Abstract—As Malaysia aims to be a developed country by year
2020; the construction industry has since been identified as a major
catalyst for the country to attain the status. It is one of the sectors that
contribute to most environmental pollutions. It is, therefore,
important for the industry to implement sustainable construction
practices to reduce the negative impacts that it has on the
environment. However, most Malaysian developers have placed
much focus on market demand and economic factors; neglecting the
need for attention on environmental issues. The practice of
sustainable construction is deemed to be an obstacle to achieve short-
term economic goals due to the higher cost incurred in the operations.
Hence, choices need to be made and a balance needs to be struck in
weighing the long-term environmental benefits against immediate
economic factors. This paper discusses the challenges faced by
Malaysian developers in adopting sustainable practices in the
construction industry and the cause of these challenges. It also looks
into the achievements and breakthroughs that developers in Malaysia
have achieved so far. The paper aims explores the long-term benefits
of sustainable practices that would potentially raise awareness on the
feasibility and economic potential of sustainable construction.
Keywords—Construction industry, construction method,
sustainability.
I. INTRODUCTION
USTAINABILITY has been an issue of interest for all
stakeholders in the engineering industry. Sustainable
practices may directly or indirectly affect the future economy
of a country and its ecosystem. As an example, the use of
certain construction materials – from the extraction of raw
materials to processing and manufacturing, from fabricating to
transporting to site, and from maintenance to disposal - may
contribute to global warming. In general, sustainability is
known as the ability to meet the current demand without
compromising future needs. This means that sustainability is a
means of action of which its end results can be sustained and
continued [1].
Construction industry is one of the sectors that contribute
the most problems to the ecological system especially to the
environment. Therefore, sustainable construction practices
play a big role in moving towards sustainability. Sustainable
construction practices refer to construction methods that cause
less harm to the environment. The implementation of
sustainable methods in this industry is required to achieve
win-win outcomes as to attain mutual benefit for the
Y. H. Chan was with UCSI University, Kuala Lumpur, Malaysia (e-
mail:loiuschan_lv7@hotmail.com)
B. C. T. Lee and J. C. Lee are with UCSI University, Kuala Lumpur,
Malaysia (e-mail: brendalee@ucsiuniversity.edu.my,
leejc@ucsiuniversity.edu.my).
environment, the advanced society, and the economy of the
industry.
In over the last twenty years, the construction industry in
Malaysia has been consistently contributing between 3%-5%
of the national Gross Domestic Product (GDP) [2]. The
construction industry is also an industry that contributes to
most of the negative impacts to the environment such as soil
erosion and sedimentation, flash floods, depletion of natural
resources and the use of building materials which will affect
human health [3]. The continuous growth of the industry is
due to the achieving of vision 2020, where it calls for adequate
housing and rapid urbanisation [4]. In response to this, most
developers have prioritised economic issues rather than
environmental and ecological issues.
However, the 5th prime minister of Malaysia, Tun Abdullah
bin Haji Ahmad Badawi, has urged Malaysians to not forget
the importance of managing and utilising natural resources in
a sustainable manner. Developers were also warned to ensure
that the environment must not be sacrificed in favour of
economic development [5]. It is the national ambition to
consider long-term strategies to assist the achievement of
national goals. Another basic vision that emerged is for the
country to be ecologically sustainable [6]. This basic vision
has become a strong step towards the sustainability agenda in
the country.
The issue of sustainable development has emerged as one of
the top issues in the Eighth Malaysia Plan (2001–2005). One
of the highlights is that government is giving high priority to
research and development as one of their strategies to achieve
sustainable development [7]. The plan also states that
concerted efforts are needed in the construction planning
processes to improve energy efficiency as well as waste and
environmental management [8]. The government continues to
address the issue in the most recent Tenth Malaysia Plan
(2011–2015) to ensure that the future is not compromised as
the country continues to develop [9].
The Construction Industry Development Board Malaysia
(CIBD), which is a body established to develop, improve and
expand the Malaysian construction industry, also plays a role
in urging all the stakeholders of the industry to develop good
construction planning and management in order to protect the
environment. CIDB has also identified the environment and
other sustainability-related issues as one of the top issues of
the construction industry [2].
Apart from these government and non-governmental
organisations, local universities such as UniversitiSains
Malaysia, University Technology of Mara and National
University of Malaysia have also shown interests in this field
Sustainability in the Construction Industry in Malaysia:
The Challenges and Breakthroughs
Yoong H. Chan, Brenda C. T. Lee, Jin C. Lee
S
World Academy of Science, Engineering and Technology
International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering Vol:8, No:4, 2014
1218International Scholarly and Scientific Research & Innovation 8(4) 2014 scholar.waset.org/1999.10/9999282
InternationalScienceIndex,EconomicsandManagementEngineeringVol:8,No:4,2014waset.org/Publication/9999282
by offering funding for more research. These universities have
also been involved in organising many symposiums and
conferences to raise the awareness on sustainable development
and to exchange knowledge in this field [8].
Although Malaysia is still in the infancy stage in moving
towards sustainability [10], positive signs are shown by most
of the stakeholders in the construction industry by taking more
initiatives in moving towards to sustainable construction.
II. METHODOLOGY
This review study was conducted to explore the
perspectives of the Malaysian construction industry on
sustainable practices and development. The literature research
aimed to investigate the progress of adoption of sustainable
practices in Malaysia by reviewing the challenges and
breakthroughs faced by the industry in the process.
This study also attempted to gather insights from two local
construction companies through responses to interview
questions. The names of the companies are not stated in this
paper to preserve the privacy of the companies. This part of
the study was conducted to seek for more updated opinions
from the industry, other than those reported in published
literature, regarding sustainable construction practices. These
construction companies were chosen because they are among
the most successful contractors in Malaysia with wide
experiences in construction industry.
The interview questions were designed to focus on the
implementation of sustainable practices in construction
industry by describing and quantifying the implementation
level of them. The interview format was composed of five
open-ended questions, which are as follows:
i. [Company name] is an undoubtedly a renowned
contractor company in Malaysia. Its pride is also coined
by its contribution in successfully completing sustainable
projects. Which of these projects would be the most
notable of all?
ii. Sustainable practices, in its initial stages, typically incur
higher costs than conventional practices [8] deterring
many companies to take heed. What are the benefits of
implementing sustainable practices in the industry that
motivate and encourage [company name] to take its step
towards sustainability?
iii. Studies have also shown that the return on investment in
the steps to undertake sustainable practices in the
construction industry take a relatively longer period of
time. In the effort of working towards sustainability, has
[company name] observed the same scenario? If so, what
is the average breakeven point?
iv. It is reported that challenges and obstacles are inevitable
when sustainable practices are implemented [11]. What
are the challenges and obstacles that [company name] has
faced?
v. With the knowledge and technology we have now, what
is your opinion on the level of practice of sustainability
in the construction industry?
The findings of the literature review and interviews with the
companies are presented in the following section.
III. RESULTS
A. Challenges Faced and Their Causes
1. Financial Constraints
In the construction industry, sustainability is generally
interpreted as environment oriented or focused. The main
reason for the neglect of sustainability in some developing
countries is that most of the sustainable methods may cause a
conflict between long-term environmental benefit and short-
term economic operational goals [12], [13]. A greater concern
is given to economic and social issues, like the return on
investment of a project, than to the affected environmental
issues such as the pollution caused by the construction of the
project. Therefore it is important to maintain a balance
between environmental protection, economic development and
social development in prioritising sustainability in the industry
[14].
Implementing sustainable practices need significant amount
of time and cost investment. This, in turn, decreases
contractors’ interests in doing so [15]. Cost increase is one of
the main challenges as the increase in cost is mainly due to the
application of the measures for implementing environmental
management, which will unavoidably require the investment
of both time and resources.
The higher cost incurred for importing of the green
materials and technology is a hindrance to the shift towards
sustainability [16]. The financial capability of a developer
depends on its size; large-sized developers have greater
financial capacity in order to pursue for sustainable practices.
Therefore, large-sized companies are more aware of the issue
of sustainability as they drive towards it by executing proper
planning, design and allocation of budget. Most of them have
the capability to perform well to meet the required standards
as well as aiming for green certification by developing and
applying more green methods.
However, Malaysian developers are mainly made up of
medium and small-sized companies. Small and medium-sized
developers are aware of issues pertaining sustainability, but
are mostly financially constrained. It is to their preference to
build to just meet the regulatory criteria and to gain optimum
profit rather than putting effort in giving more consideration to
environmental and social aspects. For this reason, unless there
is an increase of market demand for green buildings; most of
the construction stakeholders will be reluctant to transform the
industry towards sustainability [16].
2. Awareness and Knowledge
The relatively slow shift [8] towards sustainability in the
construction industry in Malaysia is also due to the lack of
awareness and knowledge of pertaining issues [16]. It is
important that all general stakeholders in the construction
industry such as contractors, developers, consultants as well as
clients are fully aware of the importance of achieving
sustainable construction. This will cultivate interest among
them and further serves as a motivation to pursue knowledge.
Having due diligence helps in their decision making which
World Academy of Science, Engineering and Technology
International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering Vol:8, No:4, 2014
1219International Scholarly and Scientific Research & Innovation 8(4) 2014 scholar.waset.org/1999.10/9999282
InternationalScienceIndex,EconomicsandManagementEngineeringVol:8,No:4,2014waset.org/Publication/9999282
benefits every party, while contributing the least damage to
the environment [17].
However, a more recent study found that bigger and more
established companies are actually well aware of the
importance of sustainability practices. In fact, actions are
being taken to meet all the requirements needed to pursue
sustainability in the construction industry. For example, by
implementing strategic planning, as well as, looking into the
allocation of resources. These companies tend to have stronger
financial positions and different perspective from smaller
companies, mainly due to their wide range of experiences and
expertise as they deal with clients whom are mostly high
income earners and foreigners. They incorporate sustainability
in their building concepts by using green materials, having
green designs as well as generating green system for their
projects. They also believe that sustainable practices can be
profitable [16].
The lack of new knowledge among contractors has also
caused another obstacle in achieving sustainable construction.
It causes failure in reaching a consensus among experienced
developers and the younger generation. This is because
environmental issues were not pertinent and were not given a
priority in education until a decade ago. The experiences of
seasoned contractors in the industry are valuable and essential,
although not equipped with new knowledge on sustainable
practices. On the other hand, the younger generations those are
educated with knowledge on sustainable construction face
difficulties in disseminating theoretical understanding of
sustainability knowledge into practice. Therefore, developers
tend to reject the suggested ideas of the younger generation
[8].
Albeit the lacking being a major hindrance to implementing
sustainable concept, eliminating this cause may not effectively
curb the problem. It is also reported that having the knowledge
does not necessarily guarantee that it is being implemented as
the level of implementation of sustainable practices in
Malaysia is reported to be still mostly low [8]. The level of
knowledge on the concept of sustainability among the
developers was found to be moderate as there is a big gap for
the level of knowledge between the big and well-established
companies and the small companies [16]. One of the main
reasons is that most developers in Malaysia are profit-driven
and they respond to client demands. The shift to focus on
sustainability would be driven if there is client demand.
B. Achievements and Breakthroughs
The slow shift to sustainability in Malaysia is not without
its notable achievement. To date, there are several projects in
the country that were sustainably constructed. Following are
an example of a construction method and an example of a
successful project.
1. Industrialised Building System (IBS)
IBS is a construction method in which structural
components of a structure are mass produced either in factory
or at site under strict quality control and minimal on site
activities [18]. The manufactured components are delivered to
construction sites for assembly and erection. The construction
operation of an IBS structure is, therefore not affected by
adverse weather condition and is shortened, thus reduces
interest payment or capital outlays [19]. IBS allows flexibility
in design as different systems may produce their own unique
prefabrication construction methods [20]. Reportedly, IBS
produces higher quality structural components through careful
selection of materials, use of advanced technology and strict
quality assurance control [21]. It is also found to be cost
saving when the system formwork that are made of steel,
aluminium and scaffolding are reusable [22].
The use of IBS in construction reduces the need for labour
on site. The Malaysian construction industry relies heavily on
foreign workers. If the demand for labour remains the same
and the supply decreases, construction cost will increase. A
study in Israel found that the use of IBS in construction
reduces the cost of labour up to 70% when compared to that of
the projects using conventional construction method [23]. In
Singapore, the savings in labour cost was found to be 46.5%
[24].
Among successful IBS buildings in Malaysia are
Brickfields Secondary School and Kuala Lumpur Convention
Centre in Kuala Lumpur, Subang Square in Subang Jaya,
Selangor, and Millennium Hall in Seberang Prai, Pulau
Pinang. Even with numerous successful projects, the
implementation of IBS was not without its challenges. The
Malaysian government encouraged the adoption of IBS in the
construction industry through the effort of CIDB in outlining
the strategies in IBS Roadmap 2003 -2010 [25].
2. Tanarimba
Tanarimba is a sustainable housing project. It occupies an
area of 7299 acres in a tropical rainforest in Janda Baik,
Pahang. Tanarimba is a blend of man-made and natural
elements in an exciting concept of ecologically-sensitive
community development. It also introduces the world to
ecotourism opportunities in Malaysian highlands. The project
has been dubbed as the forefront of the ecological movement
in construction [26].
The highlight of project Tanarimba is that most of the
structures in it were built using natural resources and all
building materials used were sourced in-situ. Pine trees were
used for the construction of road and infrastructure work,
which were sourced from a plantation. The plantation covers
60 hectares of land which was initiated as an alternative for
paper industry. It was however left unutilised due to project
revaluation. Rocks were used for the construction of wall and
pillars. Pine was used for the flooring system while doors are
made of resak woods. The design of window frames and roof
trusses are made up of words and mixed hardwoods
respectively. The completion of Tanarimba shows that the
workability and stability of structures can be achieved by
using natural resources instead of common construction
materials such as concrete [27].
The alignment of roads in Tanarimba was designed
according to the natural terrain of the land, eliminating the
World Academy of Science, Engineering and Technology
International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering Vol:8, No:4, 2014
1220International Scholarly and Scientific Research & Innovation 8(4) 2014 scholar.waset.org/1999.10/9999282
InternationalScienceIndex,EconomicsandManagementEngineeringVol:8,No:4,2014waset.org/Publication/9999282
needs of cutting down the trees. This has allowed 80% of the
area of Tanarimba to remain as forest [27].
Tanarimba has proven itself to be profitable after it
hasbroke-even in 1999, four years after construction. The
success of Tanarimba is awarded with ‘Honorary Mention’ in
the Planning and Master Plan category in the Malaysia
Institute of Architects (PAM) Award in 2004 [27].
C. Insights from Local Construction Companies
Some of the feedback provided through the interview was
not informative as one of the companies is not the developer
of their projects and the decision to implement sustainable
practices is vested in the original intent of the developers.
However, it was emphasised that an efficient waste and
environmental management are implemented during the
construction of projects.
The other company suggested that Malaysia is currently
moving towards sustainability in a slower pace, mainly due to
lack of human resources and skills. The implementation of
sustainable practices is recognised to require the support of
trained professionals, tradesmen and labourers. This is
certainly consistent with the findings of the literature study. In
their opinion, the uncertain economic environment especially
in developing countries where the private sector has a very
narrow market base to leverage is another main challenge. It
was also noted that there is a conflict between experienced
contractors and younger engineers. The experienced
contractors do not have much exposure to sustainable
construction and therefore prefer to use conventional method
of construction that are tried and tested. On the other hand, the
effort of new and younger engineers whom are exposed to this
subject during their higher education is usually hampered due
to the lack of experience and skills in the particular field.
The company also emphasised that government effort
would play a main role in pushing the trend forward. The
government would need to play a main role in promoting the
adoption as the joint effort between the government, non-
government organizations and educational institutions to
create awareness among the public on the benefits of
sustainable construction practice. Cooperation among them is
essential as there are projects that embrace the ideas of
sustainable construction, but the number is still low. This
creates the need for support from the private sector as well to
work along with the government.
The more notable projects that the two companies contacted
were/are involved in are the SMART Tunnel and KLIA 2.
IV. DISCUSSION
The paradigm shift to adopt sustainable construction
method in Malaysia is at a slower pace compared to other
advanced countries. The findings of this study show that the
challenges faced by the industry are basically associated with
the burden of having additional costs. It is not only the
intricate work and green materials that incur costs, but also the
skills and expertise required for the execution of sustainable
construction methods.
Since expertise is needed for sustainable construction,
measures should also be taken to preserve the skills sets of
practitioners. Initiatives in research and development activities
may enable development of knowledge and technology in
sustainable practice. This may accelerate the progress in
implementing sustainable construction method, as more
interest among experts are sparked and that technologies may
be made available locally.
The awareness of the benefit of sustainable practice on the
environment among the developers and contractors needs to
be raised. It is also important that stakeholders of construction
companies to be well informed about the economic benefit of
implementing sustainable construction method. Since the
construction industry responds to client demands, awareness
of the issue should also be raised among the public. The cause
and effect scenario is clear, especially of late, as the private
sector responded to the demand for green residential buildings
that are built according to Green Building Index (GBI)
certification. For example, the Central Residence project by
Yuk Tung Group, VERDE at AraDamansara by
VillamasSdnBhd, and KEN RimbaLegian Residences by KEN
Holdings Berhad, the first landed home development in the
country to be awarded the BCA Green Mark Gold Award. In
such fashion, also, the developers and contractors may be
encouraged as consumers become more informed about the
effect of sustainable construction practice.
V. CONCLUSION
As the concern for the environment increases, the need for
greater focus on sustainable practice becomes more urgent.
The major consideration that impedes the change of practice to
sustainable method in the construction industry is found to be
financial. This shows that awareness should be raised and
knowledge needs to be delivered to contractors, developers
and the public on the long term benefit of sustainable
construction practice.
This can be made possible with the government playing the
main role. Through joint effort with educational institutions,
research and development activities can be increased to enable
local production of green building materials and technology at
a lower cost and hence encourage contractors to adopt
sustainable practice. Training programs can be organised to
increase and deliver knowledge on sustainability to
stakeholders of the construction industry through bodies like
CIDB.
Measures can also be taken by the government in ensuring
the practice of sustainable construction method by enforcing
strict rules and regulations for disposal of construction waste.
Proper waste management in the construction industry has
been found to be cost saving [28], [29].
Of late, more GBI certified buildings are emerging in
Malaysia, indicating that the nation is already aware of
sustainability issues. To date, although the shift to sustainable
construction in Malaysia is still at its infancy stage, it is
important to note that there are projects that have been
successful. In view of this, the construction industry in
Malaysia is able to progress and be more sustainable when the
World Academy of Science, Engineering and Technology
International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering Vol:8, No:4, 2014
1221International Scholarly and Scientific Research & Innovation 8(4) 2014 scholar.waset.org/1999.10/9999282
InternationalScienceIndex,EconomicsandManagementEngineeringVol:8,No:4,2014waset.org/Publication/9999282
government and private sector share a common concern and
vision.
REFERENCES
[1] Johnston, P., Everard, M., Santillo, D., Robert, K.H.: “Reclaiming the
Definition of Sustainbility,” Environmental Science and Pollution
Research – International, 14 , 60-66, 2007.
[2] Construction Industry Development Board (CIDB): “Malaysian
Construction Industry: Technology Foresight Report,” CIDB Malaysia
and APEC Technology Foresight Center, Bangkok, 2000.
[3] CIDB Malaysia: “Strategic recommendations for improving
environmental practices in construction industry,” Kuala Lumpur: CIDB
Publisher, 2007
[4] Plessis, C.D.: “A Strategic framework for sustainable construction in
developing countries,” Construction Management and Economics, 25,
67-76, 2007.
[5] Chin, K.L.: “Major challenges in protecting biodiversity,” New Straits
Times, January 25, 2005.
[6] A. H. Ahmad Sarji: “Malaysia's Vision 2020: Understanding the
Concept, Implications and Challenges,” Pelanduk Publications, 1993.
[7] Eight Malaysia Plan: “Eight Malaysia Plan 2001 – 2005,” Kuala
Lumpur, PercetakanNasional Malaysia, 2001.
[8] Abidin, N.Z.: “Sustainable Construction in Malaysia – Developers’
Awareness,” World Academy of Science, Engineering and Technology,
p. 53, 2009.
[9] Tenth Malaysia Plan: “Tenth Malaysia Plan 2011 – 2015,” The
Economic Planning Unit, Prime Minister’s Department, Putrajaya, 2010.
[10] Abidin, N.Z.: “Sustainable practices in Malaysia: are we ready for it,”
Global conference on global warming, 379-388, 2008.
[11] Kibert, C. J.: “Sustainable Construction: Green building Design and
Delivery,” 2nd Edition, New York: John Wiley & Sons, Inc., 2008.
[12] Lilja, R.: “Negotiated environmental agreements in promoting material
efficiency in industry – first steps in Finland,” Journal of Cleaner
Production, 17, 863–72, 2009.
[13] Tam, W.Y.V.: “On the effectiveness of implementing a waste-
management-plan method in construction,” Waste Management, 28,
1072–80, 2008.
[14] Shen, L.Y., Vivian, W.Y.T., Leona, T., Ji, Y.B.: “Project feasibility
study: the key to successful implementation of sustainable and socially
responsible construction management practice,” Journal of Cleaner
Production, 18, 254–259, 2010.
[15] Shen, L.Y. Bao, Q. & Yip, S.L.: “Implementing innovative functions in
construction project management towards the mission of sustainable
environment,” Proceedings of the Millennium Conference on
Construction Project Management, Hong Kong, October, 77-84, 2000.
[16] Abidin, N.Z.: “Investigating the awareness and application of
sustainable construction concept by Malaysian developers,” Habitat
International, 34, 421-426, 2010.
[17] Parkin, S.: “Sustainable development: The concept and the practical
challenge,” Proceedings of the Institution of Civil Engineers: Civil
Engineering, 138, 3-8, 2000.
[18] Trikha, D.N.: “Industrialised building systems. Prospects in Malaysia,”
Proceedings World Engineering Congress, Malaysia, 1999.
[19] Peng, C.S.: “The scenario of industrialised building systems in
Malaysia,” Proceedings of a UNESCO/FEISEAP Regional workshop,
UPM Serdang, 1986.
[20] Zaini, O.: “Malaysian Construction Industry. Challenges and demand,”
Malaysian Structural Steel Association Convention, Kuala Lumpur,
2000.
[21] Din, H.: “Industrialised building and its application in Malaysia,”
Seminar on Prefabrication of Building Construction, Kuala Lumpur,
1984.
[22] Bing, L., Kwong, Y.W., and Hao, K.J.: “Seismic behaviour of
connection between precast concrete beams,” CSE Research Bulletin,
No.14, 2001.
[23] Warszawski, A.: “Industrialised and automated building systems,”
Technion-Israel Institute of Technology, E & FN Spon, 1999.
[24] Cheong, G.K.: “The Bayshore Condominium prefabricated
construction,” Precastech Newsletter On Line, Volume 7, 1996.
[25] Ahmad Baharuddin, A.R., Omar, W.: “Issues and Challenges in the
Implementation of Industrialised Building System in Malaysia,”
Proceedings of the 6th Asia-Pacific Structural Engineering and
Construction Conference (APSEC 2006), Kuala Lumpur, Malaysia, 5 –
6 September 2006.
[26] Tanarimba: “Tanarimba Project Development (Online),” Available
from: <http://tanarimba.com.my> (Accessed 10 February 2013), 2006.
[27] Tanarimba: “Where Sustainable Development Works Beautifully
(Online),” Available from: <http://www.mtc.com.my/info/
index.php?option=com_content&view=article&id=44&Itemid=53>
(Accessed 10 February 2013), 2008.
[28] Rawshan, A.B., Chamhuri, S., Pereiraa, J.J., Jaafarb, A.H.: “Attitude and
behavioral factors in waste management in the construction industry of
Malaysia,” Resources, Conservation and Recycling, 53, 321–328, 2009.
[29] Rawshan A.B., Chamhuri, S., Pereira, J.J., Jaafar, A.H.: “A benefit–cost
analysis on the economic feasibility of construction waste minimisation:
The case of Malaysia,” Resources, Conservation and Recycling, 48, 86–
98, 2006.
World Academy of Science, Engineering and Technology
International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering Vol:8, No:4, 2014
1222International Scholarly and Scientific Research & Innovation 8(4) 2014 scholar.waset.org/1999.10/9999282
InternationalScienceIndex,EconomicsandManagementEngineeringVol:8,No:4,2014waset.org/Publication/9999282

More Related Content

What's hot

Causes of Variation Orders 1268
Causes of Variation Orders 1268Causes of Variation Orders 1268
Causes of Variation Orders 1268HASHIM HANIF
 
Lecture 1 overview of the construction industry
Lecture 1  overview of the construction industryLecture 1  overview of the construction industry
Lecture 1 overview of the construction industryJB Juanzon Builders Inc.
 
Effects of Construction Materials to Achieve Sustainable Buildings
Effects of Construction Materials to Achieve Sustainable BuildingsEffects of Construction Materials to Achieve Sustainable Buildings
Effects of Construction Materials to Achieve Sustainable BuildingsDr. Amarjeet Singh
 
Overview of construction sector in India (construction management )
Overview of construction sector in India (construction management )Overview of construction sector in India (construction management )
Overview of construction sector in India (construction management )shindesuraj82
 
Study of Trends and Perspectives of Industrial Engineering Research - By Suni...
Study of Trends and Perspectives of Industrial Engineering Research - By Suni...Study of Trends and Perspectives of Industrial Engineering Research - By Suni...
Study of Trends and Perspectives of Industrial Engineering Research - By Suni...SunilVethody2
 
Responsibility of CONSTRUCTION INDUSTRY in Indian Sustainable Development
Responsibility of CONSTRUCTION INDUSTRY in Indian Sustainable DevelopmentResponsibility of CONSTRUCTION INDUSTRY in Indian Sustainable Development
Responsibility of CONSTRUCTION INDUSTRY in Indian Sustainable DevelopmentAman Gupta
 
Construction industry
Construction industryConstruction industry
Construction industryShahrukh Niaz
 
Knowledge and skill requirements in the installation of prefabricated members
Knowledge and skill requirements in the installation of prefabricated membersKnowledge and skill requirements in the installation of prefabricated members
Knowledge and skill requirements in the installation of prefabricated membersIAEME Publication
 
Causes of delays on Construction Projects in Kuwait according to opinion of e...
Causes of delays on Construction Projects in Kuwait according to opinion of e...Causes of delays on Construction Projects in Kuwait according to opinion of e...
Causes of delays on Construction Projects in Kuwait according to opinion of e...IJERA Editor
 
Barriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryBarriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryAM Publications
 
1 1 Introduction Construction Industry
1 1 Introduction Construction Industry1 1 Introduction Construction Industry
1 1 Introduction Construction Industrymissnadz
 
Evaluating the benefits of bim for sustainable design
Evaluating the benefits of bim for sustainable designEvaluating the benefits of bim for sustainable design
Evaluating the benefits of bim for sustainable designMuhannad AbdulRaouf
 
Management of government funded construction projects in ghana
Management of government funded construction projects in ghanaManagement of government funded construction projects in ghana
Management of government funded construction projects in ghanaAlexander Decker
 
Implementation of e-learning system readiness: The effect of the cost readine...
Implementation of e-learning system readiness: The effect of the cost readine...Implementation of e-learning system readiness: The effect of the cost readine...
Implementation of e-learning system readiness: The effect of the cost readine...AI Publications
 
A Knotworking Guideline for Building Projects: Bridging the Gap between Parti...
A Knotworking Guideline for Building Projects: Bridging the Gap between Parti...A Knotworking Guideline for Building Projects: Bridging the Gap between Parti...
A Knotworking Guideline for Building Projects: Bridging the Gap between Parti...IJERA Editor
 
Bringing Green Home Silcock EMBA Project Oct 2008
Bringing Green Home Silcock EMBA Project Oct 2008Bringing Green Home Silcock EMBA Project Oct 2008
Bringing Green Home Silcock EMBA Project Oct 2008Jonathan Silcock, MBA, PMP
 

What's hot (20)

Causes of Variation Orders 1268
Causes of Variation Orders 1268Causes of Variation Orders 1268
Causes of Variation Orders 1268
 
F1304013139
F1304013139F1304013139
F1304013139
 
Lecture 1 overview of the construction industry
Lecture 1  overview of the construction industryLecture 1  overview of the construction industry
Lecture 1 overview of the construction industry
 
Effects of Construction Materials to Achieve Sustainable Buildings
Effects of Construction Materials to Achieve Sustainable BuildingsEffects of Construction Materials to Achieve Sustainable Buildings
Effects of Construction Materials to Achieve Sustainable Buildings
 
Overview of construction sector in India (construction management )
Overview of construction sector in India (construction management )Overview of construction sector in India (construction management )
Overview of construction sector in India (construction management )
 
Construction industry
Construction industryConstruction industry
Construction industry
 
Study of Trends and Perspectives of Industrial Engineering Research - By Suni...
Study of Trends and Perspectives of Industrial Engineering Research - By Suni...Study of Trends and Perspectives of Industrial Engineering Research - By Suni...
Study of Trends and Perspectives of Industrial Engineering Research - By Suni...
 
Responsibility of CONSTRUCTION INDUSTRY in Indian Sustainable Development
Responsibility of CONSTRUCTION INDUSTRY in Indian Sustainable DevelopmentResponsibility of CONSTRUCTION INDUSTRY in Indian Sustainable Development
Responsibility of CONSTRUCTION INDUSTRY in Indian Sustainable Development
 
Construction industry
Construction industryConstruction industry
Construction industry
 
Knowledge and skill requirements in the installation of prefabricated members
Knowledge and skill requirements in the installation of prefabricated membersKnowledge and skill requirements in the installation of prefabricated members
Knowledge and skill requirements in the installation of prefabricated members
 
ISS_6
ISS_6ISS_6
ISS_6
 
Causes of delays on Construction Projects in Kuwait according to opinion of e...
Causes of delays on Construction Projects in Kuwait according to opinion of e...Causes of delays on Construction Projects in Kuwait according to opinion of e...
Causes of delays on Construction Projects in Kuwait according to opinion of e...
 
Barriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryBarriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction Industry
 
1 1 Introduction Construction Industry
1 1 Introduction Construction Industry1 1 Introduction Construction Industry
1 1 Introduction Construction Industry
 
Evaluating the benefits of bim for sustainable design
Evaluating the benefits of bim for sustainable designEvaluating the benefits of bim for sustainable design
Evaluating the benefits of bim for sustainable design
 
Management of government funded construction projects in ghana
Management of government funded construction projects in ghanaManagement of government funded construction projects in ghana
Management of government funded construction projects in ghana
 
F1304033438
F1304033438F1304033438
F1304033438
 
Implementation of e-learning system readiness: The effect of the cost readine...
Implementation of e-learning system readiness: The effect of the cost readine...Implementation of e-learning system readiness: The effect of the cost readine...
Implementation of e-learning system readiness: The effect of the cost readine...
 
A Knotworking Guideline for Building Projects: Bridging the Gap between Parti...
A Knotworking Guideline for Building Projects: Bridging the Gap between Parti...A Knotworking Guideline for Building Projects: Bridging the Gap between Parti...
A Knotworking Guideline for Building Projects: Bridging the Gap between Parti...
 
Bringing Green Home Silcock EMBA Project Oct 2008
Bringing Green Home Silcock EMBA Project Oct 2008Bringing Green Home Silcock EMBA Project Oct 2008
Bringing Green Home Silcock EMBA Project Oct 2008
 

Viewers also liked

Nict2012 perak piezoelectric research updated
Nict2012 perak piezoelectric research updatedNict2012 perak piezoelectric research updated
Nict2012 perak piezoelectric research updatedAbu Bakar Abd Hamid
 
MUCED 2003 PUTRAJAYA: ENVIRONMENTAL EVALUATION ON FISHING VILLAGE
MUCED 2003 PUTRAJAYA: ENVIRONMENTAL EVALUATION ON FISHING VILLAGEMUCED 2003 PUTRAJAYA: ENVIRONMENTAL EVALUATION ON FISHING VILLAGE
MUCED 2003 PUTRAJAYA: ENVIRONMENTAL EVALUATION ON FISHING VILLAGEYayasan Pendidikan Labuan
 
Green building technology in the context of sustainable housing affordability
Green building technology in the context of sustainable housing affordabilityGreen building technology in the context of sustainable housing affordability
Green building technology in the context of sustainable housing affordabilityijerd
 
Green Technology Policy On Energy In Malaysia
Green Technology Policy On Energy In MalaysiaGreen Technology Policy On Energy In Malaysia
Green Technology Policy On Energy In MalaysiaNoor Shahiwan
 
What Is Project Documentation
What Is Project DocumentationWhat Is Project Documentation
What Is Project Documentationcwarren
 
Project m&e & logframe
Project m&e & logframeProject m&e & logframe
Project m&e & logframeWesley Opaki
 
Solar energy market a case study on sustainable energy industry
Solar energy market a case study on sustainable energy industrySolar energy market a case study on sustainable energy industry
Solar energy market a case study on sustainable energy industryNorrazman Zaiha Zainol
 
Sustainability in built environment: Green Building Index (GBI) Platinum Cert...
Sustainability in built environment: Green Building Index (GBI) Platinum Cert...Sustainability in built environment: Green Building Index (GBI) Platinum Cert...
Sustainability in built environment: Green Building Index (GBI) Platinum Cert...ESD UNU-IAS
 
Green Building Index
Green Building IndexGreen Building Index
Green Building IndexEraz
 
BIM for Construction, BPMs and Owners
BIM for Construction, BPMs and OwnersBIM for Construction, BPMs and Owners
BIM for Construction, BPMs and OwnersMarc Goldman
 
Green building index
Green building index Green building index
Green building index hott1771
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULEAjeesh Mk
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposalrexcris
 
Sustainable Development, Millenium Development Goals (MDGs) and Sustainable D...
Sustainable Development, Millenium Development Goals (MDGs) and Sustainable D...Sustainable Development, Millenium Development Goals (MDGs) and Sustainable D...
Sustainable Development, Millenium Development Goals (MDGs) and Sustainable D...ESD UNU-IAS
 

Viewers also liked (20)

Nict2012 perak piezoelectric research updated
Nict2012 perak piezoelectric research updatedNict2012 perak piezoelectric research updated
Nict2012 perak piezoelectric research updated
 
MUCED 2003 PUTRAJAYA: ENVIRONMENTAL EVALUATION ON FISHING VILLAGE
MUCED 2003 PUTRAJAYA: ENVIRONMENTAL EVALUATION ON FISHING VILLAGEMUCED 2003 PUTRAJAYA: ENVIRONMENTAL EVALUATION ON FISHING VILLAGE
MUCED 2003 PUTRAJAYA: ENVIRONMENTAL EVALUATION ON FISHING VILLAGE
 
Resume
ResumeResume
Resume
 
Project cost control
Project cost controlProject cost control
Project cost control
 
Overview of green purchasing in Malaysia - Augustine Koh
Overview of green purchasing in Malaysia - Augustine KohOverview of green purchasing in Malaysia - Augustine Koh
Overview of green purchasing in Malaysia - Augustine Koh
 
Green building technology in the context of sustainable housing affordability
Green building technology in the context of sustainable housing affordabilityGreen building technology in the context of sustainable housing affordability
Green building technology in the context of sustainable housing affordability
 
Green Technology Policy On Energy In Malaysia
Green Technology Policy On Energy In MalaysiaGreen Technology Policy On Energy In Malaysia
Green Technology Policy On Energy In Malaysia
 
SDSN Malaysia
SDSN MalaysiaSDSN Malaysia
SDSN Malaysia
 
What Is Project Documentation
What Is Project DocumentationWhat Is Project Documentation
What Is Project Documentation
 
Project cost control
Project cost controlProject cost control
Project cost control
 
Project m&e & logframe
Project m&e & logframeProject m&e & logframe
Project m&e & logframe
 
Solar energy market a case study on sustainable energy industry
Solar energy market a case study on sustainable energy industrySolar energy market a case study on sustainable energy industry
Solar energy market a case study on sustainable energy industry
 
Sustainability in built environment: Green Building Index (GBI) Platinum Cert...
Sustainability in built environment: Green Building Index (GBI) Platinum Cert...Sustainability in built environment: Green Building Index (GBI) Platinum Cert...
Sustainability in built environment: Green Building Index (GBI) Platinum Cert...
 
Green Building Index
Green Building IndexGreen Building Index
Green Building Index
 
BIM for Construction, BPMs and Owners
BIM for Construction, BPMs and OwnersBIM for Construction, BPMs and Owners
BIM for Construction, BPMs and Owners
 
Green building index
Green building index Green building index
Green building index
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposal
 
ACH 216 Lecture 08 (Scheduling)
ACH 216 Lecture 08 (Scheduling)ACH 216 Lecture 08 (Scheduling)
ACH 216 Lecture 08 (Scheduling)
 
Sustainable Development, Millenium Development Goals (MDGs) and Sustainable D...
Sustainable Development, Millenium Development Goals (MDGs) and Sustainable D...Sustainable Development, Millenium Development Goals (MDGs) and Sustainable D...
Sustainable Development, Millenium Development Goals (MDGs) and Sustainable D...
 

Similar to Sustainable construction practices in Malaysia: Challenges and breakthroughs explored

Strategicv5
Strategicv5Strategicv5
Strategicv5zurasco
 
Effect of ecodesign practices on the financial performance of manufacturing f...
Effect of ecodesign practices on the financial performance of manufacturing f...Effect of ecodesign practices on the financial performance of manufacturing f...
Effect of ecodesign practices on the financial performance of manufacturing f...Martin Otundo
 
Construction Project Essay
Construction Project EssayConstruction Project Essay
Construction Project EssayAshley Thomas
 
Ecodesign position paper_welshgov
Ecodesign position paper_welshgovEcodesign position paper_welshgov
Ecodesign position paper_welshgovInfo EDCW
 
Innovation, Change & Strategy
Innovation, Change & StrategyInnovation, Change & Strategy
Innovation, Change & StrategyRidhwan Ikhsan
 
Green Skills as an Added-Value Element in Producing Competent Students
Green Skills as an Added-Value Element in Producing Competent StudentsGreen Skills as an Added-Value Element in Producing Competent Students
Green Skills as an Added-Value Element in Producing Competent StudentsIJERA Editor
 
Sustainability 12-06571-v2
Sustainability 12-06571-v2Sustainability 12-06571-v2
Sustainability 12-06571-v2SITINURAIN41
 
A Multi-Criteria Decision-Making Model To Choose The Best Option For Sustaina...
A Multi-Criteria Decision-Making Model To Choose The Best Option For Sustaina...A Multi-Criteria Decision-Making Model To Choose The Best Option For Sustaina...
A Multi-Criteria Decision-Making Model To Choose The Best Option For Sustaina...Claire Webber
 
The development of sustainable manufacturing practices and sustainable perfor...
The development of sustainable manufacturing practices and sustainable perfor...The development of sustainable manufacturing practices and sustainable perfor...
The development of sustainable manufacturing practices and sustainable perfor...Alexander Decker
 
An empirical examination of sustainability for multinational firms in china ...
An empirical examination of sustainability for multinational firms in china  ...An empirical examination of sustainability for multinational firms in china  ...
An empirical examination of sustainability for multinational firms in china ...Faiza Latif
 
Lack of understanding and awareness
Lack of understanding and awarenessLack of understanding and awareness
Lack of understanding and awarenessMelvin Lim
 
GREEN MANAGEMENT: OPPORTUNITIES AND CHALLENGES IN INTERNATIONAL BUSINESS FOR ...
GREEN MANAGEMENT: OPPORTUNITIES AND CHALLENGES IN INTERNATIONAL BUSINESS FOR ...GREEN MANAGEMENT: OPPORTUNITIES AND CHALLENGES IN INTERNATIONAL BUSINESS FOR ...
GREEN MANAGEMENT: OPPORTUNITIES AND CHALLENGES IN INTERNATIONAL BUSINESS FOR ...Muhammad Nazri Abdul Halim
 
Sustainable Construction Implementations Strategies.pptx
Sustainable Construction Implementations Strategies.pptxSustainable Construction Implementations Strategies.pptx
Sustainable Construction Implementations Strategies.pptxTantish QS, UTM
 
Role of Green Issues of Mining Supply Chain on Sustainable Development
Role of Green Issues of Mining Supply Chain on Sustainable DevelopmentRole of Green Issues of Mining Supply Chain on Sustainable Development
Role of Green Issues of Mining Supply Chain on Sustainable Developmentirwan zulkifli
 
Role of green issues of mining supply chain on
Role of green issues of mining supply chain onRole of green issues of mining supply chain on
Role of green issues of mining supply chain onAlfi Nugraha
 
Sustainability Indicators in Building Projects in Khartoum State during Const...
Sustainability Indicators in Building Projects in Khartoum State during Const...Sustainability Indicators in Building Projects in Khartoum State during Const...
Sustainability Indicators in Building Projects in Khartoum State during Const...IJAEMSJORNAL
 
Transformation from Lean to Green Service
Transformation from Lean to Green ServiceTransformation from Lean to Green Service
Transformation from Lean to Green ServiceBC Chew
 

Similar to Sustainable construction practices in Malaysia: Challenges and breakthroughs explored (20)

Strategicv5
Strategicv5Strategicv5
Strategicv5
 
Effect of ecodesign practices on the financial performance of manufacturing f...
Effect of ecodesign practices on the financial performance of manufacturing f...Effect of ecodesign practices on the financial performance of manufacturing f...
Effect of ecodesign practices on the financial performance of manufacturing f...
 
Construction Project Essay
Construction Project EssayConstruction Project Essay
Construction Project Essay
 
Ecodesign position paper_welshgov
Ecodesign position paper_welshgovEcodesign position paper_welshgov
Ecodesign position paper_welshgov
 
Innovation, Change & Strategy
Innovation, Change & StrategyInnovation, Change & Strategy
Innovation, Change & Strategy
 
Essay Construction
Essay ConstructionEssay Construction
Essay Construction
 
cibwbc2013_submission_208
cibwbc2013_submission_208cibwbc2013_submission_208
cibwbc2013_submission_208
 
Green Skills as an Added-Value Element in Producing Competent Students
Green Skills as an Added-Value Element in Producing Competent StudentsGreen Skills as an Added-Value Element in Producing Competent Students
Green Skills as an Added-Value Element in Producing Competent Students
 
Sustainability 12-06571-v2
Sustainability 12-06571-v2Sustainability 12-06571-v2
Sustainability 12-06571-v2
 
A Multi-Criteria Decision-Making Model To Choose The Best Option For Sustaina...
A Multi-Criteria Decision-Making Model To Choose The Best Option For Sustaina...A Multi-Criteria Decision-Making Model To Choose The Best Option For Sustaina...
A Multi-Criteria Decision-Making Model To Choose The Best Option For Sustaina...
 
The development of sustainable manufacturing practices and sustainable perfor...
The development of sustainable manufacturing practices and sustainable perfor...The development of sustainable manufacturing practices and sustainable perfor...
The development of sustainable manufacturing practices and sustainable perfor...
 
Proposal .pdf
Proposal .pdfProposal .pdf
Proposal .pdf
 
An empirical examination of sustainability for multinational firms in china ...
An empirical examination of sustainability for multinational firms in china  ...An empirical examination of sustainability for multinational firms in china  ...
An empirical examination of sustainability for multinational firms in china ...
 
Lack of understanding and awareness
Lack of understanding and awarenessLack of understanding and awareness
Lack of understanding and awareness
 
GREEN MANAGEMENT: OPPORTUNITIES AND CHALLENGES IN INTERNATIONAL BUSINESS FOR ...
GREEN MANAGEMENT: OPPORTUNITIES AND CHALLENGES IN INTERNATIONAL BUSINESS FOR ...GREEN MANAGEMENT: OPPORTUNITIES AND CHALLENGES IN INTERNATIONAL BUSINESS FOR ...
GREEN MANAGEMENT: OPPORTUNITIES AND CHALLENGES IN INTERNATIONAL BUSINESS FOR ...
 
Sustainable Construction Implementations Strategies.pptx
Sustainable Construction Implementations Strategies.pptxSustainable Construction Implementations Strategies.pptx
Sustainable Construction Implementations Strategies.pptx
 
Role of Green Issues of Mining Supply Chain on Sustainable Development
Role of Green Issues of Mining Supply Chain on Sustainable DevelopmentRole of Green Issues of Mining Supply Chain on Sustainable Development
Role of Green Issues of Mining Supply Chain on Sustainable Development
 
Role of green issues of mining supply chain on
Role of green issues of mining supply chain onRole of green issues of mining supply chain on
Role of green issues of mining supply chain on
 
Sustainability Indicators in Building Projects in Khartoum State during Const...
Sustainability Indicators in Building Projects in Khartoum State during Const...Sustainability Indicators in Building Projects in Khartoum State during Const...
Sustainability Indicators in Building Projects in Khartoum State during Const...
 
Transformation from Lean to Green Service
Transformation from Lean to Green ServiceTransformation from Lean to Green Service
Transformation from Lean to Green Service
 

More from Est

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017Est
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3Est
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4Est
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmEst
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM PartneringEst
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in constructionEst
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscmEst
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangementEst
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2Est
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016Est
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systemsEst
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmEst
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docxEst
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignmentEst
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MSEst
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrmEst
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergEst
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationEst
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communicationEst
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016Est
 

More from Est (20)

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscm
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM Partnering
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in construction
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscm
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangement
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systems
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignment
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MS
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrm
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerberg
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivation
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communication
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016
 

Recently uploaded

SHIVNA SAHITYIKI APRIL JUNE 2024 Magazine
SHIVNA SAHITYIKI APRIL JUNE 2024 MagazineSHIVNA SAHITYIKI APRIL JUNE 2024 Magazine
SHIVNA SAHITYIKI APRIL JUNE 2024 MagazineShivna Prakashan
 
Islamabad Call Girls # 03091665556 # Call Girls in Islamabad | Islamabad Escorts
Islamabad Call Girls # 03091665556 # Call Girls in Islamabad | Islamabad EscortsIslamabad Call Girls # 03091665556 # Call Girls in Islamabad | Islamabad Escorts
Islamabad Call Girls # 03091665556 # Call Girls in Islamabad | Islamabad Escortswdefrd
 
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | DelhiMalviyaNagarCallGirl
 
Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...
Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...
Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...akbard9823
 
FULL ENJOY - 9953040155 Call Girls in Shahdara | Delhi
FULL ENJOY - 9953040155 Call Girls in Shahdara | DelhiFULL ENJOY - 9953040155 Call Girls in Shahdara | Delhi
FULL ENJOY - 9953040155 Call Girls in Shahdara | DelhiMalviyaNagarCallGirl
 
Alex and Chloe by Daniel Johnson Storyboard
Alex and Chloe by Daniel Johnson StoryboardAlex and Chloe by Daniel Johnson Storyboard
Alex and Chloe by Daniel Johnson Storyboardthephillipta
 
FULL ENJOY - 9953040155 Call Girls in Moti Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Moti Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in Moti Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Moti Nagar | DelhiMalviyaNagarCallGirl
 
Aminabad @ Book Call Girls in Lucknow - 450+ Call Girl Cash Payment 🍵 8923113...
Aminabad @ Book Call Girls in Lucknow - 450+ Call Girl Cash Payment 🍵 8923113...Aminabad @ Book Call Girls in Lucknow - 450+ Call Girl Cash Payment 🍵 8923113...
Aminabad @ Book Call Girls in Lucknow - 450+ Call Girl Cash Payment 🍵 8923113...akbard9823
 
Islamabad Escorts # 03080115551 # Escorts in Islamabad || Call Girls in Islam...
Islamabad Escorts # 03080115551 # Escorts in Islamabad || Call Girls in Islam...Islamabad Escorts # 03080115551 # Escorts in Islamabad || Call Girls in Islam...
Islamabad Escorts # 03080115551 # Escorts in Islamabad || Call Girls in Islam...wdefrd
 
Call Girl Service In Dubai #$# O56521286O #$# Dubai Call Girls
Call Girl Service In Dubai #$# O56521286O #$# Dubai Call GirlsCall Girl Service In Dubai #$# O56521286O #$# Dubai Call Girls
Call Girl Service In Dubai #$# O56521286O #$# Dubai Call Girlsparisharma5056
 
Lucknow 💋 Escorts Service Lucknow Phone No 8923113531 Elite Escort Service Av...
Lucknow 💋 Escorts Service Lucknow Phone No 8923113531 Elite Escort Service Av...Lucknow 💋 Escorts Service Lucknow Phone No 8923113531 Elite Escort Service Av...
Lucknow 💋 Escorts Service Lucknow Phone No 8923113531 Elite Escort Service Av...anilsa9823
 
Deconstructing Gendered Language; Feminist World-Making 2024
Deconstructing Gendered Language; Feminist World-Making 2024Deconstructing Gendered Language; Feminist World-Making 2024
Deconstructing Gendered Language; Feminist World-Making 2024samlnance
 
Lucknow 💋 Cheap Call Girls In Lucknow Finest Escorts Service 8923113531 Avail...
Lucknow 💋 Cheap Call Girls In Lucknow Finest Escorts Service 8923113531 Avail...Lucknow 💋 Cheap Call Girls In Lucknow Finest Escorts Service 8923113531 Avail...
Lucknow 💋 Cheap Call Girls In Lucknow Finest Escorts Service 8923113531 Avail...anilsa9823
 
exhuma plot and synopsis from the exhuma movie.pptx
exhuma plot and synopsis from the exhuma movie.pptxexhuma plot and synopsis from the exhuma movie.pptx
exhuma plot and synopsis from the exhuma movie.pptxKurikulumPenilaian
 
Bridge Fight Board by Daniel Johnson dtjohnsonart.com
Bridge Fight Board by Daniel Johnson dtjohnsonart.comBridge Fight Board by Daniel Johnson dtjohnsonart.com
Bridge Fight Board by Daniel Johnson dtjohnsonart.comthephillipta
 
FULL ENJOY - 9953040155 Call Girls in Shaheen Bagh | Delhi
FULL ENJOY - 9953040155 Call Girls in Shaheen Bagh | DelhiFULL ENJOY - 9953040155 Call Girls in Shaheen Bagh | Delhi
FULL ENJOY - 9953040155 Call Girls in Shaheen Bagh | DelhiMalviyaNagarCallGirl
 
FULL ENJOY - 9953040155 Call Girls in Indirapuram | Delhi
FULL ENJOY - 9953040155 Call Girls in Indirapuram | DelhiFULL ENJOY - 9953040155 Call Girls in Indirapuram | Delhi
FULL ENJOY - 9953040155 Call Girls in Indirapuram | DelhiMalviyaNagarCallGirl
 
(NEHA) Call Girls Ahmedabad Booking Open 8617697112 Ahmedabad Escorts
(NEHA) Call Girls Ahmedabad Booking Open 8617697112 Ahmedabad Escorts(NEHA) Call Girls Ahmedabad Booking Open 8617697112 Ahmedabad Escorts
(NEHA) Call Girls Ahmedabad Booking Open 8617697112 Ahmedabad EscortsCall girls in Ahmedabad High profile
 
Charbagh / best call girls in Lucknow - Book 🥤 8923113531 🪗 Call Girls Availa...
Charbagh / best call girls in Lucknow - Book 🥤 8923113531 🪗 Call Girls Availa...Charbagh / best call girls in Lucknow - Book 🥤 8923113531 🪗 Call Girls Availa...
Charbagh / best call girls in Lucknow - Book 🥤 8923113531 🪗 Call Girls Availa...gurkirankumar98700
 

Recently uploaded (20)

Dxb Call Girls # +971529501107 # Call Girls In Dxb Dubai || (UAE)
Dxb Call Girls # +971529501107 # Call Girls In Dxb Dubai || (UAE)Dxb Call Girls # +971529501107 # Call Girls In Dxb Dubai || (UAE)
Dxb Call Girls # +971529501107 # Call Girls In Dxb Dubai || (UAE)
 
SHIVNA SAHITYIKI APRIL JUNE 2024 Magazine
SHIVNA SAHITYIKI APRIL JUNE 2024 MagazineSHIVNA SAHITYIKI APRIL JUNE 2024 Magazine
SHIVNA SAHITYIKI APRIL JUNE 2024 Magazine
 
Islamabad Call Girls # 03091665556 # Call Girls in Islamabad | Islamabad Escorts
Islamabad Call Girls # 03091665556 # Call Girls in Islamabad | Islamabad EscortsIslamabad Call Girls # 03091665556 # Call Girls in Islamabad | Islamabad Escorts
Islamabad Call Girls # 03091665556 # Call Girls in Islamabad | Islamabad Escorts
 
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in New Ashok Nagar | Delhi
 
Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...
Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...
Hazratganj ] (Call Girls) in Lucknow - 450+ Call Girl Cash Payment 🧄 89231135...
 
FULL ENJOY - 9953040155 Call Girls in Shahdara | Delhi
FULL ENJOY - 9953040155 Call Girls in Shahdara | DelhiFULL ENJOY - 9953040155 Call Girls in Shahdara | Delhi
FULL ENJOY - 9953040155 Call Girls in Shahdara | Delhi
 
Alex and Chloe by Daniel Johnson Storyboard
Alex and Chloe by Daniel Johnson StoryboardAlex and Chloe by Daniel Johnson Storyboard
Alex and Chloe by Daniel Johnson Storyboard
 
FULL ENJOY - 9953040155 Call Girls in Moti Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Moti Nagar | DelhiFULL ENJOY - 9953040155 Call Girls in Moti Nagar | Delhi
FULL ENJOY - 9953040155 Call Girls in Moti Nagar | Delhi
 
Aminabad @ Book Call Girls in Lucknow - 450+ Call Girl Cash Payment 🍵 8923113...
Aminabad @ Book Call Girls in Lucknow - 450+ Call Girl Cash Payment 🍵 8923113...Aminabad @ Book Call Girls in Lucknow - 450+ Call Girl Cash Payment 🍵 8923113...
Aminabad @ Book Call Girls in Lucknow - 450+ Call Girl Cash Payment 🍵 8923113...
 
Islamabad Escorts # 03080115551 # Escorts in Islamabad || Call Girls in Islam...
Islamabad Escorts # 03080115551 # Escorts in Islamabad || Call Girls in Islam...Islamabad Escorts # 03080115551 # Escorts in Islamabad || Call Girls in Islam...
Islamabad Escorts # 03080115551 # Escorts in Islamabad || Call Girls in Islam...
 
Call Girl Service In Dubai #$# O56521286O #$# Dubai Call Girls
Call Girl Service In Dubai #$# O56521286O #$# Dubai Call GirlsCall Girl Service In Dubai #$# O56521286O #$# Dubai Call Girls
Call Girl Service In Dubai #$# O56521286O #$# Dubai Call Girls
 
Lucknow 💋 Escorts Service Lucknow Phone No 8923113531 Elite Escort Service Av...
Lucknow 💋 Escorts Service Lucknow Phone No 8923113531 Elite Escort Service Av...Lucknow 💋 Escorts Service Lucknow Phone No 8923113531 Elite Escort Service Av...
Lucknow 💋 Escorts Service Lucknow Phone No 8923113531 Elite Escort Service Av...
 
Deconstructing Gendered Language; Feminist World-Making 2024
Deconstructing Gendered Language; Feminist World-Making 2024Deconstructing Gendered Language; Feminist World-Making 2024
Deconstructing Gendered Language; Feminist World-Making 2024
 
Lucknow 💋 Cheap Call Girls In Lucknow Finest Escorts Service 8923113531 Avail...
Lucknow 💋 Cheap Call Girls In Lucknow Finest Escorts Service 8923113531 Avail...Lucknow 💋 Cheap Call Girls In Lucknow Finest Escorts Service 8923113531 Avail...
Lucknow 💋 Cheap Call Girls In Lucknow Finest Escorts Service 8923113531 Avail...
 
exhuma plot and synopsis from the exhuma movie.pptx
exhuma plot and synopsis from the exhuma movie.pptxexhuma plot and synopsis from the exhuma movie.pptx
exhuma plot and synopsis from the exhuma movie.pptx
 
Bridge Fight Board by Daniel Johnson dtjohnsonart.com
Bridge Fight Board by Daniel Johnson dtjohnsonart.comBridge Fight Board by Daniel Johnson dtjohnsonart.com
Bridge Fight Board by Daniel Johnson dtjohnsonart.com
 
FULL ENJOY - 9953040155 Call Girls in Shaheen Bagh | Delhi
FULL ENJOY - 9953040155 Call Girls in Shaheen Bagh | DelhiFULL ENJOY - 9953040155 Call Girls in Shaheen Bagh | Delhi
FULL ENJOY - 9953040155 Call Girls in Shaheen Bagh | Delhi
 
FULL ENJOY - 9953040155 Call Girls in Indirapuram | Delhi
FULL ENJOY - 9953040155 Call Girls in Indirapuram | DelhiFULL ENJOY - 9953040155 Call Girls in Indirapuram | Delhi
FULL ENJOY - 9953040155 Call Girls in Indirapuram | Delhi
 
(NEHA) Call Girls Ahmedabad Booking Open 8617697112 Ahmedabad Escorts
(NEHA) Call Girls Ahmedabad Booking Open 8617697112 Ahmedabad Escorts(NEHA) Call Girls Ahmedabad Booking Open 8617697112 Ahmedabad Escorts
(NEHA) Call Girls Ahmedabad Booking Open 8617697112 Ahmedabad Escorts
 
Charbagh / best call girls in Lucknow - Book 🥤 8923113531 🪗 Call Girls Availa...
Charbagh / best call girls in Lucknow - Book 🥤 8923113531 🪗 Call Girls Availa...Charbagh / best call girls in Lucknow - Book 🥤 8923113531 🪗 Call Girls Availa...
Charbagh / best call girls in Lucknow - Book 🥤 8923113531 🪗 Call Girls Availa...
 

Sustainable construction practices in Malaysia: Challenges and breakthroughs explored

  • 1.  Abstract—As Malaysia aims to be a developed country by year 2020; the construction industry has since been identified as a major catalyst for the country to attain the status. It is one of the sectors that contribute to most environmental pollutions. It is, therefore, important for the industry to implement sustainable construction practices to reduce the negative impacts that it has on the environment. However, most Malaysian developers have placed much focus on market demand and economic factors; neglecting the need for attention on environmental issues. The practice of sustainable construction is deemed to be an obstacle to achieve short- term economic goals due to the higher cost incurred in the operations. Hence, choices need to be made and a balance needs to be struck in weighing the long-term environmental benefits against immediate economic factors. This paper discusses the challenges faced by Malaysian developers in adopting sustainable practices in the construction industry and the cause of these challenges. It also looks into the achievements and breakthroughs that developers in Malaysia have achieved so far. The paper aims explores the long-term benefits of sustainable practices that would potentially raise awareness on the feasibility and economic potential of sustainable construction. Keywords—Construction industry, construction method, sustainability. I. INTRODUCTION USTAINABILITY has been an issue of interest for all stakeholders in the engineering industry. Sustainable practices may directly or indirectly affect the future economy of a country and its ecosystem. As an example, the use of certain construction materials – from the extraction of raw materials to processing and manufacturing, from fabricating to transporting to site, and from maintenance to disposal - may contribute to global warming. In general, sustainability is known as the ability to meet the current demand without compromising future needs. This means that sustainability is a means of action of which its end results can be sustained and continued [1]. Construction industry is one of the sectors that contribute the most problems to the ecological system especially to the environment. Therefore, sustainable construction practices play a big role in moving towards sustainability. Sustainable construction practices refer to construction methods that cause less harm to the environment. The implementation of sustainable methods in this industry is required to achieve win-win outcomes as to attain mutual benefit for the Y. H. Chan was with UCSI University, Kuala Lumpur, Malaysia (e- mail:loiuschan_lv7@hotmail.com) B. C. T. Lee and J. C. Lee are with UCSI University, Kuala Lumpur, Malaysia (e-mail: brendalee@ucsiuniversity.edu.my, leejc@ucsiuniversity.edu.my). environment, the advanced society, and the economy of the industry. In over the last twenty years, the construction industry in Malaysia has been consistently contributing between 3%-5% of the national Gross Domestic Product (GDP) [2]. The construction industry is also an industry that contributes to most of the negative impacts to the environment such as soil erosion and sedimentation, flash floods, depletion of natural resources and the use of building materials which will affect human health [3]. The continuous growth of the industry is due to the achieving of vision 2020, where it calls for adequate housing and rapid urbanisation [4]. In response to this, most developers have prioritised economic issues rather than environmental and ecological issues. However, the 5th prime minister of Malaysia, Tun Abdullah bin Haji Ahmad Badawi, has urged Malaysians to not forget the importance of managing and utilising natural resources in a sustainable manner. Developers were also warned to ensure that the environment must not be sacrificed in favour of economic development [5]. It is the national ambition to consider long-term strategies to assist the achievement of national goals. Another basic vision that emerged is for the country to be ecologically sustainable [6]. This basic vision has become a strong step towards the sustainability agenda in the country. The issue of sustainable development has emerged as one of the top issues in the Eighth Malaysia Plan (2001–2005). One of the highlights is that government is giving high priority to research and development as one of their strategies to achieve sustainable development [7]. The plan also states that concerted efforts are needed in the construction planning processes to improve energy efficiency as well as waste and environmental management [8]. The government continues to address the issue in the most recent Tenth Malaysia Plan (2011–2015) to ensure that the future is not compromised as the country continues to develop [9]. The Construction Industry Development Board Malaysia (CIBD), which is a body established to develop, improve and expand the Malaysian construction industry, also plays a role in urging all the stakeholders of the industry to develop good construction planning and management in order to protect the environment. CIDB has also identified the environment and other sustainability-related issues as one of the top issues of the construction industry [2]. Apart from these government and non-governmental organisations, local universities such as UniversitiSains Malaysia, University Technology of Mara and National University of Malaysia have also shown interests in this field Sustainability in the Construction Industry in Malaysia: The Challenges and Breakthroughs Yoong H. Chan, Brenda C. T. Lee, Jin C. Lee S World Academy of Science, Engineering and Technology International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering Vol:8, No:4, 2014 1218International Scholarly and Scientific Research & Innovation 8(4) 2014 scholar.waset.org/1999.10/9999282 InternationalScienceIndex,EconomicsandManagementEngineeringVol:8,No:4,2014waset.org/Publication/9999282
  • 2. by offering funding for more research. These universities have also been involved in organising many symposiums and conferences to raise the awareness on sustainable development and to exchange knowledge in this field [8]. Although Malaysia is still in the infancy stage in moving towards sustainability [10], positive signs are shown by most of the stakeholders in the construction industry by taking more initiatives in moving towards to sustainable construction. II. METHODOLOGY This review study was conducted to explore the perspectives of the Malaysian construction industry on sustainable practices and development. The literature research aimed to investigate the progress of adoption of sustainable practices in Malaysia by reviewing the challenges and breakthroughs faced by the industry in the process. This study also attempted to gather insights from two local construction companies through responses to interview questions. The names of the companies are not stated in this paper to preserve the privacy of the companies. This part of the study was conducted to seek for more updated opinions from the industry, other than those reported in published literature, regarding sustainable construction practices. These construction companies were chosen because they are among the most successful contractors in Malaysia with wide experiences in construction industry. The interview questions were designed to focus on the implementation of sustainable practices in construction industry by describing and quantifying the implementation level of them. The interview format was composed of five open-ended questions, which are as follows: i. [Company name] is an undoubtedly a renowned contractor company in Malaysia. Its pride is also coined by its contribution in successfully completing sustainable projects. Which of these projects would be the most notable of all? ii. Sustainable practices, in its initial stages, typically incur higher costs than conventional practices [8] deterring many companies to take heed. What are the benefits of implementing sustainable practices in the industry that motivate and encourage [company name] to take its step towards sustainability? iii. Studies have also shown that the return on investment in the steps to undertake sustainable practices in the construction industry take a relatively longer period of time. In the effort of working towards sustainability, has [company name] observed the same scenario? If so, what is the average breakeven point? iv. It is reported that challenges and obstacles are inevitable when sustainable practices are implemented [11]. What are the challenges and obstacles that [company name] has faced? v. With the knowledge and technology we have now, what is your opinion on the level of practice of sustainability in the construction industry? The findings of the literature review and interviews with the companies are presented in the following section. III. RESULTS A. Challenges Faced and Their Causes 1. Financial Constraints In the construction industry, sustainability is generally interpreted as environment oriented or focused. The main reason for the neglect of sustainability in some developing countries is that most of the sustainable methods may cause a conflict between long-term environmental benefit and short- term economic operational goals [12], [13]. A greater concern is given to economic and social issues, like the return on investment of a project, than to the affected environmental issues such as the pollution caused by the construction of the project. Therefore it is important to maintain a balance between environmental protection, economic development and social development in prioritising sustainability in the industry [14]. Implementing sustainable practices need significant amount of time and cost investment. This, in turn, decreases contractors’ interests in doing so [15]. Cost increase is one of the main challenges as the increase in cost is mainly due to the application of the measures for implementing environmental management, which will unavoidably require the investment of both time and resources. The higher cost incurred for importing of the green materials and technology is a hindrance to the shift towards sustainability [16]. The financial capability of a developer depends on its size; large-sized developers have greater financial capacity in order to pursue for sustainable practices. Therefore, large-sized companies are more aware of the issue of sustainability as they drive towards it by executing proper planning, design and allocation of budget. Most of them have the capability to perform well to meet the required standards as well as aiming for green certification by developing and applying more green methods. However, Malaysian developers are mainly made up of medium and small-sized companies. Small and medium-sized developers are aware of issues pertaining sustainability, but are mostly financially constrained. It is to their preference to build to just meet the regulatory criteria and to gain optimum profit rather than putting effort in giving more consideration to environmental and social aspects. For this reason, unless there is an increase of market demand for green buildings; most of the construction stakeholders will be reluctant to transform the industry towards sustainability [16]. 2. Awareness and Knowledge The relatively slow shift [8] towards sustainability in the construction industry in Malaysia is also due to the lack of awareness and knowledge of pertaining issues [16]. It is important that all general stakeholders in the construction industry such as contractors, developers, consultants as well as clients are fully aware of the importance of achieving sustainable construction. This will cultivate interest among them and further serves as a motivation to pursue knowledge. Having due diligence helps in their decision making which World Academy of Science, Engineering and Technology International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering Vol:8, No:4, 2014 1219International Scholarly and Scientific Research & Innovation 8(4) 2014 scholar.waset.org/1999.10/9999282 InternationalScienceIndex,EconomicsandManagementEngineeringVol:8,No:4,2014waset.org/Publication/9999282
  • 3. benefits every party, while contributing the least damage to the environment [17]. However, a more recent study found that bigger and more established companies are actually well aware of the importance of sustainability practices. In fact, actions are being taken to meet all the requirements needed to pursue sustainability in the construction industry. For example, by implementing strategic planning, as well as, looking into the allocation of resources. These companies tend to have stronger financial positions and different perspective from smaller companies, mainly due to their wide range of experiences and expertise as they deal with clients whom are mostly high income earners and foreigners. They incorporate sustainability in their building concepts by using green materials, having green designs as well as generating green system for their projects. They also believe that sustainable practices can be profitable [16]. The lack of new knowledge among contractors has also caused another obstacle in achieving sustainable construction. It causes failure in reaching a consensus among experienced developers and the younger generation. This is because environmental issues were not pertinent and were not given a priority in education until a decade ago. The experiences of seasoned contractors in the industry are valuable and essential, although not equipped with new knowledge on sustainable practices. On the other hand, the younger generations those are educated with knowledge on sustainable construction face difficulties in disseminating theoretical understanding of sustainability knowledge into practice. Therefore, developers tend to reject the suggested ideas of the younger generation [8]. Albeit the lacking being a major hindrance to implementing sustainable concept, eliminating this cause may not effectively curb the problem. It is also reported that having the knowledge does not necessarily guarantee that it is being implemented as the level of implementation of sustainable practices in Malaysia is reported to be still mostly low [8]. The level of knowledge on the concept of sustainability among the developers was found to be moderate as there is a big gap for the level of knowledge between the big and well-established companies and the small companies [16]. One of the main reasons is that most developers in Malaysia are profit-driven and they respond to client demands. The shift to focus on sustainability would be driven if there is client demand. B. Achievements and Breakthroughs The slow shift to sustainability in Malaysia is not without its notable achievement. To date, there are several projects in the country that were sustainably constructed. Following are an example of a construction method and an example of a successful project. 1. Industrialised Building System (IBS) IBS is a construction method in which structural components of a structure are mass produced either in factory or at site under strict quality control and minimal on site activities [18]. The manufactured components are delivered to construction sites for assembly and erection. The construction operation of an IBS structure is, therefore not affected by adverse weather condition and is shortened, thus reduces interest payment or capital outlays [19]. IBS allows flexibility in design as different systems may produce their own unique prefabrication construction methods [20]. Reportedly, IBS produces higher quality structural components through careful selection of materials, use of advanced technology and strict quality assurance control [21]. It is also found to be cost saving when the system formwork that are made of steel, aluminium and scaffolding are reusable [22]. The use of IBS in construction reduces the need for labour on site. The Malaysian construction industry relies heavily on foreign workers. If the demand for labour remains the same and the supply decreases, construction cost will increase. A study in Israel found that the use of IBS in construction reduces the cost of labour up to 70% when compared to that of the projects using conventional construction method [23]. In Singapore, the savings in labour cost was found to be 46.5% [24]. Among successful IBS buildings in Malaysia are Brickfields Secondary School and Kuala Lumpur Convention Centre in Kuala Lumpur, Subang Square in Subang Jaya, Selangor, and Millennium Hall in Seberang Prai, Pulau Pinang. Even with numerous successful projects, the implementation of IBS was not without its challenges. The Malaysian government encouraged the adoption of IBS in the construction industry through the effort of CIDB in outlining the strategies in IBS Roadmap 2003 -2010 [25]. 2. Tanarimba Tanarimba is a sustainable housing project. It occupies an area of 7299 acres in a tropical rainforest in Janda Baik, Pahang. Tanarimba is a blend of man-made and natural elements in an exciting concept of ecologically-sensitive community development. It also introduces the world to ecotourism opportunities in Malaysian highlands. The project has been dubbed as the forefront of the ecological movement in construction [26]. The highlight of project Tanarimba is that most of the structures in it were built using natural resources and all building materials used were sourced in-situ. Pine trees were used for the construction of road and infrastructure work, which were sourced from a plantation. The plantation covers 60 hectares of land which was initiated as an alternative for paper industry. It was however left unutilised due to project revaluation. Rocks were used for the construction of wall and pillars. Pine was used for the flooring system while doors are made of resak woods. The design of window frames and roof trusses are made up of words and mixed hardwoods respectively. The completion of Tanarimba shows that the workability and stability of structures can be achieved by using natural resources instead of common construction materials such as concrete [27]. The alignment of roads in Tanarimba was designed according to the natural terrain of the land, eliminating the World Academy of Science, Engineering and Technology International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering Vol:8, No:4, 2014 1220International Scholarly and Scientific Research & Innovation 8(4) 2014 scholar.waset.org/1999.10/9999282 InternationalScienceIndex,EconomicsandManagementEngineeringVol:8,No:4,2014waset.org/Publication/9999282
  • 4. needs of cutting down the trees. This has allowed 80% of the area of Tanarimba to remain as forest [27]. Tanarimba has proven itself to be profitable after it hasbroke-even in 1999, four years after construction. The success of Tanarimba is awarded with ‘Honorary Mention’ in the Planning and Master Plan category in the Malaysia Institute of Architects (PAM) Award in 2004 [27]. C. Insights from Local Construction Companies Some of the feedback provided through the interview was not informative as one of the companies is not the developer of their projects and the decision to implement sustainable practices is vested in the original intent of the developers. However, it was emphasised that an efficient waste and environmental management are implemented during the construction of projects. The other company suggested that Malaysia is currently moving towards sustainability in a slower pace, mainly due to lack of human resources and skills. The implementation of sustainable practices is recognised to require the support of trained professionals, tradesmen and labourers. This is certainly consistent with the findings of the literature study. In their opinion, the uncertain economic environment especially in developing countries where the private sector has a very narrow market base to leverage is another main challenge. It was also noted that there is a conflict between experienced contractors and younger engineers. The experienced contractors do not have much exposure to sustainable construction and therefore prefer to use conventional method of construction that are tried and tested. On the other hand, the effort of new and younger engineers whom are exposed to this subject during their higher education is usually hampered due to the lack of experience and skills in the particular field. The company also emphasised that government effort would play a main role in pushing the trend forward. The government would need to play a main role in promoting the adoption as the joint effort between the government, non- government organizations and educational institutions to create awareness among the public on the benefits of sustainable construction practice. Cooperation among them is essential as there are projects that embrace the ideas of sustainable construction, but the number is still low. This creates the need for support from the private sector as well to work along with the government. The more notable projects that the two companies contacted were/are involved in are the SMART Tunnel and KLIA 2. IV. DISCUSSION The paradigm shift to adopt sustainable construction method in Malaysia is at a slower pace compared to other advanced countries. The findings of this study show that the challenges faced by the industry are basically associated with the burden of having additional costs. It is not only the intricate work and green materials that incur costs, but also the skills and expertise required for the execution of sustainable construction methods. Since expertise is needed for sustainable construction, measures should also be taken to preserve the skills sets of practitioners. Initiatives in research and development activities may enable development of knowledge and technology in sustainable practice. This may accelerate the progress in implementing sustainable construction method, as more interest among experts are sparked and that technologies may be made available locally. The awareness of the benefit of sustainable practice on the environment among the developers and contractors needs to be raised. It is also important that stakeholders of construction companies to be well informed about the economic benefit of implementing sustainable construction method. Since the construction industry responds to client demands, awareness of the issue should also be raised among the public. The cause and effect scenario is clear, especially of late, as the private sector responded to the demand for green residential buildings that are built according to Green Building Index (GBI) certification. For example, the Central Residence project by Yuk Tung Group, VERDE at AraDamansara by VillamasSdnBhd, and KEN RimbaLegian Residences by KEN Holdings Berhad, the first landed home development in the country to be awarded the BCA Green Mark Gold Award. In such fashion, also, the developers and contractors may be encouraged as consumers become more informed about the effect of sustainable construction practice. V. CONCLUSION As the concern for the environment increases, the need for greater focus on sustainable practice becomes more urgent. The major consideration that impedes the change of practice to sustainable method in the construction industry is found to be financial. This shows that awareness should be raised and knowledge needs to be delivered to contractors, developers and the public on the long term benefit of sustainable construction practice. This can be made possible with the government playing the main role. Through joint effort with educational institutions, research and development activities can be increased to enable local production of green building materials and technology at a lower cost and hence encourage contractors to adopt sustainable practice. Training programs can be organised to increase and deliver knowledge on sustainability to stakeholders of the construction industry through bodies like CIDB. Measures can also be taken by the government in ensuring the practice of sustainable construction method by enforcing strict rules and regulations for disposal of construction waste. Proper waste management in the construction industry has been found to be cost saving [28], [29]. Of late, more GBI certified buildings are emerging in Malaysia, indicating that the nation is already aware of sustainability issues. To date, although the shift to sustainable construction in Malaysia is still at its infancy stage, it is important to note that there are projects that have been successful. In view of this, the construction industry in Malaysia is able to progress and be more sustainable when the World Academy of Science, Engineering and Technology International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering Vol:8, No:4, 2014 1221International Scholarly and Scientific Research & Innovation 8(4) 2014 scholar.waset.org/1999.10/9999282 InternationalScienceIndex,EconomicsandManagementEngineeringVol:8,No:4,2014waset.org/Publication/9999282
  • 5. government and private sector share a common concern and vision. REFERENCES [1] Johnston, P., Everard, M., Santillo, D., Robert, K.H.: “Reclaiming the Definition of Sustainbility,” Environmental Science and Pollution Research – International, 14 , 60-66, 2007. [2] Construction Industry Development Board (CIDB): “Malaysian Construction Industry: Technology Foresight Report,” CIDB Malaysia and APEC Technology Foresight Center, Bangkok, 2000. [3] CIDB Malaysia: “Strategic recommendations for improving environmental practices in construction industry,” Kuala Lumpur: CIDB Publisher, 2007 [4] Plessis, C.D.: “A Strategic framework for sustainable construction in developing countries,” Construction Management and Economics, 25, 67-76, 2007. [5] Chin, K.L.: “Major challenges in protecting biodiversity,” New Straits Times, January 25, 2005. [6] A. H. Ahmad Sarji: “Malaysia's Vision 2020: Understanding the Concept, Implications and Challenges,” Pelanduk Publications, 1993. [7] Eight Malaysia Plan: “Eight Malaysia Plan 2001 – 2005,” Kuala Lumpur, PercetakanNasional Malaysia, 2001. [8] Abidin, N.Z.: “Sustainable Construction in Malaysia – Developers’ Awareness,” World Academy of Science, Engineering and Technology, p. 53, 2009. [9] Tenth Malaysia Plan: “Tenth Malaysia Plan 2011 – 2015,” The Economic Planning Unit, Prime Minister’s Department, Putrajaya, 2010. [10] Abidin, N.Z.: “Sustainable practices in Malaysia: are we ready for it,” Global conference on global warming, 379-388, 2008. [11] Kibert, C. J.: “Sustainable Construction: Green building Design and Delivery,” 2nd Edition, New York: John Wiley & Sons, Inc., 2008. [12] Lilja, R.: “Negotiated environmental agreements in promoting material efficiency in industry – first steps in Finland,” Journal of Cleaner Production, 17, 863–72, 2009. [13] Tam, W.Y.V.: “On the effectiveness of implementing a waste- management-plan method in construction,” Waste Management, 28, 1072–80, 2008. [14] Shen, L.Y., Vivian, W.Y.T., Leona, T., Ji, Y.B.: “Project feasibility study: the key to successful implementation of sustainable and socially responsible construction management practice,” Journal of Cleaner Production, 18, 254–259, 2010. [15] Shen, L.Y. Bao, Q. & Yip, S.L.: “Implementing innovative functions in construction project management towards the mission of sustainable environment,” Proceedings of the Millennium Conference on Construction Project Management, Hong Kong, October, 77-84, 2000. [16] Abidin, N.Z.: “Investigating the awareness and application of sustainable construction concept by Malaysian developers,” Habitat International, 34, 421-426, 2010. [17] Parkin, S.: “Sustainable development: The concept and the practical challenge,” Proceedings of the Institution of Civil Engineers: Civil Engineering, 138, 3-8, 2000. [18] Trikha, D.N.: “Industrialised building systems. Prospects in Malaysia,” Proceedings World Engineering Congress, Malaysia, 1999. [19] Peng, C.S.: “The scenario of industrialised building systems in Malaysia,” Proceedings of a UNESCO/FEISEAP Regional workshop, UPM Serdang, 1986. [20] Zaini, O.: “Malaysian Construction Industry. Challenges and demand,” Malaysian Structural Steel Association Convention, Kuala Lumpur, 2000. [21] Din, H.: “Industrialised building and its application in Malaysia,” Seminar on Prefabrication of Building Construction, Kuala Lumpur, 1984. [22] Bing, L., Kwong, Y.W., and Hao, K.J.: “Seismic behaviour of connection between precast concrete beams,” CSE Research Bulletin, No.14, 2001. [23] Warszawski, A.: “Industrialised and automated building systems,” Technion-Israel Institute of Technology, E & FN Spon, 1999. [24] Cheong, G.K.: “The Bayshore Condominium prefabricated construction,” Precastech Newsletter On Line, Volume 7, 1996. [25] Ahmad Baharuddin, A.R., Omar, W.: “Issues and Challenges in the Implementation of Industrialised Building System in Malaysia,” Proceedings of the 6th Asia-Pacific Structural Engineering and Construction Conference (APSEC 2006), Kuala Lumpur, Malaysia, 5 – 6 September 2006. [26] Tanarimba: “Tanarimba Project Development (Online),” Available from: <http://tanarimba.com.my> (Accessed 10 February 2013), 2006. [27] Tanarimba: “Where Sustainable Development Works Beautifully (Online),” Available from: <http://www.mtc.com.my/info/ index.php?option=com_content&view=article&id=44&Itemid=53> (Accessed 10 February 2013), 2008. [28] Rawshan, A.B., Chamhuri, S., Pereiraa, J.J., Jaafarb, A.H.: “Attitude and behavioral factors in waste management in the construction industry of Malaysia,” Resources, Conservation and Recycling, 53, 321–328, 2009. [29] Rawshan A.B., Chamhuri, S., Pereira, J.J., Jaafar, A.H.: “A benefit–cost analysis on the economic feasibility of construction waste minimisation: The case of Malaysia,” Resources, Conservation and Recycling, 48, 86– 98, 2006. World Academy of Science, Engineering and Technology International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering Vol:8, No:4, 2014 1222International Scholarly and Scientific Research & Innovation 8(4) 2014 scholar.waset.org/1999.10/9999282 InternationalScienceIndex,EconomicsandManagementEngineeringVol:8,No:4,2014waset.org/Publication/9999282