Upgrading the 
Telecommunication 
System
Every organization relies 
on good communication to 
succeed
There are times when our 
methods have become 
outdated
Legacy Equipment has 
several drawbacks 
• Less Efficient 
• Not Scalable 
• Cannot Connect to 
Internet
Purchasing a new telecommunication 
system allows the company to: 
 Streamline operations 
 Automated callbacks and reminders 
 Enable Smart technology 
 Fully integrate all systems 
 Reduce cost
Voice Over Internet Protocol 
 Automatic switching 
 Network Traffic control 
 Hardware is Present
Implementing a switch would 
require little down time 
 Installed over the weekend 
 Minimal training required 
 24/7 Support
Risks 
 Hardware/Software problems 
 Employee confusion 
 Network slowdown 
 Delayed installation
Recommendations 
1. Create a project plan 
2. Hire 3rd party contractor 
3. Train employees 
4. Implement switch 
5. Troubleshoot 
6. Assess and evaluate
It’s time to make the change! 
I hope this proposal helps you see the value 
of what new technology can bring 
Thank you for your time!
Prepared by: 
James Keener 
www.slideshare.net/jalkeener/upgrading-the-telecommunication-system-42537198

Upgrading St. Luke's telecommunication system

  • 1.
  • 2.
    Every organization relies on good communication to succeed
  • 3.
    There are timeswhen our methods have become outdated
  • 4.
    Legacy Equipment has several drawbacks • Less Efficient • Not Scalable • Cannot Connect to Internet
  • 5.
    Purchasing a newtelecommunication system allows the company to:  Streamline operations  Automated callbacks and reminders  Enable Smart technology  Fully integrate all systems  Reduce cost
  • 6.
    Voice Over InternetProtocol  Automatic switching  Network Traffic control  Hardware is Present
  • 7.
    Implementing a switchwould require little down time  Installed over the weekend  Minimal training required  24/7 Support
  • 8.
    Risks  Hardware/Softwareproblems  Employee confusion  Network slowdown  Delayed installation
  • 9.
    Recommendations 1. Createa project plan 2. Hire 3rd party contractor 3. Train employees 4. Implement switch 5. Troubleshoot 6. Assess and evaluate
  • 10.
    It’s time tomake the change! I hope this proposal helps you see the value of what new technology can bring Thank you for your time!
  • 11.
    Prepared by: JamesKeener www.slideshare.net/jalkeener/upgrading-the-telecommunication-system-42537198