Jatin Kumar Arvindbhai Patel has over 15 years of experience in project management, operations, maintenance, instrumentation, and control in industries including oil and gas, refinery, petrochemical, and power. He holds a diploma in instrumentation and is proficient in planning, engineering, commissioning, and executing large projects while meeting quality standards and KPIs. He has strong leadership skills and experience managing teams.
• A competent professional with over 8 years of rich & versatile experience in Quality Control & Inspection and Instrument Maintenance commissioning-pre commissioning Operations (Onshore) in India & Middle East across Oil & Gas industry
• Well versed with the concepts of process control, calibration, loop checking, pre-commissioning, commissioning and troubleshooting for Pneumatic, Electro-Pneumatic & Smart Instruments
• Holds the merit of working with renowned organizations like Supreme Group FZE (Fuels), Qatar Engineering & Construction Company W.L.L., Petromar (Saipem) Soyo Base, Hofincons Infotech Industrial Services, J Ray Mc Dermott Middle East Inc. and Sabero Organics Gujarat Ltd.
• A competent professional with over 8 years of rich & versatile experience in Quality Control & Inspection and Instrument Maintenance commissioning-pre commissioning Operations (Onshore) in India & Middle East across Oil & Gas industry
• Well versed with the concepts of process control, calibration, loop checking, pre-commissioning, commissioning and troubleshooting for Pneumatic, Electro-Pneumatic & Smart Instruments
• Holds the merit of working with renowned organizations like Supreme Group FZE (Fuels), Qatar Engineering & Construction Company W.L.L., Petromar (Saipem) Soyo Base, Hofincons Infotech Industrial Services, J Ray Mc Dermott Middle East Inc. and Sabero Organics Gujarat Ltd.
Pre Commissioning Testing Training and Maintenance of Instrumentation Analyzer, Metering Skid, Crude Oil Samplers, Corrosion, CP Radio Monitoring system, Laser HF and H2S Hydrogen, Oxygen Emerson oxymitter, Emerson Bentely Navada Vibration Analyzers, Thermography, Gas cement Petroleum Analyzers, Gas Chromatograph in Refinery Oil Gas Plants Petrochemical Aramco Sabic.
Extensive coordination between client and supplier in make sure all resolution successfully covered to achieve end client satisfaction.
Pre Commissioning Testing Training and Maintenance of Instrumentation Analyzer, Metering Skid, Crude Oil Samplers, Corrosion, CP Radio Monitoring system, Laser HF and H2S Hydrogen, Oxygen Emerson oxymitter, Emerson Bentely Navada Vibration Analyzers, Thermography, Gas cement Petroleum Analyzers, Gas Chromatograph in Refinery Oil Gas Plants Petrochemical Aramco Sabic.
Extensive coordination between client and supplier in make sure all resolution successfully covered to achieve end client satisfaction.
INSTRUMENT - TECHNICIAN – PROCESS CONTROL & INSTRUMENTATION umesh patel
To,
Respected sir,
I humbly wish to apply for the position of an instrument technician. Attached is a copy of my curriculum
vitae for your consideration and acceptance. Thank you in anticipation that this my application will be considered.
i will appreciate this opportunity secured and to exploiting my skills.
Thanks,
Regards,
Umesh Patel.
India.
1. JATIN KUMAR ARVINDBHAI PATEL
Contact: 9825831821, 9879102127
E-Mail: jatinpatel_4321@yahoo.co.in, pateljatin4321@gmail.com
SENIOR LEVEL ASSIGNMENTS
Project Management Team/Operations & Maintenance
Industry Preference:Oil and Gas, Refinery, Petrochemical and Power Plant
AREAS OF EXPERTISE
Erection & Commissioning
Pre-Commissioning
Operations
Operations & Maintenance
Instrumentation& Control
Process Improvement
Project Management
Client Relationship
Management
Team Management
PROFILE SUMMARY
Qualified Diploma in Instrumentation with 15 years of experience
Proficient in managing overall project while ensuring high quality standards and
meeting KPIs
Expertise in planning, engineering, managing & executing Oil & Gas, Refinery,
Petrochemicals and power plant projects including erection, commissioning,
operations and maintenance of the same
Efficient in managing overall operations and preventive maintenance activities with
a view to enhance the operational efficiency of operations and eliminating
obsolescence
Effective leader with excellent motivational skills to sustain growth momentum
while motivating peak individual performances
CORE COMPETENCIES
Planning and effectuating predictive & preventive maintenance schedules for various equipment to increase machine
uptime & equipment reliability
Conceptualizing & implementing maintenance schedules, carrying out periodic checks to ensure performance and
maintaining requisite documents for the same; identifying areas of bottlenecks / breakdowns and taking steps to
rectify through application of troubleshooting tools
Managing overall operations for executing projects within cost & time norms
Preparing project schedules and monitoring projects with respect to cost, resource deployment, time over-runs &
quality compliance to ensure timely execution of projects
Anchoring on-site installation & commissioning activities to ensure completion of project within time & cost
parameters and effective resource utilization to maximize the output
Carrying out overhauling work of equipment and major repairs to improve equipment efficiency by fault finding;
conducting performance trials of engineering equipment to establish standards before and after major repairs
KEY SKILLS
InvolvedinColdSAT, HotSAT,ModbusCheck,RFI, LoopCheck,FunctionCheck,FF SegmentCheck, DCC, SMCC, PSSR, Start-up,
Commissioning, Installation, Troubleshooting, Calibration, Repairing, Operation & Maintenance of Instrument
General Instruments: Sound Command on Pneumatic Instruments as well as Electronic Instruments such as
Differential Pressure, Level, Temperature Flow Transmitter, Control Valves, Controllers, Pressure, Temperature, and
Flow & Level Switches
Fire& Gas Instruments:Possess good experience of working on F&G Instruments like IR/UV Flame Detector, Line of
Sight Gas Detector
Vibration Monitoring Systems:Worked on Vibration Monitoring System of Bentley Nevada 3300, 3500. Experience
of Vibration Probe Installation, Probe health checking and characteristics by using Tk3 probe calibrator
Drawings:Posses understanding of P&ID’s, PFD’s, ILD’s, Hook-up Drawings, and Loop Drawings & Loop Philosophies
as well as start-up sequence, FLD, cause & effects
ORGANIZATIONAL EXPERIENCE
Sept’15-Nov’15 Ras Gas Company Ltd., Raslaffan, Qatar as Senior Instrument Technician
Role:
Mainly involved in removal and fixing back of all kind of instruments like Control Valve accessories, Temperature
elements, Vibration Probe, Flame detectors, Ignitor etc.
Calibration of Control Valves and all kind of Transmitters.
Valve positioner adjustment done for problematic valves.
Glycol feel in all level transmitters and calibration done.
Do start-up assistance from Instrument site with operation.
Plant start successfully and same handed over to Operation and Maintenance team.
2. Mar’13-Jun’15 ADCO - SAS (Sahil), Abu-Dhabi - Onshore as Instrument Commissioning Foreman
Role:
Involved in SAS Project(SAS FFD -Full Field Development) as an ADCO (PMT) Representative
Worked in loop check, function check according with cause and effect matrix (Process logic, F&G logics)
Coordinated with Contractor Team for RDS and WAG well loop check and functional check
Looked after instrument function during commissioning for Centrifugal compressor, Production separator, Glycol unit
and vapour recovery units
Liaised to raise punch points during loop check, site visit and functional test as well as PMT (Project
Management Team) of ADCO
May’12-Dec’12 ADCO- ASAB, Abu-Dhabi - Onshore as Instrument Commissioning Technician
Role:
Project: ASAB FFD-Full Field Development
Carried outdifferent vendor skid support to loop check and commission it with plant
Executed Brownfield Project ensuring adherence to all safety and environment norms
Conducted loop checks with ADCO representative and finished all loop and filled up all loop sheets with signed by
ADCO person and handed over to Commissioning Supervisor
Completed loop check all cause and effect cause as well as finished it successfully
Involved in plant start-up and successfully completed project
May’11-Mar’12 ONGC Plant (Oil & Natural Gas Company)- Offshore as Instrument Technician
Role:
Involved in Pasha 2 Maintenance activities
Worked on FOX BORO IA Series Distributive Control System and A/B, PLC System
Handledloop checked, Function Tested, ESD Function Checked, Equipment Function Testand ESD/EDP test to ensure
the reliability of Instrument System
Carried out installation, calibration, loop checking and maintenance of all types of electronics smart instruments for
Level, Temperature, Pressure and Flow Transmittermakes of Emerson Rosemount
Sept’10-Apr’11 KNPCMINA ALL-Ahmadi-Kuwait as Instrument Foreman
Role:
Worked inInstrument Forman in SRU(Sulphur Recovery Unit), SAR (Sulphuric Acide Recovery), HP (Hydrogen Plant)&
VRU (Vapour Recovery Unit) area of KNPC MAA Refinery (KUWAIT)
Handled calibration, servicing andoverhauling, dismantling and replacing of different types of instrument such as
Level, DP, Pressure, Temperature Transmitters, I/P, Control Valve & Accessories
Removed all types of Valves & Transmitters and handed over to workshop as well as installed back it again in field and
check with DCS for putting it online
Involved in after completion of turnaround stay for plant start-up with operation support and successfully completed
all the units
May’09-Jun’10 Qatar Gas - Doha Qatar as Instrument Technician
Role:
Worked in World’s Largest Gas Plant QATAR GAS (Train-1, Train-2, AGE-2,GranulationUnit Area)
Managed Maintenance Department with Qatar Gas Maintenance Team
Handled preventive and corrective maintenance of QG-1 area which includedValve Stroke Test and Transmitter
Calibration whenever required
Involved in preventive and corrective maintenance for field instruments during shutdown loop checking instrument
loop/signal from control room to instrument equipment such as control valve, all type transmitter, flow switch and all
type of signal from field handle DCS Foxboro IA Series and Triconix PLC calibration and servicing of pressure, flow,
level and temperature instruments such as transmitter, switches and analyzer)
Carried out partial stroke check for SDV's cause and effect logic check
3. PREVIOUS EXPERIENCE
Apr’09-Apr’09 KNPCMINA ALL-Ahmadi, Kuwait as Instrument Foreman
Role:
Served as Instrument Forman in HP unit 53&54 area/ KNPC (KUWAIT) ShutDown
Involved in calibration, serving and overhauling, dismantling and replacing of different type of instrument such as
transmitters, I/P, control valve & accessories (positioner, booster relays, lock up relay and valve positioner)
Nov’07-Nov’08 Essar Steel (CMD)-Hazira (Surat) as Instrument Technician
Role:
Served as Instrument Maintenance Technician Essar Steel Hazira Plant CMD (Central Maintenance Department) for
maintenance calibration job for ISO9001, loop checking, commissioning and troubleshooting
Worked on Yokogawa DCS, PLC Yaskawa SCU 84, transmitters such as Rosemount Model No. 1151, DP. 2, 3, 4, 5, 6, 7,
1151 GP 0, 2,3, 4, 5, 6, 444 RL-2, 444 TK 2, 3
Involved inRosemount Smart Transmitters Model No. 3051, CD2A, 3A & 3051 CG-4A and calibration using Hart
communicator of modelNo. 275 & 268. Kent, Accutech, Smar, Mobrey,I/P Convertors, Valve, Positioners, Switches for
Pressure, Temperature and Level
Sep’05-Oct’07 Reliance Petrochemical HAZIRA (Surat) as Sr. Instrument Technician
Role:
Involved in commissioning and maintenance activities in Reliance Petrochemical- PTA (Pure Tepthalic Acid) Plant.
Worked on Yokogawa Centum, Distributive Control System and A/B, PLC System
Involved in:
o Loop Checking, Equipment Function Test, and ESD/EDP test to ensure the reliability of Instrument System
o Installation, Calibration, Loop Checking and Maintenance of all types of Electronics Smart Instruments for Level,
Temperature, Pressure and Flow Transmitter makes of Emerson Rosemount Supervision on Erection activities
like Cabling, Fabrication and Installation of Supports, Tubing, Installations of Panels as per approved drawings
Sep’06-Oct’06 Qatar Petroleum- Doha Qatar as Sr. Instrument Technician
Role:
Involved in calibration and maintenance of all types of electronics smart instruments for level, temperature, pressure
and flow transmitter
Worked on Calibration of Smart Instrument Devices with HART Compatibility online and offline
Carried out removing, calibration, & installation of all types of instrument , valves and accessories (positioner ,booster
relays, lock up relay, and position transmitters)
Jun’05-Sep’05 Delta Steel Company-Negirya as Instrument Technician
Role:
Involved in overhauling, servicing, & calibration of electric, pneumatic, hydraulic, motor operated valves and
accessories (positioner, booster relays, lock up relay, and position transmitters)
Served and worked on calibration of smart instrument devices with HART Compatibility online and offline
Aug’00-Jun’05 Essar Power Plant (515 MW) Hazira-Surat as Instrument Technician
Role:
Served as Instrument Maintenance Technician in 515MW Power Plant. In Power Plant, 110mw three Gas tarbain and
one 185MW steam terbain. Worked on Turbine MARK IV Control System and Allen Bradley3300 System
Handled independently breakdown/shutdown, maintenance (in-running plant) in shift hours and ISO9001 calibration
job in plant
TRAININGS
Attended safety trainings on:
o H2S
o Material Handling
o Red Mask Respirator, Green Mask Respirator
o PTW(Permit To Work)
o First Aid, IIF (Incident & Injury Free)
4. ACADEMIC DETAILS
2009 Diploma in Instrumentation from Aura Management Studies
2000 I.T.I. (Instrumentation) from Industrial Training Institute
PERSONAL DETAILS
Date of Birth: 2nd June 1980
Languages Known: English/Hindi/Gujarati
Address: 2 - Atmiya Park Society, Opp. - Jahagirpura Police, Rander Road, Surat, Gujarat-39500
Location Preference: Gulf, African countries
Nationality: Indian
Marital Status: Married
No. of Dependents: 5 Persons
Passport Details: K6965912 (Issued at 05/02/2013 Valid up to 04/02/2023)