This document discusses disaster recovery best practices from Plan B Disaster Recovery Ltd. It emphasizes the importance of testing disaster recovery plans regularly, as most failures occur during initial tests. It also recommends automating recovery plans as much as possible and prioritizing a fast recovery time. The document discusses how Plan B's pre-recovery service can provide a tested hot standby system to enable recovery within minutes at a lower cost than traditional disaster recovery methods. It provides two case studies where Plan B's pre-recovery system successfully enabled fast recovery and minimal business disruption following an IT disaster.