SlideShare a Scribd company logo
KHALID ALI SAAD ELDIN
PO Box 50284
Mesaieed, Qatar
Phone: 974 44684813 Mobile: 974 55297170
E-mails: Saadkhaled61@hotmail.com Or: saadkhaled1961@gmail.com
Summary of experience
26 years’ experience in rotating, projects and inspection of static equipment
This experience is classified as follows::
1987 till 1994 – Vibration Engineer / acting as Head of Engineering Department
1994 till present Olefin Inspection Senior Specialist
Personal Information
Date Of Birth: 18 August 1961 Nationality: Egyptian
Marital Status: Married with 4 children
Permanent Address:
Ain Khalid – Doha - Qatar
Phone: 0974 44684813
: 0974 55297170
Profession:
An inspection Engineering Position that requires Strong Background in Inspection of
Static equipment and plant integrity
Education:
B. Sc. in Mechanical Engineering, Faculty of Engineering, Cairo University
Graduated in May 1984 (Grade: Good).
Qualifications:
• Certified Piping Inspector API 570 (P CERT. NO. 39821)
• Certified pressure vessel inspector API 510 (certification no. 23806)
• Certified above ground storage tank inspector API 653 (certification no.
30214)
• Certified API 580 Risk Based Inspection Professional ( CR. NO. 50544 )
• Certified Senior welding Inspector CSWIP 3.2 ( CSWIP CERT.NO. 15380 )
• Attend API 579 ( Fitness of services ) + PCC 2 course
Selected Courses:
A- Vibration Analysis:
* Measurement Of Machinery Vibration (Cairo-Egypt ,Jan 1989)
* Vibration Analysis (Cairo-Egypt ,Jan 1989)
* Introduction to dynamic Balancing (Cairo-Egypt ,Jan 1989)
* Balancing Techniques (Cairo-Egypt, Jan 1989)
* Measurements of vibration in Mech. (Cairo-Egypt, Feb 1988)
& Elect. Machinery
* Measurements and vibration analysis (Cairo- Egypt, June 1987)
* Failure Analysis (Cairo-Egypt , Oct. 1988)
B- Gas Turbine Courses:
* Control System Logic for Solar Saturn (Caterpillar-USA, October1992)
Gas Turbine Generator Sets
* Operation & Routine Maint. I for Solar (Caterpillar-USA, October 1992)
Saturn Gas Turbine Generator Sets
* Operation & Routine Maint.II for Solar (Caterpillar-USA, October 1992)
Saturn Gas Turbine Generator Sets
* Gas Turbine Maintenance (GE-Cairo-Egypt, September 1987)
* SPEEDTRONICS Mark II Controls (GE-Cairo-Egypt, September 1987)
C- Inspection, Welding & Testing:
* Ultrasonic Testing level-I (Saudi Arabia, June 1996)
* Welding process, inspection and QC (AUC - Egypt, October 1993)
* Visual Inspection of Welds (Qatar, December 1997)
* Welding inspector (CSWIP) (Qatar, March 1999)
(Certified welding inspector)
* API 510 Pressure vessel inspector (Saudi Arabia, May 2002)
* PSM (Process Safety Management ) ( Qapco - May, 2013)
Work Experience:
Poly Olefin Inspection Engineer
1994 - to present Qatar Petrochemical Company (QAPCO)
Inspection Section
Job Description:
1- Manages and coordinates all Inspection activities in Poly Olefin plant within
the inspection section and with the other departments.
2- Inform and advise the general condition of the plant equipment, which are
within Inspections domain of competence. Anticipates remaining service life
and or repairs to QAPCO equipment and recommends technical solutions.
3- Prepare the inspection planning / duration of the static equipment and piping in
Qapco plants according to French Regulation and API Standards.
4- Review and analyses all inspection reports submitted by inspectors and senior
inspectors and prepare comments and inspection recommendations
depending on nature of inspection findings.
5- Participate with Maint. And Production in the investigation and solving of
problems encountered in the plant and technically advice to solve it to increase
plant mechanical integrity.
6- Schedule all periodic shutdowns and recommend shutdowns when necessary
schedule, and supervise necessary inspection work advising Maint. Dept. of
detail technical requirements.
7- Prepare technical specifications and requirements for external inspection work
services required by QAPCO and participate in the review and evaluation of
bids for inspection work according to specifications.
8- Attend meetings and participate solving technical problems in cooperation with
Maint. And production.
9- Using updated inspection techniques to carry out inspection activities in Poly
Olefin Plant.
10- Review all inspection technical issues with Engineering section for all the new
projects
11- Review WPS / PQR and welder qualification procedures, witness these tests,
interprets radiographic examination results, accept/reject results according to
standards/company requirements and sign acceptance certificates.
12- Preparing technical inspection reports to support the plant integrity by using
2
remaining life calculation and fitness for service by using API 510/ 570/ 653
and API 579.
13- By using DNVGL software ( Galiom ) , prepare all static equipment data for
using Risk based inspection which will change inspection strategy from time
base, condition base to be Risk Based inspection.
14- Enforce strict compliance to industry codes and standards related to integrity
inspection performed by AIMD. Review major inspection findings and provide
engineering support to enhance overall AIMD Quality and reputation. Ensure
that inspection reports are issued with desired quality and comprehension and
to expected accuracy.
15- Implement cost saving activities as per section‘s cost saving plan and
managing the sectional operation cost with due diligent.
16- Ensure assigned all engineering tasks and related activities meet corporate
safety and environmental policy and standards in order to minimize risk of
industrial injuries and un-wanted incidents.
17- Lead and advice operation on full life cycle asset integrity engineering of all
static equipment in Poly Olefin Plant.
18- Implement / support asset integrity condition management strategies and
programs for loss containment purpose including corrosion management.
19- Troubleshoot static equipment recurrent problems and participating in root
case analysis ( RCA)
Acting as Department Head of the Engineering department
1987 - 1994 Gulf Of Suez Petroleum Co. (GUPCO)
Engineering Department
Job Description:
Vibration Engineer for all types of machines of GUPCO Gas Plant at Ras
Shukair, Egypt. The Gas Plant contains turbines, gas compressors, generators,
Turbo-expanders , pumps, Electrical motors, gas oil coolers, gas and diesel
generators and air coolers. The job duties are as follows:
1- Prepare vibration survey schedule for all rotating equipment in the Gas
Plant and its Satellite Stations.
2- Determine the vibration monitoring points for every machine.
2- Diagnose all vibration problems.
3- Prepare abnormal vibration reports for all vibration problems.
4- Use updated vibration instruments in collecting data and diagnoses vibration
problems.
5- Use different vibration instruments for surveying such as : IRD, B&K, Bently
Nevada and Scientific Atlanta such as the following:
• IRD MACHANALYSIS 890&880
• B&K TAPE RECORDER 7100
• Scientific Atlanta Analyzer
• TK8 & TK3
3
6- Execute field balancing.
Project Engineer: Execution of different projects in the Gas Plant such as:
• The installation of new Desalination Unit as per the following steps
1. Prepare estimate cost for the project.
2. Prepare quotation for the new units.
3. Receive the offers and compare between them to choose the best
offer.
4. Order the chosen offer after management approval.
5. Review vendor drawings & send comments to finalize the drawing to
be issued for fabrication.
6. Prepare piping isometric for the new unit with the existing piping
system.
7. Prepare the material list required for the project.
8. check the availability of material in the warehouse and order the
material which is not available from local market or abroad.
9. prepare time schedule for the project.
10. Supervise the different stages of the project.
• The study of the efficiency for the fire fighting system of the Gas Plant:
1. Check the amount of firewater and see if it is enough in case of fire.
2. If needed recommendations for additional pumps are recommended.
Fiberglass piping is recommended since seawater is used.
3. Prepare isometric drawings for the project and estimated cost.
4. Receive support from ENPPI for the proposed project.
5. Same steps are followed afterwards as mentioned in the previous
project.
Computer Skills
Well versed with several computer packages:
Windows 7
Office 2000
Lotus 123
MS Project
ADRE for windows (Vibration Monitor Program)
WinCairs-CCM(Corrosion condition monitoring)
References
Mr. Mohd Al Ajji Eng. Services MGR, QAPCO
Phone No. (0974) 44777807
Mr. Yousuf Abdulla M.A.Rebeeh Group Manager Operation. QAPCO
Phone No. (0974) 44777277
4

More Related Content

What's hot

Mohammed vasil k.
Mohammed vasil k.Mohammed vasil k.
Mohammed vasil k.
MOHAMMAD VASIL K
 
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspectorQa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
Wael Mahmoud alkilany
 
INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORRegu Mkc
 
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad GilbertThad Gilbert
 
E&I QAQC Sup,Insp
E&I QAQC Sup,InspE&I QAQC Sup,Insp
E&I QAQC Sup,InspEZAZ ALAM
 
Method Statement of precast pilie and its risk assessment
Method Statement of precast pilie and its risk assessmentMethod Statement of precast pilie and its risk assessment
Method Statement of precast pilie and its risk assessment
jihanshagor
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq Ahmad
 
Sr. Ammonia Process Engineer's CV
Sr. Ammonia Process Engineer's CVSr. Ammonia Process Engineer's CV
Sr. Ammonia Process Engineer's CVMohamed Abosereei
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad
 

What's hot (18)

Mohammed vasil k.
Mohammed vasil k.Mohammed vasil k.
Mohammed vasil k.
 
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspectorQa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
 
P7512-EXT-SQ-0030
P7512-EXT-SQ-0030P7512-EXT-SQ-0030
P7512-EXT-SQ-0030
 
Adeel Shaikh CV
Adeel Shaikh CVAdeel Shaikh CV
Adeel Shaikh CV
 
INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTOR
 
OHA LATEST CURRICULLUM
OHA LATEST CURRICULLUMOHA LATEST CURRICULLUM
OHA LATEST CURRICULLUM
 
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad Gilbert
 
CV_ak_2015EN
CV_ak_2015ENCV_ak_2015EN
CV_ak_2015EN
 
CV 23-10-2014
CV 23-10-2014CV 23-10-2014
CV 23-10-2014
 
DKSHAH RESUME
DKSHAH RESUMEDKSHAH RESUME
DKSHAH RESUME
 
Saurav Rawat CV
Saurav Rawat CVSaurav Rawat CV
Saurav Rawat CV
 
E&I QAQC Sup,Insp
E&I QAQC Sup,InspE&I QAQC Sup,Insp
E&I QAQC Sup,Insp
 
Method Statement of precast pilie and its risk assessment
Method Statement of precast pilie and its risk assessmentMethod Statement of precast pilie and its risk assessment
Method Statement of precast pilie and its risk assessment
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 
Sr. Ammonia Process Engineer's CV
Sr. Ammonia Process Engineer's CVSr. Ammonia Process Engineer's CV
Sr. Ammonia Process Engineer's CV
 
Gorga Silalahi (CV)
Gorga Silalahi (CV)Gorga Silalahi (CV)
Gorga Silalahi (CV)
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updated
 
Instrumentation Inspector
Instrumentation InspectorInstrumentation Inspector
Instrumentation Inspector
 

Similar to khaled-2

Hisham.cv
Hisham.cvHisham.cv
Hisham.cv
Hisham Hegab
 
Abdalla Ghanem CV.. rotating, reliability and mechanical engineering, and pl...
Abdalla Ghanem CV..  rotating, reliability and mechanical engineering, and pl...Abdalla Ghanem CV..  rotating, reliability and mechanical engineering, and pl...
Abdalla Ghanem CV.. rotating, reliability and mechanical engineering, and pl...Abdalla Ghanem
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
Mohammed Reda
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
Mohammed Reda
 
Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Hegab
 
Maintanance supervisor
Maintanance supervisorMaintanance supervisor
Maintanance supervisorMohamed Oweda
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)Ahmed Youssef
 
Eng mostafa magdy cv
Eng mostafa magdy cvEng mostafa magdy cv
Eng mostafa magdy cvmostafa magdy
 
Nasser Rabie Resume
Nasser Rabie ResumeNasser Rabie Resume
Nasser Rabie ResumeNasser Rabie
 
updated Kessouar's Resume
updated Kessouar's Resumeupdated Kessouar's Resume
updated Kessouar's ResumeMehdi Kessouar
 
Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)Budi Prihartono
 

Similar to khaled-2 (20)

Hisham.cv
Hisham.cvHisham.cv
Hisham.cv
 
Abdalla Ghanem CV.. rotating, reliability and mechanical engineering, and pl...
Abdalla Ghanem CV..  rotating, reliability and mechanical engineering, and pl...Abdalla Ghanem CV..  rotating, reliability and mechanical engineering, and pl...
Abdalla Ghanem CV.. rotating, reliability and mechanical engineering, and pl...
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
 
M.Reda CV
M.Reda CVM.Reda CV
M.Reda CV
 
Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Resume ( CV )
Hisham Resume ( CV )
 
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
 
Hesham_cv
Hesham_cvHesham_cv
Hesham_cv
 
Maintanance supervisor
Maintanance supervisorMaintanance supervisor
Maintanance supervisor
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
Eng mostafa magdy cv
Eng mostafa magdy cvEng mostafa magdy cv
Eng mostafa magdy cv
 
Nasser Rabie Resume
Nasser Rabie ResumeNasser Rabie Resume
Nasser Rabie Resume
 
Moh.Ramadan-CV
Moh.Ramadan-CVMoh.Ramadan-CV
Moh.Ramadan-CV
 
updated Kessouar's Resume
updated Kessouar's Resumeupdated Kessouar's Resume
updated Kessouar's Resume
 
Mohamed abdulazeem_C V.
Mohamed abdulazeem_C V.Mohamed abdulazeem_C V.
Mohamed abdulazeem_C V.
 
Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)
 
Majdi Resume-Z
Majdi Resume-ZMajdi Resume-Z
Majdi Resume-Z
 
khalid mowafy CV
khalid mowafy CVkhalid mowafy CV
khalid mowafy CV
 
Aftab CV.
Aftab CV.Aftab CV.
Aftab CV.
 

khaled-2

  • 1. KHALID ALI SAAD ELDIN PO Box 50284 Mesaieed, Qatar Phone: 974 44684813 Mobile: 974 55297170 E-mails: Saadkhaled61@hotmail.com Or: saadkhaled1961@gmail.com Summary of experience 26 years’ experience in rotating, projects and inspection of static equipment This experience is classified as follows:: 1987 till 1994 – Vibration Engineer / acting as Head of Engineering Department 1994 till present Olefin Inspection Senior Specialist Personal Information Date Of Birth: 18 August 1961 Nationality: Egyptian Marital Status: Married with 4 children Permanent Address: Ain Khalid – Doha - Qatar Phone: 0974 44684813 : 0974 55297170 Profession: An inspection Engineering Position that requires Strong Background in Inspection of Static equipment and plant integrity Education: B. Sc. in Mechanical Engineering, Faculty of Engineering, Cairo University Graduated in May 1984 (Grade: Good). Qualifications: • Certified Piping Inspector API 570 (P CERT. NO. 39821) • Certified pressure vessel inspector API 510 (certification no. 23806) • Certified above ground storage tank inspector API 653 (certification no. 30214) • Certified API 580 Risk Based Inspection Professional ( CR. NO. 50544 ) • Certified Senior welding Inspector CSWIP 3.2 ( CSWIP CERT.NO. 15380 ) • Attend API 579 ( Fitness of services ) + PCC 2 course Selected Courses: A- Vibration Analysis: * Measurement Of Machinery Vibration (Cairo-Egypt ,Jan 1989) * Vibration Analysis (Cairo-Egypt ,Jan 1989) * Introduction to dynamic Balancing (Cairo-Egypt ,Jan 1989) * Balancing Techniques (Cairo-Egypt, Jan 1989) * Measurements of vibration in Mech. (Cairo-Egypt, Feb 1988) & Elect. Machinery * Measurements and vibration analysis (Cairo- Egypt, June 1987) * Failure Analysis (Cairo-Egypt , Oct. 1988) B- Gas Turbine Courses: * Control System Logic for Solar Saturn (Caterpillar-USA, October1992) Gas Turbine Generator Sets * Operation & Routine Maint. I for Solar (Caterpillar-USA, October 1992) Saturn Gas Turbine Generator Sets * Operation & Routine Maint.II for Solar (Caterpillar-USA, October 1992) Saturn Gas Turbine Generator Sets * Gas Turbine Maintenance (GE-Cairo-Egypt, September 1987)
  • 2. * SPEEDTRONICS Mark II Controls (GE-Cairo-Egypt, September 1987) C- Inspection, Welding & Testing: * Ultrasonic Testing level-I (Saudi Arabia, June 1996) * Welding process, inspection and QC (AUC - Egypt, October 1993) * Visual Inspection of Welds (Qatar, December 1997) * Welding inspector (CSWIP) (Qatar, March 1999) (Certified welding inspector) * API 510 Pressure vessel inspector (Saudi Arabia, May 2002) * PSM (Process Safety Management ) ( Qapco - May, 2013) Work Experience: Poly Olefin Inspection Engineer 1994 - to present Qatar Petrochemical Company (QAPCO) Inspection Section Job Description: 1- Manages and coordinates all Inspection activities in Poly Olefin plant within the inspection section and with the other departments. 2- Inform and advise the general condition of the plant equipment, which are within Inspections domain of competence. Anticipates remaining service life and or repairs to QAPCO equipment and recommends technical solutions. 3- Prepare the inspection planning / duration of the static equipment and piping in Qapco plants according to French Regulation and API Standards. 4- Review and analyses all inspection reports submitted by inspectors and senior inspectors and prepare comments and inspection recommendations depending on nature of inspection findings. 5- Participate with Maint. And Production in the investigation and solving of problems encountered in the plant and technically advice to solve it to increase plant mechanical integrity. 6- Schedule all periodic shutdowns and recommend shutdowns when necessary schedule, and supervise necessary inspection work advising Maint. Dept. of detail technical requirements. 7- Prepare technical specifications and requirements for external inspection work services required by QAPCO and participate in the review and evaluation of bids for inspection work according to specifications. 8- Attend meetings and participate solving technical problems in cooperation with Maint. And production. 9- Using updated inspection techniques to carry out inspection activities in Poly Olefin Plant. 10- Review all inspection technical issues with Engineering section for all the new projects 11- Review WPS / PQR and welder qualification procedures, witness these tests, interprets radiographic examination results, accept/reject results according to standards/company requirements and sign acceptance certificates. 12- Preparing technical inspection reports to support the plant integrity by using 2
  • 3. remaining life calculation and fitness for service by using API 510/ 570/ 653 and API 579. 13- By using DNVGL software ( Galiom ) , prepare all static equipment data for using Risk based inspection which will change inspection strategy from time base, condition base to be Risk Based inspection. 14- Enforce strict compliance to industry codes and standards related to integrity inspection performed by AIMD. Review major inspection findings and provide engineering support to enhance overall AIMD Quality and reputation. Ensure that inspection reports are issued with desired quality and comprehension and to expected accuracy. 15- Implement cost saving activities as per section‘s cost saving plan and managing the sectional operation cost with due diligent. 16- Ensure assigned all engineering tasks and related activities meet corporate safety and environmental policy and standards in order to minimize risk of industrial injuries and un-wanted incidents. 17- Lead and advice operation on full life cycle asset integrity engineering of all static equipment in Poly Olefin Plant. 18- Implement / support asset integrity condition management strategies and programs for loss containment purpose including corrosion management. 19- Troubleshoot static equipment recurrent problems and participating in root case analysis ( RCA) Acting as Department Head of the Engineering department 1987 - 1994 Gulf Of Suez Petroleum Co. (GUPCO) Engineering Department Job Description: Vibration Engineer for all types of machines of GUPCO Gas Plant at Ras Shukair, Egypt. The Gas Plant contains turbines, gas compressors, generators, Turbo-expanders , pumps, Electrical motors, gas oil coolers, gas and diesel generators and air coolers. The job duties are as follows: 1- Prepare vibration survey schedule for all rotating equipment in the Gas Plant and its Satellite Stations. 2- Determine the vibration monitoring points for every machine. 2- Diagnose all vibration problems. 3- Prepare abnormal vibration reports for all vibration problems. 4- Use updated vibration instruments in collecting data and diagnoses vibration problems. 5- Use different vibration instruments for surveying such as : IRD, B&K, Bently Nevada and Scientific Atlanta such as the following: • IRD MACHANALYSIS 890&880 • B&K TAPE RECORDER 7100 • Scientific Atlanta Analyzer • TK8 & TK3 3
  • 4. 6- Execute field balancing. Project Engineer: Execution of different projects in the Gas Plant such as: • The installation of new Desalination Unit as per the following steps 1. Prepare estimate cost for the project. 2. Prepare quotation for the new units. 3. Receive the offers and compare between them to choose the best offer. 4. Order the chosen offer after management approval. 5. Review vendor drawings & send comments to finalize the drawing to be issued for fabrication. 6. Prepare piping isometric for the new unit with the existing piping system. 7. Prepare the material list required for the project. 8. check the availability of material in the warehouse and order the material which is not available from local market or abroad. 9. prepare time schedule for the project. 10. Supervise the different stages of the project. • The study of the efficiency for the fire fighting system of the Gas Plant: 1. Check the amount of firewater and see if it is enough in case of fire. 2. If needed recommendations for additional pumps are recommended. Fiberglass piping is recommended since seawater is used. 3. Prepare isometric drawings for the project and estimated cost. 4. Receive support from ENPPI for the proposed project. 5. Same steps are followed afterwards as mentioned in the previous project. Computer Skills Well versed with several computer packages: Windows 7 Office 2000 Lotus 123 MS Project ADRE for windows (Vibration Monitor Program) WinCairs-CCM(Corrosion condition monitoring) References Mr. Mohd Al Ajji Eng. Services MGR, QAPCO Phone No. (0974) 44777807 Mr. Yousuf Abdulla M.A.Rebeeh Group Manager Operation. QAPCO Phone No. (0974) 44777277 4