SlideShare a Scribd company logo
JATIN KUMAR ARVINDBHAI PATEL
Contact: 9825831821, 9879102127
E-Mail: jatinpatel_4321@yahoo.co.in, pateljatin4321@gmail.com
SENIOR LEVEL ASSIGNMENTS
Project Management Team/Operations & Maintenance
Industry Preference:Oil and Gas, Refinery, Petrochemical and Power Plant
AREAS OF EXPERTISE
Erection & Commissioning
Pre-Commissioning
Operations
Operations & Maintenance
Instrumentation& Control
Process Improvement
Project Management
Client Relationship
Management
Team Management
PROFILE SUMMARY
 Qualified Diploma in Instrumentation with 15 years of experience
 Proficient in managing overall project while ensuring high quality standards and
meeting KPIs
 Expertise in planning, engineering, managing & executing Oil & Gas, Refinery,
Petrochemicals and power plant projects including erection, commissioning,
operations and maintenance of the same
 Efficient in managing overall operations and preventive maintenance activities with
a view to enhance the operational efficiency of operations and eliminating
obsolescence
 Effective leader with excellent motivational skills to sustain growth momentum
while motivating peak individual performances
CORE COMPETENCIES
 Planning and effectuating predictive & preventive maintenance schedules for various equipment to increase machine
uptime & equipment reliability
 Conceptualizing & implementing maintenance schedules, carrying out periodic checks to ensure performance and
maintaining requisite documents for the same; identifying areas of bottlenecks / breakdowns and taking steps to
rectify through application of troubleshooting tools
 Managing overall operations for executing projects within cost & time norms
 Preparing project schedules and monitoring projects with respect to cost, resource deployment, time over-runs &
quality compliance to ensure timely execution of projects
 Anchoring on-site installation & commissioning activities to ensure completion of project within time & cost
parameters and effective resource utilization to maximize the output
 Carrying out overhauling work of equipment and major repairs to improve equipment efficiency by fault finding;
conducting performance trials of engineering equipment to establish standards before and after major repairs
KEY SKILLS
 InvolvedinColdSAT, HotSAT,ModbusCheck,RFI, LoopCheck,FunctionCheck,FF SegmentCheck, DCC, SMCC, PSSR, Start-up,
Commissioning, Installation, Troubleshooting, Calibration, Repairing, Operation & Maintenance of Instrument
 General Instruments: Sound Command on Pneumatic Instruments as well as Electronic Instruments such as
Differential Pressure, Level, Temperature Flow Transmitter, Control Valves, Controllers, Pressure, Temperature, and
Flow & Level Switches
 Fire& Gas Instruments:Possess good experience of working on F&G Instruments like IR/UV Flame Detector, Line of
Sight Gas Detector
 Vibration Monitoring Systems:Worked on Vibration Monitoring System of Bentley Nevada 3300, 3500. Experience
of Vibration Probe Installation, Probe health checking and characteristics by using Tk3 probe calibrator
 Drawings:Posses understanding of P&ID’s, PFD’s, ILD’s, Hook-up Drawings, and Loop Drawings & Loop Philosophies
as well as start-up sequence, FLD, cause & effects
ORGANIZATIONAL EXPERIENCE
Sept’15-Nov’15 Ras Gas Company Ltd., Raslaffan, Qatar as Senior Instrument Technician
Role:
 Mainly involved in removal and fixing back of all kind of instruments like Control Valve accessories, Temperature
elements, Vibration Probe, Flame detectors, Ignitor etc.
 Calibration of Control Valves and all kind of Transmitters.
 Valve positioner adjustment done for problematic valves.
 Glycol feel in all level transmitters and calibration done.
 Do start-up assistance from Instrument site with operation.
 Plant start successfully and same handed over to Operation and Maintenance team.
Mar’13-Jun’15 ADCO - SAS (Sahil), Abu-Dhabi - Onshore as Instrument Commissioning Foreman
Role:
 Involved in SAS Project(SAS FFD -Full Field Development) as an ADCO (PMT) Representative
 Worked in loop check, function check according with cause and effect matrix (Process logic, F&G logics)
 Coordinated with Contractor Team for RDS and WAG well loop check and functional check
 Looked after instrument function during commissioning for Centrifugal compressor, Production separator, Glycol unit
and vapour recovery units
 Liaised to raise punch points during loop check, site visit and functional test as well as PMT (Project
Management Team) of ADCO
May’12-Dec’12 ADCO- ASAB, Abu-Dhabi - Onshore as Instrument Commissioning Technician
Role:
Project: ASAB FFD-Full Field Development
 Carried outdifferent vendor skid support to loop check and commission it with plant
 Executed Brownfield Project ensuring adherence to all safety and environment norms
 Conducted loop checks with ADCO representative and finished all loop and filled up all loop sheets with signed by
ADCO person and handed over to Commissioning Supervisor
 Completed loop check all cause and effect cause as well as finished it successfully
 Involved in plant start-up and successfully completed project
May’11-Mar’12 ONGC Plant (Oil & Natural Gas Company)- Offshore as Instrument Technician
Role:
 Involved in Pasha 2 Maintenance activities
 Worked on FOX BORO IA Series Distributive Control System and A/B, PLC System
 Handledloop checked, Function Tested, ESD Function Checked, Equipment Function Testand ESD/EDP test to ensure
the reliability of Instrument System
 Carried out installation, calibration, loop checking and maintenance of all types of electronics smart instruments for
Level, Temperature, Pressure and Flow Transmittermakes of Emerson Rosemount
Sept’10-Apr’11 KNPCMINA ALL-Ahmadi-Kuwait as Instrument Foreman
Role:
 Worked inInstrument Forman in SRU(Sulphur Recovery Unit), SAR (Sulphuric Acide Recovery), HP (Hydrogen Plant)&
VRU (Vapour Recovery Unit) area of KNPC MAA Refinery (KUWAIT)
 Handled calibration, servicing andoverhauling, dismantling and replacing of different types of instrument such as
Level, DP, Pressure, Temperature Transmitters, I/P, Control Valve & Accessories
 Removed all types of Valves & Transmitters and handed over to workshop as well as installed back it again in field and
check with DCS for putting it online
 Involved in after completion of turnaround stay for plant start-up with operation support and successfully completed
all the units
May’09-Jun’10 Qatar Gas - Doha Qatar as Instrument Technician
Role:
 Worked in World’s Largest Gas Plant QATAR GAS (Train-1, Train-2, AGE-2,GranulationUnit Area)
 Managed Maintenance Department with Qatar Gas Maintenance Team
 Handled preventive and corrective maintenance of QG-1 area which includedValve Stroke Test and Transmitter
Calibration whenever required
 Involved in preventive and corrective maintenance for field instruments during shutdown loop checking instrument
loop/signal from control room to instrument equipment such as control valve, all type transmitter, flow switch and all
type of signal from field handle DCS Foxboro IA Series and Triconix PLC calibration and servicing of pressure, flow,
level and temperature instruments such as transmitter, switches and analyzer)
 Carried out partial stroke check for SDV's cause and effect logic check
PREVIOUS EXPERIENCE
Apr’09-Apr’09 KNPCMINA ALL-Ahmadi, Kuwait as Instrument Foreman
Role:
 Served as Instrument Forman in HP unit 53&54 area/ KNPC (KUWAIT) ShutDown
 Involved in calibration, serving and overhauling, dismantling and replacing of different type of instrument such as
transmitters, I/P, control valve & accessories (positioner, booster relays, lock up relay and valve positioner)
Nov’07-Nov’08 Essar Steel (CMD)-Hazira (Surat) as Instrument Technician
Role:
 Served as Instrument Maintenance Technician Essar Steel Hazira Plant CMD (Central Maintenance Department) for
maintenance calibration job for ISO9001, loop checking, commissioning and troubleshooting
 Worked on Yokogawa DCS, PLC Yaskawa SCU 84, transmitters such as Rosemount Model No. 1151, DP. 2, 3, 4, 5, 6, 7,
1151 GP 0, 2,3, 4, 5, 6, 444 RL-2, 444 TK 2, 3
 Involved inRosemount Smart Transmitters Model No. 3051, CD2A, 3A & 3051 CG-4A and calibration using Hart
communicator of modelNo. 275 & 268. Kent, Accutech, Smar, Mobrey,I/P Convertors, Valve, Positioners, Switches for
Pressure, Temperature and Level
Sep’05-Oct’07 Reliance Petrochemical HAZIRA (Surat) as Sr. Instrument Technician
Role:
 Involved in commissioning and maintenance activities in Reliance Petrochemical- PTA (Pure Tepthalic Acid) Plant.
 Worked on Yokogawa Centum, Distributive Control System and A/B, PLC System
 Involved in:
o Loop Checking, Equipment Function Test, and ESD/EDP test to ensure the reliability of Instrument System
o Installation, Calibration, Loop Checking and Maintenance of all types of Electronics Smart Instruments for Level,
Temperature, Pressure and Flow Transmitter makes of Emerson Rosemount Supervision on Erection activities
like Cabling, Fabrication and Installation of Supports, Tubing, Installations of Panels as per approved drawings
Sep’06-Oct’06 Qatar Petroleum- Doha Qatar as Sr. Instrument Technician
Role:
 Involved in calibration and maintenance of all types of electronics smart instruments for level, temperature, pressure
and flow transmitter
 Worked on Calibration of Smart Instrument Devices with HART Compatibility online and offline
 Carried out removing, calibration, & installation of all types of instrument , valves and accessories (positioner ,booster
relays, lock up relay, and position transmitters)
Jun’05-Sep’05 Delta Steel Company-Negirya as Instrument Technician
Role:
 Involved in overhauling, servicing, & calibration of electric, pneumatic, hydraulic, motor operated valves and
accessories (positioner, booster relays, lock up relay, and position transmitters)
 Served and worked on calibration of smart instrument devices with HART Compatibility online and offline
Aug’00-Jun’05 Essar Power Plant (515 MW) Hazira-Surat as Instrument Technician
Role:
 Served as Instrument Maintenance Technician in 515MW Power Plant. In Power Plant, 110mw three Gas tarbain and
one 185MW steam terbain. Worked on Turbine MARK IV Control System and Allen Bradley3300 System
 Handled independently breakdown/shutdown, maintenance (in-running plant) in shift hours and ISO9001 calibration
job in plant
TRAININGS
 Attended safety trainings on:
o H2S
o Material Handling
o Red Mask Respirator, Green Mask Respirator
o PTW(Permit To Work)
o First Aid, IIF (Incident & Injury Free)
ACADEMIC DETAILS
2009 Diploma in Instrumentation from Aura Management Studies
2000 I.T.I. (Instrumentation) from Industrial Training Institute
PERSONAL DETAILS
Date of Birth: 2nd June 1980
Languages Known: English/Hindi/Gujarati
Address: 2 - Atmiya Park Society, Opp. - Jahagirpura Police, Rander Road, Surat, Gujarat-39500
Location Preference: Gulf, African countries
Nationality: Indian
Marital Status: Married
No. of Dependents: 5 Persons
Passport Details: K6965912 (Issued at 05/02/2013 Valid up to 04/02/2023)

More Related Content

What's hot

Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineer
Srivenkatesh Padmanaban
 
Bryan Enon Cledoro - Inst. Maint. Tech. CV
Bryan Enon Cledoro - Inst. Maint. Tech. CVBryan Enon Cledoro - Inst. Maint. Tech. CV
Bryan Enon Cledoro - Inst. Maint. Tech. CVBryan Cledoro
 
Pre commissioning Instrument Engineer
Pre commissioning Instrument EngineerPre commissioning Instrument Engineer
Pre commissioning Instrument Engineer
Kamran Saeed
 
Saurabh Singh - CV.DOC
Saurabh Singh - CV.DOCSaurabh Singh - CV.DOC
Saurabh Singh - CV.DOCsaurabh singh
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar Patel
 
Instrument Supervisor
Instrument SupervisorInstrument Supervisor
Instrument SupervisorSatish Patel
 
Instrument Technician for Maintenance new
Instrument Technician  for Maintenance newInstrument Technician  for Maintenance new
Instrument Technician for Maintenance newNoel Roque
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceDHRUVA MISHRA
 
Manoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire
 
1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years expParthsarathy vijayan
 
instrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbineinstrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbine
KsPuri
 
Resume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineerResume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineer
Srivenkatesh Padmanaban
 
instrument and control cv (1)
instrument and control cv (1)instrument and control cv (1)
instrument and control cv (1)Marlowe Salenga
 
SR. instrument technician
SR. instrument technicianSR. instrument technician
SR. instrument technicianALPESH SUTHAR
 

What's hot (20)

Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineer
 
Bryan Enon Cledoro - Inst. Maint. Tech. CV
Bryan Enon Cledoro - Inst. Maint. Tech. CVBryan Enon Cledoro - Inst. Maint. Tech. CV
Bryan Enon Cledoro - Inst. Maint. Tech. CV
 
Pre commissioning Instrument Engineer
Pre commissioning Instrument EngineerPre commissioning Instrument Engineer
Pre commissioning Instrument Engineer
 
Saurabh Singh - CV.DOC
Saurabh Singh - CV.DOCSaurabh Singh - CV.DOC
Saurabh Singh - CV.DOC
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
 
Matt Instr CV
Matt Instr CVMatt Instr CV
Matt Instr CV
 
Instrument Supervisor
Instrument SupervisorInstrument Supervisor
Instrument Supervisor
 
Instrument Technician for Maintenance new
Instrument Technician  for Maintenance newInstrument Technician  for Maintenance new
Instrument Technician for Maintenance new
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experience
 
Manoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire-Resume
Manoj Ahire-Resume
 
CV
CVCV
CV
 
Instrument Supervisor CV
Instrument Supervisor CVInstrument Supervisor CV
Instrument Supervisor CV
 
Fahad CV
Fahad CVFahad CV
Fahad CV
 
1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp
 
cv Instrument Commissioning Engineer
cv Instrument Commissioning Engineercv Instrument Commissioning Engineer
cv Instrument Commissioning Engineer
 
instrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbineinstrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbine
 
Resume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineerResume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineer
 
instrument and control cv (1)
instrument and control cv (1)instrument and control cv (1)
instrument and control cv (1)
 
SR. instrument technician
SR. instrument technicianSR. instrument technician
SR. instrument technician
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 

Similar to Jatin_inst (1)

E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2mohammad tanweer
 
Instrument Engg Resume
Instrument Engg ResumeInstrument Engg Resume
Instrument Engg Resumemohamed saffi
 
INSTRUMENT - TECHNICIAN – PROCESS CONTROL & INSTRUMENTATION
INSTRUMENT - TECHNICIAN  – PROCESS CONTROL & INSTRUMENTATION  INSTRUMENT - TECHNICIAN  – PROCESS CONTROL & INSTRUMENTATION
INSTRUMENT - TECHNICIAN – PROCESS CONTROL & INSTRUMENTATION
umesh patel
 
Iprofessional
IprofessionalIprofessional
Iprofessionalkaraguppi
 
MANSOOR_ALI_CV -QA QC
MANSOOR_ALI_CV -QA QCMANSOOR_ALI_CV -QA QC
MANSOOR_ALI_CV -QA QCMansoor Ali
 
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Rahman
 
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Rahman
 
AVINASH . Basrur
AVINASH . BasrurAVINASH . Basrur
AVINASH . BasrurAvinash B
 

Similar to Jatin_inst (1) (20)

Antony Praveen
Antony PraveenAntony Praveen
Antony Praveen
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2
 
umesh kumar (1)
umesh kumar (1)umesh kumar (1)
umesh kumar (1)
 
Instrument Engg Resume
Instrument Engg ResumeInstrument Engg Resume
Instrument Engg Resume
 
Bhavin Tailor CV
Bhavin Tailor CVBhavin Tailor CV
Bhavin Tailor CV
 
M.Yesrub Iqbal
M.Yesrub IqbalM.Yesrub Iqbal
M.Yesrub Iqbal
 
INSTRUMENT - TECHNICIAN – PROCESS CONTROL & INSTRUMENTATION
INSTRUMENT - TECHNICIAN  – PROCESS CONTROL & INSTRUMENTATION  INSTRUMENT - TECHNICIAN  – PROCESS CONTROL & INSTRUMENTATION
INSTRUMENT - TECHNICIAN – PROCESS CONTROL & INSTRUMENTATION
 
Iprofessional
IprofessionalIprofessional
Iprofessional
 
Mresume
MresumeMresume
Mresume
 
venkat resume
venkat resumevenkat resume
venkat resume
 
Mario Gali Cv
Mario Gali CvMario Gali Cv
Mario Gali Cv
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
MANSOOR_ALI_CV -QA QC
MANSOOR_ALI_CV -QA QCMANSOOR_ALI_CV -QA QC
MANSOOR_ALI_CV -QA QC
 
REY CV
REY CVREY CV
REY CV
 
SATHISH KUMAR - E&I
SATHISH KUMAR - E&ISATHISH KUMAR - E&I
SATHISH KUMAR - E&I
 
RESUME
RESUMERESUME
RESUME
 
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017
 
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
AVINASH . Basrur
AVINASH . BasrurAVINASH . Basrur
AVINASH . Basrur
 

Jatin_inst (1)

  • 1. JATIN KUMAR ARVINDBHAI PATEL Contact: 9825831821, 9879102127 E-Mail: jatinpatel_4321@yahoo.co.in, pateljatin4321@gmail.com SENIOR LEVEL ASSIGNMENTS Project Management Team/Operations & Maintenance Industry Preference:Oil and Gas, Refinery, Petrochemical and Power Plant AREAS OF EXPERTISE Erection & Commissioning Pre-Commissioning Operations Operations & Maintenance Instrumentation& Control Process Improvement Project Management Client Relationship Management Team Management PROFILE SUMMARY  Qualified Diploma in Instrumentation with 15 years of experience  Proficient in managing overall project while ensuring high quality standards and meeting KPIs  Expertise in planning, engineering, managing & executing Oil & Gas, Refinery, Petrochemicals and power plant projects including erection, commissioning, operations and maintenance of the same  Efficient in managing overall operations and preventive maintenance activities with a view to enhance the operational efficiency of operations and eliminating obsolescence  Effective leader with excellent motivational skills to sustain growth momentum while motivating peak individual performances CORE COMPETENCIES  Planning and effectuating predictive & preventive maintenance schedules for various equipment to increase machine uptime & equipment reliability  Conceptualizing & implementing maintenance schedules, carrying out periodic checks to ensure performance and maintaining requisite documents for the same; identifying areas of bottlenecks / breakdowns and taking steps to rectify through application of troubleshooting tools  Managing overall operations for executing projects within cost & time norms  Preparing project schedules and monitoring projects with respect to cost, resource deployment, time over-runs & quality compliance to ensure timely execution of projects  Anchoring on-site installation & commissioning activities to ensure completion of project within time & cost parameters and effective resource utilization to maximize the output  Carrying out overhauling work of equipment and major repairs to improve equipment efficiency by fault finding; conducting performance trials of engineering equipment to establish standards before and after major repairs KEY SKILLS  InvolvedinColdSAT, HotSAT,ModbusCheck,RFI, LoopCheck,FunctionCheck,FF SegmentCheck, DCC, SMCC, PSSR, Start-up, Commissioning, Installation, Troubleshooting, Calibration, Repairing, Operation & Maintenance of Instrument  General Instruments: Sound Command on Pneumatic Instruments as well as Electronic Instruments such as Differential Pressure, Level, Temperature Flow Transmitter, Control Valves, Controllers, Pressure, Temperature, and Flow & Level Switches  Fire& Gas Instruments:Possess good experience of working on F&G Instruments like IR/UV Flame Detector, Line of Sight Gas Detector  Vibration Monitoring Systems:Worked on Vibration Monitoring System of Bentley Nevada 3300, 3500. Experience of Vibration Probe Installation, Probe health checking and characteristics by using Tk3 probe calibrator  Drawings:Posses understanding of P&ID’s, PFD’s, ILD’s, Hook-up Drawings, and Loop Drawings & Loop Philosophies as well as start-up sequence, FLD, cause & effects ORGANIZATIONAL EXPERIENCE Sept’15-Nov’15 Ras Gas Company Ltd., Raslaffan, Qatar as Senior Instrument Technician Role:  Mainly involved in removal and fixing back of all kind of instruments like Control Valve accessories, Temperature elements, Vibration Probe, Flame detectors, Ignitor etc.  Calibration of Control Valves and all kind of Transmitters.  Valve positioner adjustment done for problematic valves.  Glycol feel in all level transmitters and calibration done.  Do start-up assistance from Instrument site with operation.  Plant start successfully and same handed over to Operation and Maintenance team.
  • 2. Mar’13-Jun’15 ADCO - SAS (Sahil), Abu-Dhabi - Onshore as Instrument Commissioning Foreman Role:  Involved in SAS Project(SAS FFD -Full Field Development) as an ADCO (PMT) Representative  Worked in loop check, function check according with cause and effect matrix (Process logic, F&G logics)  Coordinated with Contractor Team for RDS and WAG well loop check and functional check  Looked after instrument function during commissioning for Centrifugal compressor, Production separator, Glycol unit and vapour recovery units  Liaised to raise punch points during loop check, site visit and functional test as well as PMT (Project Management Team) of ADCO May’12-Dec’12 ADCO- ASAB, Abu-Dhabi - Onshore as Instrument Commissioning Technician Role: Project: ASAB FFD-Full Field Development  Carried outdifferent vendor skid support to loop check and commission it with plant  Executed Brownfield Project ensuring adherence to all safety and environment norms  Conducted loop checks with ADCO representative and finished all loop and filled up all loop sheets with signed by ADCO person and handed over to Commissioning Supervisor  Completed loop check all cause and effect cause as well as finished it successfully  Involved in plant start-up and successfully completed project May’11-Mar’12 ONGC Plant (Oil & Natural Gas Company)- Offshore as Instrument Technician Role:  Involved in Pasha 2 Maintenance activities  Worked on FOX BORO IA Series Distributive Control System and A/B, PLC System  Handledloop checked, Function Tested, ESD Function Checked, Equipment Function Testand ESD/EDP test to ensure the reliability of Instrument System  Carried out installation, calibration, loop checking and maintenance of all types of electronics smart instruments for Level, Temperature, Pressure and Flow Transmittermakes of Emerson Rosemount Sept’10-Apr’11 KNPCMINA ALL-Ahmadi-Kuwait as Instrument Foreman Role:  Worked inInstrument Forman in SRU(Sulphur Recovery Unit), SAR (Sulphuric Acide Recovery), HP (Hydrogen Plant)& VRU (Vapour Recovery Unit) area of KNPC MAA Refinery (KUWAIT)  Handled calibration, servicing andoverhauling, dismantling and replacing of different types of instrument such as Level, DP, Pressure, Temperature Transmitters, I/P, Control Valve & Accessories  Removed all types of Valves & Transmitters and handed over to workshop as well as installed back it again in field and check with DCS for putting it online  Involved in after completion of turnaround stay for plant start-up with operation support and successfully completed all the units May’09-Jun’10 Qatar Gas - Doha Qatar as Instrument Technician Role:  Worked in World’s Largest Gas Plant QATAR GAS (Train-1, Train-2, AGE-2,GranulationUnit Area)  Managed Maintenance Department with Qatar Gas Maintenance Team  Handled preventive and corrective maintenance of QG-1 area which includedValve Stroke Test and Transmitter Calibration whenever required  Involved in preventive and corrective maintenance for field instruments during shutdown loop checking instrument loop/signal from control room to instrument equipment such as control valve, all type transmitter, flow switch and all type of signal from field handle DCS Foxboro IA Series and Triconix PLC calibration and servicing of pressure, flow, level and temperature instruments such as transmitter, switches and analyzer)  Carried out partial stroke check for SDV's cause and effect logic check
  • 3. PREVIOUS EXPERIENCE Apr’09-Apr’09 KNPCMINA ALL-Ahmadi, Kuwait as Instrument Foreman Role:  Served as Instrument Forman in HP unit 53&54 area/ KNPC (KUWAIT) ShutDown  Involved in calibration, serving and overhauling, dismantling and replacing of different type of instrument such as transmitters, I/P, control valve & accessories (positioner, booster relays, lock up relay and valve positioner) Nov’07-Nov’08 Essar Steel (CMD)-Hazira (Surat) as Instrument Technician Role:  Served as Instrument Maintenance Technician Essar Steel Hazira Plant CMD (Central Maintenance Department) for maintenance calibration job for ISO9001, loop checking, commissioning and troubleshooting  Worked on Yokogawa DCS, PLC Yaskawa SCU 84, transmitters such as Rosemount Model No. 1151, DP. 2, 3, 4, 5, 6, 7, 1151 GP 0, 2,3, 4, 5, 6, 444 RL-2, 444 TK 2, 3  Involved inRosemount Smart Transmitters Model No. 3051, CD2A, 3A & 3051 CG-4A and calibration using Hart communicator of modelNo. 275 & 268. Kent, Accutech, Smar, Mobrey,I/P Convertors, Valve, Positioners, Switches for Pressure, Temperature and Level Sep’05-Oct’07 Reliance Petrochemical HAZIRA (Surat) as Sr. Instrument Technician Role:  Involved in commissioning and maintenance activities in Reliance Petrochemical- PTA (Pure Tepthalic Acid) Plant.  Worked on Yokogawa Centum, Distributive Control System and A/B, PLC System  Involved in: o Loop Checking, Equipment Function Test, and ESD/EDP test to ensure the reliability of Instrument System o Installation, Calibration, Loop Checking and Maintenance of all types of Electronics Smart Instruments for Level, Temperature, Pressure and Flow Transmitter makes of Emerson Rosemount Supervision on Erection activities like Cabling, Fabrication and Installation of Supports, Tubing, Installations of Panels as per approved drawings Sep’06-Oct’06 Qatar Petroleum- Doha Qatar as Sr. Instrument Technician Role:  Involved in calibration and maintenance of all types of electronics smart instruments for level, temperature, pressure and flow transmitter  Worked on Calibration of Smart Instrument Devices with HART Compatibility online and offline  Carried out removing, calibration, & installation of all types of instrument , valves and accessories (positioner ,booster relays, lock up relay, and position transmitters) Jun’05-Sep’05 Delta Steel Company-Negirya as Instrument Technician Role:  Involved in overhauling, servicing, & calibration of electric, pneumatic, hydraulic, motor operated valves and accessories (positioner, booster relays, lock up relay, and position transmitters)  Served and worked on calibration of smart instrument devices with HART Compatibility online and offline Aug’00-Jun’05 Essar Power Plant (515 MW) Hazira-Surat as Instrument Technician Role:  Served as Instrument Maintenance Technician in 515MW Power Plant. In Power Plant, 110mw three Gas tarbain and one 185MW steam terbain. Worked on Turbine MARK IV Control System and Allen Bradley3300 System  Handled independently breakdown/shutdown, maintenance (in-running plant) in shift hours and ISO9001 calibration job in plant TRAININGS  Attended safety trainings on: o H2S o Material Handling o Red Mask Respirator, Green Mask Respirator o PTW(Permit To Work) o First Aid, IIF (Incident & Injury Free)
  • 4. ACADEMIC DETAILS 2009 Diploma in Instrumentation from Aura Management Studies 2000 I.T.I. (Instrumentation) from Industrial Training Institute PERSONAL DETAILS Date of Birth: 2nd June 1980 Languages Known: English/Hindi/Gujarati Address: 2 - Atmiya Park Society, Opp. - Jahagirpura Police, Rander Road, Surat, Gujarat-39500 Location Preference: Gulf, African countries Nationality: Indian Marital Status: Married No. of Dependents: 5 Persons Passport Details: K6965912 (Issued at 05/02/2013 Valid up to 04/02/2023)