What You Need to Know
About MSE Berms
March 27, 2017
Overview
• MSE Berm Design
• MSE Berm Construction
• MSE Berm Monitoring
ARM Group Inc.
A Technically Oriented Earth Sciences & Engineering Firm 2
3
MSE Berm Design
ARM Group Inc.
Vision. Partnership. Results.
MSE Berm Design
4
Conceptual Layout:
• Geometric optimization
Thorough Site Investigation:
• Soil borings/test pits
• Laboratory testing
• Groundwater
characterization
• Field reconnaissance
ARM Group Inc.
Vision. Partnership. Results.
MSE Berm Design
5ARM Group Inc.
Vision. Partnership. Results.
How Tall to Make Berm
Costs & Losses
Total Harms
MSE Berm Design
6
Design Considerations
Soil specifications:
• What soil is available and from where will it be sourced? Soil can greatly impact
project economics.
• Does soil require special processing or drainage features to be installed within
MSE berm?
• Any special conformance testing?
• What is the strength of the soil?
• What stress conditions will be present?
Geosynthetic reinforcement specifications:
• What are the appropriate reduction factors?
• Any special conformance testing?
Subgrade/Subsurface conditions:
• Any subgrade requirements? Drainage? Rate of construction and/or
consolidation?
ARM Group Inc.
Vision. Partnership. Results.
MSE Berm Design
7ARM Group Inc.
• Determine “critical” stability sections
based upon geometry, existing conditions,
loading conditions, etc.
• Iterative process to ensure adequate factors
of safety for internal, global, and
compound stability.
• Geosynthetic reinforcement elements are
lengthened, shortened, or strengths are
changed to get adequate factors of safety.
• Great advancements in slope stability
software in the past 10 years.
Slope Stability Analysis
MSE Berm Design
8
• Additional cross-sections can optimize
geosynthetic reinforcement design (i.e.,
reduce required length and/or spacing
requirements and consequently, costs).
• Optimize design for a consistent factor of
safety throughout the length of the berm.
• Review design for conflicts with
infrastructure.
Geogrid Optimization
ARM Group Inc.
Vision. Partnership. Results.
DRAINAGE! DRAINAGE! DRAINAGE!
MSE Berm Design
9
Design Insights
 Experienced geotechnical engineers familiar with MSE berm design are critically
important. Additionally, experienced design engineers can save client significant
money in Total Project Cost.
 If geosynthetic reinforcement vendors are used during the design, global &
compound stability must be independently confirmed by geotechnical engineer.
 Design guidance provided by FHWA Publications:
• Slopes vs. Walls
• Fine vs. Coarse Grained Soils
• Performance Criteria
• Design Life
ARM Group Inc.
Vision. Partnership. Results.
MSE Berm Design
10
Unique ARM Designs
• Solar Integrated MSE Berm (patented)
• MSE Berm on Waste Subgrade
• Alternative Backfill (crushed
asphalt/brick/concrete) [ABC Material]
• Shored MSE Berms
• Soft, Saturated Subgrade
• Ash Backfill MSE Berm
ARM Group Inc.
Vision. Partnership. Results.
Innovation
11
 ARM patented technology.
 Anchors for the solar panels are
installed within the MSE berm.
 Photovoltaic solar panels are attached
to the anchors along the face of the
MSE berm.
 Important environmental benefits.
 Maximization of the revenue
generating area at a facility.
Solar-integrated MSE Berms
ARM Group Inc.
Vision. Partnership. Results.
Innovation
12
 The availability and cost of suitable
structural fill will significantly impact
the bottom-line of an MSE berm
project.
 Crushed concrete, asphalt, and
masonry may be a suitable backfill
source.
 ARM designed an MSE berm using
incinerator ash as backfill for a landfill
in Pennsylvania.
Alternative Backfill / Beneficial Reuse
ARM Group Inc.
Vision. Partnership. Results.
MSE BERM CONSTRUCTION
13ARM Group Inc.
Vision. Partnership. Results.
MSE Berm Construction
14
Typical Facing Detail
ARM Group Inc.
Vision. Partnership. Results.
MSE Berm Construction
15
Subgrade Preparation and
MSE Berm Construction
ARM Group Inc.
Vision. Partnership. Results.
MSE Berm Construction
16
Welded wire form and biaxial
(facing) geogrid installation
ARM Group Inc.
Vision. Partnership. Results.
MSE Berm Construction
17
Installation of ECM
following biaxial
geogrid.
ARM Group Inc.
Vision. Partnership. Results.
MSE Berm Construction
18
Setting uniaxial
geogrid following
installation of ECM
and biaxial geogrid.
ARM Group Inc.
Vision. Partnership. Results.
MSE Berm Construction
19
Uniaxial geogrid, ECM,
and bodkin connection
installation
MSE Berm Construction
ARM Group Inc.
20
Separation of uniaxial geogrid and
reinforced backfill installation.
MSE Berm Construction
21
Progression of reinforced
backfill installation and
interior slope grading
ARM Group Inc.
Vision. Partnership. Results.
MSE Berm Construction
22
Liner installation
on interior slope of
MSE berm.
ARM Group Inc.
Vision. Partnership. Results.
MSE Berm Construction
23
Utilities atop MSE
berm crest and
access road.
Protective cover
visible on slope,
leachate pump system
riser pipes, valve
vault, anchor trench
low-perm soil, litter
control fence poles,
and stormwater
management channel.
ARM Group Inc.
Vision. Partnership. Results.
MSE Berm Construction
24
Utilities atop MSE
berm crest and
access road.
Litter control fence
poles, and
stormwater
management drop
inlet channel with
trash rack – future
tie-in for final cover
system downchute.
ARM Group Inc.
Vision. Partnership. Results.
MSE Berm Construction
25
Options:
45’ tall steel litter
control fence poles,
heavy duty
guiderail, security
fence, and access
road pavement.
ARM Group Inc.
Vision. Partnership. Results.
MSE Berm Construction
26
Vegetated MSE berm facing
ARM Group Inc.
Vision. Partnership. Results.
MSE Berm Construction
27ARM Group Inc.
Vision. Partnership. Results.
MSE Berm Construction
28
 Construction inspection and testing are
critical for MSE berm projects
 Experienced construction monitors are
essential
 Experienced contractors can make a
large difference in project success
 Quality construction materials are
important
 Construction inspection certification
provides added assurance to stakeholders
Construction-Phase Engineering and Construction Quality Assurance
Experienced construction-phase engineering and CQA are essential for MSE berm
projects to be completed on-time, within budget, and in accordance with the permitted
design and CQA Plan.
ARM Group Inc.
Vision. Partnership. Results.
MSE BERM MONITORING
29ARM Group Inc.
Vision. Partnership. Results.
MSE Berm Monitoring
30
Possible Instrumentation:
 Settlement Plates
 Survey Monuments
 Inclinometers
MSE berms should be inspected on a regular basis.
Inclinometers are the most prevalent.
 Provide continuous monitoring of displacement
throughout the MSE berm and subgrade profile.
Visual Inspections
 Should be completed by a PE with MSE berm
experience.
ARM Group Inc.
Vision. Partnership. Results.
MSE Berm Monitoring
31
Projects should develop a comprehensive Monitoring, Maintenance, & Inspection Plan.
Monitoring Program:
• Instrumentation Readings
• Data Analyzation
Inspection Program:
• Routine site inspections
• PE inspections
• Erosion, vegetation, geogrid
assessment, movement, etc.
• Annual alignment survey
Maintenance Program:
• Vegetation maintenance
• Stormwater channel maintenance
• Roadway maintenance
ARM Group Inc.
Vision. Partnership. Results.
Thank You
32
Questions?
Benjamin S. Allen, P.E.
ARM Group Inc.
ballen@armgroup.net
Phone: (717) 250-5581
ARM Group Inc.
Vision. Partnership. Results.
ARM Group Inc.
33
 Established in 1998
 Civil and Environmental Engineering Firm
 Full suite of services to support
the solid waste industry
 Office & Personnel Locations:
o Hershey, PA (HQ)
o State College, PA
o Wilkes-Barre, PA
o Pittsburgh, PA
o Columbia, MD
 MSE berm designs at landfills in
PA, CT, & MA
ARM Group Inc.
Vision. Partnership. Results.

More Related Content

What's hot

Larsen & toubro constructions
Larsen & toubro constructionsLarsen & toubro constructions
Larsen & toubro constructions
engineeringwatch
 
U BOOT TECHNOLOGY
U BOOT TECHNOLOGYU BOOT TECHNOLOGY
U BOOT TECHNOLOGY
sathish sak
 
Morocco Mall Post Tensioned Concrete Case Study
Morocco Mall Post Tensioned Concrete Case StudyMorocco Mall Post Tensioned Concrete Case Study
Morocco Mall Post Tensioned Concrete Case Study
CCL Concrete
 
Pebvsconvsteel
PebvsconvsteelPebvsconvsteel
Pebvsconvsteel
hlksd
 
Document
DocumentDocument
Document
mounika akula
 
Pre Engineered Steel Buildings
Pre Engineered Steel BuildingsPre Engineered Steel Buildings
Pre Engineered Steel Buildings
Delta Steel Structures Pvt Ltd
 
Introduction of Prefabricated structures
Introduction  of Prefabricated structuresIntroduction  of Prefabricated structures
Introduction of Prefabricated structures
Yogi Yogesh
 
First Single-storey Bungalow Project after 9 years since 2008.
First Single-storey Bungalow Project after 9 years since 2008.First Single-storey Bungalow Project after 9 years since 2008.
First Single-storey Bungalow Project after 9 years since 2008.
Teow Beng Hur
 
PEB Steel Buildings_English version Brochure (Jan 2015)
PEB Steel Buildings_English version Brochure (Jan 2015)PEB Steel Buildings_English version Brochure (Jan 2015)
PEB Steel Buildings_English version Brochure (Jan 2015)
PEB Steel Buildings
 
Mohd Mustafa CV
Mohd Mustafa CV Mohd Mustafa CV
Mohd Mustafa CV
Moh'd Mustafa
 
Pre engineered building
Pre engineered buildingPre engineered building
Pre engineered building
Unique Roof Pvt Ltd
 
Pre engineered and other buildings
Pre engineered and other buildingsPre engineered and other buildings
Pre engineered and other buildings
Dr K M SONI
 
U-BOOT BETON TECHNOLOGY
U-BOOT BETON TECHNOLOGYU-BOOT BETON TECHNOLOGY
U-BOOT BETON TECHNOLOGY
adityas07
 
AllenCon Capability
AllenCon CapabilityAllenCon Capability
AllenCon Capability
Damien Allen
 
U boot technology
U boot technologyU boot technology
U boot technology
Bowshiv
 
U boot beton technology
U boot beton technologyU boot beton technology
U boot beton technology
Amish Raj
 
PEB Steel Company profile
PEB Steel Company profilePEB Steel Company profile
PEB Steel Company profile
PEB Steel Buildings
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
ABIRAMI G
 
Josh Squyres Resume 3
Josh Squyres Resume 3Josh Squyres Resume 3
Josh Squyres Resume 3
Joshua Squyres
 
PCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. ReconstructionPCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. Reconstruction
Jill Reeves
 

What's hot (20)

Larsen & toubro constructions
Larsen & toubro constructionsLarsen & toubro constructions
Larsen & toubro constructions
 
U BOOT TECHNOLOGY
U BOOT TECHNOLOGYU BOOT TECHNOLOGY
U BOOT TECHNOLOGY
 
Morocco Mall Post Tensioned Concrete Case Study
Morocco Mall Post Tensioned Concrete Case StudyMorocco Mall Post Tensioned Concrete Case Study
Morocco Mall Post Tensioned Concrete Case Study
 
Pebvsconvsteel
PebvsconvsteelPebvsconvsteel
Pebvsconvsteel
 
Document
DocumentDocument
Document
 
Pre Engineered Steel Buildings
Pre Engineered Steel BuildingsPre Engineered Steel Buildings
Pre Engineered Steel Buildings
 
Introduction of Prefabricated structures
Introduction  of Prefabricated structuresIntroduction  of Prefabricated structures
Introduction of Prefabricated structures
 
First Single-storey Bungalow Project after 9 years since 2008.
First Single-storey Bungalow Project after 9 years since 2008.First Single-storey Bungalow Project after 9 years since 2008.
First Single-storey Bungalow Project after 9 years since 2008.
 
PEB Steel Buildings_English version Brochure (Jan 2015)
PEB Steel Buildings_English version Brochure (Jan 2015)PEB Steel Buildings_English version Brochure (Jan 2015)
PEB Steel Buildings_English version Brochure (Jan 2015)
 
Mohd Mustafa CV
Mohd Mustafa CV Mohd Mustafa CV
Mohd Mustafa CV
 
Pre engineered building
Pre engineered buildingPre engineered building
Pre engineered building
 
Pre engineered and other buildings
Pre engineered and other buildingsPre engineered and other buildings
Pre engineered and other buildings
 
U-BOOT BETON TECHNOLOGY
U-BOOT BETON TECHNOLOGYU-BOOT BETON TECHNOLOGY
U-BOOT BETON TECHNOLOGY
 
AllenCon Capability
AllenCon CapabilityAllenCon Capability
AllenCon Capability
 
U boot technology
U boot technologyU boot technology
U boot technology
 
U boot beton technology
U boot beton technologyU boot beton technology
U boot beton technology
 
PEB Steel Company profile
PEB Steel Company profilePEB Steel Company profile
PEB Steel Company profile
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Josh Squyres Resume 3
Josh Squyres Resume 3Josh Squyres Resume 3
Josh Squyres Resume 3
 
PCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. ReconstructionPCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. Reconstruction
 

Similar to Berms mass swana march 2017

UNIT 1 INTRODUCTION | CE8022 PREFABRICATION STRUCTURES |
UNIT 1 INTRODUCTION | CE8022 PREFABRICATION STRUCTURES |UNIT 1 INTRODUCTION | CE8022 PREFABRICATION STRUCTURES |
UNIT 1 INTRODUCTION | CE8022 PREFABRICATION STRUCTURES |
Venkateswaran S
 
INTERNSHIP PPT on police building B18 - Copy.pptx
INTERNSHIP PPT on police building  B18 - Copy.pptxINTERNSHIP PPT on police building  B18 - Copy.pptx
INTERNSHIP PPT on police building B18 - Copy.pptx
kotresha5
 
Tubular Rivet Foundation (Part 1) .pdf
Tubular Rivet Foundation (Part 1) .pdfTubular Rivet Foundation (Part 1) .pdf
Tubular Rivet Foundation (Part 1) .pdf
DongyuanWang1
 
Introduction - Design of Structure - 1.pdf
Introduction - Design of Structure - 1.pdfIntroduction - Design of Structure - 1.pdf
Introduction - Design of Structure - 1.pdf
UmarSaba1
 
CE 72.32 (January 2016 Semester) Lecture 5 - Preliminary Design and Sizing
CE 72.32 (January 2016 Semester) Lecture 5 - Preliminary Design and SizingCE 72.32 (January 2016 Semester) Lecture 5 - Preliminary Design and Sizing
CE 72.32 (January 2016 Semester) Lecture 5 - Preliminary Design and Sizing
Fawad Najam
 
Lecture # 03 Design for Additive Manufacturing
Lecture # 03 Design for Additive ManufacturingLecture # 03 Design for Additive Manufacturing
Lecture # 03 Design for Additive Manufacturing
Solomon Tekeste
 
PVAmerica Donaldson final 051614 v4
PVAmerica Donaldson final 051614 v4PVAmerica Donaldson final 051614 v4
PVAmerica Donaldson final 051614 v4
Robert Donaldson
 
High strength m70 concrete grade
High strength m70 concrete gradeHigh strength m70 concrete grade
High strength m70 concrete grade
jay panchal
 
Summer training report
Summer training reportSummer training report
Summer training report
aki8872233
 
General & geotechnical considerations for pile design
General & geotechnical considerations for pile designGeneral & geotechnical considerations for pile design
General & geotechnical considerations for pile design
Rizwan Khurram
 
Mivan Aluminum formwork ppt presentation
Mivan Aluminum formwork ppt presentationMivan Aluminum formwork ppt presentation
Mivan Aluminum formwork ppt presentation
CivilTY09AdityaGaval
 
Catalyzing Innovation by Performance-Based Design and Material Specifications
Catalyzing Innovation by Performance-Based Design and Material SpecificationsCatalyzing Innovation by Performance-Based Design and Material Specifications
Catalyzing Innovation by Performance-Based Design and Material Specifications
AIT Solutions
 
Precast Construction
Precast ConstructionPrecast Construction
Precast Construction
mukul srivastava
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction technique
IEI GSC
 
Foundation_HU_Lec_5 Design of Shallow Foundations Lec#1.pptx
Foundation_HU_Lec_5 Design of Shallow Foundations  Lec#1.pptxFoundation_HU_Lec_5 Design of Shallow Foundations  Lec#1.pptx
Foundation_HU_Lec_5 Design of Shallow Foundations Lec#1.pptx
SolomonAlemu28
 
Presentation 1-Official.pptx
Presentation 1-Official.pptxPresentation 1-Official.pptx
Presentation 1-Official.pptx
PrabhuGurusamy2
 
Sealants - Engineering Sealant Joints by Design
Sealants - Engineering Sealant Joints by DesignSealants - Engineering Sealant Joints by Design
Sealants - Engineering Sealant Joints by Design
Lawrence Le Roux
 
Abhishek presentation.pptx
Abhishek presentation.pptxAbhishek presentation.pptx
Abhishek presentation.pptx
RAKESHPANDEY754083
 
Company profile
Company profileCompany profile
Company profile
Dr Kari Thangaratnam
 
IRJET- Strengthening of New Building
IRJET- Strengthening of New BuildingIRJET- Strengthening of New Building
IRJET- Strengthening of New Building
IRJET Journal
 

Similar to Berms mass swana march 2017 (20)

UNIT 1 INTRODUCTION | CE8022 PREFABRICATION STRUCTURES |
UNIT 1 INTRODUCTION | CE8022 PREFABRICATION STRUCTURES |UNIT 1 INTRODUCTION | CE8022 PREFABRICATION STRUCTURES |
UNIT 1 INTRODUCTION | CE8022 PREFABRICATION STRUCTURES |
 
INTERNSHIP PPT on police building B18 - Copy.pptx
INTERNSHIP PPT on police building  B18 - Copy.pptxINTERNSHIP PPT on police building  B18 - Copy.pptx
INTERNSHIP PPT on police building B18 - Copy.pptx
 
Tubular Rivet Foundation (Part 1) .pdf
Tubular Rivet Foundation (Part 1) .pdfTubular Rivet Foundation (Part 1) .pdf
Tubular Rivet Foundation (Part 1) .pdf
 
Introduction - Design of Structure - 1.pdf
Introduction - Design of Structure - 1.pdfIntroduction - Design of Structure - 1.pdf
Introduction - Design of Structure - 1.pdf
 
CE 72.32 (January 2016 Semester) Lecture 5 - Preliminary Design and Sizing
CE 72.32 (January 2016 Semester) Lecture 5 - Preliminary Design and SizingCE 72.32 (January 2016 Semester) Lecture 5 - Preliminary Design and Sizing
CE 72.32 (January 2016 Semester) Lecture 5 - Preliminary Design and Sizing
 
Lecture # 03 Design for Additive Manufacturing
Lecture # 03 Design for Additive ManufacturingLecture # 03 Design for Additive Manufacturing
Lecture # 03 Design for Additive Manufacturing
 
PVAmerica Donaldson final 051614 v4
PVAmerica Donaldson final 051614 v4PVAmerica Donaldson final 051614 v4
PVAmerica Donaldson final 051614 v4
 
High strength m70 concrete grade
High strength m70 concrete gradeHigh strength m70 concrete grade
High strength m70 concrete grade
 
Summer training report
Summer training reportSummer training report
Summer training report
 
General & geotechnical considerations for pile design
General & geotechnical considerations for pile designGeneral & geotechnical considerations for pile design
General & geotechnical considerations for pile design
 
Mivan Aluminum formwork ppt presentation
Mivan Aluminum formwork ppt presentationMivan Aluminum formwork ppt presentation
Mivan Aluminum formwork ppt presentation
 
Catalyzing Innovation by Performance-Based Design and Material Specifications
Catalyzing Innovation by Performance-Based Design and Material SpecificationsCatalyzing Innovation by Performance-Based Design and Material Specifications
Catalyzing Innovation by Performance-Based Design and Material Specifications
 
Precast Construction
Precast ConstructionPrecast Construction
Precast Construction
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction technique
 
Foundation_HU_Lec_5 Design of Shallow Foundations Lec#1.pptx
Foundation_HU_Lec_5 Design of Shallow Foundations  Lec#1.pptxFoundation_HU_Lec_5 Design of Shallow Foundations  Lec#1.pptx
Foundation_HU_Lec_5 Design of Shallow Foundations Lec#1.pptx
 
Presentation 1-Official.pptx
Presentation 1-Official.pptxPresentation 1-Official.pptx
Presentation 1-Official.pptx
 
Sealants - Engineering Sealant Joints by Design
Sealants - Engineering Sealant Joints by DesignSealants - Engineering Sealant Joints by Design
Sealants - Engineering Sealant Joints by Design
 
Abhishek presentation.pptx
Abhishek presentation.pptxAbhishek presentation.pptx
Abhishek presentation.pptx
 
Company profile
Company profileCompany profile
Company profile
 
IRJET- Strengthening of New Building
IRJET- Strengthening of New BuildingIRJET- Strengthening of New Building
IRJET- Strengthening of New Building
 

More from MassRecycle .

2018 R3 Conference SWANA Afternoon Keynote
2018 R3 Conference SWANA Afternoon Keynote2018 R3 Conference SWANA Afternoon Keynote
2018 R3 Conference SWANA Afternoon Keynote
MassRecycle .
 
2018 R3 Conference Furniture Reuse IRN/Casella
2018 R3 Conference Furniture Reuse IRN/Casella2018 R3 Conference Furniture Reuse IRN/Casella
2018 R3 Conference Furniture Reuse IRN/Casella
MassRecycle .
 
2018 R3 Conference Yarmouth Energy Park
2018 R3 Conference Yarmouth Energy Park2018 R3 Conference Yarmouth Energy Park
2018 R3 Conference Yarmouth Energy Park
MassRecycle .
 
2018 R3 Conference Cambridge Curbside Composting
2018 R3 Conference Cambridge Curbside Composting2018 R3 Conference Cambridge Curbside Composting
2018 R3 Conference Cambridge Curbside Composting
MassRecycle .
 
2018 R3 Conference Decentralized Composting
2018 R3 Conference Decentralized Composting2018 R3 Conference Decentralized Composting
2018 R3 Conference Decentralized Composting
MassRecycle .
 
2018 R3 Conference Interstate MSW Flow Griffith
2018 R3 Conference Interstate MSW Flow Griffith2018 R3 Conference Interstate MSW Flow Griffith
2018 R3 Conference Interstate MSW Flow Griffith
MassRecycle .
 
2018 R3 Conference SWMP Goddard
2018 R3 Conference SWMP Goddard2018 R3 Conference SWMP Goddard
2018 R3 Conference SWMP Goddard
MassRecycle .
 
2018 R3 Conference MA Capacity Constraints Koehler
2018 R3 Conference MA Capacity Constraints Koehler2018 R3 Conference MA Capacity Constraints Koehler
2018 R3 Conference MA Capacity Constraints Koehler
MassRecycle .
 
2018 R3 Conference LeanPath Food Waste Reduction
2018 R3 Conference LeanPath Food Waste Reduction2018 R3 Conference LeanPath Food Waste Reduction
2018 R3 Conference LeanPath Food Waste Reduction
MassRecycle .
 
2018 R3 Conference Boston College Food Waste Reduction
2018 R3 Conference Boston College Food Waste Reduction2018 R3 Conference Boston College Food Waste Reduction
2018 R3 Conference Boston College Food Waste Reduction
MassRecycle .
 
2018 R3 Conference Green Team
2018 R3 Conference Green Team2018 R3 Conference Green Team
2018 R3 Conference Green Team
MassRecycle .
 
2018 R3 Conference Andover Public Schools Composting
2018 R3 Conference Andover Public Schools Composting2018 R3 Conference Andover Public Schools Composting
2018 R3 Conference Andover Public Schools Composting
MassRecycle .
 
2018 R3 Conference Cambridge Cafeteria Composting
2018 R3 Conference Cambridge Cafeteria Composting2018 R3 Conference Cambridge Cafeteria Composting
2018 R3 Conference Cambridge Cafeteria Composting
MassRecycle .
 
2018 R3 Conference ACA Paint Stewardship
2018 R3 Conference ACA Paint Stewardship2018 R3 Conference ACA Paint Stewardship
2018 R3 Conference ACA Paint Stewardship
MassRecycle .
 
2018 R3 Conference ISPA Mattress Recycling
2018 R3 Conference ISPA Mattress Recycling2018 R3 Conference ISPA Mattress Recycling
2018 R3 Conference ISPA Mattress Recycling
MassRecycle .
 
2018 R3 Conference MASSPSC Update
2018 R3 Conference MASSPSC Update2018 R3 Conference MASSPSC Update
2018 R3 Conference MASSPSC Update
MassRecycle .
 
2018 R3 Conference Morning Keynote - City of Boston Zero Waste Planning
2018 R3 Conference Morning Keynote - City of Boston Zero Waste Planning2018 R3 Conference Morning Keynote - City of Boston Zero Waste Planning
2018 R3 Conference Morning Keynote - City of Boston Zero Waste Planning
MassRecycle .
 
2018 R3 Conference Intro and Annual Meeting
2018 R3 Conference Intro and Annual Meeting2018 R3 Conference Intro and Annual Meeting
2018 R3 Conference Intro and Annual Meeting
MassRecycle .
 
Donovan mr 2017 k12 compost final
Donovan mr 2017 k12 compost finalDonovan mr 2017 k12 compost final
Donovan mr 2017 k12 compost final
MassRecycle .
 
Ipswich systemsofsustainabilitypres3 2017
Ipswich systemsofsustainabilitypres3 2017Ipswich systemsofsustainabilitypres3 2017
Ipswich systemsofsustainabilitypres3 2017
MassRecycle .
 

More from MassRecycle . (20)

2018 R3 Conference SWANA Afternoon Keynote
2018 R3 Conference SWANA Afternoon Keynote2018 R3 Conference SWANA Afternoon Keynote
2018 R3 Conference SWANA Afternoon Keynote
 
2018 R3 Conference Furniture Reuse IRN/Casella
2018 R3 Conference Furniture Reuse IRN/Casella2018 R3 Conference Furniture Reuse IRN/Casella
2018 R3 Conference Furniture Reuse IRN/Casella
 
2018 R3 Conference Yarmouth Energy Park
2018 R3 Conference Yarmouth Energy Park2018 R3 Conference Yarmouth Energy Park
2018 R3 Conference Yarmouth Energy Park
 
2018 R3 Conference Cambridge Curbside Composting
2018 R3 Conference Cambridge Curbside Composting2018 R3 Conference Cambridge Curbside Composting
2018 R3 Conference Cambridge Curbside Composting
 
2018 R3 Conference Decentralized Composting
2018 R3 Conference Decentralized Composting2018 R3 Conference Decentralized Composting
2018 R3 Conference Decentralized Composting
 
2018 R3 Conference Interstate MSW Flow Griffith
2018 R3 Conference Interstate MSW Flow Griffith2018 R3 Conference Interstate MSW Flow Griffith
2018 R3 Conference Interstate MSW Flow Griffith
 
2018 R3 Conference SWMP Goddard
2018 R3 Conference SWMP Goddard2018 R3 Conference SWMP Goddard
2018 R3 Conference SWMP Goddard
 
2018 R3 Conference MA Capacity Constraints Koehler
2018 R3 Conference MA Capacity Constraints Koehler2018 R3 Conference MA Capacity Constraints Koehler
2018 R3 Conference MA Capacity Constraints Koehler
 
2018 R3 Conference LeanPath Food Waste Reduction
2018 R3 Conference LeanPath Food Waste Reduction2018 R3 Conference LeanPath Food Waste Reduction
2018 R3 Conference LeanPath Food Waste Reduction
 
2018 R3 Conference Boston College Food Waste Reduction
2018 R3 Conference Boston College Food Waste Reduction2018 R3 Conference Boston College Food Waste Reduction
2018 R3 Conference Boston College Food Waste Reduction
 
2018 R3 Conference Green Team
2018 R3 Conference Green Team2018 R3 Conference Green Team
2018 R3 Conference Green Team
 
2018 R3 Conference Andover Public Schools Composting
2018 R3 Conference Andover Public Schools Composting2018 R3 Conference Andover Public Schools Composting
2018 R3 Conference Andover Public Schools Composting
 
2018 R3 Conference Cambridge Cafeteria Composting
2018 R3 Conference Cambridge Cafeteria Composting2018 R3 Conference Cambridge Cafeteria Composting
2018 R3 Conference Cambridge Cafeteria Composting
 
2018 R3 Conference ACA Paint Stewardship
2018 R3 Conference ACA Paint Stewardship2018 R3 Conference ACA Paint Stewardship
2018 R3 Conference ACA Paint Stewardship
 
2018 R3 Conference ISPA Mattress Recycling
2018 R3 Conference ISPA Mattress Recycling2018 R3 Conference ISPA Mattress Recycling
2018 R3 Conference ISPA Mattress Recycling
 
2018 R3 Conference MASSPSC Update
2018 R3 Conference MASSPSC Update2018 R3 Conference MASSPSC Update
2018 R3 Conference MASSPSC Update
 
2018 R3 Conference Morning Keynote - City of Boston Zero Waste Planning
2018 R3 Conference Morning Keynote - City of Boston Zero Waste Planning2018 R3 Conference Morning Keynote - City of Boston Zero Waste Planning
2018 R3 Conference Morning Keynote - City of Boston Zero Waste Planning
 
2018 R3 Conference Intro and Annual Meeting
2018 R3 Conference Intro and Annual Meeting2018 R3 Conference Intro and Annual Meeting
2018 R3 Conference Intro and Annual Meeting
 
Donovan mr 2017 k12 compost final
Donovan mr 2017 k12 compost finalDonovan mr 2017 k12 compost final
Donovan mr 2017 k12 compost final
 
Ipswich systemsofsustainabilitypres3 2017
Ipswich systemsofsustainabilitypres3 2017Ipswich systemsofsustainabilitypres3 2017
Ipswich systemsofsustainabilitypres3 2017
 

Recently uploaded

RoHS stands for Restriction of Hazardous Substances, which is also known as t...
RoHS stands for Restriction of Hazardous Substances, which is also known as t...RoHS stands for Restriction of Hazardous Substances, which is also known as t...
RoHS stands for Restriction of Hazardous Substances, which is also known as t...
vijaykumar292010
 
Environment Conservation Rules 2023 (ECR)-2023.pptx
Environment Conservation Rules 2023 (ECR)-2023.pptxEnvironment Conservation Rules 2023 (ECR)-2023.pptx
Environment Conservation Rules 2023 (ECR)-2023.pptx
neilsencassidy
 
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Joshua Orris
 
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener FutureBiomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
Dr. P.B.Dharmasena
 
Lessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approachesLessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approaches
CIFOR-ICRAF
 
Wildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environmentWildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environment
amishajha2407
 
world-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptxworld-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptx
mfasna35
 
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENTBASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
AmitKumar619042
 
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
p2npnqp
 
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
astuz
 
PACKAGING OF FROZEN FOODS ( food technology)
PACKAGING OF FROZEN FOODS  ( food technology)PACKAGING OF FROZEN FOODS  ( food technology)
PACKAGING OF FROZEN FOODS ( food technology)
Addu25809
 
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
pjq9n1lk
 
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Joshua Orris
 
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
mvrpcz6
 
Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...
Open Access Research Paper
 
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Open Access Research Paper
 

Recently uploaded (16)

RoHS stands for Restriction of Hazardous Substances, which is also known as t...
RoHS stands for Restriction of Hazardous Substances, which is also known as t...RoHS stands for Restriction of Hazardous Substances, which is also known as t...
RoHS stands for Restriction of Hazardous Substances, which is also known as t...
 
Environment Conservation Rules 2023 (ECR)-2023.pptx
Environment Conservation Rules 2023 (ECR)-2023.pptxEnvironment Conservation Rules 2023 (ECR)-2023.pptx
Environment Conservation Rules 2023 (ECR)-2023.pptx
 
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
 
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener FutureBiomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
 
Lessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approachesLessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approaches
 
Wildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environmentWildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environment
 
world-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptxworld-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptx
 
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENTBASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
 
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
 
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
 
PACKAGING OF FROZEN FOODS ( food technology)
PACKAGING OF FROZEN FOODS  ( food technology)PACKAGING OF FROZEN FOODS  ( food technology)
PACKAGING OF FROZEN FOODS ( food technology)
 
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
 
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
 
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
 
Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...
 
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
 

Berms mass swana march 2017

  • 1. What You Need to Know About MSE Berms March 27, 2017
  • 2. Overview • MSE Berm Design • MSE Berm Construction • MSE Berm Monitoring ARM Group Inc. A Technically Oriented Earth Sciences & Engineering Firm 2
  • 3. 3 MSE Berm Design ARM Group Inc. Vision. Partnership. Results.
  • 4. MSE Berm Design 4 Conceptual Layout: • Geometric optimization Thorough Site Investigation: • Soil borings/test pits • Laboratory testing • Groundwater characterization • Field reconnaissance ARM Group Inc. Vision. Partnership. Results.
  • 5. MSE Berm Design 5ARM Group Inc. Vision. Partnership. Results. How Tall to Make Berm Costs & Losses Total Harms
  • 6. MSE Berm Design 6 Design Considerations Soil specifications: • What soil is available and from where will it be sourced? Soil can greatly impact project economics. • Does soil require special processing or drainage features to be installed within MSE berm? • Any special conformance testing? • What is the strength of the soil? • What stress conditions will be present? Geosynthetic reinforcement specifications: • What are the appropriate reduction factors? • Any special conformance testing? Subgrade/Subsurface conditions: • Any subgrade requirements? Drainage? Rate of construction and/or consolidation? ARM Group Inc. Vision. Partnership. Results.
  • 7. MSE Berm Design 7ARM Group Inc. • Determine “critical” stability sections based upon geometry, existing conditions, loading conditions, etc. • Iterative process to ensure adequate factors of safety for internal, global, and compound stability. • Geosynthetic reinforcement elements are lengthened, shortened, or strengths are changed to get adequate factors of safety. • Great advancements in slope stability software in the past 10 years. Slope Stability Analysis
  • 8. MSE Berm Design 8 • Additional cross-sections can optimize geosynthetic reinforcement design (i.e., reduce required length and/or spacing requirements and consequently, costs). • Optimize design for a consistent factor of safety throughout the length of the berm. • Review design for conflicts with infrastructure. Geogrid Optimization ARM Group Inc. Vision. Partnership. Results. DRAINAGE! DRAINAGE! DRAINAGE!
  • 9. MSE Berm Design 9 Design Insights  Experienced geotechnical engineers familiar with MSE berm design are critically important. Additionally, experienced design engineers can save client significant money in Total Project Cost.  If geosynthetic reinforcement vendors are used during the design, global & compound stability must be independently confirmed by geotechnical engineer.  Design guidance provided by FHWA Publications: • Slopes vs. Walls • Fine vs. Coarse Grained Soils • Performance Criteria • Design Life ARM Group Inc. Vision. Partnership. Results.
  • 10. MSE Berm Design 10 Unique ARM Designs • Solar Integrated MSE Berm (patented) • MSE Berm on Waste Subgrade • Alternative Backfill (crushed asphalt/brick/concrete) [ABC Material] • Shored MSE Berms • Soft, Saturated Subgrade • Ash Backfill MSE Berm ARM Group Inc. Vision. Partnership. Results.
  • 11. Innovation 11  ARM patented technology.  Anchors for the solar panels are installed within the MSE berm.  Photovoltaic solar panels are attached to the anchors along the face of the MSE berm.  Important environmental benefits.  Maximization of the revenue generating area at a facility. Solar-integrated MSE Berms ARM Group Inc. Vision. Partnership. Results.
  • 12. Innovation 12  The availability and cost of suitable structural fill will significantly impact the bottom-line of an MSE berm project.  Crushed concrete, asphalt, and masonry may be a suitable backfill source.  ARM designed an MSE berm using incinerator ash as backfill for a landfill in Pennsylvania. Alternative Backfill / Beneficial Reuse ARM Group Inc. Vision. Partnership. Results.
  • 13. MSE BERM CONSTRUCTION 13ARM Group Inc. Vision. Partnership. Results.
  • 14. MSE Berm Construction 14 Typical Facing Detail ARM Group Inc. Vision. Partnership. Results.
  • 15. MSE Berm Construction 15 Subgrade Preparation and MSE Berm Construction ARM Group Inc. Vision. Partnership. Results.
  • 16. MSE Berm Construction 16 Welded wire form and biaxial (facing) geogrid installation ARM Group Inc. Vision. Partnership. Results.
  • 17. MSE Berm Construction 17 Installation of ECM following biaxial geogrid. ARM Group Inc. Vision. Partnership. Results.
  • 18. MSE Berm Construction 18 Setting uniaxial geogrid following installation of ECM and biaxial geogrid. ARM Group Inc. Vision. Partnership. Results.
  • 19. MSE Berm Construction 19 Uniaxial geogrid, ECM, and bodkin connection installation
  • 20. MSE Berm Construction ARM Group Inc. 20 Separation of uniaxial geogrid and reinforced backfill installation.
  • 21. MSE Berm Construction 21 Progression of reinforced backfill installation and interior slope grading ARM Group Inc. Vision. Partnership. Results.
  • 22. MSE Berm Construction 22 Liner installation on interior slope of MSE berm. ARM Group Inc. Vision. Partnership. Results.
  • 23. MSE Berm Construction 23 Utilities atop MSE berm crest and access road. Protective cover visible on slope, leachate pump system riser pipes, valve vault, anchor trench low-perm soil, litter control fence poles, and stormwater management channel. ARM Group Inc. Vision. Partnership. Results.
  • 24. MSE Berm Construction 24 Utilities atop MSE berm crest and access road. Litter control fence poles, and stormwater management drop inlet channel with trash rack – future tie-in for final cover system downchute. ARM Group Inc. Vision. Partnership. Results.
  • 25. MSE Berm Construction 25 Options: 45’ tall steel litter control fence poles, heavy duty guiderail, security fence, and access road pavement. ARM Group Inc. Vision. Partnership. Results.
  • 26. MSE Berm Construction 26 Vegetated MSE berm facing ARM Group Inc. Vision. Partnership. Results.
  • 27. MSE Berm Construction 27ARM Group Inc. Vision. Partnership. Results.
  • 28. MSE Berm Construction 28  Construction inspection and testing are critical for MSE berm projects  Experienced construction monitors are essential  Experienced contractors can make a large difference in project success  Quality construction materials are important  Construction inspection certification provides added assurance to stakeholders Construction-Phase Engineering and Construction Quality Assurance Experienced construction-phase engineering and CQA are essential for MSE berm projects to be completed on-time, within budget, and in accordance with the permitted design and CQA Plan. ARM Group Inc. Vision. Partnership. Results.
  • 29. MSE BERM MONITORING 29ARM Group Inc. Vision. Partnership. Results.
  • 30. MSE Berm Monitoring 30 Possible Instrumentation:  Settlement Plates  Survey Monuments  Inclinometers MSE berms should be inspected on a regular basis. Inclinometers are the most prevalent.  Provide continuous monitoring of displacement throughout the MSE berm and subgrade profile. Visual Inspections  Should be completed by a PE with MSE berm experience. ARM Group Inc. Vision. Partnership. Results.
  • 31. MSE Berm Monitoring 31 Projects should develop a comprehensive Monitoring, Maintenance, & Inspection Plan. Monitoring Program: • Instrumentation Readings • Data Analyzation Inspection Program: • Routine site inspections • PE inspections • Erosion, vegetation, geogrid assessment, movement, etc. • Annual alignment survey Maintenance Program: • Vegetation maintenance • Stormwater channel maintenance • Roadway maintenance ARM Group Inc. Vision. Partnership. Results.
  • 32. Thank You 32 Questions? Benjamin S. Allen, P.E. ARM Group Inc. ballen@armgroup.net Phone: (717) 250-5581 ARM Group Inc. Vision. Partnership. Results.
  • 33. ARM Group Inc. 33  Established in 1998  Civil and Environmental Engineering Firm  Full suite of services to support the solid waste industry  Office & Personnel Locations: o Hershey, PA (HQ) o State College, PA o Wilkes-Barre, PA o Pittsburgh, PA o Columbia, MD  MSE berm designs at landfills in PA, CT, & MA ARM Group Inc. Vision. Partnership. Results.