Hunter Mill Road and Sunset Hills Road StudyFairfax County
Hunter Mill Road and Sunset Hills Road Study
Kick Off Meeting Dec. 8, 2014
There is recurring congestion Hunter Mill Road from Sunrise Valley Drive to the Colvin Run Bridge during the morning and evening peak hours. The congestion is heavily concentrated at the intersections of Sunset Hills Road and the west bound Dulles Toll Road ramps at Hunter Mill Road. These two intersections are closely spaced and constrained by the existing bridge. The number of vehicles using Hunter Mill Road is forecasted to increase in the future. The opening of the Wiehle Avenue-Reston East Metrorail station in 2014, new development anticipated in Reston, and an increase in background traffic associated with development elsewhere in the region are likely to increase vehicular traffic in this area. This study will look at alternatives to mitigate the existing conditions and future conditions to ensure traffic can move efficiently through the intersections.
Shirley Gate Road Extended Corridor Planning StudyFairfax County
This presentation on the Shirley Gate Road extension was presented to the Fairfax County Board of Supervisors Transportation Committee on July 19, 2016.
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
During a routine Closed-Circuit Television (CCTV) Camera inspection by Wastewater Collection Division (WCD), it was found that 45 linear feet of 8-inch asbestos reinforced concrete pipe (RCP) between MH-292 to MH-291 was within imminent danger of failing. The bottom of the RCP was missing within the 45 linear feet of repair and the pipe was on the verge of surcharging. After an immediate pre-construction meeting with Merrifield Nursery, it was agreed to work from 6pm-10am everyday of the week to avoid disruption and potentially placing patrons at risk during the biggest time of the year for Merrifield Garden Center. The contractor mobilized to the site and began the 20-foot excavation to replace 45 linear feet of broken gravity sewer. The project started on March 14th, 2022 and was substantially complete on March 23, 2022.
The Sully Basins Stormwater Pond Retrofits project was substantially completed on April 19, 2022. The project is located within the Cub Run watershed. The project consisted of repair and enhancement of multiple stormwater basins, 0326DP, 0964DP and 1484DP. The project also included construction of new stone cascades, stone weir basin structures and the construction of wetlands with high and low marsh areas. The project will facilitate improved sediment removal and improve downstream water quality using forebays and micro pools. Aquatic and natural habitat were also added within the three basins.
Clarks Crossing Road Improvements 05-13-22Fairfax County
The Clarks Crossing Road Pedestrian Access Improvement project improved the pedestrian and bicycle access along Clarks Crossing Road and was substantially completed on March 23, 2022.
This project completed the missing link between the existing sidewalk at Brookside Lane and the previously constructed sidewalk along Clarks Crossing Road. The scope of this project included construction of asphalt sidewalk, curb ramps, curb and gutter, drainage improvements along Brookside Lane and asphalt mill/overlay on Clarks Crossing and Brookside Lane.
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
Future wastewater flows in northern Fairfax County exceed existing system capacity
Treatment capacity is available in Noman M. Cole Jr. Pollution Control Plant in Lorton, VA
New pipes and pumps are needed to move future flows to treatment plant
NEXT STEPS
Field investigations / surveys
Finalize alignments and pump station layout
Use of open cut excavation
Use of trenchless methods
Easement acquisition needed
Develop traffic control plans
Description:
The project consists of a new, 23,000 square feet, two-story, four-bay fire station facility and associated improvements to the 3.3-acre site including storm water detention, landscaping and parking. The scope also included the demolition of the existing fire station, and a temporary fire station to house the Fire and Rescue Department during construction of the new facility. The key elements of the overall project include:
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
Scotts Run @ Old Meadow Road Stream Restoration was substantially completed on March 30, 2022. The Scotts Run project consisted of restoring, enhancement, and stabilizing of approximately 2,930 linear feet of eroding stream using Natural Channel Design criteria. This project included two phases: Phase I was funded by proffers from a private development and Phase II was County funded. Also included was the removal of invasive non-native plants and the installation of new plantings to stabilize the stream and floodplain.
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
The new 4-inch ductile iron force main will serve the surrounding community for the foreseeable future. Replacement of the force main will:
Reduce the level and frequency of maintenance required to keep the force main operating.
Prevent costly emergency repairs.
Provide residents with safe, reliable utility infrastructure.
Enhance the quality of life for residents.
Reduce risks to public health and the environment.
Burke Centre VRE Connector Phase IV project was substantially completed on March 7, 2022. This project enhanced the access to mass transit by creating a more direct connection from the VRE Station to the residential areas west of Premier Court. This project also connects the Oak Bluff community to the Virginia Rail Express (VRE) Burke Station and provides a multi-use shared pedestrian and bicycle trail for outdoor recreation.
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
Overarching Project Goals:
-Achieve Long Branch Central TMDL waste load reduction requirements.
-Provide long-term stability and have low maintenance.
-Improve water quality within the Long Branch Central Watershed.
-Improve habitat and environmental health (ecological lift).
Objectives: Share our project understanding with the council and seek input on the unique opportunities and housing goals for this site that could help guide
our master planning process.
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
4,800 linear feet of stream will be restored using Natural Channel Design methodologies
Pollutant reduction
1,439 lbs/total phosphorus
3,400 lbs/total nitrogen
462.1 tons of total suspended sediment
Protection of private property and public infrastructure
Increased ecological diversity with native vegetation
DEQ has awarded a SLAF grant to this project for these environmental benefits
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
The Lake Barton Dredging, Restoration, and Riser Modification project was substantially completed on December 29, 2021. The project is located within the Pohick Creek watershed. The project consisted of dredging and removal of approximately 19,100 cubic yards of sediment to restore the sediment trapping capacity and improve water quality. The project also included construction of new sediment forebays, in-lake haul roads, and riser modifications (new mid-level sluice gate and cold-water intake) to facilitate future maintenance, stabilize the shoreline, and improve downstream water quality. Fish habitat was also added within the lake.
Reston Arts Community Center Feasibility - Wrap UpFairfax County
This is the last of 5 engagement meetings. We are excited to report back what we heard from you – your preferences, priorities, questions, hopes, concerns. The information we received will be used to inform the space allocations and cost estimating for discussion of the proffer by Fairfax County.
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
Benefits of Consolidated Facility
Building and Site Efficiencies
Operational Efficiencies
Addresses Space Deficiencies
Addresses Renovations and Capital Renewal Requirements
for WCD
Provides for a Centrally Located Site that Accommodates Program
Consolidates Integrated Services on One Centrally Located Site
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
This is the 4th of 5 engagement meetings. We are excited to hear from you – your preferences, priorities, questions, hopes, concerns. The information we receive today will be used to inform the space allocations and cost estimating for discussion of the proffer by Fairfax County.
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
Neighborhood was built in the 1980s, and the sewer infrastructure has been in operation since.
Aged pump station equipment – pumps, valves, fans, concrete, etc.
This aging equipment has the potential of causing:
Sanitary Sewer Overflows (SSO)
Sewer back-ups into homes
Environmental damages
Maintenance problems
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
Identify and evaluate house flooding and public safety concerns
Improve drainage conditions to convey 100-year storm if feasible
Reduce and treat stormwater runoff at the source
Improve water quality and stream protection
Use resilient & functional designs
Make improvements compatible with characteristics of neighborhood
Partner with community to develop sound, cost effective solutions that can be collaboratively implemented and maintained
Build on lessons learned to help improve site development process for infill development
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
These community outreach meetings are being conducted to understand community needs for a proposed arts venue in the Reston Town Center.
The proposed arts center would be a result of a proffer from Boston Properties in the next phase of Reston Town Center development (Block J).
The proffer would provide for an approximately 60,000 gross square foot facility to house a stage suitable for large-scale music and dance performances, as well as other arts-related amenities.
03062024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
role of women and girls in various terror groupssadiakorobi2
Women have three distinct types of involvement: direct involvement in terrorist acts; enabling of others to commit such acts; and facilitating the disengagement of others from violent or extremist groups.
In a May 9, 2024 paper, Juri Opitz from the University of Zurich, along with Shira Wein and Nathan Schneider form Georgetown University, discussed the importance of linguistic expertise in natural language processing (NLP) in an era dominated by large language models (LLMs).
The authors explained that while machine translation (MT) previously relied heavily on linguists, the landscape has shifted. “Linguistics is no longer front and center in the way we build NLP systems,” they said. With the emergence of LLMs, which can generate fluent text without the need for specialized modules to handle grammar or semantic coherence, the need for linguistic expertise in NLP is being questioned.
31052024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
01062024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
हम आग्रह करते हैं कि जो भी सत्ता में आए, वह संविधान का पालन करे, उसकी रक्षा करे और उसे बनाए रखे।" प्रस्ताव में कुल तीन प्रमुख हस्तक्षेप और उनके तंत्र भी प्रस्तुत किए गए। पहला हस्तक्षेप स्वतंत्र मीडिया को प्रोत्साहित करके, वास्तविकता पर आधारित काउंटर नैरेटिव का निर्माण करके और सत्तारूढ़ सरकार द्वारा नियोजित मनोवैज्ञानिक हेरफेर की रणनीति का मुकाबला करके लोगों द्वारा निर्धारित कथा को बनाए रखना और उस पर कार्यकरना था।
‘वोटर्स विल मस्ट प्रीवेल’ (मतदाताओं को जीतना होगा) अभियान द्वारा जारी हेल्पलाइन नंबर, 4 जून को सुबह 7 बजे से दोपहर 12 बजे तक मतगणना प्रक्रिया में कहीं भी किसी भी तरह के उल्लंघन की रिपोर्ट करने के लिए खुला रहेगा।
Balls Hill Road and Old Dominion Drive Roadway Spot Improvement Intersection Alternative Study Public Information Meeting
1. County of Fairfax, Virginia
Department of Transportation
Balls Hill Road & Old Dominion Drive
Roadway Spot Improvement
Intersection Alternative Study
Public Information Meeting
Cooper Middle School
November 28, 2018
7:45 P.M.
Project Manager – Gibran Abifadel
2. County of Fairfax, Virginia
Department of Transportation
2
1. Project Location and Purpose
2. Project Background
3. Existing Conditions
4. Level of Service
5. Developer Projects
6. Intersection Improvement Alternatives (Alts. A-C)
7. Preferred Alternative (Alt A.1)
8. June 28, 2018 – Public Meeting Update
9. Project Schedule and Funding
10. Questions and Answers
Agenda
3. County of Fairfax, Virginia
Department of Transportation
3
Project Location
4. County of Fairfax, Virginia
Department of Transportation
4
• Improve traffic flow through the intersection by improving
geometry, signal operations, accessibility, and safety.
Project Purpose
5. County of Fairfax, Virginia
Project Background
• Partial funding for alternative analysis was included in the
Transportation Priorities Plan approved by the Board in 2014
• Study started March 2016
• Conceptual design and analysis of four alternatives
Department of Transportation
5
6. County of Fairfax, Virginia
Department of Transportation
6
1. Weekday AM Peak Hour – Example of
WB of Old Dominion Drive Queueing
2. Old Dominion Drive looking northwest
3. Balls Hill Road looking north
1
2
3
Existing Conditions
7. County of Fairfax, Virginia
• Poor intersection operations
• Back-ups in the A.M. & P.M. peak periods
• Poor sight distance at all legs of the intersection
• Left turns act as U-turns from Old Dominion Drive onto
Balls Hill Road
• Right turns act as U-turns from Balls Hill Road onto
Old Dominion Drive
Department of Transportation
7
Existing Conditions
8. County of Fairfax, Virginia
Department of Transportation
8
Level of Service
Control Delay (seconds per vehicle)
Signalized Intersection Unsignalized Intersection
A ≤ 10 ≤ 10
B >10 and ≤20 >10 and ≤15
C >20 and ≤35 >15 and ≤25
D >35 and ≤55 >25 and ≤35
E >55 and ≤80 >35 and ≤50
F > 80 > 50
LOS Criteria - Highway Capacity Manual 2010
Level of Service (LOS) Overview
9. County of Fairfax, Virginia
Department of Transportation
9
AM Peak hr.: 7:45 AM to 8:45 AM
PM Peak hr.: 5:00 PM to 6:00 PM
Existing Conditions
SCENARIO
AM LOS &
Overall Intersection Delay
PM LOS &
Overall Intersection Delay
Existing - 2016
F
209.3 seconds
F
207.5 seconds
11. County of Fairfax, Virginia
Department of Transportation
11
Mehr Farms
Proposed
Summerstone
Mehr Farms
As of October 2018,
Owned by
Fairfax County Board
of Supervisors
12. County of Fairfax, Virginia
Department of Transportation
12
Alternative A – T-Intersection
Alternative A
Pros
•Solves delay and queuing issues
•Incorporates improved access for Mehr
Farms and possible future development
west of existing intersection
Cons
•Unconventional southern intersection
– Improvement of this conceptual design in A.1
13. County of Fairfax, Virginia
Department of Transportation
13
Alternative B – Roundabout
Alternative B
Pros
•Improvement in LOS to C/C for 2040
AM/PM
•Reduces queuing
•Improves alignment at Balls Hill Road and
Old Dominion Drive intersection
Cons
•The cost and impacts associated with right-
of-way
•Poor access management east and west of
the intersection for developments
14. County of Fairfax, Virginia
Department of Transportation
14
Alternative C – Addition of Dedicated Left-Turn Lanes
Alternative C
Pros
•Improvement in LOS to D/E in 2040 AM/PM
•No major road link realignments (widens along
existing alignment)
Cons
•Poor access management of Mehr Farms
(Greyson Woods Lane) and potential future
development west of the intersection
15. County of Fairfax, Virginia
Department of Transportation
15
Recommended Alternative
Alternative A.1 – T-Intersection Improved
16. County of Fairfax, Virginia
Department of Transportation
16
Alternative A.1 – T-Intersection Improved
(Mehr Farms)
Alternative A.1
(Continued)
Pros
•Improved Access
management to and
from the Mehr Farm’s
development
•Future access
management west of
the intersection will also
be improved
17. County of Fairfax, Virginia
Department of Transportation
17
Alternative A.1 – T-Intersection Improved
Pedestrian Access
18. County of Fairfax, Virginia
Summary of Public Comments
• 32 comments received
• Many comments indicated an improvement is needed for
the congestion in the area
• Roundabout and T-Intersection (A.1) were the
suggested alternatives citizens preferred
• Pedestrian and cyclist access is important for mobility
and access to McLean’s Downtown and recreational use
• Improvement will ease cross-neighborhood access for
residents
Department of Transportation
18
19. County of Fairfax, Virginia
Common Reasons Respondents Oppose Alts.
• Roundabout would be difficult to navigate
• Right-of-Way needs to be compared between the
Roundabout and T-Intersection Alternatives
• Better termination points for pedestrian connectivity
needs to be addressed in design
Department of Transportation
19
20. County of Fairfax, Virginia
Right-of-Way at Mehr Farms Alternative B
Department of Transportation
20
• Mehr Farms home cost is $1.8
Million +
• Roundabout requires 3 homes
to purchase at a minimum
estimate of $5.4 Million
– However, this number could
increase
21. County of Fairfax, Virginia
Right-of-Way Summerstone Alternative A.1
Department of Transportation
21
• This site was approved for
4 new homes in April 2018
• Purchased in October 2018
• Provides space for
construction access and
room for storm water
management facilities
22. County of Fairfax, Virginia
Department of Transportation
22
• Fall 2018
• Spring 2019 – Spring 2023
• Spring 2021 – Spring 2023
• Spring 2023 – Fall 2024
• Board of Supervisors approved $20.5 million local funding for
Balls Hill Road at Old Dominion Drive intersection improvement
on May 15, 2018.
Finalize Study
Preliminary Engineering Design
Right-of-Way Acquisition
Construction
Anticipated Project Schedule and Funding
23. County of Fairfax, Virginia
Department of Transportation
23
Questions and Answers
For more information, visit
www.fairfaxcounty.gov/transportation/projects/balls-hill-road
or contact Gibran Abifadel at
Gibran.Abifadel@fairfaxcounty.gov