.28 Construction Industry Bechtel Parsons Recordable Injuries Lost-Time Injuries (12-month rolling rate) Accidents per 200,000 job hours 4
  • 5. Continued Safety Focus  Safety remains a core value of the project workforce  Management and employees focusing on goal of Zero Accidents: ― Communicating proper construction housekeeping, its relationship to safety excellence and need for continuous improvement ― Communicating importance of pre-planning and discussing daily work activities; identifying potential safety hazards before work begins  Instilling a Brother’s Keeper mindset to mentor one another, remain vigilant and respectfully challenge unsafe workplace behaviors 5
  • 6. Current Project Staffing  Total project employment―1,055  Richmond, Ky.―996 ― Nonmanual―523 ― Craft―473 ― Local hires―57 percent  Other locations―59 ― Pasco, Wash. ― San Diego, Calif. ― Columbus, Ohio ― Frederick, Md. There are 473 craft workers at BGCAPP representing 10 different building & construction trades. 6
  • 7. Economic Impact  Acquisitions to date ― $103.3 million spent with Kentucky companies ― $63.2 million spent in Madison and surrounding counties  Payroll to date (includes nonmanual and craft) ― $383 million of local payroll paid ― $427 million more to be paid during the remainder of project 7
  • 8. Construction Work in Progress 5 4 3 1 2 1  Control and Support Building (CSB) 3 Utility Building • • Electrical, piping and fire detection systems • Exterior pipe rack support steel • Heating, ventilation and air conditioning (HVAC) • Interior electrical and piping systems • Facility control system cabinets and infrastructure • Nitrogen generation plant equipment 2  Munitions Demilitarization Building (MDB) 4 Supercritical Water Oxidation (SCWO)  • Structural steel, paneling, protective coatings Process Building (not visible in photo) • HVAC, electrical, piping, mechanical systems • Exterior siding and pipe rack support steel • MDB filter area foundations and filters  Laboratory Building (not visible in photo) 5 • Construction and systemization complete • Systemization and Laboratory personnel occupancy 8
  • 9. Control and Support Building (CSB) Electricians install electrical panel box wiring (above left) inside the CSB. Outside the CSB, electrical cable tray and conduit (above right) have been installed within support steel which surrounds the building. The tray and conduit will house the electrical cable needed to power the CSB during plant operations. Once complete, the CSB will house the control room and the integrated control system used to operate the plant. 9
  • 10. Munitions Demilitarization Building (MDB) Structural steel and exterior paneling (above left) installation continues around the MDB energetics neutralization system equipment. Next to the energetics neutralization equipment rooms, a craft worker welds metal deck plating (above right) together. The MDB is where the chemical weapons will be disassembled, the explosives removed and the agent neutralized. 10
  • 11. Supercritical Water Oxidation (SCWO) Process Building and Hydrolysate Storage Area (HSA) SCWO Process Building exterior siding installation (above left) continues. At the HSA, workers have erected the first of five large hydrolysate storage tanks (above right) and prepare to install the dome. During operations, agent and energetic hydrolysates, byproducts of the neutralization process, are emptied into HSA holding tanks once agent destruction is verified. The hydrolysate is transferred to the SCWO Process Building which houses the reactors where agent and energetic hydrolysates will be subjected to very high temperatures and pressures to destroy their organic content. 11
  • 12. Utility Building (UB) Workers safely lift and install a 100-foot, 40,000-pound section of pipe rack steel (above left) between the Supercritical Water Oxidation Process Building and the UB. The pipe rack will carry utilities for plant operations. Adjacent to the UB, workers have installed the nitrogen generation plant equipment and began excavations (above right) for future support infrastructure. Once complete, the UB will house equipment to produce steam, compressed air, chilled water and hot water for operations. The nitrogen generation plant will supply nitrogen, an inert and non- flammable gas, during plant operations to maintain a combustion-free environment. 12