SlideShare a Scribd company logo
BENJAMIN L. GIMAN
MechanicalLead
Objectives – To be employed in the company with big business and reputation,
Contribute my knowledge and experience in the field of mechanical.
PERSONAL BACKGROUND
Contact Address : 38 San Francisco St. Bauan, Batangas Philippines
Tel. Number : +63434171867
Mobile Number : +639157761209
Email Address : giman331@yahoo.com
Age : 49 years old
Civil Status : Married
Nationality : Filipino
Passport Number : EC0014697
EDUCATIONAL ATTAINMENT
Mechanical Engineering : International Correspondence Schools - Completed
Technology
WORKING EXPERIENCE
Mechanical Lead : March 2014 to February 2015
Commissioning
SPIE Oil & Gas Services : OFON Phase 2 Project (OFP2 Topsides)
Total E&P Nigeria Limited
Nigeria (Offshore)
Duties and Responsibilities
 Attended daily tool box talk & commissioning meeting.
 Attended walk down inspection of equipment’s such Gas Turbine Generator (Rolls
Royce-RB211), MP/HP/LP Compressors (General Electric), Water Injection Pumps
(Sulzer), Fire Water Pumps (Enertia), Emergency Diesel Generator ( Enertia), Oil
Export Pumps (Flowserve) & Chemical Injection Package prior for signing of Ready
For Commissioning (RFC) certificate .
 Supervised and assisted HHI for testing of rotating equipment as per Operational Test
Procedure (OTP).
 Witnessed & monitor mechanical run test of rotating equipment.
 Reviewed & signed off Commissioning Test/Report sheet, OTP Acceptance & Ready
For Start Up (RFSU) certificate.
 Direct reporting and receiving information from Commissioning Site Leader.
Mechanical Enginner : November 2012 to December 2013
Commissioning
SPIE Oil & Gas Services : OFON Phase 2 Project (OFP2 Topsides)
Total E&P Nigeria Limited
Ulsan South Korea
Duties and Responsibilities
 Review company procedures and specification.
 Review vendor’s manual, drawing, P&ID and assisted Hyundai Heavy Industries Co.
(HHI) in preparation and incorporating comments of Operational Test Procedures
(OTP) of rotating equipment.
 Check and review Integrated Commissioning And Progress System (ICAPS) data
base regarding equipment’s status, punch items categories before walk down
inspection of equipments and signing Ready For Commissioning (RFC) dossier.
 Review Work Method Statement regarding oil flushing and witnessed the activities of
pre commissioning.
 Coordinate equipment’s vendor and HHI supervisors regarding running test of
equipments base on OTP.
 Direct reporting and receiving information from commissioning manager.
Machinery Specialist : December 2011 to May 2012
Commissioning
Saipem : GNL-3Z (LNG) Project
Arzew Algeria
Duties and Responsibilities
 Commissioning preparation.
 Review vendors manual and drawing.
 Reviewed Work Method Statement of Sub contractor regarding oil flushing and
witnessed the activities of pre commissioning.
 Witnessed final shaft alignment.
 Prepared final punch list.
 Coordinate process operator regarding rotating equipments that are scheduled to be
tested.
 Supervised and monitor 4 hrs run test with load of rotating equipments.
 Supervised in any repair work of rotating equipments such as; changing drive end
bearing, non drive end bearing and mechanical seals.
 Direct reporting and receiving information from superior.
Rotating Equipment Specialist : February 2011 to September 2011
Commissioning
SPIE Oil & Gas Services : Ningxia Hanas LNG Project
Yinchuan PR China
Duties and Responsibilities
 Commissioning preparation
 Check project document data base and updated equipment list in spread sheet.
 Review vendor’s manual, drawing and P&ID.
 Prepared Operational Testing Procedure of Feed Gas Booster Compressor, Mixed
Refrigerant Compressor and Boil Off Gas Compressor (motor driven).
 Checked and verified pre commissioning permit to work application.
 Inspection and witnessed 4 hour motor solo run test and final shaft alignment for
commissioning acceptance.
 Witnessed oil flushing activities of pre commissioning.
 Prepared punch list for construction.
 Coordinate process operator in testing of rotating equipment.
 Supervised commissioning mechanical team for 4 hour run test with load of rotating
equipments.
 Attended meeting regarding commissioning activities.
Machinery Field Supervisor : March 15, 2010 to August 31, 2010
Pre-Commissioning
TECHNIP Singapore : Singapore NExBTL Project (Bio Diesel Plant)
Tuas South Avenue 9, Singapore
Duties and Responsibilities
 Review company procedures and specification.
 Attended tool box meeting of sub contractor.
 Supervised in all rotating equipments that are schedule for solo run test.
 Advised to verify soft foot of motors that indicating of high vibration & re-run again.
 Coordinate with piping supervisor regarding correction of flanges parallelism for final
alignment of rotating equipments.
 Scheduled and supervised final shaft alignment inspection of rotating equipments.
 Supervised and monitor oil flushing activities.
 Assisted client Neste Oil in test run with load of rotating equipments.
 Prepared daily report and directly receiving information regarding activities from
superior.
Rotating Equipment Supervisor : December 02, 2008 to February 28, 2010
Construction & Pre-Commissioning
CB&I – Toyo Engineering : Shell Houdini Ethylene Cracker Complex (ECC)
Joint Venture Pulau Ular, Singapore
Duties and Responsibilities
 Review vendor manual and drawing.
 Supervised sub contractor and checked the equipments that need to withdraw in the
ware house.
 Supervised and monitor erection, installation, centering and alignment of compressor,
steam turbine, horizontal pump, lube oil skid, fire water pump and fin fan cooler
according to Installation and Technical Procedures API 686 and Shell Design
Engineering Practice (DEP).
 Coordinated sub contractor QC personnel to raise inspection notice to all equipments
that had been done.
 Supervised and monitor lube oil flushing of Mitsubishi Heavy Industries (MHI)
Charge Gas compressor and Kobelco instrument air compressor base on API 617.
 Attended 4 hours motor solo run test and checked the right direction of motor.
 Supervised and assisted vendor of Hitachi compressor in installation, alignment and
connecting lube oil system of the equipment.
 Supervised inspection of final shaft alignment of rotating equipments.
 Advised engineering to contact manufacturer regarding specification of equipment
which is out of tolerances, such as shaft run out and bearing radial play.
 Attended weekly mechanical meeting regarding progress of the equipment that had
been installed and equipment that going to install.
 Prepared daily report regarding activities and equipment status and sent to superior.
Rotating Equipment Supervisor : April 22, 2008 to November 15, 2008
Construction
Kellogg Brown & Root : Shell Qatar Gas to Liquid Project (GTL)
Ras Laffan Industrial City, Qatar
Duties and Responsibilities
 Review vendor procedure and equipment drawing.
 Assisted engineering in clearing mechanical site technical query.
 Supervised assembling deaerator platforms.
 Supervised assembling of fin fan cooler for Emergency Diesel Generator and
installation as well.
 Supervised and monitor installation, alignment of Gas Turbine Generator, assembling
and erection of enclosure and filter house as well.
 Supervised installation and alignment of Atlas Copco instrument air compressor.
 Responsible for workers safety and attended tool box meeting.
 Attended mechanical meeting with sub contractor regarding equipment progress.
 Direct reporting and receiving information from superior.
Rotating Equipment Supervisor : September, 2004 to February, 2008
Commissioning, Start Up & Warranty
Technip, Snamprogetti, Kellogg- : Shell NLNG Plus Project Train 4, 5 & Project 6
Brown & Root, Japan Gas- Bonny Island, Nigeria
Corporation Joint Venture
Duties and Responsibilities
 Review vendor drawing and procedures.
 Prepared and plan daily activities.
 Monitor and updated all rotating equipments in commissioning work sheet.
 Personally checked and withdrawn spare parts that need to be changed.
 Held tool box meeting before commencing any work.
 Responsible on distributing manpower in their designated area.
 Coordinate process operator regarding the equipment that need to be repaired,
prepared working permit and checked system line up were isolated before to start any
work.
 Supervised on assisting vendor Siemens on changing dry seal of End Plus
compressor.
 Supervised on assisting vendor Nuovo Pignone in Gas Turbine Generator.
 Supervised and monitored 4 hours test run with load of rotating equipment such as,
cooling water pump, fin fan cooler, main & auxiliary hydraulic pump, lube oil pump,
jacking oil pump and seal oil pump of MR / PR compressors.
 Supervised and performed repair works of any rotating equipments and control
valves.
 Supervised operator of air compressor on assisting pneumatic test using primary
compressor, secondary booster compressor and monitor the equipment as well.
 Executed installation and final set up of valve interlock device according to its
procedure and line up on P&ID drawing witnessed by the client.
 Supervised oil flushing activities.
 Assisted operator on starting up all outstanding equipment and monitor during
operation.
 Supervised on repair of some work during warranty period.
 Attended commissioning meeting.
 Directly receiving information regarding all activities from superior.
Mechanical Supervisor : September 2002 to October 2003
Maintenance & Technical Assistance
Groupe Ipedex : Shurtan Gas Chemical Complex (SGCC)
Republic of Uzbekistan
Duties and Responsibilities
 Visited the plant every morning and checked all rotating equipments are in good
condition during operation.
 Review manual drawing of equipments.
 Supervised on repair and maintenance of all rotating equipment included mechanical
seal and minimized replacement of parts.
 Supervised in dismantling, assembling and repair of various pumps, steam turbines,
compressor, high pressure valves and mechanical seals.
 Supervised and monitor replacement of valve seals and hydro testing of any repaired
valve according to the required pressure.
 Performed overhauling and reconditioning of pumps, mechanical seals, reciprocating
and centrifugal compressors.
 Coordinate local mechanical personnel regarding ordering of materials and the
availability of spare parts before any repair work.
 Help and develop Uzbek nationals.
Rotating Equipment Supervisor : September 01, 2001 to August 31, 2002
Commissioning & Start Up
A.B.B Lummus : Shurtan Gas Chemical Complex (SGCC)
Republic of Uzbekistan
Duties and responsibilities
 Review vendor and equipment drawing procedures.
 Updated commissioning work sheet regarding equipments that had been done.
 Prepared working permit & gave safety instruction before starting any work.
 Repaired various valves such as, gate valve, ball valve, butterfly valve and globe
valve.
 Performed dismantling, assembling and changing of rotating ring and stationary
ring of mechanical seal.
 Supervised test run with load of motors, pumps, turbines and monitor bearing
temperature, vibration and rpm.
 Supervised oil flushing activities.
 Checked all necessary things before starting up rotating equipment such as, oil,
grease, cooling system and alignment as well.
 Coordinate process operator regarding starting up of any rotating equipment.
 Attended commissioning meeting.
 Directly reporting to commissioning superintendent regarding the status of
equipments that had been repaired and inspected.
Rotating Equipment Supervisor : November 15, 1999 to August 31, 2001
Construction
A.B.B Soimi S.p.a : Shurtan Gas Chemical Complex (SGCC)
Republic of Uzbekistan
Duties and responsibilities
 Review and check equipment detail drawing.
 Supervised and performed installation of horizontal pumps, vertical pumps,
compressors, standby generator, steam and gas turbine, fin fan cooler, extruder
machine, reactor unit and bagging conveyor machine.
 Supervised installation of horizontal and vertical vessel and checked orientation,
level and alignment as well.
 Advised millwright foreman to check soft foot before to start any shaft alignment.
 Supervised checking pipe stress before to start final shaft alignment.
 Responsible in scheduling final inspection of shaft alignment.
 Supervised and assisted vendor such as; A.B.B Stahl (Gas turbine), Black
Clawson (Extruder Machine), Mitsubishi Heavy Industry (Charge Gas
Compressor) and Mouller (Bagging Machine & Conveyor).
 Held tool box meeting every morning.
 Directly reporting to site superintendent regarding the status of all equipments
that had been installed and inspected.
Mechanical Foreman : September, 1991 to February, 1998
Ship Repair
Dubai Government : Dubai Dry Docks :
Dubai U.A.E
Duties and responsibilities
 Take charged in every repair work.
 Execute overhauling of air compressor.
 Dismantling and assembling of centrifugal pumps, cylinder head, valves and
anchor winch.
 Reliever in case Supervisor is on vacation.
Tri-Tool Machinist : February, 1989 to May, 1989
Construction
Snamprogetti : Oil Natural Gas Complex (ONGC)
Offshore, India
Duties and responsibilities
 Assist in piping activities.
 Beveling duplex pipe from 50.8 mm diameter to 400 mm diameter in tri-tool
machine.
 Fabricated different kind of blots and nuts.
 Fabricated rotor shafts, bushing and sleeves.
Lead man Machinist : September, 1986 to February, 1989
Fabrication
Atlantic Gulf & Pacific Co. : Batangas Fabrication Yard
(AG&P) Batangas, Philippines
Duties and responsibilities
 Follow instruction and drawing before to start machining.
 Fabricated different kinds of shafts, bushings, sleeves, bolts and nuts.
 Fabricated spur gear in milling machine.
 Reliever in case foreman is on leave.
Seminars / Training Attended
 BOISET (OPITO) – Conducted by International Maritime & Offshore Training
 Oil and Petrochemical Safety Orientation Course – Conducted by Ministry of
Manpower Singapore
 Easy Laser ( Laser Alignment) – Conducted in Ras Laffan Qatar
 Health, Safety and Environmental ( HSE ) - Conducted in Nigeria
 Flow serve (Mechanical Seal) - Conducted in Republic of Uzbekistan.
 Basic Safety Course and Fire Fighting - Conducted by Philippines Maritime Institute
Language Spoken: English & Tagalog
I herby certify that the information written above were true and correct to the best of
my knowledge and belief.
Benjamin L. Giman
Applicant
References:
Yves Castel – Commissioning Manager (SPIE) Email Add – yves.castel@spie.com
Fiorenzo Vuch - Commissioning Manager (KBR) Email Add - renzo99@hotmail.com
Dwayne Barnard – Commissioning Process (KBR) Email Add – dwaynebarnard@yahoo.ca
Elmer Angeles – Commissioning Rotating Equipment Superintendent (KBR) Email Add –
elmer_angeles@yahoo.com / elmer.angeles@kbr.com

More Related Content

What's hot

What's hot (20)

MIDEL C resume013[1]
MIDEL C resume013[1]MIDEL C resume013[1]
MIDEL C resume013[1]
 
Gorga Silalahi (CV)
Gorga Silalahi (CV)Gorga Silalahi (CV)
Gorga Silalahi (CV)
 
Resume-Ramasamy Ganapathy
Resume-Ramasamy GanapathyResume-Ramasamy Ganapathy
Resume-Ramasamy Ganapathy
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&I
 
Ramy .Joseph CV
Ramy .Joseph CVRamy .Joseph CV
Ramy .Joseph CV
 
Bhavin Tailor CV
Bhavin Tailor CVBhavin Tailor CV
Bhavin Tailor CV
 
Sr. Instrument Commissioning & Maintenance Technician
Sr. Instrument Commissioning & Maintenance TechnicianSr. Instrument Commissioning & Maintenance Technician
Sr. Instrument Commissioning & Maintenance Technician
 
M.Saravanan - Resume
M.Saravanan - ResumeM.Saravanan - Resume
M.Saravanan - Resume
 
Jatin_inst (1)
Jatin_inst (1)Jatin_inst (1)
Jatin_inst (1)
 
E&I QAQC Sup,Insp
E&I QAQC Sup,InspE&I QAQC Sup,Insp
E&I QAQC Sup,Insp
 
C.V (1)
C.V (1)C.V (1)
C.V (1)
 
Hisham.cv
Hisham.cvHisham.cv
Hisham.cv
 
JG Smit - CV
JG Smit - CVJG Smit - CV
JG Smit - CV
 
CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC
 
mallick resume qc eng.
mallick resume qc eng.mallick resume qc eng.
mallick resume qc eng.
 
Matt Instr CV
Matt Instr CVMatt Instr CV
Matt Instr CV
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
MARK P BOUVIER
MARK P BOUVIERMARK P BOUVIER
MARK P BOUVIER
 
Instrument Technician for Maintenance new
Instrument Technician  for Maintenance newInstrument Technician  for Maintenance new
Instrument Technician for Maintenance new
 
julian sharman CV 2016
julian sharman CV 2016julian sharman CV 2016
julian sharman CV 2016
 

Viewers also liked

Bio data Form Philippines (copyrighted)
Bio data Form Philippines (copyrighted)Bio data Form Philippines (copyrighted)
Bio data Form Philippines (copyrighted)Angelo Rivera
 
Life and Works of Rizal - Simple Biodata Complete
Life and Works of Rizal - Simple Biodata CompleteLife and Works of Rizal - Simple Biodata Complete
Life and Works of Rizal - Simple Biodata CompleteCristy Melloso
 
Canbankfactors biodata form
Canbankfactors biodata formCanbankfactors biodata form
Canbankfactors biodata formAnimesh Mehta
 
Resume
ResumeResume
Resumekclyn
 
Kabanata i v pananaliksik
Kabanata i   v pananaliksikKabanata i   v pananaliksik
Kabanata i v pananaliksikA. D.
 

Viewers also liked (8)

Bio data Form Philippines (copyrighted)
Bio data Form Philippines (copyrighted)Bio data Form Philippines (copyrighted)
Bio data Form Philippines (copyrighted)
 
Resume 100415202653-phpapp02 (1)
Resume 100415202653-phpapp02 (1)Resume 100415202653-phpapp02 (1)
Resume 100415202653-phpapp02 (1)
 
Life and Works of Rizal - Simple Biodata Complete
Life and Works of Rizal - Simple Biodata CompleteLife and Works of Rizal - Simple Biodata Complete
Life and Works of Rizal - Simple Biodata Complete
 
Canbankfactors biodata form
Canbankfactors biodata formCanbankfactors biodata form
Canbankfactors biodata form
 
BIODATA-1
BIODATA-1BIODATA-1
BIODATA-1
 
Bio data
Bio dataBio data
Bio data
 
Resume
ResumeResume
Resume
 
Kabanata i v pananaliksik
Kabanata i   v pananaliksikKabanata i   v pananaliksik
Kabanata i v pananaliksik
 

Similar to biodata%252520giman (20)

CV 15 Sep2016
CV 15 Sep2016CV 15 Sep2016
CV 15 Sep2016
 
Cv 15 sep2016
Cv 15 sep2016Cv 15 sep2016
Cv 15 sep2016
 
ElanCVdocx
ElanCVdocxElanCVdocx
ElanCVdocx
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATIC
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATIC
 
Gavin Murray new layout Resume
Gavin Murray new layout ResumeGavin Murray new layout Resume
Gavin Murray new layout Resume
 
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
 
CV
CVCV
CV
 
jayaprakash
jayaprakashjayaprakash
jayaprakash
 
MYCVDAHALAN
MYCVDAHALANMYCVDAHALAN
MYCVDAHALAN
 
Cv of nilesh rk
Cv of nilesh rkCv of nilesh rk
Cv of nilesh rk
 
resume-mr.vidallo
resume-mr.vidalloresume-mr.vidallo
resume-mr.vidallo
 
cv of Edgardo
cv of Edgardocv of Edgardo
cv of Edgardo
 
Resume Henri final[1]
Resume Henri final[1]Resume Henri final[1]
Resume Henri final[1]
 
Mario Gali Cv
Mario Gali CvMario Gali Cv
Mario Gali Cv
 
Ward, George Resume
Ward, George ResumeWard, George Resume
Ward, George Resume
 
my_resume-1
my_resume-1my_resume-1
my_resume-1
 
Field service engineer
Field service engineerField service engineer
Field service engineer
 
upinder_CV
upinder_CVupinder_CV
upinder_CV
 
New Resume Francis Ellivera.. (1)
New Resume Francis Ellivera.. (1)New Resume Francis Ellivera.. (1)
New Resume Francis Ellivera.. (1)
 

biodata%252520giman

  • 1. BENJAMIN L. GIMAN MechanicalLead Objectives – To be employed in the company with big business and reputation, Contribute my knowledge and experience in the field of mechanical. PERSONAL BACKGROUND Contact Address : 38 San Francisco St. Bauan, Batangas Philippines Tel. Number : +63434171867 Mobile Number : +639157761209 Email Address : giman331@yahoo.com Age : 49 years old Civil Status : Married Nationality : Filipino Passport Number : EC0014697 EDUCATIONAL ATTAINMENT Mechanical Engineering : International Correspondence Schools - Completed Technology WORKING EXPERIENCE Mechanical Lead : March 2014 to February 2015 Commissioning SPIE Oil & Gas Services : OFON Phase 2 Project (OFP2 Topsides) Total E&P Nigeria Limited Nigeria (Offshore) Duties and Responsibilities  Attended daily tool box talk & commissioning meeting.  Attended walk down inspection of equipment’s such Gas Turbine Generator (Rolls Royce-RB211), MP/HP/LP Compressors (General Electric), Water Injection Pumps (Sulzer), Fire Water Pumps (Enertia), Emergency Diesel Generator ( Enertia), Oil Export Pumps (Flowserve) & Chemical Injection Package prior for signing of Ready For Commissioning (RFC) certificate .
  • 2.  Supervised and assisted HHI for testing of rotating equipment as per Operational Test Procedure (OTP).  Witnessed & monitor mechanical run test of rotating equipment.  Reviewed & signed off Commissioning Test/Report sheet, OTP Acceptance & Ready For Start Up (RFSU) certificate.  Direct reporting and receiving information from Commissioning Site Leader. Mechanical Enginner : November 2012 to December 2013 Commissioning SPIE Oil & Gas Services : OFON Phase 2 Project (OFP2 Topsides) Total E&P Nigeria Limited Ulsan South Korea Duties and Responsibilities  Review company procedures and specification.  Review vendor’s manual, drawing, P&ID and assisted Hyundai Heavy Industries Co. (HHI) in preparation and incorporating comments of Operational Test Procedures (OTP) of rotating equipment.  Check and review Integrated Commissioning And Progress System (ICAPS) data base regarding equipment’s status, punch items categories before walk down inspection of equipments and signing Ready For Commissioning (RFC) dossier.  Review Work Method Statement regarding oil flushing and witnessed the activities of pre commissioning.  Coordinate equipment’s vendor and HHI supervisors regarding running test of equipments base on OTP.  Direct reporting and receiving information from commissioning manager. Machinery Specialist : December 2011 to May 2012 Commissioning Saipem : GNL-3Z (LNG) Project Arzew Algeria Duties and Responsibilities  Commissioning preparation.  Review vendors manual and drawing.  Reviewed Work Method Statement of Sub contractor regarding oil flushing and witnessed the activities of pre commissioning.  Witnessed final shaft alignment.  Prepared final punch list.  Coordinate process operator regarding rotating equipments that are scheduled to be tested.  Supervised and monitor 4 hrs run test with load of rotating equipments.  Supervised in any repair work of rotating equipments such as; changing drive end bearing, non drive end bearing and mechanical seals.  Direct reporting and receiving information from superior. Rotating Equipment Specialist : February 2011 to September 2011 Commissioning
  • 3. SPIE Oil & Gas Services : Ningxia Hanas LNG Project Yinchuan PR China Duties and Responsibilities  Commissioning preparation  Check project document data base and updated equipment list in spread sheet.  Review vendor’s manual, drawing and P&ID.  Prepared Operational Testing Procedure of Feed Gas Booster Compressor, Mixed Refrigerant Compressor and Boil Off Gas Compressor (motor driven).  Checked and verified pre commissioning permit to work application.  Inspection and witnessed 4 hour motor solo run test and final shaft alignment for commissioning acceptance.  Witnessed oil flushing activities of pre commissioning.  Prepared punch list for construction.  Coordinate process operator in testing of rotating equipment.  Supervised commissioning mechanical team for 4 hour run test with load of rotating equipments.  Attended meeting regarding commissioning activities. Machinery Field Supervisor : March 15, 2010 to August 31, 2010 Pre-Commissioning TECHNIP Singapore : Singapore NExBTL Project (Bio Diesel Plant) Tuas South Avenue 9, Singapore Duties and Responsibilities  Review company procedures and specification.  Attended tool box meeting of sub contractor.  Supervised in all rotating equipments that are schedule for solo run test.  Advised to verify soft foot of motors that indicating of high vibration & re-run again.  Coordinate with piping supervisor regarding correction of flanges parallelism for final alignment of rotating equipments.  Scheduled and supervised final shaft alignment inspection of rotating equipments.  Supervised and monitor oil flushing activities.  Assisted client Neste Oil in test run with load of rotating equipments.  Prepared daily report and directly receiving information regarding activities from superior. Rotating Equipment Supervisor : December 02, 2008 to February 28, 2010 Construction & Pre-Commissioning CB&I – Toyo Engineering : Shell Houdini Ethylene Cracker Complex (ECC) Joint Venture Pulau Ular, Singapore Duties and Responsibilities  Review vendor manual and drawing.  Supervised sub contractor and checked the equipments that need to withdraw in the ware house.  Supervised and monitor erection, installation, centering and alignment of compressor, steam turbine, horizontal pump, lube oil skid, fire water pump and fin fan cooler
  • 4. according to Installation and Technical Procedures API 686 and Shell Design Engineering Practice (DEP).  Coordinated sub contractor QC personnel to raise inspection notice to all equipments that had been done.  Supervised and monitor lube oil flushing of Mitsubishi Heavy Industries (MHI) Charge Gas compressor and Kobelco instrument air compressor base on API 617.  Attended 4 hours motor solo run test and checked the right direction of motor.  Supervised and assisted vendor of Hitachi compressor in installation, alignment and connecting lube oil system of the equipment.  Supervised inspection of final shaft alignment of rotating equipments.  Advised engineering to contact manufacturer regarding specification of equipment which is out of tolerances, such as shaft run out and bearing radial play.  Attended weekly mechanical meeting regarding progress of the equipment that had been installed and equipment that going to install.  Prepared daily report regarding activities and equipment status and sent to superior. Rotating Equipment Supervisor : April 22, 2008 to November 15, 2008 Construction Kellogg Brown & Root : Shell Qatar Gas to Liquid Project (GTL) Ras Laffan Industrial City, Qatar Duties and Responsibilities  Review vendor procedure and equipment drawing.  Assisted engineering in clearing mechanical site technical query.  Supervised assembling deaerator platforms.  Supervised assembling of fin fan cooler for Emergency Diesel Generator and installation as well.  Supervised and monitor installation, alignment of Gas Turbine Generator, assembling and erection of enclosure and filter house as well.  Supervised installation and alignment of Atlas Copco instrument air compressor.  Responsible for workers safety and attended tool box meeting.  Attended mechanical meeting with sub contractor regarding equipment progress.  Direct reporting and receiving information from superior. Rotating Equipment Supervisor : September, 2004 to February, 2008 Commissioning, Start Up & Warranty Technip, Snamprogetti, Kellogg- : Shell NLNG Plus Project Train 4, 5 & Project 6 Brown & Root, Japan Gas- Bonny Island, Nigeria Corporation Joint Venture Duties and Responsibilities  Review vendor drawing and procedures.  Prepared and plan daily activities.  Monitor and updated all rotating equipments in commissioning work sheet.  Personally checked and withdrawn spare parts that need to be changed.  Held tool box meeting before commencing any work.  Responsible on distributing manpower in their designated area.  Coordinate process operator regarding the equipment that need to be repaired, prepared working permit and checked system line up were isolated before to start any work.
  • 5.  Supervised on assisting vendor Siemens on changing dry seal of End Plus compressor.  Supervised on assisting vendor Nuovo Pignone in Gas Turbine Generator.  Supervised and monitored 4 hours test run with load of rotating equipment such as, cooling water pump, fin fan cooler, main & auxiliary hydraulic pump, lube oil pump, jacking oil pump and seal oil pump of MR / PR compressors.  Supervised and performed repair works of any rotating equipments and control valves.  Supervised operator of air compressor on assisting pneumatic test using primary compressor, secondary booster compressor and monitor the equipment as well.  Executed installation and final set up of valve interlock device according to its procedure and line up on P&ID drawing witnessed by the client.  Supervised oil flushing activities.  Assisted operator on starting up all outstanding equipment and monitor during operation.  Supervised on repair of some work during warranty period.  Attended commissioning meeting.  Directly receiving information regarding all activities from superior. Mechanical Supervisor : September 2002 to October 2003 Maintenance & Technical Assistance Groupe Ipedex : Shurtan Gas Chemical Complex (SGCC) Republic of Uzbekistan Duties and Responsibilities  Visited the plant every morning and checked all rotating equipments are in good condition during operation.  Review manual drawing of equipments.  Supervised on repair and maintenance of all rotating equipment included mechanical seal and minimized replacement of parts.  Supervised in dismantling, assembling and repair of various pumps, steam turbines, compressor, high pressure valves and mechanical seals.  Supervised and monitor replacement of valve seals and hydro testing of any repaired valve according to the required pressure.  Performed overhauling and reconditioning of pumps, mechanical seals, reciprocating and centrifugal compressors.  Coordinate local mechanical personnel regarding ordering of materials and the availability of spare parts before any repair work.  Help and develop Uzbek nationals. Rotating Equipment Supervisor : September 01, 2001 to August 31, 2002 Commissioning & Start Up A.B.B Lummus : Shurtan Gas Chemical Complex (SGCC) Republic of Uzbekistan Duties and responsibilities  Review vendor and equipment drawing procedures.  Updated commissioning work sheet regarding equipments that had been done.
  • 6.  Prepared working permit & gave safety instruction before starting any work.  Repaired various valves such as, gate valve, ball valve, butterfly valve and globe valve.  Performed dismantling, assembling and changing of rotating ring and stationary ring of mechanical seal.  Supervised test run with load of motors, pumps, turbines and monitor bearing temperature, vibration and rpm.  Supervised oil flushing activities.  Checked all necessary things before starting up rotating equipment such as, oil, grease, cooling system and alignment as well.  Coordinate process operator regarding starting up of any rotating equipment.  Attended commissioning meeting.  Directly reporting to commissioning superintendent regarding the status of equipments that had been repaired and inspected. Rotating Equipment Supervisor : November 15, 1999 to August 31, 2001 Construction A.B.B Soimi S.p.a : Shurtan Gas Chemical Complex (SGCC) Republic of Uzbekistan Duties and responsibilities  Review and check equipment detail drawing.  Supervised and performed installation of horizontal pumps, vertical pumps, compressors, standby generator, steam and gas turbine, fin fan cooler, extruder machine, reactor unit and bagging conveyor machine.  Supervised installation of horizontal and vertical vessel and checked orientation, level and alignment as well.  Advised millwright foreman to check soft foot before to start any shaft alignment.  Supervised checking pipe stress before to start final shaft alignment.  Responsible in scheduling final inspection of shaft alignment.  Supervised and assisted vendor such as; A.B.B Stahl (Gas turbine), Black Clawson (Extruder Machine), Mitsubishi Heavy Industry (Charge Gas Compressor) and Mouller (Bagging Machine & Conveyor).  Held tool box meeting every morning.  Directly reporting to site superintendent regarding the status of all equipments that had been installed and inspected. Mechanical Foreman : September, 1991 to February, 1998 Ship Repair Dubai Government : Dubai Dry Docks : Dubai U.A.E Duties and responsibilities  Take charged in every repair work.  Execute overhauling of air compressor.  Dismantling and assembling of centrifugal pumps, cylinder head, valves and anchor winch.  Reliever in case Supervisor is on vacation.
  • 7. Tri-Tool Machinist : February, 1989 to May, 1989 Construction Snamprogetti : Oil Natural Gas Complex (ONGC) Offshore, India Duties and responsibilities  Assist in piping activities.  Beveling duplex pipe from 50.8 mm diameter to 400 mm diameter in tri-tool machine.  Fabricated different kind of blots and nuts.  Fabricated rotor shafts, bushing and sleeves. Lead man Machinist : September, 1986 to February, 1989 Fabrication Atlantic Gulf & Pacific Co. : Batangas Fabrication Yard (AG&P) Batangas, Philippines Duties and responsibilities  Follow instruction and drawing before to start machining.  Fabricated different kinds of shafts, bushings, sleeves, bolts and nuts.  Fabricated spur gear in milling machine.  Reliever in case foreman is on leave. Seminars / Training Attended  BOISET (OPITO) – Conducted by International Maritime & Offshore Training  Oil and Petrochemical Safety Orientation Course – Conducted by Ministry of Manpower Singapore  Easy Laser ( Laser Alignment) – Conducted in Ras Laffan Qatar  Health, Safety and Environmental ( HSE ) - Conducted in Nigeria  Flow serve (Mechanical Seal) - Conducted in Republic of Uzbekistan.  Basic Safety Course and Fire Fighting - Conducted by Philippines Maritime Institute Language Spoken: English & Tagalog I herby certify that the information written above were true and correct to the best of my knowledge and belief. Benjamin L. Giman Applicant References: Yves Castel – Commissioning Manager (SPIE) Email Add – yves.castel@spie.com Fiorenzo Vuch - Commissioning Manager (KBR) Email Add - renzo99@hotmail.com Dwayne Barnard – Commissioning Process (KBR) Email Add – dwaynebarnard@yahoo.ca Elmer Angeles – Commissioning Rotating Equipment Superintendent (KBR) Email Add – elmer_angeles@yahoo.com / elmer.angeles@kbr.com