BINUKUMAR BARAL
QA/QC ENGINEER
Email: binubaral85@yahoo.com
Email: binubaral85@gmail.com
Mob. No. +974 -70790085
ObjectiveObjective
Having Around 9 years experience (Quality Assurance and Quality Control activities. four years with NDT
inspection) in piping and inspection field, I am seeking for a challenging position in a growth-oriented
environment that would utilize my skills, provides me an opportunity to share and enhance my
expertise in Engineering, and to contribute to the growth of the company in terms of revenue and
values
KEY RESULT AREAS
Piping Inspection : RT/RTFI/UT/MT/LPT&HT
Fabrication Inspection : Welding Inspection on Piping & Structural
Academic Qualifications:
 Intermediate in (education) from Tribhuwan University. Butwal, Nepal.
Professional Qualification:
 Diploma in Mechanical Engineering, Butwal technical institute (BTI) Butwal, Nepal.
 API -570(American petrolem institute) pressure piping inspector.
 CSWIP 3.1 Welding Inspector from UK. (CSWIP Cert no 70809).
 ASNT NDT Level-II Certified in LPT, HT, MPI, UT, RT & RTFI.
 Training of Trainers (TOT), CTEVT-Bhaktapur, Nepal.
 Saudi Aramco RT Level-II Card Holder.
 Saudi Aramco Radiation Safety Card Holder.
 Saudi Gov.light driving license (1159984) & Nepalese Driving License (06-067499).
Other training/courses and certifications:
 Safety induction training, K.S.A.
 Training of radiation protection permit for industrial radiographer in Saudi Aramco (Dhahran.KSA).
 Training of confined Space Entry for KGP Project CCC khurshaniyah, K.S.A.
 Defensive Driving Training in Saudi Aramco, K.S.A.
 Work at height strop project jubail, KSA.
 Electrical safety in Samsung strop project jubail, K.S.A.
 Basic fire protection safety course,K.S.A
 H2s (hydrogen sulphide) BA/Escape training,QATAR.
 Health, Safety & Environment (HSE) trained,K.S.A.
Page 1 of 6
Software Skills:
IT SKILLS in Data Entry using Windows 98 & windows 8/XP programming, MS Word, Excel
& Power Point.
KNOWLEDGE ABOUT STANDARDS:
Knowledge of ASTM, ASME, AWS, and API codes
PROFESSIONAL EXPERIENCE:
A.EMPLOYER
Name of the Company : Nepal Hydropower Electric p.v.t (ltd). Butwal, Nepal.
Period : 26-02-2002 to 07-11-2003
Designation : SUPERVISOR
B.EMPLOYER
Name of the Company : NDT&CCS.DAMMAM, KSA
Period : 02-12-2006 to 04-10-2012
Designation : QA/QC INSPECTOR in Piping.
PROJECTS : RIYAD REFINEREY, KPF&KGP, WASIT
KHURSANIYA,
PROJECTS : KCC &KUC KHURAIS, HAWAIYAH.
CLIENT : SAUDI ARAMCO& SABIC GROUP.
C.EMPLOYER
Name of the Company : Associated Engineer & fabricators Nepal (p) Ltd. Chitwan, Nepal.
Period : 15-01-2013 to 28-09-2013
Designation : QA/QC INSPECTOR
PROJECTS : INGO
D.EMPLOYER
Name of the Company : AL-BALAGH TRADING & CONTRACTING CO.W.L.L.Doha,Qatar
Period : 31-10-2013 to 30-09-2014.
Designation : QA/QC INSPECTOR (Piping & Structural).
PROJECT-1 : EPIC OF PIGGING FACILITIES (GC11111700)
PROJECT-2 : EPIC OF MECHANICAL PLANT CHANGE REQUEST-
Page 2 of 6
JOBS (LC12108800)
CLIENT : QATAR PETROLEUM DUKHAN FIELDS, QATAR.
E.EMPLOYER
Name of the Company : AL-BALAGH TRADING & CONTRACTING CO.W.L.L.Doha, Qatar
Period : 01-10-2014 to 01-10-2015.
Designation : QA/QC ENGINEER (Piping).
PROJECT-1 : EPIC OF PIGGING FACILITIES (GC11111700)
PROJECT-2 : EPIC OF MECHANICAL PLANT CHANGE REQUEST-
JOBS (LC12108800)
PROJECT-2 : GAS DISTRIBUTION STATION IMPROVEMENT WORKS WITHIN
QP GAS OPERATIONS DHUKAN -QATAR (CONTRACT NO: LC-09108600)
CLIENT : QATAR PETROLEUM DUKHAN FIELDS, QATAR.
F.EMPLOYER
Name of the Company : AL-BALAGH DYNASPEX COMPANY W.L.L. Doha-Qatar
Period : 01-10-2015 to till Date.
Designation : QA/QC ENGINEER (Piping).
PROJECT : CONSTRUCTION OF CP-07A 1A WATER FRONT
COMMERCIAL/SEEF LUSAIL INFRASTRUCTURE WORKS SOUTH
CLIENT : MARAFEQ QATAR&HBK-QBC CONTACTING COMPANY QATAR.
Professional Summary:
 Non-destructive evaluation techniques (Interpretation, inspection & procedure).
 Quality Assurance of equipments, pipeline, piping accessories, and other materials.
 Welding (Procedure, inspection, fabrication, testing, pre-commissioning, commissioning,
Quality Control) for pipelines, structures and other integrity requirements.
 Witnessing Procedure Qualification Record welding test according to WPS & Witnessing
various mechanical tests and Macro examination.
 Reviewing the Hardness reports according to specification.
 Witnessing Welder qualification tests for different base metals, thickness and diameter
Ranges as per BS standard EN 287 part 1 and EN 288 Part 3. Conducting NDT tests like MPT,
PT and UT.
 Controlling the welding of joints according to Isometric Drawings and Checking Diameter,
Thickness, Drawing Number & Class in welding Progress report.
 Reviewing The PWHT charts cooling rate, heating rate, soaking period according to
specification and approving the charts.
 Non-destructive test.
 Interpreting the radiographic films according to Project spec/ASME B31.3, ASME Sec IX, AWS
D1.1 & API 1104.
DUTIES & RESPONSIBILITIES:
Page 3 of 6
 Conducting tool box talks for welders, fitters, helpers on a weekly basis and maintaining the
report for the same.
 Fit-up inspection, review of fit up report submitted by sub-contractor on daily basis.
 Conducting the Line check to all the test packages as per the Isometric Drawings and issues
the punch list of category A, B & C according to its Severity.
 Reviewing the test packages as per the test pack management procedure and checks the
punch list for clearance.
 Coordinating with sub-contractors for planning and scheduling of site activities on daily basis.
 Witnessing the pressure test based on a system and sub system wise along with the client
and clears the test package if test is successfully executed.
 Shut down activities monitoring and Coordination.
 Involved in welding inspection and coordinated in Non-Destructive Examinations.
 Verification of isometric drawing with respect to P&ID.
 Raw material inspection.
 Witnessing of pneumatic test hydro test, flushing & system lay up.
 Reinstatement inspection of completed /erected pipelines.
 Monitoring Heat treatment activities including preheat and Post Weld Heat Treatment (PWHT)
as per the corresponding WPS.
 Assure that all joints are exposed for examination during pressure test.
 Confirm repairs, re-testing and re-inspection in accordance with specifications.
 Knowledge on the welding process includes SMAW, GTAW, and SAW.
 Witnessing Procedure Qualification Record welding test according to WPS & Witnessing
various mechanical tests and Macro examination.
 Reviewing the Hardness reports according to specification.
 Witnessing Welder qualification tests for different base metals, thickness and diameter
Ranges as per BS standard EN 287 part 1 and EN 288 Part 3. Conducting NDT tests like MPT,
LPT and UT, HT.
 Controlling the welding of joints according to Isometric Drawings and Checking Diameter,
Thickness, Drawing Number & Class in welding Progress report.
 Interpreting the radiographic films according to Project spec/ASME B31.3, ASME Sec IX & API
1104.
 Prepared documents, procedures for inspection methods, inspection and testing plan in
computerized environment.
 Visual inspection of fabrication and site welds.
 Witnessing the hot tapping jobs and finally gets the client approval.
 Reviewing the approved quality plans, manuals, and scope of work to perform the required
inspection.
 Coordinating and monitoring of NDT activities in site inspection of welding.
 Review and interpretation of NDT reports and acceptance of welds, fittings as per ASME SEC
V, B31.3, API 1104, AWS D1.1.
 Reviewing the approved quality plans, manuals, and scope of work to perform the required
inspection.
 Stage-wise inspections and fabrication of piping, structures and installation of equipment.
Page 4 of 6
 Reviewing the applicable instruments for inspection with valid calibration certificates.
 Quality check on the piping material/ accessories and installation as per the Quality
Specifications/ Manual.
 Preparation of inspection reports for different stages and keeping records.
 Preparation of quality assurance plan in line with drawings, purchase orders, customer
requirements and applicable code etc.
 Ability to follow established departmental policies, procedures, and objectives, continuous
quality improvement objectives, safety, environmental, and/or infectious control standards.
Ability to communicate clearly and effectively, both orally and in writing, or via e-mail, co-
workers and subordinates as a representative of the company.
 Ability to demonstrate proper operation of tools, instruments, equipment and work aids used
in performing quality related tasks.
 Knowledge of computerized information systems used in quality applications
Possess strong interpersonal and communication skills and the ability to work effectively with
a wide range of constituencies in a diverse community.
PERSONAL DATA:
Name : Binukumar baral
Fathers Name : Indra bahadur baral
Date of Birth : 26-02–1985
Marital Status : Married
Passport No : 07688079
Date of Issue : 30 -07– 2014
Date of Expiry : 29 -07– 2024
Religion : Buddha.
Marital Status : Married.
Permanent Address : Khandbari -2, Sankhuwa-sabha, Nepal.
Nationality : Nepali.
Permanent Address : Khandbari -2, Sankhuwa-sabha, Nepal.
Mobile-1 : +9779814338359(Residence)
Page 5 of 6
Mobile-2 : +9779849032379(Residence)
Declaration:
Here by declare that the above information provided by me is take and accurate to the best
of my Knowledge.
BINUKUMAR BARAL
Page 6 of 6
Mobile-2 : +9779849032379(Residence)
Declaration:
Here by declare that the above information provided by me is take and accurate to the best
of my Knowledge.
BINUKUMAR BARAL
Page 6 of 6

Binukumar resume- QA-QC ENGINEER

  • 1.
    BINUKUMAR BARAL QA/QC ENGINEER Email:binubaral85@yahoo.com Email: binubaral85@gmail.com Mob. No. +974 -70790085 ObjectiveObjective Having Around 9 years experience (Quality Assurance and Quality Control activities. four years with NDT inspection) in piping and inspection field, I am seeking for a challenging position in a growth-oriented environment that would utilize my skills, provides me an opportunity to share and enhance my expertise in Engineering, and to contribute to the growth of the company in terms of revenue and values KEY RESULT AREAS Piping Inspection : RT/RTFI/UT/MT/LPT&HT Fabrication Inspection : Welding Inspection on Piping & Structural Academic Qualifications:  Intermediate in (education) from Tribhuwan University. Butwal, Nepal. Professional Qualification:  Diploma in Mechanical Engineering, Butwal technical institute (BTI) Butwal, Nepal.  API -570(American petrolem institute) pressure piping inspector.  CSWIP 3.1 Welding Inspector from UK. (CSWIP Cert no 70809).  ASNT NDT Level-II Certified in LPT, HT, MPI, UT, RT & RTFI.  Training of Trainers (TOT), CTEVT-Bhaktapur, Nepal.  Saudi Aramco RT Level-II Card Holder.  Saudi Aramco Radiation Safety Card Holder.  Saudi Gov.light driving license (1159984) & Nepalese Driving License (06-067499). Other training/courses and certifications:  Safety induction training, K.S.A.  Training of radiation protection permit for industrial radiographer in Saudi Aramco (Dhahran.KSA).  Training of confined Space Entry for KGP Project CCC khurshaniyah, K.S.A.  Defensive Driving Training in Saudi Aramco, K.S.A.  Work at height strop project jubail, KSA.  Electrical safety in Samsung strop project jubail, K.S.A.  Basic fire protection safety course,K.S.A  H2s (hydrogen sulphide) BA/Escape training,QATAR.  Health, Safety & Environment (HSE) trained,K.S.A. Page 1 of 6
  • 2.
    Software Skills: IT SKILLSin Data Entry using Windows 98 & windows 8/XP programming, MS Word, Excel & Power Point. KNOWLEDGE ABOUT STANDARDS: Knowledge of ASTM, ASME, AWS, and API codes PROFESSIONAL EXPERIENCE: A.EMPLOYER Name of the Company : Nepal Hydropower Electric p.v.t (ltd). Butwal, Nepal. Period : 26-02-2002 to 07-11-2003 Designation : SUPERVISOR B.EMPLOYER Name of the Company : NDT&CCS.DAMMAM, KSA Period : 02-12-2006 to 04-10-2012 Designation : QA/QC INSPECTOR in Piping. PROJECTS : RIYAD REFINEREY, KPF&KGP, WASIT KHURSANIYA, PROJECTS : KCC &KUC KHURAIS, HAWAIYAH. CLIENT : SAUDI ARAMCO& SABIC GROUP. C.EMPLOYER Name of the Company : Associated Engineer & fabricators Nepal (p) Ltd. Chitwan, Nepal. Period : 15-01-2013 to 28-09-2013 Designation : QA/QC INSPECTOR PROJECTS : INGO D.EMPLOYER Name of the Company : AL-BALAGH TRADING & CONTRACTING CO.W.L.L.Doha,Qatar Period : 31-10-2013 to 30-09-2014. Designation : QA/QC INSPECTOR (Piping & Structural). PROJECT-1 : EPIC OF PIGGING FACILITIES (GC11111700) PROJECT-2 : EPIC OF MECHANICAL PLANT CHANGE REQUEST- Page 2 of 6
  • 3.
    JOBS (LC12108800) CLIENT :QATAR PETROLEUM DUKHAN FIELDS, QATAR. E.EMPLOYER Name of the Company : AL-BALAGH TRADING & CONTRACTING CO.W.L.L.Doha, Qatar Period : 01-10-2014 to 01-10-2015. Designation : QA/QC ENGINEER (Piping). PROJECT-1 : EPIC OF PIGGING FACILITIES (GC11111700) PROJECT-2 : EPIC OF MECHANICAL PLANT CHANGE REQUEST- JOBS (LC12108800) PROJECT-2 : GAS DISTRIBUTION STATION IMPROVEMENT WORKS WITHIN QP GAS OPERATIONS DHUKAN -QATAR (CONTRACT NO: LC-09108600) CLIENT : QATAR PETROLEUM DUKHAN FIELDS, QATAR. F.EMPLOYER Name of the Company : AL-BALAGH DYNASPEX COMPANY W.L.L. Doha-Qatar Period : 01-10-2015 to till Date. Designation : QA/QC ENGINEER (Piping). PROJECT : CONSTRUCTION OF CP-07A 1A WATER FRONT COMMERCIAL/SEEF LUSAIL INFRASTRUCTURE WORKS SOUTH CLIENT : MARAFEQ QATAR&HBK-QBC CONTACTING COMPANY QATAR. Professional Summary:  Non-destructive evaluation techniques (Interpretation, inspection & procedure).  Quality Assurance of equipments, pipeline, piping accessories, and other materials.  Welding (Procedure, inspection, fabrication, testing, pre-commissioning, commissioning, Quality Control) for pipelines, structures and other integrity requirements.  Witnessing Procedure Qualification Record welding test according to WPS & Witnessing various mechanical tests and Macro examination.  Reviewing the Hardness reports according to specification.  Witnessing Welder qualification tests for different base metals, thickness and diameter Ranges as per BS standard EN 287 part 1 and EN 288 Part 3. Conducting NDT tests like MPT, PT and UT.  Controlling the welding of joints according to Isometric Drawings and Checking Diameter, Thickness, Drawing Number & Class in welding Progress report.  Reviewing The PWHT charts cooling rate, heating rate, soaking period according to specification and approving the charts.  Non-destructive test.  Interpreting the radiographic films according to Project spec/ASME B31.3, ASME Sec IX, AWS D1.1 & API 1104. DUTIES & RESPONSIBILITIES: Page 3 of 6
  • 4.
     Conducting toolbox talks for welders, fitters, helpers on a weekly basis and maintaining the report for the same.  Fit-up inspection, review of fit up report submitted by sub-contractor on daily basis.  Conducting the Line check to all the test packages as per the Isometric Drawings and issues the punch list of category A, B & C according to its Severity.  Reviewing the test packages as per the test pack management procedure and checks the punch list for clearance.  Coordinating with sub-contractors for planning and scheduling of site activities on daily basis.  Witnessing the pressure test based on a system and sub system wise along with the client and clears the test package if test is successfully executed.  Shut down activities monitoring and Coordination.  Involved in welding inspection and coordinated in Non-Destructive Examinations.  Verification of isometric drawing with respect to P&ID.  Raw material inspection.  Witnessing of pneumatic test hydro test, flushing & system lay up.  Reinstatement inspection of completed /erected pipelines.  Monitoring Heat treatment activities including preheat and Post Weld Heat Treatment (PWHT) as per the corresponding WPS.  Assure that all joints are exposed for examination during pressure test.  Confirm repairs, re-testing and re-inspection in accordance with specifications.  Knowledge on the welding process includes SMAW, GTAW, and SAW.  Witnessing Procedure Qualification Record welding test according to WPS & Witnessing various mechanical tests and Macro examination.  Reviewing the Hardness reports according to specification.  Witnessing Welder qualification tests for different base metals, thickness and diameter Ranges as per BS standard EN 287 part 1 and EN 288 Part 3. Conducting NDT tests like MPT, LPT and UT, HT.  Controlling the welding of joints according to Isometric Drawings and Checking Diameter, Thickness, Drawing Number & Class in welding Progress report.  Interpreting the radiographic films according to Project spec/ASME B31.3, ASME Sec IX & API 1104.  Prepared documents, procedures for inspection methods, inspection and testing plan in computerized environment.  Visual inspection of fabrication and site welds.  Witnessing the hot tapping jobs and finally gets the client approval.  Reviewing the approved quality plans, manuals, and scope of work to perform the required inspection.  Coordinating and monitoring of NDT activities in site inspection of welding.  Review and interpretation of NDT reports and acceptance of welds, fittings as per ASME SEC V, B31.3, API 1104, AWS D1.1.  Reviewing the approved quality plans, manuals, and scope of work to perform the required inspection.  Stage-wise inspections and fabrication of piping, structures and installation of equipment. Page 4 of 6
  • 5.
     Reviewing theapplicable instruments for inspection with valid calibration certificates.  Quality check on the piping material/ accessories and installation as per the Quality Specifications/ Manual.  Preparation of inspection reports for different stages and keeping records.  Preparation of quality assurance plan in line with drawings, purchase orders, customer requirements and applicable code etc.  Ability to follow established departmental policies, procedures, and objectives, continuous quality improvement objectives, safety, environmental, and/or infectious control standards. Ability to communicate clearly and effectively, both orally and in writing, or via e-mail, co- workers and subordinates as a representative of the company.  Ability to demonstrate proper operation of tools, instruments, equipment and work aids used in performing quality related tasks.  Knowledge of computerized information systems used in quality applications Possess strong interpersonal and communication skills and the ability to work effectively with a wide range of constituencies in a diverse community. PERSONAL DATA: Name : Binukumar baral Fathers Name : Indra bahadur baral Date of Birth : 26-02–1985 Marital Status : Married Passport No : 07688079 Date of Issue : 30 -07– 2014 Date of Expiry : 29 -07– 2024 Religion : Buddha. Marital Status : Married. Permanent Address : Khandbari -2, Sankhuwa-sabha, Nepal. Nationality : Nepali. Permanent Address : Khandbari -2, Sankhuwa-sabha, Nepal. Mobile-1 : +9779814338359(Residence) Page 5 of 6
  • 6.
    Mobile-2 : +9779849032379(Residence) Declaration: Hereby declare that the above information provided by me is take and accurate to the best of my Knowledge. BINUKUMAR BARAL Page 6 of 6
  • 7.
    Mobile-2 : +9779849032379(Residence) Declaration: Hereby declare that the above information provided by me is take and accurate to the best of my Knowledge. BINUKUMAR BARAL Page 6 of 6