Best of Scrum and Lean Startup
for product development
Prepared By Anish Cheriyan,
Director, Huawei Technologies
Topics
• Typical Challenges of Large Organization
• Development method based on degree of uncertainty
• Background of the Business Problem
• Lean Startup and Scrum practices applied
Typical Challenges of Big Organization
• One size fits all solution for the management
method
• Failure is a failure
• Delayed Validated Learning
One size fits all solution for the management
method
Picture Courtesy: wikimedia.org
Large Organization have ready made past proven life cycle following waterfall, scrum,
scrumban or related life cycle. Teams somehow forcefiet the project into such framework.
What happens if you fail
Failure is not considered good in most situations or may be in all situations.
Picture Courtesy: dietlogo.com
Delayed Validated Learning
In most cases the validated learning comes after we do the big bang development.
Concept Plan
Design
and
Develop
Testing Release
Beta
Test
Final
Release
Most
learning
happen here
2 week to 3 months duration
Method based on degree of uncertainty
Based on degree of uncertainty development method can be used.
Background of the Business Problem
• Embedded Development.
• Customer was not clear about the
problem.
• Not clear about what feature is
required.
“A Startup is a
human
institution
designed to
deliver a product
or service
under conditions
of extreme
uncertainty”
Eric Ries
Our Approach
Concept Plan …
Problem
Validation
Solution
Validation
Scale
We used the Lean Startup framework to validate the problem and the solution and for
scaling we used the product development life cyde
Scrum and Lean Startup Applied
Idea/Unkno
wn
problem
Product
Ready
Scale (Product
Development)
Integrated Product Development Process
Key Practices used
. Lean Canvas
. Interview, . Survey
. Presentation
. Go out of the
building
. Wireframing
. Wireframing
. Working Prototype
. Iterative
Development
. Customer Demo
. One Metric that
matters
Concept Plan Develop Release
. Scrum Life Cycle
. Continuous Delivery
. All related practices
Lean Canvas, Wireframing and iterative development practices were extensively used.
Key Results
• We have been able to finalize around 15 key features
of the product using Lean Startup and Scrum
approach.
• Right now realization is in progress.
• We are 100% confident about the success of these
features as customer has seen the working feature.
Thank You
“Life is too short to build something which
nobody wants”

Best of scrum and lean startup for product development

  • 1.
    Prepared by : AnishCheriyan, Director, Huawei Best of Scrum and Lean Startup for product development Prepared By Anish Cheriyan, Director, Huawei Technologies
  • 2.
    Topics • Typical Challengesof Large Organization • Development method based on degree of uncertainty • Background of the Business Problem • Lean Startup and Scrum practices applied
  • 3.
    Typical Challenges ofBig Organization • One size fits all solution for the management method • Failure is a failure • Delayed Validated Learning
  • 4.
    One size fitsall solution for the management method Picture Courtesy: wikimedia.org Large Organization have ready made past proven life cycle following waterfall, scrum, scrumban or related life cycle. Teams somehow forcefiet the project into such framework.
  • 5.
    What happens ifyou fail Failure is not considered good in most situations or may be in all situations. Picture Courtesy: dietlogo.com
  • 6.
    Delayed Validated Learning Inmost cases the validated learning comes after we do the big bang development. Concept Plan Design and Develop Testing Release Beta Test Final Release Most learning happen here 2 week to 3 months duration
  • 7.
    Method based ondegree of uncertainty Based on degree of uncertainty development method can be used.
  • 8.
    Background of theBusiness Problem • Embedded Development. • Customer was not clear about the problem. • Not clear about what feature is required.
  • 9.
    “A Startup isa human institution designed to deliver a product or service under conditions of extreme uncertainty” Eric Ries
  • 11.
    Our Approach Concept Plan… Problem Validation Solution Validation Scale We used the Lean Startup framework to validate the problem and the solution and for scaling we used the product development life cyde
  • 12.
    Scrum and LeanStartup Applied Idea/Unkno wn problem Product Ready Scale (Product Development) Integrated Product Development Process
  • 13.
    Key Practices used .Lean Canvas . Interview, . Survey . Presentation . Go out of the building . Wireframing . Wireframing . Working Prototype . Iterative Development . Customer Demo . One Metric that matters Concept Plan Develop Release . Scrum Life Cycle . Continuous Delivery . All related practices Lean Canvas, Wireframing and iterative development practices were extensively used.
  • 14.
    Key Results • Wehave been able to finalize around 15 key features of the product using Lean Startup and Scrum approach. • Right now realization is in progress. • We are 100% confident about the success of these features as customer has seen the working feature.
  • 15.
    Thank You “Life istoo short to build something which nobody wants”