ROY L. ENCALLADO
Andres : Prk. Bonifacio High Way Luga-it
MISAMIS Oriental 9025 philippines
Contact No. : 09272789577/09104265170
E-Mail Add : roy.encallado@yahoo.com
SKYPE : roy.encallado
Availability : December 20, 2015
POSITION: ROTATING & Static EQUIPMENT ENGINEER
PERSONAL DATA:
Date of Birth : January 28, 1978
Place of Birth : Aya-Aya Luga-it Misamis Oriental
City Address : Cagayan De Oro City
Civil Status : Widowed
Citizenship : Filipino
Religion : Roman Catholic
Height : 5’5”
Weight : 160 lbs.
Verbal Comm. : English, Filipino, and Visayan
Children : Mel Vincent Roy Encallado & Roy A. Encallado Jr.
Contact Person : Meguela Lingatong
Relationship : Sister
Address : Purok Andres Bonifacio
Poblacion, Lugait Misamis Oriental
EDUCATIONAL BACKGROUND
Primary : San Antonio Elementary School
Lugait, Misamis Oriental
School Year (1987 – 1993)
Secondary : Lugait Nationalized High School
Lugait, Misamis Oriental
School Year (1993 – 1997)
College/ Course : MECHANICAL ENGINEERING
Lyceum of Iligan Foundation
Iligan city
School Year (1997 – 2002)
Vocational : Basic Computer Programming
: Microsoft office Excel 2007
: Microsoft office word 2007
: AUTO CAD 2010
Lugait Technical and Vocational School
PROOF OF OFW LEGITIMACIES:
ID / IQAMA NO. : 2224349585
SISCO BADGE NO. : 45310
PASS PORT NO. : EB6270727
ARAMCO NO. : C-766824
SADARA ARAMCO APPROVED : 10029
SABIC GLOBAL APPROVED : HAD-SPJ-2014-969
POSITION DESIRED : Commissioning Engineer
CAREER HIGHLIGHTS:
Over nine (13.5) years of continues experience in various fields of engineering
discipline. Work involved in construction, installation / pre-commissioning of all
Mechanical equipments, pressure vessels/heavy lifting, erection of various
Pressure vessels pipe system & inspection. Previous engaged with
Multinational / international project such as oil and gas refineries, petro chemical &
power/ industrial plant and providing input to the project management, design, site
execution, supervision but not limited to; day to day administration in accordance with
established procedures and projects policies to include contractual correspondence,
reporting in the field of technical support and engineering services; familiar with design
int’l code and standard.
W O R K E X P E R I E N C E:
Company : KOBE STEEL, LTD.
PROJECT : KOBE STEEL MANUFACTURING SHOP
Address : ARAICHO SHINHAMMA 2-CHOME,TAGASAGO,HYOGO 676-8670, JAPAN
Position : COMMISSIONING ENGINEER
Date hired : MARCH 19, 2015 – PRESENT
JOB DESCRIPTION
Prepare field services jobs and interventions with the project manager base in the
KOBELCO STEEL. Assist start- up engineer during commissioning phase insuring
proper and safe operation of the machine by evaluating the running parameters and
troubleshoot control systems as they arise. Write accurate professional reports acting as a
single points of contact between customers and kobelco steel and gas headquarter
concerning technical issues and interfacing with all involved functions. Use company E-
tools to retrieve technical documents ang management of pocking list, bills of material
and drawings. Ensure all in-field activities are carried out safety complying with
company environmental health and safety ( EHS ) guide lines and procedures. Lead and
execute assembly, installation and alignment of the equipment including foundation and
soft foot checks. Lead and execute independently inspection of centrifugal compressors
and accessories.
Company : SPECIALIZED INDUSTRIAL SERVICES CO., LTD.
PROJECT : HADEED – MODULE A/B DIRECT REDUCTION FACILITY
Address : JUBAIL INDUTRIAL CITY ( SAUDI ARABIA)
Position : QA/QC MECHANICAL ROTATING & STATIC INSPECTOR.
Date hired : November 17, 2014 – February 03, 2015
( No employment certificate issue )
JOB DESCRIPTION
Review of all documents for material receiving inspection. Check mechanical
equipment & materials in accordance with the drawing & specification. Conduct
inspection for all mechanical rotating equipments such as equipment installation of
rotating & static equipment. Conduct Inspection of base plates prior to installed or
erection of equipment. Conduct centering & coordinates inspection prior to Proceed
pocket grout. Hand over to civil for pocket grout. Leveling of pumps and motor or
elevation of plunges inspection before to Proceed another activities base in our ITP.
Sump pits inspection on pumps, etc. as per project plan and ITP procedures. Review
and counter sign RFI and all related field inspection checklists by sub-contractors
before submitting to the client. Conduct final box-up inspections on mechanical
equipments. Preparation of inspection & test plan (ITP) & checklist for site
inspection. Monitor quality controls for each definable area / section of work as per
PQP, Method of Statement, ITP & specification. Secure foundation release of the
equipments. Check for anchor bolt elevation and location. Check for correct
orientation & leveling of the equipments. Check embedded hardware elevation &
location. Conduct free alignment of generator & turbine shaft alignment. Conduct
final inspection of generator & turbine shaft alignment with the client. Conduct final
inspection of the turning device shaft alignment with the client. Check for applicable
torque values on mechanical structures. Check for pipe stress prior to final alignment
on centrifugal pump. Check/inspect the alignment, elevation levelness of the installed
stationary & rotating equipment & ensure the deficiencies are within acceptable limit.
Company : AIC-Arabian International Company
Under the supervision of TEKFEN Construction
Address : Jubail Saudi Arabia
Project : SADARA UNIT 360 PROPYLENE OXIDE PLANT PROJECT
Position : QA/QC ROTATING & STATIC INSPECTOR
Date hired : March 10, 2014 – November 16, 2014
( No Employment certificate issue )
Check mechanical equipment, materials in accordance with the drawing &
specification. Conduct inspection for all mechanical rotating equipments such as
equipment installation, material receiving, preliminary and final inspection alignment
of pumps, compressors and piping lines connected to the equipment, sump pits
inspection on pumps, etc. as per project plan and ITP procedures. Review and counter
sign RFI and all related field inspection checklist by main-contractors before
submitting to the client. Conduct final box-up inspections on mechanical equipments.
Preparation of inspection & test plan (ITP) & checklist for site inspection. Monitor
quality controls for each definable area / section of work as per PQP, Method of
Statement, ITP & specification. Secure foundation release of the equipments. Check
for correct leveling of soleplates & base plate prior to erect the equipment on the
foundation. Check for correct orientation & centering of pumps & motor and anchor
bolt projection prior to pocket grout. Check of leveling of pumps & motor and
elevation of plunges center and initial tight of anchor bolt prior to preliminary
alignment. Conduct final inspection of generator & turbine shaft alignment with the
client. Conduct final inspection of the turning device shaft alignment with the client.
Conduct final inspection of mechanical equipments prior to grouting works. Check
for applicable torque values on mechanical structures. Check for pipe stress prior to
final alignment on centrifugal pump. Check/inspect the alignment, elevation levelness
of the installed stationary & rotating equipment & ensure the deficiencies are within
acceptable limit and preparation and monitoring on site.
Company : GS-BEMCO JOINT VENTURE
Address : Durma Riyadh Saudi Arabia
Project : PP12 Combine Cycle Project
Position : Mechanical Rotating Engineer
Date hired : November 25, 2013-January 07, 2014
( No Employment certificate issue )
JOB DESCRIPTION:
Responsible for the execution of gas Turbine Erection & Installation Preparation
works for PP12 Combine Cycle Project. Duties include control and monitoring, Installation
and alignment of Rotating Equipment such as Turbine, Centrifugal, compressors,
Reciprocating compressors, Centrifugal pumps, Blowers, and drivers. Inspect, evaluate and
arrange field installation and recommend design modification to eliminate machine or
system malfunctions. Knowledge and experience in the inspection, performance testing and
engineering, pre-commissioning and start-up of Rotating equipments. Knowledge of
International Standards such as ASTM, ANSI, API standards associated with rotating
equipment, installation, alignment methods, tolerances and basic engineering practices.
Check / review vendor documents, P & ID’s, PEFS, ISO drawing, technical specification,
engineering drawings and method statements preparation to ensure project execution in
accordance with Project requirements. Responsible for the dismantling and re-assembly of
Centrifugal pumps, Vertical in line pumps, Reciprocating Compressor, Turbo-Expander
compressor, and other Rotating equipment for the replacement of seals, impellers and parts,
check internal / Mechanical center section, Bores cope inspection, and equipment
preservation. Coordinate with the client PMT), vendors, engineering / other disciplines,
suppliers and subcontractors in the control of quality, labor, equipment, and materials to
meet schedules and ensure a safe and incident-free planning and project execution.
Computer skills: MS Office applications, MS Project and other Software such as, Microsoft
word 2007 & Microsoft excel 2007 Integrated Document Management System, Equipment
Installation Monitoring System (EQMS), Windows Project Completion and Certification
System.
Company : BONATTI S.P.A
Address : Yanbu Saudi Arabia
Project : Yanbu Aramco Sinopec refinery project (YASREF)
Position : commissioning rotating & static engineer
Date hired : July 27, 2013 – November 17, 2013
JOB DESCRIPTION:
Report to the mechanical commissioning manager & coordinate with the construction
manager department. review of work schedule and preparation of all site jobs procedure
in commissioning job or method of statement in every equipment prior to start execution
and accomplishment, man power loading & materials procurement; organize, plans,
direct and supervising different trades such as; oil flushing, final cleaning of piping lines,
checking the alignment of all rotating equipment prior such as; centrifugal pumps,
turbines, compressors. Motor running test(mrt) prior to installed the coupling spacer,
preparation for start-up and prior to start load running we need to coordinate the
mechanical site manager & electrical, instrument department and specially the qc
department representative for inspection. Leads monitor in planning & executing
commissioning activities and to insure the proper installation for the compliance with
construction policies, procedures, methods and technical department of the contract;
ensure that all activities comply with ohs standards.
Prepared documents for all mechanical rotating equipments such as equipment
installation, material receiving, pre and final alignment of pumps, compressors and piping
lines connected to the equipment, sump pits inspection on pumps, etc. as per project plan
and ITP procedures. Check the installation of air fan coolers such as ; fixing of plenum,
tightening, angle of fan blades, motor installation, shafting, shaft – sleeve, bearings, fly
wheel, bracing, top cover, pulley and belt installation. Alignment of rotary equipments
such as; compressor and pumps, motor, by using conventional alignment.
Final box up checking, filling of chemicals, Manages the start-up activities such as;
compressors, turbines, pumps & Perform commissioning activities.
Company: NEO-NESMA ESSER ONUR CONTRATING COMPANY LTD..,
King Abdullah Financial District Project
Address : Riyadh Saudi Arabia
Project : Internal roads, utilities infrastructure
Position : piping site engineer
Date hired: April 16, 2013- July 13, 2013
( No Employment certificate issue )
JOB DESCRIPTION
Acting as the main technical adviser on a construction site for subcontractors, crafts
people and operatives; setting out, leveling and surveying the site;
checking plans, drawings and quantities for accuracy of calculations;
ensuring all materials used and work performed are as per specifications;
managing, monitoring and interpreting the contract design documents supplied by the
client/architect; liaising with any consultants, sub-contractors, supervisors, planners,
quantity surveyors and the general workforce involved in the project;
liaising with the local authority to ensure compliance with local construction regulations
and by-laws; liaising with clients and their representatives (architects, engineers and
surveyors), including attending regular meetings to keep them informed of progress;
day-to-day management of the site, including supervising and monitoring the site labor
force and the work of any subcontractors; planning the work and efficiently organizing
the site facilities in order to meet agreed deadlines; overseeing quality control, health and
safety matters on site; preparing reports as required; resolving any unexpected technical
difficulties, and other problems that may arise Inspects all works during, pre and post-
construction process and strictly implement Method Statement, Standard Drawings and
Work Specifications for the construction of KAFD project Give full assistant for the
Project Engineer/Manager in all activities required to be delivered in the site on timely
manner and required Quality/Quantity. Oversee and execute site by following
approved construction drawing and prescribed policies. Define the project materials,
manpower’s and equipments needed to finish the work assigned. Study drawing to
provide technical clearance to foreman in coordination with the Project Manager and
Consultant. Initiate Fast Accident Report immediately when an accident/incident
noticed, and forward to the Safety Officer and Project Manager. Attend coordination
meeting with the Project Owner, Project Manager, and all Sub-Contractors to discuss
Quality, Safety and Construction Progress. Prepare Materials Daily Report and Schedule
of Works (Weekly)
Provides Daily Activity Reports of day to day activities/operations.
Implement Environmental Health and Safety Procedures.
Company : e-TEC CONTRUCTION CO., LTD...ARABIAN LIMITED (HADEED
STRAIGHTENING SHOP PROJECT)
Address : FORMELY HADI AL NAJRANI O & M EST P.B. #11584 JUBAIL,
SAUDI ARABIA
Position : QA/QC MECHANICAL ROTATING & STATIC
Date hired : January 21, 2013 –APRIL 16, 2013
Reason : finished project
( No Employment certificate issue )
JOB DESCRIPTION
Prepared documents for all mechanical rotating equipments such as equipment
installation, material receiving, preleminary alignment and final alignment of pumps,
compressors and piping lines connected to the equipment, sump pits inspection on
pumps, etc. as per project plan and ITP procedures. Report to mechanical manager &
coordinate with the construction management. Review work schedule,
accomplishment, manpower loading & materials procurement, plans, directs.
Supervises different types of mechanical work and also rigging, erection, and
installation of mechanical equipments pumps & as per in API 686,650, ASME VIII-
DIV 1&2 standards.
Coordinate with mechanical / site manager and also handle punch listing.
Implement site inspection surveillance plan.
Lead and monitor effort in planning and executing lifting activities.
To ensure proper applications of a compliance with construction policies, procedures,
method and technical requirements of the contract. Ensure all activities comply with
OHS standard. Prepare P&ID and equipments drawing priority for inspection.
Conduct Site Monitoring Reviewed the HADDED Engineering Standard. Documents,
Procedures, HADDED Typical Inspection Plan. Prepared documents for all
mechanical rotating equipments such as equipment installation, material receiving,
pre and final alignment of pumps, compressors and piping lines connected to the
equipment, sump pits inspection on pumps, etc. as per project plan and ITP
procedures. Preparation of all standard for the installation of monorail hoists and also
DIN 536 & 15030 and also FEM 9.511 manual procedure.
Company : CHUNJO CONSTRUCTION CO., LTD. Under The Supervision of
HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD.
(South Yoloten Desulfurization Project)
Address : South Yoloten, Mary, Province, Turkmenistan
Position : MECHANICAL INSPECTORS ROTATING & STATIC
Date hired : may 01, 2011-august 31, 2012
JOB DESCRIPTION
Check mechanical equipment, materials in accordance with the drawing &
specification. Conduct inspection for all mechanical rotating equipments such as
equipment installation, material receiving, pre and final alignment of pumps,
compressors and piping lines connected to the equipment, sump pits inspection on
pumps, etc. as per project plan and ITP procedures. Review and counter sign RFI and
all related field inspection checklists by sub-contractors before submitting to the
client. Conduct final box-up inspections on mechanical equipments. Preparation of
inspection & test plan (ITP) & checklist for site inspection. Monitor quality controls
for each definable area / section of work as per PQP, Method of Statement, ITP
&specification. Secure foundation release of the equipments. Check for correct
leveling of soleplates & base plate. Check for anchor bolt elevation and location.
Check for correct orientation & leveling of the equipments. Check embedded
hardware elevation & location. Conduct free alignment of generator & turbine shaft
alignment. Conduct final inspection of generator & turbine shaft alignment with the
client. Conduct final inspection of the turning device shaft alignment with the client.
Conduct final inspection of mechanical equipments prior to grouting works. Check
for applicable torque values on mechanical structures. Check for pipe stress prior to
final alignment on centrifugal pump. Check/inspect the alignment, elevation levelness
of the installed stationary & rotating equipment & ensure the deficiencies are within
acceptable limit
Company : HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. (RAS
LAFFAN C Independent Water & Power Project)
Address : RAS LAFFAN, Qatar
Position : ROTATING & STATIC SUPERVISOR
Date hired : July 27, 2009 – April 14 2011
JOB DESCRIPTION:
Will be responsible for receiving and passing-on instruction from
department head supervisors. Will supervise and motivate team of 3-5 groups of
Millwright workers. Will communicate progress and work with department
supervisors. Will work with team to complete Millwright jobs in static & rotating
equipment as a timely and efficient manner. Lead all Millwright workers to Align
of rotary equipments such as; compressor and pumps, motor, by using
conventional alignment & reverse alignment. Erection of natural gas boiler,
centering & final tightening of anchor bolt. Skid centering. Erection of chimney
of natural gas boiler & checking the plumpness using transit level. Erection fuel
gas filter & checking the verticality of the equipment. Preparation of the
foundation such as, chipping & installation of packer plates using the theodolite
or auto level in checking the elevation from the bench mark. Erection of feed
water pump preparing all procedure of millwright works such as grouting until
final grouting. Alignment of feed water pumps from preliminary alignment &
final alignment with parallism by applying face & rim or conventional alignment.
Erection of blow down return pump & applying single alignment. Erection of
auxiliary cooling water pump for single cycle pump applying single alignment.
Erection of auxiliary cooling water pump for combine cycle pump & applying
single alignment. Cooling tower installation such as blade assemble fun stock
assemble, preliminary and final alignment.
Company : NOUVO-PIGNONE VENDOR UNDER GS-ENGINEERING &
CONSTRUCTION CO….LTD
Address : SPOGC-PHASE 9 & 10 assaluyeh, busher, province, Islamic
Republic : Islamic of Iran
Position : Mechanical Rotating & Static Supervisor
Date hired : July 2008 - October 2009
JOB DESCRIPTION:
Pre-Commissioning and Start up commissioning of all rotating equipment such’s
as; Compressor and pump, turbines and checking monitoring prior to start up. Installed
and align assembled by using conventional alignment & reverse alignment. Checking of
installation on natural gas boiler, check also the centering & final tightening of anchor
bolt. Check the installation of chimney on natural gas boiler & checking the plumbness
using combination total station. Assist Erection on fuel gas filter & checking the
verticality of the equipment. Preparation of the foundation such as, chipping &
installation of packer plates using the theodolite or auto level for checking the elevation
from the bench mark. Check and assist Erection of feed water pump preparing all
procedure of millwright works such as pocket grout and full grout. Alignment of feed
water pumps from preliminary alignment & final alignment with parallism by applying
face & rim or conventional alignment Check the installation of air fan coolers such as ;
fixing of plenum, tightening, angle of fan blades, motor installation, shafting, shaft –
sleeve, bearings, fly wheel, bracing, top cover, pulley and belt installation Alignment of
rotary equipments such as ; compressor and pumps, motor, by using conventional
alignment. Oil plashing of the compressor 8 units with Nuevo-pignoni.
Company : GS-ENGINEERING & CONSTRUCTION CO….LTD
Address : SPOGC-PHASE 9 & 10 assaluyeh, busher, province, Islamic
Republic : Islamic of Iran
Position : Mechanical Rotating & Static Supervisor
Date hired : July 27, 2008 to April 10, 2009
JOB DESCRIPTION:
Pre-Commissioning and Start up commissioning of all rotating equipment such’s
as; Compressor and pump, turbines and checking monitoring prior to start up. Installed
and align assembled by using conventional alignment & reverse alignment. Checking of
installation on natural gas boiler, check also the centering & final tightening of anchor
bolt. Check the installation of chimney on natural gas boiler & checking the plumbness
using combination total station. Assist Erection on fuel gas filter & checking the
verticality of the equipment. Preparation of the foundation such as, chipping &
installation of packer plates using the theodolite or auto level for checking the elevation
from the bench mark. Check and assist Erection of feed water pump preparing all
procedure of millwright works such as pocket grout and full grout. Alignment of feed
water pumps from preliminary alignment & final alignment with parallism by applying
face & rim or conventional alignment Check the installation of air fan coolers such as ;
fixing of plenum, tightening, angle of fan blades, motor installation, shafting, shaft –
sleeve, bearings, fly wheel, bracing, top cover, pulley and belt installation Alignment of
rotary equipments such as ; compressor and pumps, motor, by using conventional
alignment. Oil plashing of the compressor 8 units with Nuevo pignoni. Installation of
cover conveyor and final checking of all equipments in sulfur unit. Final box up
checking. Filling of Cathy list. Assist of start-up activities such as ; compressors,
turbines, pumps and motor pumps. Perform commissioning activities. MRT-motor
running test inspection up to the final operation of the plant, and monitoring of plant wide
operation.
Company : CONSOLIDATED CONTRACTOR COMPANY
Jubail Chevron Philips Project
Address : Jubail, K.S.A.
Position : Millwright foreman
Date hired : March 11, 2006 to March 29, 2008
JOB DESCRIPTION:
Erection of static equipments such as; Pump skid gear box, drums, Air fan
cooler, TEG re-boiler modules, raw water treatment facilities. Erection of rotary
equipments such as; Pump skid gear box, motor, compressor and water injection
pumps. Alignment and leveling of rotary equipments such Compressor and water
injection pumps, motor by using dial indicator and apply stand
system...Installation and assembled of air fan cooler accessories such as; Plenum,
fan blades, motor, shaft sleeve, upper bearing, fly wheel, bracing, top cover,
pulley, belts, preliminary inspection and final alignment. Installation and
assembled of oil mist tubing and accessories such as; manifold, reclassifies, drain
box, fittings, vent fill collection, vent collection, oil sight and drain leg. Cleaning,
tightening and fixing all man ways of the tray inside the vessel and final
inspection. Perform pre-commissioning job like load running test. Be able to
interpret the drawings. Safety oriented worker and maintenance good
housekeeping before and after work.
Company : HOLCEM PHILIPPINES INCORPORATED
Address : Lugait, Misamis Oriental
Contractor : 4J’s engineering and Allied Services
Position : MILLWRIGHT MECHANICAL MAINTENANCE
Date hired : September 18, 2004 to January 26, 2006
JOB DESCRIPTION:
Performed preventive maintenance work to the plant and equipment such as;
replacing of worn-out bearings, bushings, mechanical seal and motor pump packing
glands. Check and inspect motor unit and gear boxes. Re-conditioning and machining of
worn-out mechanical parts, shaft, pulleys and sprockets. Performed for daily overhauling
and inspection. Rouble shouting and alignment of pumps.Performed for daily over
hauling and inspection especially on motoring of plant operation.Trouble shouting
and alignment of pumps.Replacements of PILLARD kiln burner assembly, kiln burner
trolley, platform and supports.Installation of roots blower and axial fan, modification of
kiln hood door.Fabrication and installation of Air pipeline, water pipeline, and BFO
pipeline for kiln burner.Replacement and alignment of kiln drive unit, Kiln pier “C”
support rollers, Kiln master gear casing.Kiln # 4 feed end rehabilitation and patching of
kiln shell.Fabrication and installation of 250 TPH belt bucket elevator.Replacement of
tire ring of Rotary kiln and dryer.Repair of kiln support rollers.Fabrication of girth gear
cover and chain guards.Repair of screw conveyors, chain conveyors, belt conveyors,
bucket elevator and gypsum pelletize.Replacement of Kiln # 4 discharge end nose
cap.Extension of Kiln # 4 Air seal wear ring.Installation of new Cooling fan # 2
assembly.Replacement of Cooling fan # 1 assembly & pier “C” support roller
assembly.Replacement of Kiln shell @ manhole area.Installation and alignment of Kiln
shell girth gear and coupling.Installation of Kiln roofing and sidings @ girth gear
area.and specialy monitoring of plant wide operation.
Company : Alsons Cement Corporation
Address : Lugait, Misamis Oriental
Contractor : 4J’s engineering and Allied Services
Position : MILLWRIGHT MECHANICAL MAINTENANCE
Date hired : April 03, 2003 – September 18, 2004
JOB DESCRIPTION:
Performed preventive maintenance work to the plant and equipment such as;
replacing of worn-out bearings, bushings, mechanical seal and motor pump packing
glands. Check and inspect motor unit and gear boxes. Re-conditioning and machining of
worn-out mechanical parts, shaft, pulleys and sprockets. Performed for daily overhauling
and inspection. Rouble shouting and alignment of pumps.Performed for daily over
hauling and inspection especially on motoring of plant operation.Trouble shouting
and alignment of pumps.Replacements of PILLARD kiln burner assembly, kiln burner
trolley, platform and supports.Installation of roots blower and axial fan, modification of
kiln hood door.Fabrication and installation of Air pipeline, water pipeline, and BFO
pipeline for kiln burner.Replacement and alignment of kiln drive unit, Kiln pier “C”
support rollers, Kiln master gear casing.Kiln # 4 feed end rehabilitation and patching of
kiln shell.Fabrication and installation of 250 TPH belt bucket elevator.Replacement of
tire ring of Rotary kiln and dryer.Repair of kiln support rollers.Fabrication of girth gear
cover and chain guards.Repair of screw conveyors, chain conveyors, belt conveyors,
bucket elevator and gypsum pelletize.Replacement of Kiln # 4 discharge end nose
cap.Extension of Kiln # 4 Air seal wear ring.Installation of new Cooling fan # 2
assembly.Replacement of Cooling fan # 1 assembly & pier “C” support roller
assembly.Replacement of Kiln shell @ manhole area.Installation and alignment of Kiln
shell girth gear and coupling.Installation of Kiln roofing and sidings @ girth gear
area.and specialy monitoring of plant wide operation.
A W A R D S and A C H I E V E M E N T S
• Top 8 Techniques to improve your ability to be an effective supervisor
training
Jubail sadala plant project
Jubail Saudi Arabia
• Certified commissioning rotating & static engr.
Bonatti s.p.a co Ltd
Yasref-Yanbu Aramco Sinopec refinery project
Yanbu Saudi Arabia.
• Certified Piping site Engineer.
NEO-NESMA ESSER ONUR CONTRATING COMPANY LTD..,
Internal roads, utilities infrastructure
Riyadh Saudi Arabia
• Certified Quality Inspector Rotating & Static
Chunjo Construction Co.., LTD.
South Yoloten, Mary, province, Turkmenistan
• Certified Rotating & Static Supervisor
Hyundai Engineering & Construction co.., LTD.
Ras Laffan, Qatar
• Certified Foreman Millwright commissioning
GS Engineering & Construction Co.., LTD.
Assaluyeh, Busher, province Republic of Iran
• Certified Millwright foreman
CCC- Consolidated Contractor Company
Kingdom Saudi Arabia
• Certified Twenty Five Million (25,000,0000)
Man Hours LTI Free
Safety Department
CCC- Consolidated Contractor Company
Kingdom of Saudi Arabia
• Certified IN – PLANT Training
ALSONS Cement Corporation
Lugait, Misamis Oriental
• Certified Mechanical Maintenance
HOLCEM Philippines Incorporated
Lugait, Misamis Oriental

More Related Content

What's hot

Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisorJames Ct
 
Resume offshore field engineer
Resume offshore field engineerResume offshore field engineer
Resume offshore field engineerandi dipayadnya
 
QA QC Engineer Mechanical
QA QC Engineer MechanicalQA QC Engineer Mechanical
QA QC Engineer MechanicalFaizan Raza
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_gobinath gobinath
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar Patel
 
Mechanical Engineer – QAQC
Mechanical Engineer – QAQCMechanical Engineer – QAQC
Mechanical Engineer – QAQCvignesh k
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineerahmedsgs
 
Updated CV Lead QAQC Engineer Acting QaQc Manager
Updated CV Lead QAQC Engineer Acting QaQc ManagerUpdated CV Lead QAQC Engineer Acting QaQc Manager
Updated CV Lead QAQC Engineer Acting QaQc ManagerMuhammad Rehman
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERSajjad Ali
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1karuppa samy
 
ELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORIKRAM HUSSAIN
 
edwin cv for QA-QC Engineer
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC EngineerEdwin Aguinaldo
 

What's hot (20)

Pradeep s (resume)
Pradeep s (resume)Pradeep s (resume)
Pradeep s (resume)
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
Resume offshore field engineer
Resume offshore field engineerResume offshore field engineer
Resume offshore field engineer
 
QA QC Engineer Mechanical
QA QC Engineer MechanicalQA QC Engineer Mechanical
QA QC Engineer Mechanical
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_
 
Cv mm
Cv mmCv mm
Cv mm
 
Mani cv
Mani   cvMani   cv
Mani cv
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
 
experience certificates.PDF
experience  certificates.PDFexperience  certificates.PDF
experience certificates.PDF
 
Mechanical Engineer – QAQC
Mechanical Engineer – QAQCMechanical Engineer – QAQC
Mechanical Engineer – QAQC
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
 
Updated CV Lead QAQC Engineer Acting QaQc Manager
Updated CV Lead QAQC Engineer Acting QaQc ManagerUpdated CV Lead QAQC Engineer Acting QaQc Manager
Updated CV Lead QAQC Engineer Acting QaQc Manager
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1
 
ELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISOR
 
edwin cv for QA-QC Engineer
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC Engineer
 
Bannichan Savier CV
Bannichan Savier CVBannichan Savier CV
Bannichan Savier CV
 
Naveen Resume.doc
Naveen Resume.docNaveen Resume.doc
Naveen Resume.doc
 
QA/QC Manager-Civil
QA/QC Manager-Civil QA/QC Manager-Civil
QA/QC Manager-Civil
 
Resume Khurshid
Resume KhurshidResume Khurshid
Resume Khurshid
 

Viewers also liked

Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanicalShaik Ghouse
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M RicoRene Rico
 
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)Mark Rodas
 
Top 8 quality engineer resume samples
Top 8 quality engineer resume samplesTop 8 quality engineer resume samples
Top 8 quality engineer resume samplesRoyKeane789
 

Viewers also liked (8)

jovy's RESUME
jovy's RESUMEjovy's RESUME
jovy's RESUME
 
romel resume
romel resumeromel resume
romel resume
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M Rico
 
JADE SANTOS CV
JADE SANTOS CVJADE SANTOS CV
JADE SANTOS CV
 
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
 
Resume ni Engr. renz kevin
Resume ni Engr. renz kevinResume ni Engr. renz kevin
Resume ni Engr. renz kevin
 
Top 8 quality engineer resume samples
Top 8 quality engineer resume samplesTop 8 quality engineer resume samples
Top 8 quality engineer resume samples
 

Similar to NEW UPDATE CV QC ROTATING & STATIC

Similar to NEW UPDATE CV QC ROTATING & STATIC (20)

MOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QCMOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QC
 
Varun Resume
Varun Resume Varun Resume
Varun Resume
 
Resume
ResumeResume
Resume
 
Aftab CV.
Aftab CV.Aftab CV.
Aftab CV.
 
cv_piping engineer updated
cv_piping engineer updatedcv_piping engineer updated
cv_piping engineer updated
 
curr. vitae
curr. vitaecurr. vitae
curr. vitae
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
CV-QC Engg Mech- piping & welding
CV-QC Engg Mech- piping & weldingCV-QC Engg Mech- piping & welding
CV-QC Engg Mech- piping & welding
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
 
Instrumentation Inspector
Instrumentation InspectorInstrumentation Inspector
Instrumentation Inspector
 
CV 15 Sep2016
CV 15 Sep2016CV 15 Sep2016
CV 15 Sep2016
 
Cv 15 sep2016
Cv 15 sep2016Cv 15 sep2016
Cv 15 sep2016
 
QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)
 
CV Ahmad Ezz QC Supervisor - Mech.& Welding
CV Ahmad Ezz QC Supervisor - Mech.& WeldingCV Ahmad Ezz QC Supervisor - Mech.& Welding
CV Ahmad Ezz QC Supervisor - Mech.& Welding
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
Arunkumar_cv-1-1
Arunkumar_cv-1-1Arunkumar_cv-1-1
Arunkumar_cv-1-1
 
RESUME__ASATH_MATHANI_-1-2 (1)
RESUME__ASATH_MATHANI_-1-2 (1)RESUME__ASATH_MATHANI_-1-2 (1)
RESUME__ASATH_MATHANI_-1-2 (1)
 
ugandhar CompEx resume
ugandhar CompEx resumeugandhar CompEx resume
ugandhar CompEx resume
 

NEW UPDATE CV QC ROTATING & STATIC

  • 1. ROY L. ENCALLADO Andres : Prk. Bonifacio High Way Luga-it MISAMIS Oriental 9025 philippines Contact No. : 09272789577/09104265170 E-Mail Add : roy.encallado@yahoo.com SKYPE : roy.encallado Availability : December 20, 2015 POSITION: ROTATING & Static EQUIPMENT ENGINEER PERSONAL DATA: Date of Birth : January 28, 1978 Place of Birth : Aya-Aya Luga-it Misamis Oriental City Address : Cagayan De Oro City Civil Status : Widowed Citizenship : Filipino Religion : Roman Catholic Height : 5’5” Weight : 160 lbs. Verbal Comm. : English, Filipino, and Visayan Children : Mel Vincent Roy Encallado & Roy A. Encallado Jr. Contact Person : Meguela Lingatong Relationship : Sister Address : Purok Andres Bonifacio Poblacion, Lugait Misamis Oriental EDUCATIONAL BACKGROUND Primary : San Antonio Elementary School Lugait, Misamis Oriental School Year (1987 – 1993) Secondary : Lugait Nationalized High School Lugait, Misamis Oriental School Year (1993 – 1997) College/ Course : MECHANICAL ENGINEERING Lyceum of Iligan Foundation Iligan city
  • 2. School Year (1997 – 2002) Vocational : Basic Computer Programming : Microsoft office Excel 2007 : Microsoft office word 2007 : AUTO CAD 2010 Lugait Technical and Vocational School PROOF OF OFW LEGITIMACIES: ID / IQAMA NO. : 2224349585 SISCO BADGE NO. : 45310 PASS PORT NO. : EB6270727 ARAMCO NO. : C-766824 SADARA ARAMCO APPROVED : 10029 SABIC GLOBAL APPROVED : HAD-SPJ-2014-969 POSITION DESIRED : Commissioning Engineer CAREER HIGHLIGHTS: Over nine (13.5) years of continues experience in various fields of engineering discipline. Work involved in construction, installation / pre-commissioning of all Mechanical equipments, pressure vessels/heavy lifting, erection of various Pressure vessels pipe system & inspection. Previous engaged with Multinational / international project such as oil and gas refineries, petro chemical & power/ industrial plant and providing input to the project management, design, site execution, supervision but not limited to; day to day administration in accordance with established procedures and projects policies to include contractual correspondence, reporting in the field of technical support and engineering services; familiar with design int’l code and standard. W O R K E X P E R I E N C E: Company : KOBE STEEL, LTD. PROJECT : KOBE STEEL MANUFACTURING SHOP Address : ARAICHO SHINHAMMA 2-CHOME,TAGASAGO,HYOGO 676-8670, JAPAN Position : COMMISSIONING ENGINEER Date hired : MARCH 19, 2015 – PRESENT JOB DESCRIPTION
  • 3. Prepare field services jobs and interventions with the project manager base in the KOBELCO STEEL. Assist start- up engineer during commissioning phase insuring proper and safe operation of the machine by evaluating the running parameters and troubleshoot control systems as they arise. Write accurate professional reports acting as a single points of contact between customers and kobelco steel and gas headquarter concerning technical issues and interfacing with all involved functions. Use company E- tools to retrieve technical documents ang management of pocking list, bills of material and drawings. Ensure all in-field activities are carried out safety complying with company environmental health and safety ( EHS ) guide lines and procedures. Lead and execute assembly, installation and alignment of the equipment including foundation and soft foot checks. Lead and execute independently inspection of centrifugal compressors and accessories. Company : SPECIALIZED INDUSTRIAL SERVICES CO., LTD. PROJECT : HADEED – MODULE A/B DIRECT REDUCTION FACILITY Address : JUBAIL INDUTRIAL CITY ( SAUDI ARABIA) Position : QA/QC MECHANICAL ROTATING & STATIC INSPECTOR. Date hired : November 17, 2014 – February 03, 2015 ( No employment certificate issue ) JOB DESCRIPTION Review of all documents for material receiving inspection. Check mechanical equipment & materials in accordance with the drawing & specification. Conduct inspection for all mechanical rotating equipments such as equipment installation of rotating & static equipment. Conduct Inspection of base plates prior to installed or erection of equipment. Conduct centering & coordinates inspection prior to Proceed pocket grout. Hand over to civil for pocket grout. Leveling of pumps and motor or elevation of plunges inspection before to Proceed another activities base in our ITP. Sump pits inspection on pumps, etc. as per project plan and ITP procedures. Review and counter sign RFI and all related field inspection checklists by sub-contractors before submitting to the client. Conduct final box-up inspections on mechanical equipments. Preparation of inspection & test plan (ITP) & checklist for site inspection. Monitor quality controls for each definable area / section of work as per PQP, Method of Statement, ITP & specification. Secure foundation release of the equipments. Check for anchor bolt elevation and location. Check for correct orientation & leveling of the equipments. Check embedded hardware elevation & location. Conduct free alignment of generator & turbine shaft alignment. Conduct final inspection of generator & turbine shaft alignment with the client. Conduct final inspection of the turning device shaft alignment with the client. Check for applicable torque values on mechanical structures. Check for pipe stress prior to final alignment
  • 4. on centrifugal pump. Check/inspect the alignment, elevation levelness of the installed stationary & rotating equipment & ensure the deficiencies are within acceptable limit. Company : AIC-Arabian International Company Under the supervision of TEKFEN Construction Address : Jubail Saudi Arabia Project : SADARA UNIT 360 PROPYLENE OXIDE PLANT PROJECT Position : QA/QC ROTATING & STATIC INSPECTOR Date hired : March 10, 2014 – November 16, 2014 ( No Employment certificate issue ) Check mechanical equipment, materials in accordance with the drawing & specification. Conduct inspection for all mechanical rotating equipments such as equipment installation, material receiving, preliminary and final inspection alignment of pumps, compressors and piping lines connected to the equipment, sump pits inspection on pumps, etc. as per project plan and ITP procedures. Review and counter sign RFI and all related field inspection checklist by main-contractors before submitting to the client. Conduct final box-up inspections on mechanical equipments. Preparation of inspection & test plan (ITP) & checklist for site inspection. Monitor quality controls for each definable area / section of work as per PQP, Method of Statement, ITP & specification. Secure foundation release of the equipments. Check for correct leveling of soleplates & base plate prior to erect the equipment on the foundation. Check for correct orientation & centering of pumps & motor and anchor bolt projection prior to pocket grout. Check of leveling of pumps & motor and elevation of plunges center and initial tight of anchor bolt prior to preliminary alignment. Conduct final inspection of generator & turbine shaft alignment with the client. Conduct final inspection of the turning device shaft alignment with the client. Conduct final inspection of mechanical equipments prior to grouting works. Check for applicable torque values on mechanical structures. Check for pipe stress prior to final alignment on centrifugal pump. Check/inspect the alignment, elevation levelness of the installed stationary & rotating equipment & ensure the deficiencies are within acceptable limit and preparation and monitoring on site. Company : GS-BEMCO JOINT VENTURE Address : Durma Riyadh Saudi Arabia Project : PP12 Combine Cycle Project Position : Mechanical Rotating Engineer Date hired : November 25, 2013-January 07, 2014 ( No Employment certificate issue )
  • 5. JOB DESCRIPTION: Responsible for the execution of gas Turbine Erection & Installation Preparation works for PP12 Combine Cycle Project. Duties include control and monitoring, Installation and alignment of Rotating Equipment such as Turbine, Centrifugal, compressors, Reciprocating compressors, Centrifugal pumps, Blowers, and drivers. Inspect, evaluate and arrange field installation and recommend design modification to eliminate machine or system malfunctions. Knowledge and experience in the inspection, performance testing and engineering, pre-commissioning and start-up of Rotating equipments. Knowledge of International Standards such as ASTM, ANSI, API standards associated with rotating equipment, installation, alignment methods, tolerances and basic engineering practices. Check / review vendor documents, P & ID’s, PEFS, ISO drawing, technical specification, engineering drawings and method statements preparation to ensure project execution in accordance with Project requirements. Responsible for the dismantling and re-assembly of Centrifugal pumps, Vertical in line pumps, Reciprocating Compressor, Turbo-Expander compressor, and other Rotating equipment for the replacement of seals, impellers and parts, check internal / Mechanical center section, Bores cope inspection, and equipment preservation. Coordinate with the client PMT), vendors, engineering / other disciplines, suppliers and subcontractors in the control of quality, labor, equipment, and materials to meet schedules and ensure a safe and incident-free planning and project execution. Computer skills: MS Office applications, MS Project and other Software such as, Microsoft word 2007 & Microsoft excel 2007 Integrated Document Management System, Equipment Installation Monitoring System (EQMS), Windows Project Completion and Certification System. Company : BONATTI S.P.A Address : Yanbu Saudi Arabia Project : Yanbu Aramco Sinopec refinery project (YASREF) Position : commissioning rotating & static engineer Date hired : July 27, 2013 – November 17, 2013 JOB DESCRIPTION: Report to the mechanical commissioning manager & coordinate with the construction manager department. review of work schedule and preparation of all site jobs procedure in commissioning job or method of statement in every equipment prior to start execution and accomplishment, man power loading & materials procurement; organize, plans, direct and supervising different trades such as; oil flushing, final cleaning of piping lines,
  • 6. checking the alignment of all rotating equipment prior such as; centrifugal pumps, turbines, compressors. Motor running test(mrt) prior to installed the coupling spacer, preparation for start-up and prior to start load running we need to coordinate the mechanical site manager & electrical, instrument department and specially the qc department representative for inspection. Leads monitor in planning & executing commissioning activities and to insure the proper installation for the compliance with construction policies, procedures, methods and technical department of the contract; ensure that all activities comply with ohs standards. Prepared documents for all mechanical rotating equipments such as equipment installation, material receiving, pre and final alignment of pumps, compressors and piping lines connected to the equipment, sump pits inspection on pumps, etc. as per project plan and ITP procedures. Check the installation of air fan coolers such as ; fixing of plenum, tightening, angle of fan blades, motor installation, shafting, shaft – sleeve, bearings, fly wheel, bracing, top cover, pulley and belt installation. Alignment of rotary equipments such as; compressor and pumps, motor, by using conventional alignment. Final box up checking, filling of chemicals, Manages the start-up activities such as; compressors, turbines, pumps & Perform commissioning activities. Company: NEO-NESMA ESSER ONUR CONTRATING COMPANY LTD.., King Abdullah Financial District Project Address : Riyadh Saudi Arabia Project : Internal roads, utilities infrastructure Position : piping site engineer Date hired: April 16, 2013- July 13, 2013 ( No Employment certificate issue ) JOB DESCRIPTION Acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives; setting out, leveling and surveying the site; checking plans, drawings and quantities for accuracy of calculations; ensuring all materials used and work performed are as per specifications; managing, monitoring and interpreting the contract design documents supplied by the client/architect; liaising with any consultants, sub-contractors, supervisors, planners, quantity surveyors and the general workforce involved in the project; liaising with the local authority to ensure compliance with local construction regulations and by-laws; liaising with clients and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress; day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors; planning the work and efficiently organizing the site facilities in order to meet agreed deadlines; overseeing quality control, health and safety matters on site; preparing reports as required; resolving any unexpected technical difficulties, and other problems that may arise Inspects all works during, pre and post-
  • 7. construction process and strictly implement Method Statement, Standard Drawings and Work Specifications for the construction of KAFD project Give full assistant for the Project Engineer/Manager in all activities required to be delivered in the site on timely manner and required Quality/Quantity. Oversee and execute site by following approved construction drawing and prescribed policies. Define the project materials, manpower’s and equipments needed to finish the work assigned. Study drawing to provide technical clearance to foreman in coordination with the Project Manager and Consultant. Initiate Fast Accident Report immediately when an accident/incident noticed, and forward to the Safety Officer and Project Manager. Attend coordination meeting with the Project Owner, Project Manager, and all Sub-Contractors to discuss Quality, Safety and Construction Progress. Prepare Materials Daily Report and Schedule of Works (Weekly) Provides Daily Activity Reports of day to day activities/operations. Implement Environmental Health and Safety Procedures. Company : e-TEC CONTRUCTION CO., LTD...ARABIAN LIMITED (HADEED STRAIGHTENING SHOP PROJECT) Address : FORMELY HADI AL NAJRANI O & M EST P.B. #11584 JUBAIL, SAUDI ARABIA Position : QA/QC MECHANICAL ROTATING & STATIC Date hired : January 21, 2013 –APRIL 16, 2013 Reason : finished project ( No Employment certificate issue ) JOB DESCRIPTION Prepared documents for all mechanical rotating equipments such as equipment installation, material receiving, preleminary alignment and final alignment of pumps, compressors and piping lines connected to the equipment, sump pits inspection on pumps, etc. as per project plan and ITP procedures. Report to mechanical manager & coordinate with the construction management. Review work schedule, accomplishment, manpower loading & materials procurement, plans, directs. Supervises different types of mechanical work and also rigging, erection, and installation of mechanical equipments pumps & as per in API 686,650, ASME VIII- DIV 1&2 standards. Coordinate with mechanical / site manager and also handle punch listing. Implement site inspection surveillance plan. Lead and monitor effort in planning and executing lifting activities. To ensure proper applications of a compliance with construction policies, procedures, method and technical requirements of the contract. Ensure all activities comply with OHS standard. Prepare P&ID and equipments drawing priority for inspection.
  • 8. Conduct Site Monitoring Reviewed the HADDED Engineering Standard. Documents, Procedures, HADDED Typical Inspection Plan. Prepared documents for all mechanical rotating equipments such as equipment installation, material receiving, pre and final alignment of pumps, compressors and piping lines connected to the equipment, sump pits inspection on pumps, etc. as per project plan and ITP procedures. Preparation of all standard for the installation of monorail hoists and also DIN 536 & 15030 and also FEM 9.511 manual procedure. Company : CHUNJO CONSTRUCTION CO., LTD. Under The Supervision of HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. (South Yoloten Desulfurization Project) Address : South Yoloten, Mary, Province, Turkmenistan Position : MECHANICAL INSPECTORS ROTATING & STATIC Date hired : may 01, 2011-august 31, 2012 JOB DESCRIPTION Check mechanical equipment, materials in accordance with the drawing & specification. Conduct inspection for all mechanical rotating equipments such as equipment installation, material receiving, pre and final alignment of pumps, compressors and piping lines connected to the equipment, sump pits inspection on pumps, etc. as per project plan and ITP procedures. Review and counter sign RFI and all related field inspection checklists by sub-contractors before submitting to the client. Conduct final box-up inspections on mechanical equipments. Preparation of inspection & test plan (ITP) & checklist for site inspection. Monitor quality controls for each definable area / section of work as per PQP, Method of Statement, ITP &specification. Secure foundation release of the equipments. Check for correct leveling of soleplates & base plate. Check for anchor bolt elevation and location. Check for correct orientation & leveling of the equipments. Check embedded hardware elevation & location. Conduct free alignment of generator & turbine shaft alignment. Conduct final inspection of generator & turbine shaft alignment with the client. Conduct final inspection of the turning device shaft alignment with the client. Conduct final inspection of mechanical equipments prior to grouting works. Check for applicable torque values on mechanical structures. Check for pipe stress prior to final alignment on centrifugal pump. Check/inspect the alignment, elevation levelness of the installed stationary & rotating equipment & ensure the deficiencies are within acceptable limit
  • 9. Company : HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. (RAS LAFFAN C Independent Water & Power Project) Address : RAS LAFFAN, Qatar Position : ROTATING & STATIC SUPERVISOR Date hired : July 27, 2009 – April 14 2011 JOB DESCRIPTION: Will be responsible for receiving and passing-on instruction from department head supervisors. Will supervise and motivate team of 3-5 groups of Millwright workers. Will communicate progress and work with department supervisors. Will work with team to complete Millwright jobs in static & rotating equipment as a timely and efficient manner. Lead all Millwright workers to Align of rotary equipments such as; compressor and pumps, motor, by using conventional alignment & reverse alignment. Erection of natural gas boiler, centering & final tightening of anchor bolt. Skid centering. Erection of chimney of natural gas boiler & checking the plumpness using transit level. Erection fuel gas filter & checking the verticality of the equipment. Preparation of the foundation such as, chipping & installation of packer plates using the theodolite or auto level in checking the elevation from the bench mark. Erection of feed water pump preparing all procedure of millwright works such as grouting until final grouting. Alignment of feed water pumps from preliminary alignment & final alignment with parallism by applying face & rim or conventional alignment. Erection of blow down return pump & applying single alignment. Erection of auxiliary cooling water pump for single cycle pump applying single alignment. Erection of auxiliary cooling water pump for combine cycle pump & applying single alignment. Cooling tower installation such as blade assemble fun stock assemble, preliminary and final alignment. Company : NOUVO-PIGNONE VENDOR UNDER GS-ENGINEERING & CONSTRUCTION CO….LTD Address : SPOGC-PHASE 9 & 10 assaluyeh, busher, province, Islamic Republic : Islamic of Iran Position : Mechanical Rotating & Static Supervisor Date hired : July 2008 - October 2009 JOB DESCRIPTION: Pre-Commissioning and Start up commissioning of all rotating equipment such’s as; Compressor and pump, turbines and checking monitoring prior to start up. Installed and align assembled by using conventional alignment & reverse alignment. Checking of installation on natural gas boiler, check also the centering & final tightening of anchor bolt. Check the installation of chimney on natural gas boiler & checking the plumbness
  • 10. using combination total station. Assist Erection on fuel gas filter & checking the verticality of the equipment. Preparation of the foundation such as, chipping & installation of packer plates using the theodolite or auto level for checking the elevation from the bench mark. Check and assist Erection of feed water pump preparing all procedure of millwright works such as pocket grout and full grout. Alignment of feed water pumps from preliminary alignment & final alignment with parallism by applying face & rim or conventional alignment Check the installation of air fan coolers such as ; fixing of plenum, tightening, angle of fan blades, motor installation, shafting, shaft – sleeve, bearings, fly wheel, bracing, top cover, pulley and belt installation Alignment of rotary equipments such as ; compressor and pumps, motor, by using conventional alignment. Oil plashing of the compressor 8 units with Nuevo-pignoni. Company : GS-ENGINEERING & CONSTRUCTION CO….LTD Address : SPOGC-PHASE 9 & 10 assaluyeh, busher, province, Islamic Republic : Islamic of Iran Position : Mechanical Rotating & Static Supervisor Date hired : July 27, 2008 to April 10, 2009 JOB DESCRIPTION: Pre-Commissioning and Start up commissioning of all rotating equipment such’s as; Compressor and pump, turbines and checking monitoring prior to start up. Installed and align assembled by using conventional alignment & reverse alignment. Checking of installation on natural gas boiler, check also the centering & final tightening of anchor bolt. Check the installation of chimney on natural gas boiler & checking the plumbness using combination total station. Assist Erection on fuel gas filter & checking the verticality of the equipment. Preparation of the foundation such as, chipping & installation of packer plates using the theodolite or auto level for checking the elevation from the bench mark. Check and assist Erection of feed water pump preparing all procedure of millwright works such as pocket grout and full grout. Alignment of feed water pumps from preliminary alignment & final alignment with parallism by applying face & rim or conventional alignment Check the installation of air fan coolers such as ; fixing of plenum, tightening, angle of fan blades, motor installation, shafting, shaft – sleeve, bearings, fly wheel, bracing, top cover, pulley and belt installation Alignment of rotary equipments such as ; compressor and pumps, motor, by using conventional alignment. Oil plashing of the compressor 8 units with Nuevo pignoni. Installation of cover conveyor and final checking of all equipments in sulfur unit. Final box up checking. Filling of Cathy list. Assist of start-up activities such as ; compressors, turbines, pumps and motor pumps. Perform commissioning activities. MRT-motor running test inspection up to the final operation of the plant, and monitoring of plant wide operation. Company : CONSOLIDATED CONTRACTOR COMPANY
  • 11. Jubail Chevron Philips Project Address : Jubail, K.S.A. Position : Millwright foreman Date hired : March 11, 2006 to March 29, 2008 JOB DESCRIPTION: Erection of static equipments such as; Pump skid gear box, drums, Air fan cooler, TEG re-boiler modules, raw water treatment facilities. Erection of rotary equipments such as; Pump skid gear box, motor, compressor and water injection pumps. Alignment and leveling of rotary equipments such Compressor and water injection pumps, motor by using dial indicator and apply stand system...Installation and assembled of air fan cooler accessories such as; Plenum, fan blades, motor, shaft sleeve, upper bearing, fly wheel, bracing, top cover, pulley, belts, preliminary inspection and final alignment. Installation and assembled of oil mist tubing and accessories such as; manifold, reclassifies, drain box, fittings, vent fill collection, vent collection, oil sight and drain leg. Cleaning, tightening and fixing all man ways of the tray inside the vessel and final inspection. Perform pre-commissioning job like load running test. Be able to interpret the drawings. Safety oriented worker and maintenance good housekeeping before and after work. Company : HOLCEM PHILIPPINES INCORPORATED Address : Lugait, Misamis Oriental Contractor : 4J’s engineering and Allied Services Position : MILLWRIGHT MECHANICAL MAINTENANCE Date hired : September 18, 2004 to January 26, 2006 JOB DESCRIPTION: Performed preventive maintenance work to the plant and equipment such as; replacing of worn-out bearings, bushings, mechanical seal and motor pump packing glands. Check and inspect motor unit and gear boxes. Re-conditioning and machining of worn-out mechanical parts, shaft, pulleys and sprockets. Performed for daily overhauling and inspection. Rouble shouting and alignment of pumps.Performed for daily over hauling and inspection especially on motoring of plant operation.Trouble shouting and alignment of pumps.Replacements of PILLARD kiln burner assembly, kiln burner trolley, platform and supports.Installation of roots blower and axial fan, modification of kiln hood door.Fabrication and installation of Air pipeline, water pipeline, and BFO pipeline for kiln burner.Replacement and alignment of kiln drive unit, Kiln pier “C” support rollers, Kiln master gear casing.Kiln # 4 feed end rehabilitation and patching of kiln shell.Fabrication and installation of 250 TPH belt bucket elevator.Replacement of
  • 12. tire ring of Rotary kiln and dryer.Repair of kiln support rollers.Fabrication of girth gear cover and chain guards.Repair of screw conveyors, chain conveyors, belt conveyors, bucket elevator and gypsum pelletize.Replacement of Kiln # 4 discharge end nose cap.Extension of Kiln # 4 Air seal wear ring.Installation of new Cooling fan # 2 assembly.Replacement of Cooling fan # 1 assembly & pier “C” support roller assembly.Replacement of Kiln shell @ manhole area.Installation and alignment of Kiln shell girth gear and coupling.Installation of Kiln roofing and sidings @ girth gear area.and specialy monitoring of plant wide operation. Company : Alsons Cement Corporation Address : Lugait, Misamis Oriental Contractor : 4J’s engineering and Allied Services Position : MILLWRIGHT MECHANICAL MAINTENANCE Date hired : April 03, 2003 – September 18, 2004 JOB DESCRIPTION: Performed preventive maintenance work to the plant and equipment such as; replacing of worn-out bearings, bushings, mechanical seal and motor pump packing glands. Check and inspect motor unit and gear boxes. Re-conditioning and machining of worn-out mechanical parts, shaft, pulleys and sprockets. Performed for daily overhauling and inspection. Rouble shouting and alignment of pumps.Performed for daily over hauling and inspection especially on motoring of plant operation.Trouble shouting and alignment of pumps.Replacements of PILLARD kiln burner assembly, kiln burner trolley, platform and supports.Installation of roots blower and axial fan, modification of kiln hood door.Fabrication and installation of Air pipeline, water pipeline, and BFO pipeline for kiln burner.Replacement and alignment of kiln drive unit, Kiln pier “C” support rollers, Kiln master gear casing.Kiln # 4 feed end rehabilitation and patching of kiln shell.Fabrication and installation of 250 TPH belt bucket elevator.Replacement of tire ring of Rotary kiln and dryer.Repair of kiln support rollers.Fabrication of girth gear cover and chain guards.Repair of screw conveyors, chain conveyors, belt conveyors, bucket elevator and gypsum pelletize.Replacement of Kiln # 4 discharge end nose cap.Extension of Kiln # 4 Air seal wear ring.Installation of new Cooling fan # 2 assembly.Replacement of Cooling fan # 1 assembly & pier “C” support roller assembly.Replacement of Kiln shell @ manhole area.Installation and alignment of Kiln shell girth gear and coupling.Installation of Kiln roofing and sidings @ girth gear area.and specialy monitoring of plant wide operation. A W A R D S and A C H I E V E M E N T S • Top 8 Techniques to improve your ability to be an effective supervisor training Jubail sadala plant project Jubail Saudi Arabia
  • 13. • Certified commissioning rotating & static engr. Bonatti s.p.a co Ltd Yasref-Yanbu Aramco Sinopec refinery project Yanbu Saudi Arabia. • Certified Piping site Engineer. NEO-NESMA ESSER ONUR CONTRATING COMPANY LTD.., Internal roads, utilities infrastructure Riyadh Saudi Arabia • Certified Quality Inspector Rotating & Static Chunjo Construction Co.., LTD. South Yoloten, Mary, province, Turkmenistan • Certified Rotating & Static Supervisor Hyundai Engineering & Construction co.., LTD. Ras Laffan, Qatar • Certified Foreman Millwright commissioning GS Engineering & Construction Co.., LTD. Assaluyeh, Busher, province Republic of Iran • Certified Millwright foreman CCC- Consolidated Contractor Company Kingdom Saudi Arabia • Certified Twenty Five Million (25,000,0000) Man Hours LTI Free Safety Department CCC- Consolidated Contractor Company Kingdom of Saudi Arabia • Certified IN – PLANT Training ALSONS Cement Corporation Lugait, Misamis Oriental • Certified Mechanical Maintenance HOLCEM Philippines Incorporated Lugait, Misamis Oriental