3. INTRODUCTION
I take pleasure in introducing “K Gowda & co”
construction company located at 1st floor Jnana Bharathi
main road , law college road Nagarbhavi, Bangalore-
560072
The scheme under which we done our internship is
“Police gruha 2020 Scheme” carried out by K Gowda &
co, company.
we attended internship for one month from july 7th -
2018.
6. SAILENT FEATURES OF THE PROJECT
Name of the work
Construction of 128PC Quarters in Nagarabhavi (PKG-
22),Bangalore District Under Police Gruha 2020
Work order No PHC/CNT/PG2020/PKG-22/42/2017-18/WI-583
Name of Agency K GOWDA AND CO
Estimate Amount 21,36,26,200/-
Tender Amount 20,91,00,000/-
Percentage 6.64% below CSR (2016-2018)
No of Units 128
No of Blocks 2
Type of Shuttering Convention method
Carpet Area/Flat 59.518sqm (640.41 SFT)
Built up area/ Floor 68.090sqm (732.64SFT)
No of Floors STILT+8
Date of Commencement of work
as per Agreement
26/03/2018
DATE OF SITE HANDOVER
DATE
27/11/2017
Date of Completion as per
Agreement
25/09/2019
11. Ready Mixed Concrete is a tailor – made concrete that is manufactured in a
factory or within a batching plant based on the standard required
specifications. The prepared concrete mix is then taken to the work site
within transit mixers mounted over a truck
Maintenance of Batching Plant
Methods of Batching Concrete
Types of Ready Mix Concrete Plants
Inspection and Testing of Ready Mix Concrete
how to control wastage of concrete at site?
Advantages of Ready Mixed Concrete
13. Plinth Beam
Applications of Plinth Beam
Concrete Strength Suitable for Plinth Beam Construction
Minimum Dimension of a Plinth Beam
Formwork for Plinth Beam
Steel Bars Used for Plinth Beam
15. Types of Formwork (Shuttering) Based on Structural
Member
Footing Forms – Formworks for foundation
Column Forms – Formwork for RCC Column
construction
Floor Forms – Formwork for construction of RCC
Slabs
16. CONCRETE WORKABILITY FOR
DIFFERENT PLACING CONDITIONS
Degree of Workability for Different Placing Conditions
Mode of Concrete Measurements at Site
21. • Factors which influence the concrete slump test:
• Equipments Required for Concrete Slump Test
• Procedure for Concrete Slump Cone Test
• Results of Slump Test on Concrete
25. • Limits of Fineness Modulus of Sand
• Effective Size of Aggregates
• Uniformity Coefficient of Aggregates
• Apparatus for Grain Size Analysis
• Procedure of Grain Size Analysis of Aggregates
• Calculations in Grain Size Analysis
• Results of Grain Size Analysis
29. • Procedure: Compressive Strength Test of Concrete Cubes
• Apparatus for Concrete Cube Test
• Preparation of Concrete Cube Specimen
• Mixing of Concrete for Cube Test
• Curing of Cubes
• Procedure for Concrete Cube Test
• Calculations of Compressive Strength
• Results of Concrete Cube Test
30. CONCLUSION
Under the guidance of Mr.Manohar sir (site Eng. - Projects) as a
mentor, we have got opportunity to understand the technical and
managerial aspect of residential housing project. The main aim of
studies within this project was to investigate how a structure is
constructed within its desired properties. We got to know about the
basic & advanced techniques of building construction as well as saw
the challenges which a civil engineer have to face during construction
i.e. labor problems, cost management, environmental challenges etc.
We cleared our many doubts regarding building construction. Overall
it must be said that the construction methods and quality control on a
residential project needs a very good coordination and large quantities
of man power, equipment and funds. During the period of 30 days all
the site staff helped us a lot to provide all the information about any
query. During the period of 30 days all the site staff helped us a lot to
provide all opportunity to learn and grow