Assignment No.2
SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
Centre for Modern Architecture Studies in Southeast Asia
Bachelor of Quantity Surveying (Honours)
MEASUREMENT I [QSB 10604]
____________________________________________________________
Assignment Title: No.2 (Group Project)
Cadangan membina dan menyiapkan kem batalion 4 PGA Sememyih dan sebuah balai polis diatas PT
3821, Mukim Semenyih, Daerah Hulu Langat, Selangor.
Percentage of Assessment: 20%
Submission Date: 4 December 2015
Assessment brief
Based on the drawings provided, you are required to prepare a COMPLETE TAKING-OFF for the following
structural elements of the chosen building.
 Pad footings including excavations from reduce level.
 Work below ground floor level including excavations, ground floor slab and apron slab etc.
 Ground floor beams
 Column stumps, columns and stiffeners
 Roof beams
Notes
 Excavate topsoil 150 mm deep to be disposed off- site, hardcore to be 150mm thick.
Assessment Criteria
Refer to matrix attached.
Assignment No.2
Teaching Objectives
 To develop an understanding of the principles of measurement and techniques in preparing the
Bills of Quantities and Specification writing.
 To develop an awareness of the nature, content, and significance of tendering and contractual
documentation.
 To have sufficient knowledge and understanding of the Standard Method of Measurement in
taking-off quantities.
Learning Outcomes
Upon successful completion of this assignment, students will be able to:
 Explain and able to interpret clauses in the Standard Method of Measurement (SMM) and adopt a
systematic approach to take-off quantities from drawing for the various trades in relation to sub-
structure and reinforced concrete frame works.
 Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for
sub-structure and reinforced concrete frame works.
 Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender
Documents for sub-structure and reinforced concrete frame works.
 Generate a conceptual understanding of and the ability to competently carry out the preparation of
the Bills of Quantities for sub-structure and reinforced concrete frame works.
Submission rules
Individual submission to Group Leader will consist of the following:
 Billing paper (handwritten)
 Query list
 Taking-off list
 Dimension sheets
 Peer assessment Form
The group leader will collect everyone's work and compile it in a binded document (comb binding) with a
COVER of the university's logo and all the names of all group members. He will also need to do a
SUMMARY of all the Billing Papers and to submit a complete BILL followed by everyone's work.
The Bill of Quantities will be arranged in the following sequence:
 Billing ( to insert in front of BQ and hand written )
 Work below ground floor level including excavations, ground floor slab and apron slab etc.
 Ground floor beams
 Column stumps, columns and stiffeners
 Roof beams.

Assignment no.2

  • 1.
    Assignment No.2 SCHOOL OFARCHITECTURE, BUILDING AND DESIGN Centre for Modern Architecture Studies in Southeast Asia Bachelor of Quantity Surveying (Honours) MEASUREMENT I [QSB 10604] ____________________________________________________________ Assignment Title: No.2 (Group Project) Cadangan membina dan menyiapkan kem batalion 4 PGA Sememyih dan sebuah balai polis diatas PT 3821, Mukim Semenyih, Daerah Hulu Langat, Selangor. Percentage of Assessment: 20% Submission Date: 4 December 2015 Assessment brief Based on the drawings provided, you are required to prepare a COMPLETE TAKING-OFF for the following structural elements of the chosen building.  Pad footings including excavations from reduce level.  Work below ground floor level including excavations, ground floor slab and apron slab etc.  Ground floor beams  Column stumps, columns and stiffeners  Roof beams Notes  Excavate topsoil 150 mm deep to be disposed off- site, hardcore to be 150mm thick. Assessment Criteria Refer to matrix attached.
  • 2.
    Assignment No.2 Teaching Objectives To develop an understanding of the principles of measurement and techniques in preparing the Bills of Quantities and Specification writing.  To develop an awareness of the nature, content, and significance of tendering and contractual documentation.  To have sufficient knowledge and understanding of the Standard Method of Measurement in taking-off quantities. Learning Outcomes Upon successful completion of this assignment, students will be able to:  Explain and able to interpret clauses in the Standard Method of Measurement (SMM) and adopt a systematic approach to take-off quantities from drawing for the various trades in relation to sub- structure and reinforced concrete frame works.  Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for sub-structure and reinforced concrete frame works.  Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender Documents for sub-structure and reinforced concrete frame works.  Generate a conceptual understanding of and the ability to competently carry out the preparation of the Bills of Quantities for sub-structure and reinforced concrete frame works. Submission rules Individual submission to Group Leader will consist of the following:  Billing paper (handwritten)  Query list  Taking-off list  Dimension sheets  Peer assessment Form The group leader will collect everyone's work and compile it in a binded document (comb binding) with a COVER of the university's logo and all the names of all group members. He will also need to do a SUMMARY of all the Billing Papers and to submit a complete BILL followed by everyone's work. The Bill of Quantities will be arranged in the following sequence:  Billing ( to insert in front of BQ and hand written )  Work below ground floor level including excavations, ground floor slab and apron slab etc.  Ground floor beams  Column stumps, columns and stiffeners  Roof beams.